Resettlement Plan
This report has been submitted to ADB by the Jiuquan Project
Management Office and is made publicly available in accordance with
ADB’s Public Communications Policy (2011). It does not necessarily
reflect the views of ADB. Your attention is directed to the “Terms
of Use” section of this website.
January 2014
PRC: Gansu Jiuquan Integrated Urban Environment Improvement
Project
Prepared by Gansu Jiuquan Project Management Office, Jiuquan
Economic Development and Investment (Group) Co., Ltd for the Asian
Development Bank. This is an updated version of the draft
originally posted in February 2013 available on
http://www.adb.org/projects/45506-002/documents
-
Final Resettlement Plan With Due Diligence Report
Of
Gansu Jiuquan Integrated Urban Environment Improvement
Project
Jiuquan PMO
Jiuquan Economic Development & Investment (Group) Co., Ltd.
Jan. 2014
ADB-financed Gansu Jiuquan Integrated Urban Environment
Improvement Project
-
CURRENCY EQUIVALENTS (As of 28 Jan. 2014)
Currency Unit – Yuan (CNY)
CNY1 = $0.165
$1 = CNY6.049
ABBREVIATION
AAOV Average Annual Output Value
ADB Asian Development Bank
AH Affected Household
AP Affected Person
CNY Abbreviation for Yuan, PRC’s currency
DDR Due Diligence Report
DI Design Institute
DMS Detailed Measurement Survey
EA Executing agency
EMA External Monitoring Agency
ERSM External Resettlement and Social Monitoring
JIUEIP Jiuquan Integrated Urban Environment Improvement
Project
JMG Jiuquan Municipal Government
FSR Feasibility Study Report
HH Household
LAB Land Administration Bureau
LA&R Land Acquisition and Resettlement
LAO Land Acquisition Office
LLF Land-Loss Farmer
LPMO Local Project Management Office
M&E Monitoring and Evaluation
mu Chinese land area unit of measure: 1 mu = 0.0667 ha
NGO Non-Government Organization
PMO Project Management Office
PPTA Project Preparation Technical Assistance
PRC People’s Republic of China
RMB Renminbi—another word for the PRC Currency, the Yuan
RP Resettlement Plan
SES Socioeconomic Survey
TOR Terms of Reference
URP Updated Resettlement Plan
NOTES
(i) The fiscal year of the Government of the People’s Republic
of China and its agencies
ends on 31 December.
(ii) (ii) In this report, "$" refers to US dollars.
-
Notes to this Update
With the assistance from the PPTA, Jiuquan PMO has prepared a
Resettlement Plan for Gansu Jiuquan Integrated Urban Environment
Improvement Project (the ―former RP‖) according to the Feasibility
Study Report for the proposed project in August 2012 which has
reviewed and approved at that stage.
On Feb.26, 2013, Gansu Provincial Development and Reform
Commission issued the Reply on the detailed design of the Jiuquan
Integrated Urban Environment Improvement Project1 (GPDRC 2013-376).
To reflect the latest resettlement impacts, resettlement progress,
resettlement policies, an updated version of the RP was prepared
with the support from Jiuquan PMO, the design agency, affected
persons and related departments.
According to the detail design, the project contents, scope and
the impact area have not been changed, but since some land has been
acquisitioned in 2012, the Location-based Integrated Land Prices
and Uniform AAOV Rates for Land Compensation has been changed in
2012, the update of this RP mainly involves adjustment of
resettlement impacts, resettlement policies, latest socioeconomic
profile, and resettlement cost & resettlement schedule.
And since the land acquisition of Xifengshi village within
Panxuan Road component has been conducted in 2012, to reflect the
resettlement process, latest situation and to meet ADB’s policy, a
due diligence report was annexed in appendix 11.
For more details about the main updates of the original RP,
please refer Table A.
1 The content and scope of the detail design is same as that of
FSR.
-
Table A Main Updates of the Former RP
No. Updated item Former RP Updated RP Remarks
1 Project contents
1) 3 road sections of South Binhe Road, North Binhe
Road, Panxuan Road extension and auxiliary works
and 2 bridges (hereinafter referred to as the road
component); 2) Jiuquan No. 2 WWTP, including
auxiliary pipelines; and 3) Landscaping and windbreak
cultivation.
Based on the latest detailed design, the project content of
this project is same as that of FSR
2 project scope
Involves Xifengsi, Guanbeigou and Pulai Villages,
Xifeng Township, and Shuimogou Village, Quanhu
Township in Suzhou District.
Involves Guanbeigou and Pulai Villages, Xifeng Township,
and Shuimogou Village, Quanhu Township in Suzhou
District.
The land
acquisition
work of
Xifengshi
village (80.35
mu farmland)
has been
conducted in
Feb.2012. For
more details,
please see
appendix 11.
3 Resettlement
impacts
609.45 mu of collective land will be acquired, including
390.2 mu of irrigated land (76.58%), 8.35 mu of
housing land (1.37%) and 134.4 mu of unutilized land
(22.05%); 287.59 mu of state-owned land will be
occupied permanently, including 171.2 mu of
state-owned Gobi (59.53%), 66.03 mu of transferred
state-owned land (22.96%), 2.5 mu of allocated
state-owned land (16.64%) and 2.5 mu of unutilized
state-owned land (0.87%); 350.76 mu of state-owned
land will be occupied temporarily, mainly as existing
roads and river flats; rural residential houses with a
529.1 mu of collective land will be acquired for the
Project,
including 305.5 mu for the Panxuan Road extension
(57.74%) and 223.6 mu for the WWTP (42.26%). By land
type, this includes 390.2 mu of agricultural land (73.75%),
4.5 mu of rural construction land (0.85%) and 134.4 mu of
unutilized land (25.40%); The 3 proposed roads will occupy
367.94 mu of state-owned land, including 171.2 mu of
state-owned Gobi (59.5%), 66.03 mu of transferred
state-owned land (23.0%), 47.86 mu of allocated
state-owned land (16.6%) and 82.85 mu of unutilized
state-owned land (0.9%); rural residential houses with a
total
-
No. Updated item Former RP Updated RP Remarks
total area of 5,624 m2 will be demolished, including
1,542 m2 in masonry concrete structure (27.42%) and
1,477 m2 in masonry timber structure (26.26%); urban
non-residential houses with a total area of 21,580.45
m2 will be demolished, and 14 types of infrastructure
and ground attachments will be affected. The Project
affects a total population of 755, including 150
households with 593 persons, and 21 entities with 162
staff members.
area of 5,624 m2 will be demolished, including 1,542 m2 in
masonry concrete structure (27.42%) and 1,477 m2 in
masonry timber structure (26.26%); urban non-residential
houses with a total area of 21,580.45 m2 will be demolished,
and 14 types of infrastructure and ground attachments will
be affected. The Project affects 129 rural households and 21
entities with 670 persons in total, in which 110 households
with 432 persons are affected by the acquisition of
collective
land only, 17 households with 67 persons by HD only, and 2
households with 9 persons by both LA and HD, and 21
entities with 162 persons will be affected.
4
Compensation
rates for land
acquisition
44,400 yuan/mu, irrigated land (Pulai Village): 41,992
yuan/mu; housing land: 44,400 yuan/mu, housing land
(Pulai Village): 41,992 yuan/mu; unutilized land: 4,400
yuan/mu; young crops: 7,000 yuan/mu.
Road construction component- agricultural land 2 :
53126.67yuan/mu (Pulai village, and Guanbeihou village
WWTP component: agricultural land and rural construction
land3: 46806.67yuan/mu (Shuimogou village, pushanggou
village) unutilized land4 : 4680.67 yuan/mu (Shuimogou
village, 4680.67(pushanggou village);
Green crops,
maze, 2100-2400 yuan/mu
Wheat: 1300 yuan/mu
Leek: 4000-5000 yuan/mu
Strawberry: 4000-5000 yuan/mu
Alfalfa: 800-1600 yuan/mu
Lilly: 5000-15000 yuan/mu
5
Compensation
rates for
temporary land
Same as former RP, the construction of sewage pipeline
network will occupy the state owned road, need not
compensation, the restoration cost has been included into
2 Means the rural land which is used direct for agricultural
purpose.
3 Means the rural land on which the buildings and structures are
built.
4 Means the rural land other than agricultural land and rural
construction land.
-
No. Updated item Former RP Updated RP Remarks
occupation the engineering cost
6 Resettlement
cost
7
Project
Implementation
schedule
June 2013 to June 2016 April 2014 and be completed in April
2017
8
DDR for land
acquisition of
Xifengshi village
of Panxuan Road
construction
component,
which has been
conducted in
2012
none Appendix 11
-
Letter of Commitment
The Jiuquan Municipal Government (JMG) has applied for a loan
from the Asian Development Bank (ADB) to finance the Gansu Jiuquan
Integrated Urban Environment Improvement Project (hereinafter, the
―Project‖). Therefore, Jiuquan PMO has prepared a Resettlement Plan
for Gansu Jiuquan Integrated Urban Environment Improvement Project
in the August 2012 which has approved by ADB and issued on ADB
website dated on February 2013. Since the detail project design has
been proved, the resettlement policy has been changed and the
project will be started soon, Jiuquan PMO updated the original RP
in accordance with ADB’s social safeguard policies. This Updated
Resettlement Plan (URP) represents a key requirement of ADB and
becomes a basis for land acquisition, house demolition and
resettlement of the Project. This URP complies with the applicable
state laws and local regulations. In order to complete resettlement
more effectively, this URP includes some additional measures, and
implementation and monitoring arrangements.
