4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ETHZ@CERN ILD-Webex meeting 17 February 2009
Jan 05, 2016
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Concept of Platformand Environment
A. Hervé / ETHZ@CERN
ILD-Webex meeting 17 February 2009
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
ILD Detectors
Design N.S. ETH-Z, January 2009.
Conceptual view of Push-Pull
IP
Garage
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
False floor modules to compensate platform height
Towers for near-by services
Services
On IP
Two Experiments, two positions
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
ILD 1
Beam Pipe position
ILD
Service position
ServicesServices
False floor modules can be rearranged to modulateworking space disposition in garage position
Two Experiments, two positions
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Tentative horizontal separations
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Increased lateral space to work on muon systemby shifting one false floor module
muon
Valve box
Dewar and local services
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Design N.S. ETH-Z, January 2009.
Possible Cavern radius(~14m)
Crane
18m
An effort has been made to reducethe radius of the Underground Hall
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
We have played on three parametersto try to reduce hall diameter
1
2
3Height of supports
Crane clearance
Pillar for Q0
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Q0 Pillar shiftedconnection byflexible lines
4m
Simple opening in garage position usinglast Matthieu’s drawing
Design N.S. ETH-Z, January 2009.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Q0 recessed in endcaps
4m
Design N.S. ETH-Z, January 2009.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
2 m
Design N.S. ETH-Z, January 2009.
Q0 recessed and Central Barrel shifted
6m
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
2 m
Design N.S. ETH-Z, January 2009.
6m
Small alcove allowing to decouple Q0 from endcap
Top view
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Advantages of platform for push-pull operation
• The use of a platform is well adapted to ILD sectioning and construction.
• With the use of airpads and indexing system, this should allow a millimetric repositioning.
• The presence of the platform can be taken advantage of to isolate the experiment from seismic events and from surrounding vibrations.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
The CMS plug is good example of a platform
rails
22 m2m thick 2000 tons
PLUG
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009
Example of anti-sismic supportsthat could be installed below the platform