LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing 2 Neutral earthing: 3 RCCB 4 Insulation 5 Cable Layout ASP 6 Protection from water 7 Lightning Arrester 8 ANTONY 9 Installation Cover & Seals 10 Electrical fire hazards SI NO. ramesh naidu's welding machine found with out earthing at cooler house Earthing should be provided. electrician of the cooler house at the weigh bridge cables are routed on surface of theground. cables are routed above the ground level. Plug Tops & Cable Joints at the raw mill silo welding machine cable having multiple joints cable is replaced by new one
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
PointsObservation Recommendation Action By
1 Earthing
2 Neutral earthing:3 RCCB4 Insulation
5 Cable Layout ASP
6 Protection from water 7 Lightning Arrester
8 ANTONY
9 Installation Cover & Seals10 Electrical fire hazards
SI NO.
ramesh naidu's welding machine found with out earthing at cooler house
Earthing should be provided.
electrician of the cooler house
at the weigh bridge cables are routed on surface of theground.
cables are routed above the ground level.
Plug Tops & Cable Joints
at the raw mill silo welding machine cable having multiple joints
cable is replaced by new one
11 Safety gaurds. TVL/MNK
12
Date:02/09/2010
grinding machine found with out safety guard.at fabrication yard
safety guard should be provided.
Others (Specify)
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
Signed BYHSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
PointsObservation Recommendation Action By
1 Earthing earthing is provided SRINIVAS
2 Neutral earthing:3 RCCB4 Insulation
5 Cable Layout SUDHAKAR
6 Protection from water 7 Lightning Arrester
8 PRATAP
9
Installation Cover & Seals
PRATAP
10 Electrical fire hazards11 Safety gaurds.12
SI NO.
cutting machines using with out earthing at pre heater
at the steel yard rods are placing on the cable
cables are covered by ledgar pipe.
Plug Tops & Cable Joints
switch board having no water protection
proper covering is provided
water pump having no proper protection
proper covering is provided
Others (Specify)
Date:09/09/2010
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
Signed BYHSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
PointsObservation Recommendation Action By
1 Earthing TVL/MNK
2 Neutral earthing:
3
RCCB
TVL/MNK
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water 7 Lightning Arrester
8 ASP
SI NO.
P&M welding machine found with out earthing
Earthing should be provided.
halogen lamps are having loose connections
cables are properly arranged
In kiln pier-3 cables are routed through ground.
cables are routed above the ground level.
Plug Tops & Cable Joints
at the weigh bridge cable is having multiple joints
cable is replaced by new one
9
Installation Cover & Seals
TVL/MNK
10 Electrical fire hazards11 Safety gaurds.12
Date:16/09/2010
welding machine is not having proper connection
proper connection is provided
Others (Specify)
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
w.i.e
Signed BYHSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
PointsObservation Recommendation Action By
1 Earthing SRINIVAS
2 Neutral earthing:
3
RCCB
proper action is taken PRATAP
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water 7 Lightning Arrester
8 replaced by new one PRATAP
9 Installation Cover & Seals
SI NO.
pabala welding machine found with out earthing at pre heater
Earthing should be provided.
halogen lamps are having loose connections at cooler house
In pre heater cables are found routed above the ground level.
cables are covered with ledgar pipes
Plug Tops & Cable Joints
at the cooler house cable is having multiple joints
10 Electrical fire hazards11 Safety gaurds.12
Date:23/09/2010
Others (Specify)
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
Signed BYHSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
PointsObservation Recommendation Action By
1 Earthing TVL/MNK
2 Neutral earthing:
3
RCCB
connection is provided CHANDRA SEKHAR
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water 7 Lightning Arrester
8 Plug top to be provided. TEJA
SI NO.
welding machine found with out earthing at the batching plant
Earthing should be provided.
halogen lamps are not having proper connections at the quality center
cables are routed on ground at pre heater at blending silo
cables are routed above the ground level.
Plug Tops & Cable Joints
S/c. pabla drilling machine found with out plug top.
9 Installation Cover & Seals10 Electrical fire hazards
11 Safety gaurds. SUDHAKAR
12
Date:10/11/08
cutting machine found with out safety guard steel yard
safety guard should be provided.
Others (Specify)
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
w.i.e
Signed BYHSEO
LARSEN & TOUBRO LIMITED: ECC DIVISIONBULDINGS AND FACTORIES OPERATING COMPANY
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO
SI NO.Points
Observation Action By
1 Earthing SHIVA
2 Neutral earthing:
3
RCCB
CHANDRA SEKHAR
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water 7 Lightning Arrester
8 TEJA
9 Installation Cover & Seals10 Electrical fire hazards
Recommendation
earthing cable is not properly attached to the welding machine at pre heater
Earthing cable is properly attached
halogen lamps are not having proper connections at the quality center
connection is provided
cables are routed on ground at pre heater at blending silo
cables are routed above the ground level.
Plug Tops & Cable Joints
S/c. pabla drilling machine found with out plug top.
Plug top to be provided.
11 Safety gaurds. SUDHAKAR
12
Date:10/11/08
cutting machine found with out safety guard steel yard
safety guard should be provided.
Others (Specify)
LARSEN & TOUBRO LIMITED: ECC DIVISIONBULDINGS AND FACTORIES OPERATING COMPANY
Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO