PEKERJAAN LANJUTAN PEMBANGUNAN KOLAM RENANG KABUPATEN ACEH TENGAH GAMBAR RENCANA L O K A S I JALAN TAKENGON - ISAQ PENGASING - ACEH TENGAH PEMERINTAH ACEH DINAS PEMUDA DAN OLAHRAGA ALAMAT JLN. GURAMI NO. 18 LAMPRIT BANDA ACEH T A H U N 2014
PE
KE
RJA
AN
LANJUTAN PEMBANGUNAN KOLAM RENANGKABUPATEN ACEH TENGAH
GAMBAR RENCANA
L O K
A S
I
JALAN TAKENGON - ISAQPENGASING - ACEH TENGAH
PEMERINTAH ACEHDINAS PEMUDA DAN OLAHRAGA
ALAMAT JLN. GURAMI NO. 18 LAMPRIT BANDA ACEH
T A
H U
N
2014
ZONNING PLANT
01
109
87
65
43
21
109
87
65
43
21
109
87
65
43
21
109
87
65
43
21
CarparkSwimming Pool
CarparkSwimming Pool
UTARA
Side Entrance
Main Entrance
Ticketing
Parkir Roda Dua
Existing PlantingGreen Background
Existing PlantingGreen Background
Parkir Roda Dua
Start AreaPRIA
Start AreaW
ANITA
Existing PlantingGreen Background
Existing PlantingGreen Background
SKALA 1 : 400ZONNING PLANT
DENAH KOLAM RENANG
POTONGAN KOLAM RENANG
02
StartingBlocks
LaneMarkers
StartingBlocks
BackStroke Turn IndicatorFalse Start Rope
BackStroke Turn Indicator
101 2 3 4 5 6 7 8 9
101 2 3 4 5 6 7 8 9
Line Guides
Greading
SKALA 1 : 200DENAH KOLAM RENANG
SKALA 1 : 200POTONGAN KOLAM RENANG
Starting BlocksPermukaan Air
Air Kolam
Greading
Beton yang menggelembung di Bongkar untuk diperbaiki ( Dirapikan )
Beton di Bongkar dan Diratakan ( Dirapikan )
Saluran Pelimpah ( Beton Bertulang )yang belum siap di Lanjutkan Kembali
Saluran Pelimpah ( Beton Bertulang )yang belum siap di Lanjutkan Kembali
Saluran Pelimpah ( Beton Bertulang )yang belum siap di Lanjutkan Kembali
POTONGAN A
POTONGAN B
03
SKALA 1 : 25PENAMPANG A
SKALA 1 : 25PENAMPANG B
Besi Horizontal 12 - 20 cm
Besi Vertikal 12 - 20 cm
GreadingPermukaan Air
Starting Blocks
Effluent 10 x 50 cm
RENCANA INSTALASI PIPA MAIN DRAINS
DETAIL INSTALASI PIPA MAN DRAINS
04
SKALA 1 : 200RENC INSTALASI PIPA MAIN DRAINS
Main Drain 9"
Pipa Galvanis 2"Pipa Galvanis 2"
Pipa Galvanis 4"
Tee 4"-2"
Permukaan Lantai Kolam
Main Drain 9"
Pipa Galvanis 2"Pipa Galvanis 2"
Pipa Galvanis 4"
Permukaan Lantai Kolam
Pipa Galvanis 4"
SKALA 1 : 50DETAIL INSTALASI PIPA MAIN DRAINS
SKALA 1 : 50DETAIL INSTALASI PIPA MAIN DRAINS
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Main Drain 9"
Ke Water Treatment
RENCANA INSTALASI PIPA INLETDETAIL INSTALASI INLET
DETAIL SAMBUNGAN PIPA INLET
05
SKALA 1 : 200RENC INSTALASI PIPA INLET
Pool Wall Fitting 3" ( INLET )
Pool Wall Fitting 3" ( INLET )
Pool Wall Fitting 3" ( INLET )
Pool Wall Fitting 3" ( INLET )
Pool Wall Fitting 3" ( INLET )
Pipa PVC 3"
Elbow PVC 3"
Socket 4" - 3"
Tee 4"Pipa PVC 4"
Pipa PVC 4"
Socket 4" - 3"
Pool Wall Fitting 3" ( INLET )
Dinding Kolam
SKALA 1 : 50DETAIL SAMBUNGAN PIPA INLET
GreadingPermukaan Air
Starting Blocks
Effluent 10 x 50 cm
Pool Wall Fitting 3" ( INLET )
Pipa PVC 4"
SKALA 1 : 200DETAIL INSTALASI INLET
DENAH PARET PELIMPAH
DETAIL INSTALASI EFFLUENT
06
101 2 3 4 5 6 7 8 9
101 2 3 4 5 6 7 8 9
SKALA 1 : 200DENAH SALURAN PELIMPAH
11
Penutup Saluran Besi Plat ( Greading )Effluent 10 x 50 cm
Starting BlocksStarting Blocks
GreadingPermukaan Air
Starting Blocks
Effluent 10 x 50 cm
Pool Wall Fitting 3" ( INLET )
Pipa PVC 4"
SKALA 1 : 200DETAIL INSTALASI EFFLUENT
RENCANA PASANGAN KERAMIK 40 X 40
POTONGAN
07
101 2 3 4 5 6 7 8 9
101 2 3 4 5 6 7 8 9
SKALA 1 : 200RENCANA PAS KERAMIK 40 X 40 ( WARNA BIRU )
SKALA 1 : 200POTONGAN
Dinding Keramik 40 x 40 ( W
arna Biru )
LANTAI 40 X 40 ( WARNA BIRU )
1.pdf2.pdf3.pdf4.pdf5.pdf6.pdf7.pdf8.pdf