Whiteboard to be installed prior to this installation?
Whiteboard to be installed as part of this task? (Note: additional fees apply)
Existing chalkboard removed for additional fee
Please provide a brief description below of the way you intend to use the product such as presentations with on screen annotation, training and conference presentations, video conferences with presentations and on screen annotation, etc. Please include description of other devices in the room and any multi-screen applications used.
Please draw your room layout below including distances between equipment (photos may be sent via email or additional pages may be attached when required)
Basic installation service includes:Installation by authorized, licensed and insured professionals backed by 3M's best in the business satisfaction guarantee. Delivery of your new Projection equipment Delivery of additional mounting hardware required to fit with your building construction Installation to the existing construction code in your areaConnect your new Projector to existing electrical outlets using standard cables Start up and test your new Projector to insure that it is working properlyProvide guidelines for proper use of your new ProjectorClean up the installation site Remove and dispose of packaging materials Includes User Training via teleconference, available at times scheduled by 3M during the monthInformation on available enhanced service plans to provide trouble free warranty coverageLocations beyond 30 miles from city center may incur additional fees
Fixed Wall Mount installation includes:3M Wall Mount Bracket if required for your site Assembly and installation of the Projector, Fixed Wall Mount and Wall Mount Bracket. Connect customer equipment & check out unit functionality.
Folding Wall Mount installation includes:3M Wall Mount Bracket if required for your site Assembly and installation of the Projector, Folding Wall Mount, Wall Mount Bracket & other 3M components & accessories. Connect customer equipment & check out unit functionality.
Installation Available 5 Days a Week Service days and hours may vary by market. Pending completion of the site assessment; additional terms, fees and restrictions may apply. Some installations may require an on-site visit at additional cost to verify site conditions.On site training can be arranged at additional charge. Enhanced warranties are available at additional cost.
NOTE: Installation and set up of additional equipment is available but not included. Please contact our Call Center at 1-800-328-1371 for additional quotation. Components installed are protected under their individual product warranties thus failures requiring their replacement may incur an additional fee.
Some localities require seismic evaluation certification per applicable Engineering requirements. If this is required by the project engineer, program manager, site engineer, or architect then please contact us at 1-800-328-1371 for available evaluations defining the recommendations.
7 of 38
3M Projection Systems Pre-Installation Survey
Warranty3M warrants that when the 3M Product is used according to 3M’s Intended Use Statement (www.3M.com/meetings), it will perform satisfactorily for the warranted durability period as stated in the applicable 3M Product Manual in effect at the time of purchase. The warranties stated in the applicable 3M Product Manuals are exclusive and are made in place of any and all express or implied warranties or conditions, including any implied warranty of merchantability or fitness for a particular purpose, or any industry practice or custom or trade usage. Failure to follow the instructions contained in the appropriate 3M Product Manual or to use the 3M Product in accordance with 3M’s Intended Use Statement, will void all warranties and limited remedies. EXCEPT AS SPECIFICALLY STATED IN THE APPLICABLE 3M PRODUCT MANUAL, 3M SHALL NOT BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, LOSS OF PROFITS, REVENUE OR BUSINESS) RESULTING FROM, OR IN ANY WAY RELATED TO PERFORMANCE, USE OR INABILITY TO USE ANY OF THE 3M PRODUCT. This limitation applies regardless of the legal theory upon which damages are sought. If 3M Product is defective within the applicable warranty period, your exclusive remedy shall be, at 3M’s option, to replace or repair the 3M Product or to refund the purchase price of the 3M Product. All replaced parts or products become property of 3M. If the 3M Product is repaired, 3M will repair the defective part(s) with a new or used part(s). If the 3M Product is replaced, 3M will replace the product with the same or equivalent model and with a new or refurbished product. In the case of an approved warranty claim, the replacement 3M Product will carry only the remaining term of the original 3M Product’s warranty period as stated in the applicable 3M Product Manual. For warranty service, you must provide proof of the date of the original purchase, otherwise the manufacturing code date will be used to establish the start date of the warranty.3M Product Manuals include durability statements and may include limitations specific to the product(s) being used or its intended applications, which take precedence over any statement made here. Warranty terms, limitations and exclusions may differ outside the United States of America.