JMG hereby acknowledges the contents of this URP, and warrants
that the budgetary funds under this URP will be included in the
general budget of the Project and made available on time. JMG has
discussed this URP with the agencies concerned through the Jiuquan
Project Management Office (PMO) and Jiuquan Economic Development
& Investment (Group) Co., Ltd. (JEDIG), and hereby authorizes
the Jiuquan PMO and JEDIG to implement the resettlement work of the
Project.
Agency Signature Date
Jiuquan PMO
JEDIG
-
Executive Summary
1) Overview of the Project
The components to be constructed under the Project include: 1) 3
road sections
of South Binhe Road, North Binhe Road, Panxuan Road extension
and auxiliary
works and 2 bridges (hereinafter referred to as the road
component); 2) Jiuquan No. 2
WWTP, including auxiliary pipelines; and 3) Landscaping and
windbreak cultivation.
The Project will break ground in April 2014 and be completed in
April 2017; the
gross investment in the Project is 1.447 billion yuan (about
US$230 million).
2) Land occupation and house demolition (HD)
Land acquisition (LA) and resettlement under the Project is
caused by the
construction of the road component and the Jiuquan No.2 WWTP;
the landscaping
and windbreak cultivation component involves neither LA nor
resettlement.
The main resettlement impacts of the Project are the permanent
acquisition of
rural collective land, the permanent occupation of state-owned
land, the demolition of
rural residential houses, and the relocation of entities.
The Project involves Guanbeigou and Pulai Villages, Xifeng
Township, and
Shuimogou Village, Quanhu Township in Suzhou District. 529.1 mu
of collective land
will be acquired for the Project, including 305.5 mu for the
Panxuan Road extension
(57.74%) and 223.6 mu for the WWTP (42.26%). By land type, this
includes 390.2 mu
of agricultural land (73.75%), 4.5 mu of rural construction land
(0.85%) and 134.4 mu
of unutilized land (25.40%); 367.94 mu of state-owned land will
be occupied
permanently, including 171.2 mu of state-owned Gobi (46.53%),
66.03 mu of
transferred state-owned land (17.95%), 47.86 mu of allocated
state-owned land
(13.01%) and 82.85 mu of unutilized state-owned land (22.52%);
350.76 mu of
state-owned land will be occupied temporarily, mainly as
existing roads and river flats;
rural residential houses with a total area of 5,624 m2 will be
demolished, including
1,542 m2 in masonry concrete structure (27.42%) and 1,477 m2 in
masonry timber
structure (26.26%); urban non-residential houses with a total
area of 21,580.45 m2 will
be demolished, and 14 types of infrastructure and ground
attachments will be affected.
The Project affects 129 rural households and 21 entities with
670 persons in total, in
which 110 households with 432 persons are affected by the
acquisition of collective
land only, 17 households with 67 persons by HD only, and 2
households with 9
persons by both LA and HD, and 21 entities with 162 persons will
be affected.
3) Policy framework and entitlements
In order to avoid or reduce negative impacts of LA, adequate
consultation was
conducted on the potential site of the Project, the affected
village groups and persons
at the feasibility study stage. An optimum option was selected
through comparison.
This URP is based on the Land Administration Law of the PRC
(2004), the
Decision of the State Council on Deepening the Reform and
Rigidly Enforcing Land
-
Administration (SC [2004] No.28), the applicable policies of
Gansu Province, and
ADB’s Safeguard Policy Statement (2009). According to the above
policies, and in
consultation with local governments and affected persons (APs),
the resettlement
principles of the Project are: (1) Involuntary resettlement
should be avoided where
feasible; (2) The APs are granted compensation and rights that
can at least maintain
or even improve their livelihoods in the absence of the project;
(3) The APs are given
compensation and assistance in resettlement whether legal title
is available or not
before the cut-off date; (4) The economic compensation shall
ensure that everyone
will at least maintain their standard of living after
resettlement; (5) If the land available
to everyone is insufficient to maintain his/her livelihood,
replacement in cash or in kind
and other income-generating activities are provided for the lost
land; (6) The APs fully
understand their entitlements, the method and standard of
compensation, the
livelihood and income restoration plan, and the project
schedule, and participate in the
implementation of the Resettlement Plan; (7) No land should be
acquired before the
APs are satisfied with the compensation and resettlement (plan);
(8) The executing
agency and an independent agency / third party should monitor
the compensation,
relocation and resettlement operations; (9) The vulnerable
groups (including women)
are provided special assistance or treatment so that they lead a
better life, and all APs
should have an opportunity to benefit from the project; and (10)
The resettlement
costs are sufficient to cover all affected aspects.
The cut-off date for the eligibility for compensation is Feb.
25, 2013, which have
been disclosed in the project area (see appendix 9).
4) Compensation and restoration
Compensation for permanent LA includes land compensation fees,
resettlement
subsidies and young crop compensation fees. LA will affect
Xifeng and Quanhu
Townships. Land compensation rates are as follows: road
construction component-
agricultural land: Road Construction component- agricultural
land and rural
construction land:53126.67 yuan/mu (Pulai village, Guanbeihou
village), unutilized
land: 5312.67 yuan/mu(Pulai village, Guanbeihou village);
WWTP
component-agricultural land and rural construction land:
46806.67yuan/mu
(Shuimogou village) unutilized land : 4680.67 yuan/mu (Shuimogou
village); Green
crops: maze, 2100-2400 yuan/mu, Wheat: 1300 yuan/mu; Leek:
4000-5000 yuan/mu;
Strawberry: 4000-5000 yuan/mu; Alfalfa: 800-1600 yuan/mu; Lilly:
5000-15000
yuan/mu. Income restoration measures for the APs include cash
compensation, skills
training, priority employment for the Project and social
security for eligible APs
The occupied transferred state-owned land will be compensated
for at the
benchmark land price disclosed by JMG, and compensation fees
will be paid directly
to the proprietor; the occupied allocated land will be reclaimed
without compensation
or replaced; the occupied unutilized state-owned land will be
reclaimed without
compensation. The benchmark land price for the affected
transferred state-owned
land is 167,000 yuan/mu.
The temporarily occupied land is existing state-owned roads or
river flats, and will
be restored by the construction agency after completion without
compensation.
-
Demolished rural residential houses will be compensated for at
replacement
rates: 640 yuan/m2 for masonry concrete structure, 440 yuan/m2
for masonry timber
structure, 320 yuan/m2 for masonry earth timber structure, 220
yuan/m2 for earth
timber structure, 100 yuan/m2 for simple structure and 30
yuan/m2 for sheds. The
implementing agency (IA) will provide housing sites to the DHs
for house
reconstruction. In addition, the DHs will also receive the
following compensation: 10
yuan per fixed telephone relocated, 230 yuan per household for
relocation of cable TV,
300 yuan per watt-hour meter relocated, and a transition subsidy
of 300 yuan per
household per month. According to the Estimated Replacement
Price① Provided by
Engineering Cost Management Division of Jiuquan Constrution
Bureau, the Aps can
restore their houses with the compensation without additional
inputs.
The affected entities will be compensated by the project owner
in consultation
with them. The IA and the affected entities has selected an
appraisal agency through
consultation for market appraisal and compensation; In May.
2013, 3 appraisal
agencies were randomly selected from the list provided by Gansu
provincial
construction department, 21 questionnaires were delivered to all
the Aps, among
which, 67% representatives selected Xinnuo Real Estate Appraisal
Center as the final
appraisal agency for the urban house demolition and the transfer
state-owned land
appraisal. On September 24, 2013, a hearing was held about the
compensation rates
for urban house demolition and transferred state-owned land. In
Dec. 2013, Xinnuo
Real Estate Appraisal Center provided a latest appraisal result
which has posted at
each affected area to collect public opinions. The compensation
fees will be paid
directly to the proprietors. According to the appraisal, the
compensation rate for
structures in Jiuquan City is 1626-1843 ②yuan/m2. In addition,
the transition subsidy,
moving subsidy and compensation for losses from production or
business suspension
has also been included into the appraisal price.
5) Vulnerable groups and women
The affected population includes 30 vulnerable households,
including 4
households with disability, 9 five-guarantee households, 5
women-headed
households, 10 households covered by minimum living security and
two ethnic
minority households.
The Project affects 324 women. During project implementation and
O&M stage,
women will obtain unskilled jobs in the priorities. In addition,
women will receive equal
pay for equal work like men do. However, employment of child
labor is prohibited.
Priority will be given to female labor in terms of skills
training so as to ensure that their
economic status and income. 800 men-times will be trained, in
which female laborers
are not less than 400 men-times (50%). Women will receive
relevant information
during resettlement, and are able to participate in resettlement
consultation. The
special FGDs for women will be held to introduce resettlement
policies and improve
① Calculated at 2013 price level.
② It is used to estimate the resettlement cost. The concrete
compensation cost will be paid by
the appraised and negotiated cost. .
-
their awareness.
