Financial Project IdentificationNumber: 437744-1-52-01 The Florida Department of Transportation will begin work on a 8.8-mile resurfacing project along State Road 57 (U.S.19) from U.S. 27 to north of Martin Road. Improvments inclued updated guardrails, improved striping, instillation of high- mast lighting from Nash Road to south of I-10, and the addition of a turn lane and median opening between Phelps Horn Road and the County Road 57A bridge over the railroad tracks. Once complete, this project will extend the life of the roadway, enhance highway safety, provide a smoother riding surface and improve drivability. Contact Information Tony Walters Project Manager Midway Operations (850) 245-7939 [email protected] Ian Satter Public Information Director FDOT District 3 (888) 638-0250, ext. 1205 [email protected] facebook.com/myFDOTNWFL www.nwflroads.com @myFDOT_NWFL Project Limits Monticello