AHK: Energy Efficiency in Greenhouse IndustriesDen Haag, 16.02.2011 Andreas Jenne REHAU AG+Co.
7/31/2019 4_Rehau_AG___Co.
2/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
MARKET SITUATIONENERGY SUPPLY FOR THE GREENHOUSE INDUSTRY MULTIPLEPOSSIBILITIES
> Wood Chip Plants > Heat Pumps
> Biogas Plants > Biomass Boiler
7/31/2019 4_Rehau_AG___Co.
3/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
RAUTHERMEXPre-insulated pipe for large district heating
networks, heat transport with great distances
- Permanently sealed connection with REHAUcompression sleeve
- Excellent heat insulation
- Rapid, simple and reliable RAUTHERMEXinsulation sleeve technology
REHAU Support
Feasibility study for community heating
schemes Design and delivery of district heating
networks
Local site support
RAUTHERMEX PRE-INSULATED PIPE SYSTEM
7/31/2019 4_Rehau_AG___Co.
4/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
RAUVITHERMPre-insulated pipe for small community
heating schemes, installation in narrow site
conditions
- Permanently sealed connection withREHAU compression sleeve
- Easy, fast and safe installation throughflexible pipe characteristics and easyshrout technology
- Best thermal insulation
REHAU Support Feasibility study for community heating
schemes
Design and delivery of district heating
networks
Local site support
RAUVITHERM PRE-INSULATED PIPE SYSTEM
7/31/2019 4_Rehau_AG___Co.
5/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
RAUBIO DIGESTER HEATINGPE-Xa heating system with protective filmfor fermenter heating directly in thebiomass or in the digester wall
- No microbiological corrosion as stainlesssteel
- High acid, temperature and pressureresistance
- Fastest heating-up through directinstallation
REHAU Support
Design of digester heating
Delivery of complete system and internat.
site support
Matching with Biogas Plant Contractors
RAUBIO DIGESTER HEATING SYSTEM
7/31/2019 4_Rehau_AG___Co.
6/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
ient heating concept for the flower grower Pfann, Nuremberg / South Germany
Challenge:
Cost efficient heating of a new
100.000m greenhouse area with a heat
consumption of 1.5 Mio KWh / year for
flower growing
Solution:
Transport connection to a CHP-Unit of an
existing biogas plant in the nearby area
REHAU Support
Design of pre-insulated piping
Delivery of the heating system
Site support for the heating installation
7/31/2019 4_Rehau_AG___Co.
7/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
tunnel heating scheme for Cobrey Farms, Wales / Ross on Whye
Challenge:
Extend the growing period of asparagus
crops on an area of 40.000 m inside a
polytunnel
Solution:
Constant temperature of 13,5C inside
the polytunnel through the winter and
spring time period (water temperature
35C)
REHAU Support Design of the subsurface heating
system
Delivery of the complete heating
system
Site support for the heating installation
7/31/2019 4_Rehau_AG___Co.
8/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
ogas Plant for a the tomato grocery Biotec, United Kingdom
Challenge:
Production of renewable heat and
power by using the tomato waste of
an existing tomato grocery.
Solution:
Build of a horizontal anaerobic
digestion plant using a vertical
fermenter heating system
REHAU Support
Design of the fermenter heating Design of the connected pre-
insulated piping
Site and installation support
7/31/2019 4_Rehau_AG___Co.
9/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
Challenge:
Ice and snow free lawn area during
winter period for the Wankdorf
Stadium in Switzerland
Solution:
Subsurface lawn heating and
drainage system
from REHAU
REHAU Support
General expertise and consultancy Design of underground heating
system
Delivery and site support for the
installation
urface lawn heating for the Wankdorf Stadium, Wankdorf / Switzerland
7/31/2019 4_Rehau_AG___Co.
10/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
ing of the new greenhouse area Biokraft Hennstedt by CHP, North Germany
Challenge:
Cost efficient heating of a new
600.000m greenhouse area including
delivery of CO2 to improve the tomato
growing
Solution:
Construction of a biogas plant and
additional installation of a wood chip
boiler with ORC-Process (power
generation) to generate heat, power and
CO2 for the tomato greenhouse
7/31/2019 4_Rehau_AG___Co.
11/12
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag
16.02.2011
Community heating scheme for Bioenergy village Waldmnchen, Bavaria
Challenge:
Renewable heat supply for a small
community in an existing housing
area with limited space between the
dwellings
Solution:
Heating network with a flexible pre-
insulated piping system with
connection to a CHP-Unit of an
existing biogas plant in the nearby
area
REHAU Support
Design of heating network
Delivery of the heating transport
system
Site support for the heating
installation