6) Public participation and information disclosure
All APs (with 30% being women) have been informed of the key
points of this
URP by various means and involved in the Project, such as
meeting, interview, FGD,
public participation meeting and community consultation, and
their opinions have
been well incorporated into this RP. The Resettlement
Information Booklet (RIB) have
been distributed to the APs or groups in mid August 2013, and
the updated RP,
including the Chinese version, will be published on ADB’s
website in March 2014. A
grievance redress system has been established. All agencies will
accept grievances
and appeals from the APs for free, and costs so reasonably
incurred will be disbursed
from the contingencies.
7) Grievances and appeals
An appeal procedure has been established to settle disputes over
compensation
and resettlement. The aim is to respond to appeals of the APs
timely and
transparently. Grievances about the Project may be from
collective LA and HD.
Correspondingly, the Jiuquan Project Leading Group, Jiuquan PMO,
JEDIG and the
affected township governments and village committees will
coordinate and handle
grievances and appeals arising from resettlement. The APs may
file appeals about
any aspect of resettlement, including compensation rates. If an
AP is still not satisfied
and believes he/she has been harmed due to non-compliance with
ADB policy, he/she
may submit a complaint to ADB’s Office of Special Project
Facility or Office of
Compliance Review in accordance with ADB’s Accountability
Mechanism①
8) Organizational structure
JMG is the executing agency of the Project.
In order to ensure the successful implementation of the Project,
JMG has
established a project leading group for overall leadership and
high-level coordination.
The Jiuquan PMO has been established under the project leading
group for
routine management and coordination in project implementation,
reporting overall
progress and issues to be decided or coordinated at higher
levels to the project
leading group, and communication between JMG and ADB.
JEDIG is the IA of the Project, responsible for the
implementation of the Project.
In addition, JEDIG and other agencies concerned are also
responsible for the
implementation of this URP.
9) Monitoring and evaluation
In order to ensure the successful implementation of this URP,
resettlement
implementation will be subject to internal and external
monitoring. The internal
monitoring agency is the Jiuquan PMO, and an internal monitoring
report will be
submitted to ADB semiannually. The Jiuquan PMO has started to,
though still in
process, appoint an independent agency to conduct external
monitoring and
evaluation (M&E) semiannually, and M&E costs will be
included in the resettlement
① For further information, see:
http://www.adb.org/Accountability-Mechanism/default.asp.
-
budget.
10) Resettlement budget and implementation schedule
All costs incurred during LA and resettlement will be included
in the general
budget of the Project. Based on prices in the end of 2013, the
total resettlement costs
of the Project are 106,257,600 yuan, including compensation fees
for LA and HD, land
taxes, M&E costs and contingencies.
To meet the schedule requirement of the construction period of
the civil works of
the Project, resettlement has been started in March 2013, the
publication and
appraisal work have done, but all agreements have not been
signed. The main
resettlement works will be completed by Dec 2014.
-
VI
Contents Notes to this Update
......................................................................................................................
1 1 Overview of the Project
.........................................................................................................
1
1.1 Background and Description of the Project
........................................................ 1 1.1.1
Background of the Project
.............................................................................
1 1.1.2 Components of the Project and Identification of
Resettlement Impacts. 2 1.1.3 Summary of Resettlement Impacts of
the Project ..................................... 5
1.2 Socioeconomic Benefits
........................................................................................
7 1.3 Estimated Resettlement Investment and Implementation Plan
....................... 7
2 Impacts of the Project
............................................................................................................
8 2.1 Measures to Minimize LA and
HD........................................................................
8
2.1.1 Principles for Project Design and Site Selection
....................................... 8 2.1.2 Comparison and
Selection of Options
......................................................... 8
2.2 Scope of Impact Survey of LA and HD
................................................................ 8
2.3 Survey Methods and Process
...............................................................................
8 2.4 Permanent Acquisition of Collective Land
.......................................................... 9 2.5
Permanent Occupation of State-owned Land
.................................................. 11 2.6 Temporary
Land Occupation
...............................................................................
11 2.7 Demolition of Residential Houses
......................................................................
11 2.8 Demolition of Non-residential Houses
............................................................... 14
2.9 Affected Infrastructure and Ground
Attachments............................................. 17 2.10
Affected Population
..............................................................................................
18
2.10.1 Summary
................................................................................................
18 2.10.2 Affected Vulnerable Groups
................................................................ 20
2.10.3 Affected Women
...................................................................................
20
3 Socioeconomic Profile
.........................................................................................................
22 3.1 Socioeconomic Profile of the Project Area
....................................................... 22
3.1.1 Gansu Province
............................................................................................
22 3.1.2 Jiuquan City
...................................................................................................
22 3.1.3 Suzhou District
..............................................................................................
22 3.1.4 Socioeconomic Profile of the Affected Townships
................................... 23 3.1.5 Socioeconomic Profile
of the Affected Villages ........................................
24
3.2 Basic Information of Affected Entities
................................................................ 25
3.3 Socioeconomic Profile of the Affected Population
........................................... 27
3.3.1 Ethnic and Gender Analysis
........................................................................
27 3.3.2 Age Structure
................................................................................................
27 3.3.3 Educational Level
.........................................................................................
27 3.3.4 Residential Conditions
.................................................................................
28 3.3.5 Infrastructure in Residential Area
............................................................... 28
3.3.6 Productive Resources
..................................................................................
28 3.3.7 Household Properties
..................................................................................
29 3.3.8 Annual Household Income and Expenditure
............................................ 29
3.4 Summary
................................................................................................................
29 4 Legal Framework and Policies
...........................................................................................
30
4.1 Laws, Regulations and Policies Applicable to Resettlement
......................... 30 4.2 Abstract of ADB Policies
......................................................................................
31 4.3 Key Provisions of PRC Laws, Regulations and Policies
................................ 32 4.4 Main Differences between
ADB Policies and PRC Laws ............................... 34 4.5
Principles for Compensation
...............................................................................
35 4.6 Cut-off Date of Compensation
............................................................................
35 4.7 Compensation Rates for Resettlement Impacts of the Project
...................... 35
4.7.1 Acquisition of Collective Land
.....................................................................
35 4.7.2 Occupation of State-owned Land
............................................................... 36
4.7.3 Temporary Land Occupation
.......................................................................
36 4.7.4 Demolition of Residential Houses
.............................................................. 36
4.7.5 Demolition of Non-residential Houses
....................................................... 37 4.7.6
Rates of Other
Costs....................................................................................
37
-
VII
4.7.7 Vulnerable Groups
........................................................................................
38 4.7.8 Supporting Measures for Women
..............................................................
38
4.8 Endowment Insurance for Land-loss farmers
.................................................. 38 4.9
Entitlement Matrix
.................................................................................................
40
5 Resettlement and Income Restoration
..............................................................................
44 5.1 Resettlement Objectives
.....................................................................................
44 5.2 Principles for Resettlement Restoration Programs
......................................... 44 5.3 Impacts of
Acquisition of Collective Land and Restoration Program ............
44
5.3.1 Impact Analysis of Acquisition of Collective Land
.................................... 44 5.3.2 Summary of
Resettlement and Income Restoration Measures for Land-loss Farmers
.......................................................................................................
48 5.3.3 Resettlement Restoration Programs of Seriously Affected
Villages ..... 50
5.4 Resettlement Program for Demolition of Rural Residential
Houses ............. 52 5.5 Resettlement Programs for Demolition of
Non-residential Houses .............. 53
5.5.1 Resettlement Program for Ordinary Entities
............................................. 54 5.5.2 Resettlement
Program for Jiuquan Technical Secondary School of Industry and
Commerce
..............................................................................................
56
5.6 Restoration Program for Temporarily Occupied Land
..................................... 56 5.7 Resettlement Program
for Infrastructure and Ground Attachments ............. 56 5.8
Assistance Measures for Vulnerable Groups
................................................... 56 5.9 Training
of APs
......................................................................................................
57 5.10 Protection of Women’s Rights and Interests
................................................. 58
6 Resettlement Organizational Structure
.............................................................................
59 6.1 Resettlement Implementation and Management Agencies
............................ 59
6.1.1 Organizational Setup
...................................................................................
59 6.1.2 Organizational Responsibilities
..................................................................
59
6.2 Staffing and
Equipment........................................................................................
61 6.2.1 Staffing
...........................................................................................................
61 6.2.2 Equipment
......................................................................................................
61 6.2.3 Organizational Training Program
...............................................................
61
7 Public Participation and Grievance Redress
....................................................................
63 7.1 Public Participation
...............................................................................................
63
7.1.1 Public Participation at the Preparation Stage
........................................... 63 7.1.2 Public
Participation at the Implementation Stage
.................................... 64
7.2 Grievances and Appeals
.....................................................................................
65 7.2.1 Grievance Redress Procedure
...................................................................
65 7.2.2 Recording and Feedback of Grievances and
Appeals............................ 65 7.2.3 Contact Information
for Grievance Redress .............................................
66
8 Resettlement Budget
...........................................................................................................
67 8.1 Resettlement Budget
...........................................................................................
67 8.2 Resettlement Investment Schedule and Funding Sources
............................ 68 8.3 Disbursement and Management of
Resettlement Funds ............................... 68
8.3.1 Disbursement of Resettlement Funds
....................................................... 68 8.3.2
Management of Resettlement Funds
........................................................ 68
9 Resettlement Implementation Plan
....................................................................................
