41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz PAUL SCHERRER INSTITUT SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher
7

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

Dec 13, 2015

Download

Documents

Jemimah Adams
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

SLS Vacuum System

Lothar SchulzTheo Bieri

Nazareno GaiffiMartin Steinacher

Page 2: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

Main Parameter

Page 3: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

• Stainless steel vacuum chambers with full ante chamber design.

• Photon flux is concentrated on lumped OFHC absorbers.

• Pumps are installed close to the photon absorbers.

• Flat seal flanges are used. (chamber toleranzes ±0.05 mm longitudinal, ±0.1 mrad angular)

Photon absorber

Chamber Design

Photon absorber

Page 4: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

SLS Cell

• Due to the small chamber tolerances the total number of bellows could be minimized.

• No bellows in the magnet cells. Only in the straights two bellows are installed.

• Chamber movements are detected with two dial gauges per BPM station.

Chamber Design

Page 5: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

• Vacuum sections assembled outside the storage ring in a clean room and baked at 250 °C in a oven.

• During the bake-out, the vacuum sections hang on chains in the oven so that the thermal expansion can take place freely.

• Sputter ion pumps started during cool down at 150 °C.

• Vacuum chambers installed under vacuum into the storage ring.

• Straight sections are baked in-situ with a mobile oven.

Vacuum Sector Assembly and Bake-out

Page 6: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

Fixed gap 11 mm, BESSY typeAluminumLength 4 m

UE 56Permane

nt Magnet

Fixed gap 18 mmStainless SteelLength 11 m

UE 212Electro Magnet

Fixed gap 5 mm APS typeAluminumLength 2 m

WigglerPermanent

Magnet

Variable gap, Stainless SteelLength 2 m3 In-Vacuum IDs (U19) are installed

U19In-Vacuum Undulator

Insertion Device Chambers

Page 7: 41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

41st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz

PAUL SCHERRER INSTITUT

Dynamic Pressure vs Accumulated Beam Dose