Desired Image Size (4:3) Clearance Required to Top of Image
Projector Model Height Width Diagonal From Ceiling [A]
From Bottom of Cover [B]
SCP712
36–39" (0.91–0.97 m) 48–52" (1.22–1.30 m) 60–65" (1.52–1.62 m) 19.00" (483 mm) 5.61" (143 mm)
39–42" (0.97–1.07 m) 52–56" (1.30–1.42 m) 65–70" (1.62–1.78 m) 19.27" (489 mm) 5.88" (150 mm)
42–45" (1.07–1.15 m) 56–60" (1.42–1.53 m) 70–75" (1.78–1.91 m) 19.55" (497 mm) 6.16" (156 mm)
45–48" (1.15–1.22 m) 60–64" (1.53–1.62 m) 75–80" (1.91–2.03 m) 19.82" (503 mm) 6.43" (163 mm)
SCP715/717
36–39" (0.91–0.97 m) 48–52" (1.22–1.30 m) 60–65" (1.52–1.62 m) 18.64" (473 mm) 5.25" (133 mm)
39–42" (0.97–1.07 m) 52–56" (1.30–1.42 m) 65–70" (1.62–1.78 m) 18.98" (482 mm) 5.59" (142 mm)
42–45" (1.07–1.15 m) 56–60" (1.42–1.53 m) 70–75" (1.78–1.91 m) 19.33" (491 mm) 5.94" (151 mm)
45–48" (1.15–1.22 m) 60–64" (1.53–1.62 m) 75–80" (1.91–2.03 m) 19.67" (500 mm) 6.28" (160 mm)
SCP716
36–39" (0.91–0.97 m) 48–52" (1.22–1.30 m) 60–65" (1.52–1.62 m) 17.64" (448 mm) 4.18" (106 mm)
39–42" (0.97–1.07 m) 52–56" (1.30–1.42 m) 65–70" (1.62–1.78 m) 17.91" (455 mm) 4.45" (113 mm)
42–45" (1.07–1.15 m) 56–60" (1.42–1.53 m) 70–75" (1.78–1.91 m) 18.19" (462 mm) 4.73" (120 mm)
45–48" (1.15–1.22 m) 60–64" (1.53–1.62 m) 75–80" (1.91–2.03 m) 18.42" (468 mm) 5.00" (127 mm)
Desired Image Size (16:10)
SCP740
29–32" (0.74–0.81 m) 47–51" (1.19–1.23 m) 55–60" (1.40–1.52 m) 22.13" (562 mm) 8.74" (222 mm)
32–34" (0.81–0.86 m) 51–55" (1.23–1.40 m) 60–65" (1.52–1.62 m) 22.82" (580 mm) 9.43" (240 mm)
34–37" (0.86–0.94 m) 55–59" (1.40–1.50 m) 65–70" (1.62–1.78 m) 23.53" (598 mm) 10.13" (257 mm)
37–40" (0.94–1.02 m) 59–64" (1.50–1.63 m) 70–75" (1.78–1.91 m) 24.21" (615 mm) 10.82" (275 mm)
Note: This document is for reference purposes only. Always refer to the installation instructions packaged with the system.
3M™ SCP Screen Size Chart
Note: A & B distance is measured from Top of Image. (Not top of screen)
Top of Screen
Top of Image
3M™ SCP Screen Size Chart
SCPV1 SCPV2
Projector Model Min. Image Size, Diagonal
Max. Image Size, Diagonal
Min. Image Size, Diagonal
Max. Image Size, Diagonal
SCP712
57.78"(1468 mm)
83.84"(2130 mm)
63.84"(1622 mm)
95.96"(2437 mm)
SCP715/717
47.26"(1200 mm)
Not Recommended
70.97"(1803 mm)
Not Recommended
52.78"(1341 mm)
82.00"(2083 mm)
SCP716
52.73"(1339 mm)
78.79"(2001 mm)
58.79"(1493 mm)
90.91"(2309 mm)
SCP740
43.50"(1105 mm)
Not Recommended
65.33"(1659 mm)
Not Recommended
48.58"(1234 mm)
75.48"(1917 mm)
SCPV1 SCPV2
Fixed Wall Mount for SCP Products 78-6969-9936-2 78-6969-9986-7
Folding Wall Mount for SCP Products 78-6969-9950-3 78-6969-9987-5
Folding Wall Mount with Speakers (2 20-watt speakers) for SCP Products 78-6969-9938-8 78-6969-9988-3
3M Projection Systems products are sold through a network of fully-trained distributors. Contact one of our full-line dealers to
place orders. To find a full-line dealer please visit: www.3m.com/meetings and select ‘Locate a Servicing or Selling Dealer’.