69 9.1 Principles for Resettlement Implementation
..................................................... 69 9.2
Resettlement Implementation Schedule
........................................................... 69
10 Monitoring and
Evaluation...........................................................................................
72 10.1 Internal Monitoring
................................................................................................
72
10.1.1 Scope of Internal Monitoring
............................................................... 72
10.1.2 Methodology of Internal Monitoring
................................................... 73 10.1.3
Period and Reporting of Internal Monitoring
..................................... 74
10.2 External Monitoring
..............................................................................................
74 10.2.1 Scope and Methodology of External Monitoring
.............................. 74 10.2.2 External Monitoring
Reporting
............................................................ 75
10.3 Post-evaluation
.....................................................................................................
75 Appendixes
....................................................................................................................................
76
-
VIII
Appendix 1 Schematic Map of the Project
.......................................................................
76 Appendix 2 Summary of Temporarily Occupied Land
..................................................... 78 Appendix 3
Gender Analysis Form
....................................................................................
79 Appendix 4 Provisions of Land Laws, Regulations and Policies of
the PRC and Gansu Province
....................................................................................................................
81 Appendix 5 Policy on the Endowment Insurance for LLFs
............................................ 86 Appendix 6
Introduction to Jiuquan Technical Secondary School of Industry and
Commerce, and Jiuquan Vocational College
...................................................................
90 Appendix 7 Public Participation and Minutes
...................................................................
91 Appendix 8 Resettlement Information Booklet
.................................................................
93 Appendix 9 Notice on Land Acquisition and Compensation Rates of
Beida River Integrated Ecological Management
Project....................................................................
111 Appendix 10 Estimated Replacement Price Provided by Engineering
Cost Management Division of Jiuquan Constrution Bureau
................................................. 112 Appendix 11
Due Diligence Report on land acquisition of Xifeng Village of
Panxuan Road Extension Component
.............................................................................................
114
-
IX
List of Tables TABLE 1-1 IDENTIFICATION OF COMPONENTS AND
RESETTLEMENT IMPACTS ........................................ 3
TABLE 1-2 SUMMARY OF RESETTLEMENT IMPACTS OF THE PROJECT
.................................................... 6 TABLE 1-3
SUMMARY OF PROJECT AND RESETTLEMENT INVESTMENT
.................................................. 7 TABLE 2-1
SUMMARY OF THE PROJECT AREA
.........................................................................................
8 TABLE 2-2 SUMMARY OF PERMANENTLY ACQUIRED COLLECTIVE LAND
.............................................. 10 TABLE 2-3 SUMMARY
OF PERMANENTLY OCCUPIED STATE-OWNED LAND
............................................................... 11
TABLE 2-4 SUMMARY OF TEMPORARILY OCCUPIED LAND
....................................................................
11 TABLE 2-5 SUMMARY OF DEMOLISHED RESIDENTIAL HOUSES
..............................................................................
13 TABLE 2-6 IMPACTS ON AFFECTED ENTITIES
......................................................................................................
15 TABLE 2-7 AFFECTED GROUND ATTACHMENTS
..................................................................................................
17 TABLE 2-8 SUMMARY OF AFFECTED
POPULATION.................................................................................
19 TABLE 2-9 SUMMARY OF AFFECTED VULNERABLE GROUPS
................................................................ 20
TABLE 3-1 SOCIOECONOMIC PROFILE OF GANSU PROVINCE, JIUQUAN CITY AND
SUZHOU DISTRICT (2012) .................. 22 TABLE 3-2
SOCIOECONOMIC PROFILE OF THE AFFECTED TOWNSHIPS
................................................ 24 TABLE 3-3
SOCIOECONOMIC PROFILE OF THE AFFECTED VILLAGES
.................................................... 24 TABLE 3-4
SOCIOECONOMIC PROFILE OF THE AFFECTED VILLAGE GROUPS
...................................... 25 TABLE 3-5 BASIC
INFORMATION ON AFFECTED ENTITIES
......................................................................................
26 TABLE 3-6 LIVING STATISTICS OF POPULATION AFFECTED BY HD
....................................................... 28 TABLE
3-7 LIVING ENVIRONMENT OF POPULATION AFFECTED BY HD
.................................................. 28 TABLE 3-8
INCOME AND EXPENDITURE OF RURAL HOUSEHOLDS AFFECTED BY LA
............................ 29 TABLE 4-1 KEY PROVISIONS OF GANSU
PROVINCE AND JIUQUAN CITY ON ACQUISITION OF COLLECTIVE LAND
............... 32 TABLE 4-2 PRINCIPLES FOR RESETTLEMENT
........................................................................................
35 TABLE 4-3 COMPENSATION RATES FOR ACQUIRED COLLECTIVE LAND
................................................ 36 TABLE 4-4
COMPENSATION RATES FOR DEMOLITION OF RURAL RESIDENTIAL HOUSES
..................... 37 TABLE 4-7 SUMMARY OF RATES OF TAXES AND
FEES PAID FOR LA
..................................................... 37 TABLE 4-8
ENTITLEMENT MATRIX
..........................................................................................................
41 TABLE 5-1 IMPACT ANALYSIS OF ACQUISITION OF COLLECTIVE LAND
.................................................. 46 TABLE 5-2
LAND LOSS RATES OF LAND-LOSS FARMERS
......................................................................
46 TABLE 5-3 EXPECTED RESETTLEMENT MODES OF RURAL HOUSEHOLDS
AFFECTED BY LA ............... 48 TABLE 5-13 RESETTLEMENT OF
AFFECTED ENTITIES
............................................................................................
55 TABLE 5-14 AGRICULTURAL TECHNICAL TRAINING PROGRAM FOR THE
PROJECT AREA .............................................. 57
TABLE 5-15 EMPLOYMENT TRAINING PROGRAM FOR THE PROJECT AREA
............................................................... 57
TABLE 6-1 RESETTLEMENT AGENCIES AND STAFFING
..........................................................................................
61 TABLE 6-2 RESETTLEMENT TRAINING SCHEDULE
................................................................................................
61 TABLE 7-1 DISCLOSURE OF RESETTLEMENT INFORMATION AND KEY
CONSULTATION ACTIVITIES ................................... 63
TABLE 7-2 PUBLIC PARTICIPATION PLAN
...........................................................................................................
64 TABLE 7-3 REGISTRATION FORM OF GRIEVANCES AND APPEALS
............................................................................
65 TABLE 7-4 ACCEPTING AGENCIES AND STAFF OF GRIEVANCES AND APPEALS
............................................................ 66
TABLE 8-1 RESETTLEMENT BUDGET SHEET
.......................................................................................................
67 TABLE 8-2 RESETTLEMENT INVESTMENT PLAN
..................................................................................................
68 TABLE 9-1 SCHEDULE OF RESETTLEMENT ACTIVITIES
...........................................................................................
69 TABLE 10-1 SAMPLE SCHEDULE OF LA AND HD
................................................................................................
72 TABLE 10-2 SAMPLE SCHEDULE OF FUND UTILIZATION
.......................................................................................
73 TABLE 10-3 SAMPLE MONITORING REPORTING FORM
.........................................................................
73 TABLE 10-4 SCHEDULE OF RESETTLEMENT MONITORING AND EVALUATION
....................................... 75
List of Figures
FIGURE 3-1 AGE
STRUCTURE......................................................................................................................................
27 FIGURE 3-2 COMPOSITION OF EDUCATIONAL LEVEL
......................................................................................................
28 FIGURE 6-1 ORGANIZATIONAL CHART
..........................................................................................................................
59
-
~ 1 ~
1 Overview of the Project
1.1 Background and Description of the Project
1.1.1 Background of the Project
Jiuquan is located at the west tip of the Hexi Corridor in Gansu
Province, and is Gansu’s ecological center that draws the attention
of state leaders. According to a scientific outlook on development,
Jiuquan is being developed into a new energy base and a new energy
equipment manufacturing base of China, and Gansu’s regional
development strategy has been elevated to the state level. As one
of Gansu’s two wings, Jiuquan is vital to Gansu’s development and
the implementation of the regional development strategy. Despite of
its vast territory, extensive industrial prospect, and vital
ecological and geographic position, Jiuquan is characterized by
harsh natural conditions, fragile ecology, weak infrastructure,
insufficient urban capacity and functionality. The Project is an
urgent need for building the city’s ecological barrier, improving
its capacity, functionality and living environment, and realizing
its sustainable development.
Figure 1-1 Location of Jiuquan city
-
~ 2 ~
1.1.2 Components of the Project and Identification of
Resettlement Impacts
The Project is located in Suzhou District, Jiuquan City, Gansu
Province. The components to be constructed under the Project
include: 1) 3 road sections of South Binhe Road, North Binhe Road,
Panxuan Road extension and auxiliary works and 2 bridges
(hereinafter referred to as the road component); 2) Jiuquan No. 2
WWTP, including auxiliary pipelines; and 3) Landscaping &
windbreak tree plantations.
The resettlement impacts of the Project are LA, HD and temporary
land occupation. See Table 1-1.
See Appendix 1 for the schematic map of the Project.
