Page 1: 4-Post Open Frame Rack

Copyright © 2016 CyberPower Systems, Inc. All rights reserved.

USER’S MANUAL

4-Post Open Frame Rack4-Post Open Frame Rack

SAVE THESE INSTRUCTIONSPlease read this manual and follow the instructions for installation and use.

K01-0000547-00

Page 2: 4-Post Open Frame Rack

i

Table of Contents

Parts List 1

Rack Assembly 2

Accessory Installation 4

Leveling Feet 4

Cable Management Rings 4

Grounding Cable 5

Page 3: 4-Post Open Frame Rack

Parts List

1

4

4

5

6

64

4

5

4

4

5

4

4

5

1

1

2

2

3

3

No.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Qty

2

2

2

8

4

2

48

48

1

1

50

50

50

Qty Varies

Qty Varies

2

4

4

4

Part

Rack Components

Left Vertical Rail

Right Vertical Rail

Base Bracket

Corner Section

Center Section

Top Bracket

Rack Assembly Hardware

M8 Bolt

M8 Washer

Rack Assembly Tool

M8 (13mm) Wrench

Phillips Screwdriver

Equipment Mounting Hardware

M6 Cage Nut

PVC Cup Washer

M6 Phillips-Head Screw

Other Hardware and Accessories

Cable Management Rings

Ring Mounting Screw

Grounding Wires

M6 Phillips-Head Screw

Toothed Lock Washer

Leveling Feet

7 8 9 10

11 12 13 14

15 16 17 18

19

Parts List 1

Rack Assembly 2

Accessory Installation 4

Leveling Feet 4

Cable Management Rings 4

Grounding Cable 5

Page 4: 4-Post Open Frame Rack

Rack AssemblyPlease check packaging contents before starting to assemble.1. Assemble the top and bottom beams (4-total) as shown below. Refer to the

table below to identify the desired mounting depth (22” to 40” available) and assemble corner and center sections at the corresponding index numbers on each side. For example, for a 33 inch depth, bolt one corner section to index #5 and the other corner section to index #6 onto the center section.

123456789 0 876543210 94

5

7

8Index Numbers

4

Mounting Depth

22 in.

23 in.

24 in.

25 in.

26 in.

27 in.

28 in.

29 in.

30 in.

31 in.

32 in.

33 in.

34 in.

35 in.

36 in.

37 in.

38 in.

39 in.

40 in.

Index Numbers

0 and 0

1 and 0

1 and 1

1 and 2

2 and 2

2 and 3

3 and 3

3 and 4

4 and 4

4 and 5

5 and 5

5 and 6

6 and 6

6 and 7

7 and 7

7 and 8

8 and 8

8 and 9

9 and 9

2

Page 5: 4-Post Open Frame Rack

2. Using two of the beams assembled in step 1, line up one left and one right vertical rails, followed by a base and top bracket and bolt together using M8 bolts with washers as shown below.NOTE: To facilitate final assembly, it is recommended to hand-tighten the bolts first.

After all parts have been bolted together then tighten them firmly.

3. Using the remaining two beams assembled in step 1, line up the other set of left and right vertical rails and fasten them to the base and top brackets as shown below.

7 8

1

2

Assembled beam

Assembled beam

7 8

1

6

6

2

3

3

Assembled beam

Assembled beam

3

Page 6: 4-Post Open Frame Rack

Accessory Installation (Optional)

Cable Management RingsScrew the included cable management rings onto the assembled rack as shown below.

14

15

19

Leveling FeetBolt the included leveling feet (4pcs) to the bottom of the base bracket as shown below.NOTE: Optional caster kit shown is available. Please contact your sales representative for

ordering information.

4

Page 7: 4-Post Open Frame Rack

16

17

18

Grounding CableTo tie the assembled rack to the facility’s ground, use the grounding wire with the included M6 screw and toothed lock washer. Screw the grounding wire to the pre-installed rivet nut on the inside of the base bracket as shown below.

5

Page 8: 4-Post Open Frame Rack

CyberPower Systems, Inc.www.cyberpower.com

For USA and Canada:4241 12th Ave East, Suite 400Shakopee, MN 55379Toll-free: (877) 297-6937

For all other regions:Please visit our website for local contact information.

Copyright © 2016 CyberPower Systems, Inc. All rights reserved. K01-0000547-00