-
~ 3 ~
Table 1-1 Identification of Components and Resettlement
Impacts
No. Component Description Location Key resettlement impact
Remarks
1 Road
Roads (3)
&
associated
utilities
North Binhe Road – 5.8 km long, urban Class II trunk road,
with
associated utilities including water supply pipes 5.8 km
long,
wastewater pipes 5.8 km, lighting, electricity,
telecommunications,
heating, and gas pipes, and a bridge across North Main Channel
30
m long
Starting point: National Highway
G312; ending point: Jiuhang
Highway
(K5+706.693~K11+466.653)
Occupying 66.03 mu of transferred
state-owned land, 47.86 mu of allocated
state-owned land and 0.2 mu of
Unutilized state-owned land,
demolishing non-residential houses of
20,999.83 m2 on state-owned land
In process,
the land
acquisition
notice and
compensation
policy have
been posted,
appraisal
agency has
been
selected,
initial
appraisal
result have
been posted,
but the
agreements
haven’t been
signed and
the
compensation
have not
been paid
yet, the
agreements
will be signed
since this
URP be
approved.
South Binhe Road – 5.4 km long, urban Class II trunk road,
with
associated utilities including water supply pipes 5.5 km
long,
wastewater pipes 5.5 km, lighting, electricity,
telecommunications,
heating, and gas pipes
Starting point: Guangdian
Avenue; ending point: urban
segment of National Highway
312 (K0+000~k5+548.576)
Occupying 150 mu of state-owned Gobi
and 2.3 mu of Unutilized state-owned
land, demolishing non-residential
houses of 580.62 m2 on state-owned
land
Extension of Panxuan Road – 4.7 km long, urban Class II trunk
road,
with associated utilities including water supply pipes 5.3
km,
wastewater pipes 5.3 km, lighting, electricity,
telecommunications,
heating, and gas pipes
Starting point: National Highway
312~ending point: North Binhe
Road (K0+000~K4+688.967)
Acquiring 305.5 mu of collective land,
demolishing rural residential houses of
5,624 m2 and occupying 21.2 mu of
state-owned Gobi in Xifeng Township.
-
~ 4 ~
No. Component Description Location Key resettlement impact
Remarks
101.55 mu state-owned land will be
freely used. 8
Landscaping within red lines of roads, in the median separating
the
motorized and non-motorized vehicles lanes, some sidewalk,
and
roadside slopes
/
Within the land acquisition areas of
above, No additional resettlement
impacts
Bridges (2)
Xiyi Bridge – 590 m long (Extension of Panxuan Road across
Beidahe) /
Within the land acquisition areas of
above, No additional resettlement
impacts
Jiu-Yin Road Beidahe Bridge – 200 m / No resettlement
2
Wastew
ater
WWTP
Capacity 60,000 m3/d, with sludge dewatered to moisture content
less
than 80%, occupying an area of 14.91 ha, including production
and
auxiliary buildings, works outside the plant, including road
works,
effluent discharge works, and power lines
East of Group 7 of Shuimogou
Village, Quanhu Township
Acquiring 89.2 mu of collective
cultivated land and 134.4 mu of
collective unutilized land
Will be
started soon
Sewer
network
Wastewater collection pipes 25.8 km long, DN600-1,000 mm,
including inverted siphon pipe crossing Beidahe of DN1,000, 2× 1
km
Along Jiefang Road, National
Highway G312, Jiuhang
Highway
Occupying 350.76 mu of state-owned
land temporarily
All state-
owned roads
Wastewater
reuse
For cooling circulation and some production uses in power plant;
for
irrigation of landscaping using watering vehicles before
completion of
power plant, with remaining effluents discharged to Beidahe
/ No resettlement
Sludge
disposal &
treatment
Sludge disposal & treatment / No resettlement
3
Landscaping and
windbreak
cultivation
Outside red lines of roads – Landscaping and windbreak tree
plantations (65.8 ha) between the Binhe Roads and the river
dikes,
along the section of North Binhe Road between Wei Six Road
and
Jiu-Hang Bridge, and along the section of South Binhe Road
between
Guangdian Road and National Road G312
/ No resettlement
8 Of which, 80.35 mu was belonged to Xifengshi village of Xifeng
Xiang, which has been acquisitioned in Feb.2012. For more details,
please see
appendix 13
-
~ 5 ~
1.1.3 Summary of Resettlement Impacts of the Project
The Project affects a total population of 682, including 132
households with 520 persons, and 21 entities with 162 staff
members. The main resettlement impacts are as follows:
1) 529.1 mu of collective land will be acquired for the Project,
including 385.85 mu for the road component (63.31%) which has been
started in March 2013 and still in process, and 223.6 mu for the
WWTP component (36.69%), affecting 112 households with 441 persons
which will be started soon. To reflect the situation of the
resettlement activities have been conducted, a DDR is annexed in
appendix 1.
2) 367.94 mu of state-owned land will be occupied permanently
for the Project, all caused by the road component, including 47.86
mu of allocated state-owned land, 66.03 mu of state-owned land of
paid use, 171.2 mu of state-owned Gobi and 82.85 mu of Unutilized
state-owned land.
3) Rural residential houses of 5,624 m2 will be demolished, all
caused by the Panxuan Road extension in the road component. 22
households with 88 persons are affected by HD only, in which 5
households with 21 persons are affected by both LA and HD. The
appraisal work of these house has been conducted in December 2013.
For more details, please refer appendix 1.
4) Non-residential houses of 21,580.45 m2 will be demolished,
affecting 21 entities with 162 persons. According to the survey,
most of these entities are partly affected, and their demolished
premises are mostly unused or used for storage.
See Table 1-2.
-
~ 6 ~
Table 1-2 Summary of Resettlement Impacts of the Project
Type
Road component WWTP
Total Remarks North Binhe
Road
South Binhe
Road
Panxuan
Road
Extension
Subtotal WWTP Sewer
network Subtotal
Acquisition of collective land mu 0 0 305.5 305.5 223.6 0 223.6
529.1
Occupation of state-owned
land mu 114.06 152.33 21.2 367.94 0 0 0 367.94
Demolition of rural residential
houses m2 0 0 5624 5624 0 0 0 5624
Demolition of non-residential
houses on state-owned land m2 20999.83 580.62 0 21580.45 0 0
21580.45
Temporary occupation of land mu 0 0 0 0 0 350.76 350.76 350.76
State-owned
roads
Affected population – households
——by LA only HH 0 0 96 96 14 0 14 110
/ 0 0 376 376 56 0 56 477
——by HD only HH 0 0 17 17 0 0 17
/ 0 0 67 67 0 0 67
——by both LA and HD HH 0 0 5 5 0 0 5
/ 0 0 18 18 0 0 18
Subtotal HH 0 0 118 118 14 0 14 132
/ 0 0 464 464 56 0 56 520
Affected population – enterprises and public institutions
Relocation of enterprises and
public institutions
HH 19 2 0 21 0 0 0 21
/ 157 5 0 162 0 0 0 162
Subtotal of affected
population / 157 5 464 626 56 0 56 682
-
~ 7 ~
1.2 Socioeconomic Benefits
1) The Project will improve regional ecology and environmental
quality, integrate land resources, improve land utilization
efficiency, build a harmonious city suitable for residence and a
well-known city on the Silk Road, and realize sustainable economic,
social and cultural development.
2) The construction of infrastructure under the Project will
relieve the difficult situation of Jiuquan City in infrastructure
development.
3) The WWTP component will eliminate wastewater pollution,
improve the water quality of the Beida River, and protect the
regional aquatic environment effectively, thereby improving the
overall environmental quality of the city and protecting the
physical health of urban residents.
In addition, the Project will build a better image for Jiuquan
City, and the improvement of urban infrastructure and environment
will enable people to live with greater pleasure, thereby promoting
social stability and economic development strongly.
1.3 Estimated Resettlement Investment and Implementation
Plan
The Project will break ground in April 2014 and be completed in
April 2017; the gross investment in the Project is 1.447 billion
yuan (about US$230 million).
The estimated resettlement costs of the Project are 106,257,600
yuan (prices in 2013), including basic land acquisition
(occupation) costs, taxes and contingencies, accounting for 7.34%
of the Project’s budget, all from domestic counterpart funds. The
construction period of the Project is 3 years. Consistent with the
construction period of the Project, resettlement will be
implemented since March 2013 to December 2014.
Table 1-3 Summary of Project and Resettlement Investment
Component Gross investment (0,000
yuan) Resettlement costs
(0,000 yuan) Percent (%)
Road
North Binhe Road 24273.9 5283.8 21.8%
South Binhe Road 22157.1 113.4 0.5%
Panxuan Road Extension 21401.1 4827.5 22.6%
WWTP 22402.8 1068.7 4.8%
Landscaping and windbreak cultivation 17966.9 0 0.0%
Subtotal 108201.8 11293.5 10.4%
-
~ 8 ~
2 Impacts of the Project
2.1 Measures to Minimize LA and HD
2.1.1 Principles for Project Design and Site Selection
Resettlement impacts have been minimized at the design stage on
the following principles:
Avoiding or minimizing occupation of existing and planned
residential areas;
Avoiding or minimizing occupation of high-quality farmland;
Gaining access to the proposed construction sites through existing
state
and local roads; Avoiding or minimizing occupation of
environmentally sensitive areas; Selecting resettlement sites in
compliance with the local development
plan
2.1.2 Comparison and Selection of Options
At the design stage, through the field survey of the project
area and the optimization of the project design, negative impacts
of the Project have been minimized without affecting the design
outputs, especially the amount of resettlement.
For North Binhe Road, The intersection of North Binhe Road and
Jiuyin Bridge is
located on the north side of Jiuyin Bridge. 1)recommended
option: the existing green belts will be used as the side
separation zones, non-motorized and motorized vehicle lanes will be
provided, and certain space will be reserved for future dyke
improvement and landscaping. 2) Substitutable option: The green
belts will be compressed, the side separation zones will be
replaced by fences, the existing dykes will be used as sidewalks,
and no space for landscaping will be reserved. 3) The optimized
option will reduce house demolition area by 1,757 m2 and
construction costs by 8,804,200 Yuan.
In addition, at the detailed design stage, the project design
will be further optimized to avoid or minimize LA and HD
impacts.
2.2 Scope of Impact Survey of LA and HD
In the recommended option, 121 households with 475 persons in 7
groups of 3 villages in two townships, Suzhou District, Jiuquan
City will be affected by LA and HD. See
Table 2-1.
Table 2-1 Summary of the Project Area
Component Township Village Type of impact
Affected households
Affected population
Panxuan Road Extension
Xifeng Township Guanbeigou LA & HD 61 223
Pulai LA & HD 46 196
WWTP Quanhu
Township Shuimogou LA 14 56
Total 121 475
-
~ 9 ~
2.3 Survey Methods and Process
In February 2011, the Jiuquan PMO appointed China Northwest
Municipal Engineering Design Institute Co., Ltd. to prepare the
Feasibility Study Report for the ADB-financed Gansu Jiuquan
Integrated Urban Environment Improvement Project.
In December 2011, the project staff from China Northwest
Municipal Engineering Design Institute Co., Ltd. conducted a field
investigation and collected information with the support of the
Jiuquan PMO; in May 2012, the draft Feasibility Study Report was
completed, defining the preliminary scope of construction of the
Project.
In May and June 2012, the survey team of Hohai University
conducted a census on the socioeconomic profile and resettlement
impacts of the project area according to the FS Report, and a
sampling socioeconomic survey on the AHs, covering household
population, impacts of LA, household economic status, and expected
resettlement modes. During the survey, the survey team also
listened to opinions of the village committees and villagers on LA,
HD and resettlement, and conducted extensive consultation. The
survey team also interviewed and collected information from the
Jiuquan PMO, JEDIG, the Jiuquan and Suzhou District Land and
Resources Bureau, the Jiuquan Urban House Demolition and
Resettlement Managemnet Office, and the labor and social security
bureau to learn the policies and practice of LA and resettlement in
Jiuquan City.
In June and July 2012, the RP of the Project was completed on
the basis of the FS and survey data, and public consultation. This
RP analyzes and evaluates the resettlement impacts and risks of the
Project, and proposes preliminary remedies.
In December 2013, a complementary survey was conducted to
reflect the latest project impacts, policies and other status.
During the survey, the survey staff also listened extensively to
expectations of the village committees and villagers on LA and
resettlement, and conducted extensive consultation. The key
findings are as follows:
Almost all villagers know that the Project is about to break
ground, and support it;
The Project involves the permanent acquisition of rural
collective land, the permanent occupation of state-owned land, the
demolition of rural residential houses and non-residential houses
on state-owned land, and temporary land occupation.
Almost all APs think that they are affected slightly by LA, and
they can continue to farm on the remaining land after acquisition;
they prefer cash compensation;
Compensation fees should be paid timely and transparently with
minimum intermediate steps.
2.4 Permanent Acquisition of Collective Land
The acquisition of collective land is caused by the Panxuan Road
extension and the WWTP. Affecting 112 households with 441 persons
in 7 groups of 3 villages in two townships, Suzhou District,
Jiuquan City. 529.1 mu of collective land will be acquired for the
Project, including 305.5 mu for the Panxuan Road extension①
(57.74%) and 223.6 mu for the WWTP (42.26%).
By land type, this includes 390.2 mu of agricultural land
(73.75%), 4.5 mu of rural construction land (0.85%) and 134.4 mu of
unutilized land (25.40%). See Table 2-2. ① Of which, 80.35mu land
of Shifengxi village has been finished in Feb.2012. For more
details,
please see appendix 13.
-
~ 10 ~
Table 2-2 Summary of Permanently Acquired Collective Land
District Component Township Village Group
Collective land to be acquired (mu) Affected population (LA
only) Land acquisition
status Subtotal Agricultural
land Waste land
Rural construction
land Households Population
Suzhou D
istrict
Panxuan Road Extension
Xifeng
Guanbeigou
Group 2
36.45 35.3 0 1.15 13 63 The pre-land
acquisition notice has
been posted; the negotiation
is in process, it
is estimated the land
acquisition contract will be signed in May 2014
Group 3
42.3 40.8 0 1.5 17 37
Group 4
29.6 29.6 0 0 12 49
Group 5
38.3 38.3 0 0 14 55
Pulai
Group 1
88.6 87.8 0 0.8 23 94
Group 4
70.25 69.2 0 1.05 19 87
Subtotal 305.5 301 0 4.5 98 385
WWTP Quanhu Shuimogou Group
7 223.6 89.2 134.4 0 14 56
Total 529.1 390.2 134.4 4.5 112 441
Percentage 100.00% 73.75% 25.40% 0.85%
Note: The population affected by housing site acquisition is
included in that affected by HD.
-
~ 11 ~
2.5 Permanent Occupation of State-owned Land
The permanent occupation of state-owned land is caused by the
road component. The 3 proposed roads will occupy 367.94 mu of
state-owned land, including 171.2 mu of state-owned Gobi (59.5%),
66.03 mu of transferred state-owned land① (23.0%), 47.86 mu of
allocated state-owned land② (16.6%) and 82.85 mu of Unutilized
state-owned land (0.9%). See Table 2-3.
Table 2-3 Summary of Permanently Occupied State-owned Land
Componen
t
State-owned land (mu)
Percentage
Resettlement progress
Gobi
Transferred
state-owned
land
Allocated
state-owned
land
Unutilized
state-owne
d land
Subtotal
North Binhe
Road 0 66.03 47.86 0.2 114.09 31.01%
In process, the land
acquisition notice and
compensation policy
have been posted,
appraisal agency has
been selected, initial
appraisal result have
been posted, but the
agreements haven’t been
signed and the
compensation fund have
not been paid yet, the
agreements will be
signed since this URP be
approved.
South
Binhe Road 132 0 0 2.3 152.3 41.39%
Panxuan
Road
Extension
21.2 0 0 80.35 21.2 27.60%
Total 171.2 66.03 47.86 82.85 367.94 100.0%
Percentage 46.53% 17.95% 13.01% 22.52% 100.0%
2.6 Temporary Land Occupation
Temporary land occupation is caused by the sewer network
associated with the WWTP, where 350.76 mu of land will be occupied,
all being existing state-owned roads and river flats. See
Table 2-4 and Appendix 2.
Table 2-4 Summary of Temporarily Occupied Land
Item Number of pipelines
Pipeline diameter (mm)
Pipeline length (m)
Temporarily occupied area
(mu)
Expected construction
period
State-owned road 13 D300-D1200 460-6820 350.16 3 months
State-owned river flat 1 DN700 2000 0.6 3 months
① It will be gained with land-transferring fees. In this
project, only 66.03mu state-owned land
need to compensate. ② It will be gained freely. In this project,
the land of Gobi, unutilized state-owned land and
Jiuquan Technical Secondary School of Industry and Commerce will
be freely gained and the
state-owned roads will be freely utilized. The concrete
situation of Jiuquan Technical
Secondary School of Industry and Commerce has detailed in
appendix 7.
-
~ 12 ~
2.7 Demolition of Residential Houses
According to the survey, the Project involves the demolition of
rural houses only, which is caused by the Panxuan Road extension.
Rural residential houses with a total area of 5,624 m2 will be
demolished, including 1,542 m2 in masonry concrete structure
(27.42%) and 1,477 m2 in masonry timber structure (26.3%),
affecting 22 households with 88 persons, in which 5 households with
21 persons are also affected by LA. See
Table 2-5.
-
~ 13 ~
Table 2-5 Summary of Demolished Residential Houses
Component Village
Area (m2) Affected population
Masonry
concrete
Masonry
timber
Masonry earth
timber
Earth
timber Simple Shed Subtotal
By HD Also by LA
House -holds Popu- lation House -holds Popu lation
Panxuan Road
extension
Xifengsi 522 623 756 585 140 609 3235 11 45 3 12
Guanbeigou 1020 654 586 401 0 0 2075 6 24 1 5
Pulai 0 200 174 114 0 0 314 5 19 1 4
Total 1542 1477 1516 1100 140 609 5624 22 88 5 21
Percentage 27.4% 26.3% 27.0% 19.6% 2.5% 10.8% 100.0%
-
~ 14 ~
2.8 Demolition of Non-residential Houses
The construction of North Binhe Road and South Binhe Road in the
Project involves the demolition of non-residential houses,
affecting 21 entities with 162 persons. 77,589.058 m2 (116.383 mu)
of land will be occupied and premises with a building area of
21,580.45 m2 will be demolished, including 19 entities with 157
persons for North Binhe Road and 2 entities with 5 persons for
South Binhe Road. See Table 2-6.
-
~ 15 ~
Table 2-6 Impacts on Affected Entities
No. Component Pile No. Business (or proprietor)
Impacts
Expected resettlement mode Affected land
area (m2)
Demolished
building area
(m2)
Affected
population Present use
1 North Binhe Road K7+640~
K9+267.406
Fu Lin 1885.4 0.00 0 Unused One-time cash compensation
2 North Binhe Road Lei Zhiyong 1983.428 0.00 0 Unused One-time
cash compensation
3 North Binhe Road K9+267.406~
K10+220
Wufu Country Villa 6676.76 1204.10 8 Large remaining plot
One-time cash compensation
4 North Binhe Road Tongyuan Resort 6291.282 92.80 5 Large
remaining plot One-time cash compensation
5 North Binhe Road Hongrizi Resort 1562.84 248.70 5 Large
remaining plot One-time cash compensation
6 North Binhe Road K10+220~
K11+466.653
Xu Xingfeng 644.8 0.00 0 Unused One-time cash compensation
7 North Binhe Road Liu Changde 1902.357 0.00 0 Unused One-time
cash compensation
8 North Binhe Road Fang Tingming 6697.544 0.00 0 Unused One-time
cash compensation
9 North Binhe Road
K6+881.843~
K7+640
Suzhou Highway
Administration Division 1720.8 2039.60 50 Including a
courtyard
One-time cash compensation,
land replacement
10 North Binhe Road Cheng Jun 3426.06 3297.25 10 Warehouse Cash
compensation, nearby
resettlement
11 North Binhe Road Cheng Jun 1751.1 2273.87 5 Warehouse Cash
compensation, nearby
resettlement
12 North Binhe Road Cheng Lu 1041.53 1351.46 5 Electroplating
plant Cash compensation, nearby
resettlement
13 North Binhe Road
Jiuquan Technical
Secondary School of
Industry and Commerce①
30185.66 5943.39 42 School To be planned by the Jiuquan
Municipal Education Bureau
14 North Binhe Road
K5+706.693~
K6+881.843
Ma Xiaowei 4550.38 1926.77 8 Building company One-time cash
compensation,
property swap
15 North Binhe Road Wang Xinyou 1533.777 1142.37 3 Warehouse
One-time cash compensation
16 North Binhe Road Zhang Liang 3192.008 1152.89 0 Out of
production One-time cash compensation
17 North Binhe Road Li Zhenwen 35 31.48 5 Straw mat workshop
One-time cash compensation
18 North Binhe Road Li XX 78 103.16 5 Lime mill One-time cash
compensation
19 North Binhe Road Tian Feng 879.012 192.00 6 Office building
of One-time cash compensation,
①
Jiuquan Technical Secondary School of Industry and Commerce will
be relocated and combined into to Jiuquan Vocational College. The
related resettlement cost is not calculated into the project cost.
The resettlement activities and merger issue will be in charged by
the Jiuquan Municipal Education Bureau. For more details, please
refer appendix 7.
-
~ 16 ~
No. Component Pile No. Business (or proprietor)
Impacts
Expected resettlement mode Affected land
area (m2)
Demolished
building area
(m2)
Affected
population Present use
building company property swap
20 South Binhe Road K5+000~K5+548.576
Xintong Repair Shop 964.96 382.59 3 One-time cash
compensation
21 South Binhe Road Qilian Asphalt Felt Factory 586.36 198.03 2
One-time cash compensation
Total 77589.058 21580.45 162
-
~ 17 ~
2.9 Affected Infrastructure and Ground Attachments
The Panxuan Road extension will affect 14 types of attachments,
including house attachments, wells, canals and towers, and
commercial forests, as shown in Table 2-7.
Table 2-7 Affected Ground Attachments
Item Unit Xifengs
i
Guanbeigo
u Pulai Total
House attachments
Masonry toilet / 8 6 2 16
Earth toilet / 2 2 4
Masonry earth toilet / 2 2
Gate towers
Ceramic tile gate tower w/ awning / 8 6 2 16
Special ceramic tile gate tower w/
awning / 2
Ceramic tile gate tower / 2 2 4
Masonry gate tower / 10 10
Iron gate w/ awning / 2 2
Earth gate tower / 5 5
Enclosing walls
Masonry enclosing wall M 72 220 20 312
Masonry earth enclosing wall M 20 14 34
Earth enclosing wall M 15 15
Bush enclosing wall M 105 105
Seedling enclosing wall M 217 217
Kilns Masonry kiln / 5 4 2 11
Earth kiln / 2 2
Sunning grounds Cement sunning ground M2 600 562 100 1262
Masonry sunning ground M2 285 212 497
Hydrotechnic
facilities
Masonry lateral canal M 300 300
U-shaped canal M 300 200 180 680
Asphalt road M2 120 120
Water supply pipe M 1013 140 140 1293
Diversion sluice / 4 2 6
Other Closed circuit TV Househol
d 10 10
Commercial forests
Young tree
-
~ 18 ~
Item Unit Xifengs
i
Guanbeigo
u Pulai Total
Non-fruit-bearing / 1
Early fruit-bearing stage / 25
Mid fruit-bearing stage / 10
Full fruit-bearing stage / 20
Landscaping trees
10cm or less / 17 33 191
11-20cm / 5 145
21-25cm / 15 35
26cm or more / 10
Pine, cypress,
spruce
40cm or less / 690 690
41-60cm / 2600 2600
61-80cm / 1156 1156
81-90cm / 617 617
91-130cm / 1003 50 1053
131-150cm / 320 33 353
151-180cm / 1054 1054
181-200cm / 891 891
2m-4m / 195 7353 7548
Pine / cypress nursery mu 16 16
Greenhouses
Plastic (high) M2 2944.84 2944.8
4
First generation M2 1500.55 129.
7
1630.2
5
Second generation M2 3400 677 4077
Greenhouse room M2 17 17
Steel frame M2 8700 3200 11900
Young crops
Leek mu 0 11.6
7 17.67
Strawberry mu 0 0.4 5.4
Alfalfa mu 2 2
2.10 Affected Population
2.10.1 Summary
The Project affects 129 rural households and 21 entities with
670 persons in total, in which 110 households with 432 persons are
affected by the acquisition of collective land only, 17 households
with 67 persons by HD only, and 2 households with 9 persons by both
LA and HD, and 21 entities with 162 persons will be affected.
See
Table 2-8.
-
~ 19 ~
Table 2-8 Summary of Affected Population
Item
Road component WWTP
Total North Binhe Road
South Binhe Road
Panxuan Road
Extension Subtotal WWTP
Sewer network
Subtotal
Affected population – households
——by LA only HH 0 0 96 96 14 0 14 110
/ 0 0 376 376 56 0 56 432
——by HD only HH 0 0 17 17 0 0 17
/ 0 0 67 67 0 0 67
——by both LA and HD
HH 0 0 2 2 0 0 2
/ 0 0 9 9 0 0 9
Subtotal HH 0 0 115 115 14 0 14 129
/ 0 0 452 452 56 0 56 508
Affected population – enterprises and public institutions
Relocation of enterprises and public institutions HH 19 2 0 21 0
0 0 21
/ 157 5 0 162 0 0 0 162
Subtotal of affected population / 157 5 452 614 56 0 56 670
-
~ 20 ~
2.10.2 Affected Vulnerable Groups
For the purpose of the Project, vulnerable groups include the
disabled, five-guarantee households①, female-headed households,
low-income people② and ethnic minorities.
The affected population includes 30 vulnerable households,
including 4 households with disability, 9 five-guarantee
households, 5 women-headed households, 10 households covered by
minimum living security and two ethnic minority households. See
Table 2-9.
Table 2-9 Summary of Affected Vulnerable Groups
Village Group Disability Five-
guarantee households
Women- headed
households
Rural minimum living security
households
Ethnic minorities
Total
Guanbeigou
Group 2 1 2 1 2 0 6
Group 3 0 1 1 2 0 4
Group 4 1 1 0 1 1 4
Group 5 0 1 1 1 0 3
Pulai Group 1 1 1 0 1 0 3
Group 4 0 1 1 2 1 5
Shuimogou Group 7 1 2 1 1 0 5
Total 4 9 5 10 2 30
The details of affected women- headed households have been shown
in table 2-10.
Table 2-10 Affected women- headed households
Sn. Population of HHs
Age of HH head
Education degree
Occupation Annual net income of HHs in 2013 (yuan)
1 2 45 senior high school
self-employed business
30000
2 1 78 primary school
Unemployed 5000
3 2 43 junior high school
casual laborer
25000
4 2 50 junior high school
casual laborer
18000
5 1 80 senior high school
Unemployed 5000
2.10.3 Affected Women
In the population affected by the Project, there are 324 women,
accounting for
① For elderly, weak, widowed and disabled members who are unable
to work and have no means of
living, or whose households lack labor, a rural production
cooperative would provide production and living
assistance, including daily supplies, education for the young
and burial for the elderly. The support
subsidy for five-guarantee households in the project area is not
less than 2,600 yuan/year,
Implementation Plan On Improving Urban And Rural Low Security
Line And The Subsidy Standard for
Rural Five Guarantees, issued by Gansu Provincial Department of
Civil Affairs in April 15, 2013 ② The latest minimum living
security line for rural areas of Gansu province in 2013 is 101
yuan/month
and the latest minimum living security line for urban residents
in 2013 is 259 yuan/month, Implementation
Plan On Improving Urban And Rural Low Security Line And The
Subsidy Standard for Rural Five
Guarantees, issued by Gansu Provincial Department of Civil
Affairs in April 15, 2013
-
~ 21 ~
48.3%. According to the survey, the affected women enjoy the
same rights as men, including land contracting, education
receiving, family planning and election. Most of the female labor
respondents think that they have the same autonomy in production
and management as men, and may elect to get employed or do small
business independently. Women do more housework, child care,
household sideline operations (e.g., household stockbreeding) and
handicraft jobs. The average working hours of women are 1.2 times
those of men. Women are more advantaged in social services, apparel
processing and like industries, but disadvantaged in the building
and transport industries.
Boys and girls have equal opportunities in education, and
parents are always willing to support their children’s
education.
According to the survey, women have the same concerns as those
of men: (a) Compensation rates should comply strictly with the
state laws and policies; (b) Compensation fees should be disbursed
directly to the AHs; and (c) Housing sites should be allocated in
advance.
Women have the following needs that are different from those of
men: (a) Women expect both cash compensation and land reallocation;
(b) Women want skills training in crop cultivation, stockbreeding
and handicrafts; and (c) Women also expect to participate in
village-level management.
See Appendix 3 for the gender analysis.
-
~ 22 ~
3 Socioeconomic Profile
3.1 Socioeconomic Profile of the Project Area
3.1.1 Gansu Province
Gansu Province is located in the upper Yellow River, between NL
32°31′-42°57′ and EL 92°13′-108°46′, bordering Shaanxi on the east,
Sichuan on the south, Qinghai and Xinjiang on the west, and Inner
Mongolia, Ningxia and the People’s Republic of Mongolia on the
north. Gansu is characterized by a diverse physiognomy composed of
hilly land, plateaus, plains, valleys, deserts and Gobi, and a
narrow topography, with a land area of 453,700 km2, accounting for
4.72% of China’s territory area. Gansu governs 12 prefecture-level
cities and two autonomous prefectures, and the provincial capital
is Lanzhou.
By the end of 2012, Gansu’s residential population was 25.7755
million, including 13.1687 million men, accounting for 51.09%, and
12.6068 million women, accounting for 48.91%. Urban population was
9.9880 million, accounting for 38.75%, rural population 15.7875
million, accounting for 61.25%. In 2013, Gansu’s gross grain output
11.39 million tons, GDP 630 billion yuan, per capita disposable
income of urban residents 19,044 yuan and per capita net income of
rural residents 5,093 yuan.
3.1.2 Jiuquan City
Jiuquan City borders Zhangye City, Gansu Province and Inner
Mongolia on the east, Qinghai on the south, Xinjiang on the west,
and the People’s Republic of Mongolia on the north, with a land
area of 192,000 km2, accounting for 42% of Gansu’s land area.
Jiuquan’s population is 1.1044 million (2012), in which urban
population is 0.5759 million, accounting for 52.15% of the total.
Jiuquan’s cultivated area is 167.3 thousand ha(2012), and the
protection rate of basic farmland is 160 thousand ha(2012). Jiuquan
governs Suzhou District, Jinta County, Guazhou County, Subei
Mongolian Autonomous County and Aksai Kazakh Autonomous County, and
there are 24 ethnic minorities in Jiuquan.
In 2012, the city’s crop sown area was 2.5358 million mu,
industrial added value 6.98 billion yuan, the city's GDP per capita
of 52,116yuan, per capita disposable income of urban residents
20,062 yuan and per capita net income of rural residents 9,645
yuan. The city's fiscal revenue reached 7.22 billion yuan.
3.1.3 Suzhou District
Suzhou District is the seat of the Jiuquan Municipal Government,
and the political, economic, cultural, technological, educational
and financial center of the city. The district governs 15
townships, which are Xidong, Qingshui, Zongzhai, Jinfosi, Shangba,
Sandun and Yinda Towns, and Xifeng, Quanhu, Guoyuan, Dongdong,
Fengle, Xiaqinghe, Huangnibao and Huajian Xiangs, and 124
administrative villages. There are 15 ethnic groups in the
district, including Han, Hui, Yugur, Tibetan and Mongolian. In
2012, the district’s resident population was 407,088, including a
nonagricultural population of 176,955.
In 2012, the district’s GDP was 18.45202 billion yuan, among
which, the primary Industry was 2.28 billion yuan, secondary
Industry was 10.19 billion yuan., gross grain output 167,797 tons,
gross agricultural output value 2.36826 billion yuan, per capita
disposable income of urban residents 20062.05 yuan and per capita
net income of rural residents 9,334 yuan. See Table 3-1.
Table 3-1 Socioeconomic Profile of Gansu Province, Jiuquan City
and Suzhou District (2012)
-
~ 23 ~
Indicator Gansu
Province Jiuquan
City Suzhou District
Population
Total population (0,000) 2577.55 110.44 43.39
Men (0,000) 1316.87 57.02 21.92
Women (0,000) 1260.68 53.42 21.47
Nonagricultural population (0,000) 998.8 35.79 17.7
Agriculture Cultivated area (ha) 3503007 160,400 40253
Grain output (10,000 tons) 1109.7 32.5723 16.7797
Output value
GDP (00 million yuan) 5650.2 573.6605 184.5202
Primary industries
Output value (00 million yuan)
780.5 68.8617 22.8272
Percent (%) 13.81% 12.00% 12.37%
Secondary industries
Output value (00 million yuan)
2600.09 307.3569 101.9624
Percent (%) 46.02% 53.58% 55.26%
Tertiary industries
Output value (00 million yuan)
2269.61 197.4419 59.7306
Percent (%) 40.17% 34.42% 32.37%
Per capita GDP (yuan) 21978 52,028 42526
Income
Per capita disposable income of urban residents (yuan)
17157 20062.05 15104
Per capita net income of farmers (yuan) 4507 9645 9334
Source: year book 2012 of Gansu Province, Jiuquan City and
Suzhou District, data from the sixth national census in 2012
3.1.4 Socioeconomic Profile of the Affected Townships15
1) Xifeng Township
Xifeng Township is located in the southwest suburb of Suzhou
District, is run through by National Highway 312, and governs 9
administrative villages. According to the survey, this Township has
2,800 households with 10,777 persons in total, and a cultivated
area of 15,090 mu. Since 2000, 6,684 mu of land has been acquired
for the new town development project and the Yumen Oilfield living
base, involving 1,463 households with 5,160 persons in 21 groups of
5 villages. There are 11 primary schools with 2,317 students, 14
enterprises with a workforce of 4,520, and 2,414 vegetable
greenhouses in this Township. Annual greenhouse income is about
20,000 yuan/mu. Many residents work outside, where men deal mainly
with building and decoration, and women deal mainly with catering
services. In 2011, per capita net income of farmers was 7,499
yuan.
2) Quanhu Township
Quanhu Township is located in the east suburb of Suzhou
District, governs 10
15
The below social economic survey was conducted in 2012 and will
be updated in the resettlement external monitoring baseline
report.
-
~ 24 ~
administrative villages, and has 5,277 households with 19,601
persons. In 2010, cultivated area was 34,603 mu, 1.7 mu per capita.
Greenhouse vegetable cultivation is developed in this Township,
with annual average income of 12,000 yuan/mu. Many residents work
outside, mostly young adults. Different from other townships, men
deal mainly with business (e.g., selling building materials) and
skilled jobs (e.g., electric welding), and women deal mainly with
catering services. See Table 3-2.
Table 3-2 Socioeconomic Profile of the Affected Townships
No. Township Households Population Labor force
Cultivated area (mu)
Per capita cultivated area (mu)
Annual per capita net income of farmers (yuan)
1 Xifeng 2800 10777 6003 15090 2.5 7499
2 Quanhu 5277 19601 10780 34603 1.7 7336
Source: township statistical stations
3.1.5 Socioeconomic Profile of the Affected Villages
Xifengsi Village—This village has 227 households with 822
persons, including 378 men, accounting for 46%, and 518 persons
working outside, accounting for 63%. 32 households are covered by
minimum living security. This village has 673.4 mu of cultivated
land, used mainly to grow cash crops and greenhouse vegetables.
Guanbeigou Village—This village has 412 households with 1,662
persons, including 897 men, accounting for 54%, and 798 persons
working outside, accounting for 48%. 93 households with 148 persons
are covered by minimum living security, and 7 households with 6
persons by five guarantees. This village has 2,328 mu of cultivated
land, in which 814.8 mu is used to grow cash crops and the other
used to grow seedlings. This village has 246 solarium greenhouses
with a total area of 319.8 mu and 416 plastic greenhouses with a
total area of 332.8 mu, with annual income of 30,000 yuan and
12,000 yuan each respectively.
Pulai Village—This village has 446 households with 1,742
persons, including 890 men, accounting for 51%, and 500 persons
working outside, accounting for 28.7%. 204 persons are covered by
minimum living security and 13 persons by five guarantees. This
village has 2,817 mu of cultivated land, used mainly to grow
potato, green onion and garlic, with annual cultivation income of
2,500 yuan/mu. This village has 320 greenhouses, used mainly to
grow tomato, cucumber and celery, with annual income of about
10,000 yuan each.