Completed Installation Sample#1
Note: In above example, wires are secured using optional (customer supplied) channel run molding. 3M standard installation provides adhesive backed wire tie wraps to secure wires.
Optional channel run molding used to secure wires.
37 of 38
Completed Installation Sample#2
Note: In above example, wires are secured using optional (customer supplied) channel run molding. 3M standard installation provides adhesive backed wire tie wraps to secure wires.
Optional channel run molding used to secure wires.
38 of 38
9 of 38
3M Annotation Sensor Kit
3M Austin CenterBuilding A147-5N-01 6801 River Place Blvd. Austin, TX 78726-9000
3M CanadaP.O. box 5757 London, Ontario N5V 3R6
3M Mexico, S.a. de C.VApartado Postal 14-139 Mexico, D.F. 07000 Mexico
3M EuropeBoulevard de l'Oise 95006 Cerge Pontoise Cedex France
Please recycle. Litho in USA
3M 2008. All Rights Reserved. 78-6971-1416-9 (3/2008)
InstallationEinrichtenInstallazione
10 of 38
Required Tools for SCP 712 install:
Step Ladder
1/2" Hammer Drill Motor, 1/2" Masonry Drill Bit and 3/16" Regular Drill Bit
Flat Blade Screwdriver Small Side Cutter Set Small Pliers Set #2 Philips Screwdriver
Minimum of five 3” wire ties Minimum of five adhesive backed wire tie anchors
11 of 38
Required Tools for SCP 712 install, continued
12’ tape measure and Small Level
Small Socket Set (1/4” to 1/2” range sockets)
Hollow wall (Drywall) Stud Locator
78-6971-1420-1 Wall Mount Bracket Installation Instructions (if bracket is being used)
78-6971-1422-7 Folding Mount Installation Instructions - or - 78-6971-1421-9 Fixed Mount Installation Instructions (depending on product SKU)
12 of 38
3M™ Folding Wall Mount SCPFWMV2 and SCPFWMSV2For use with 3M™ Super Close Projection SystemInstallation Instructions
Safety InstructionsPlease read and follow all safety information contained in these instructions prior to installation and use of the folding or fi xed wall mounts. Retain these instructions for future reference.
Intended Use
The folding wall mount is intended to provide wall mounting of the 3M™ Super Close Projection System SCP700 Series projectors to the wall as described in the Installation Instructions. It is expected that all installers and users be fully aware of safe operation of this product. Other applications have not been evaluated by 3M and may lead to an unsafe condition.
Explanation of Signal Word Consequences
WARNING: Indicates a potentially hazardous situation, which if not avoided, could result in death or serious injury and/or property damage.
CAUTION: Indicates a potentially hazardous situation, which if not avoided, may result in minor or moderate injury and/or property damage.
Summary of device labels containing safety information
Caution: Pinch Hazard
Warning: Do not hang on the product
Attention: Read Accompanying Documentation
Caution: Hot Surface
Warning: Do not look into the projector lamp
WARNINGTo reduce the risk associated with all applicable hazards:
Installation Instructions and Product Safety Guide prior to installing, using or servicing the wall mount. Retain these instructions for future reference.
To reduce the risk associated with choking:
materials.
To reduce the risk associated with impact:
installation instructions for details).
is properly reinforced.
mounted projector around children.
of the wall mount.
Projection System SCP700 Series projectors only. It has not
tightened and that no damage has occurred. Repair or replace all issues found prior to further use.
Optional Accessories2.03M™ Wall Mount Bracket (78-6969-9962-8)
3M™ Wall Mount Bracket Security Cable (78-6969-9961-0)
Remove the Cover3.0Remove the Folding Wall Mount from the packaging 3.1and set base-down on a table.
Swing the arm up until it locks in place.3.2
Using a Phillips (+) screwdriver, remove the three 3.3screws holding the cover to the base.
Lift the cover off the base and set aside.3.4
Route Cables4.0Feed the USB, VGA, and optional control cables 4.1through the arm. Align the cable ends and secure about 6 inches (150 mm) from the end using a cable tie.
Align the cables alongside the power cable and 4.2 secure using cable ties.
Solid Wall Installation5.0 (For Concrete Block or Stud Walls, Skip to Step 7)
Determine desired size and location of projected 5.1 image and mark the location of the top and center of the image.
Locate the “top of image” line of the template for 5.2 the desired image size and then align “top of image” and “image center line” lines with the location of the desired image size. Then mark the positions of the template’s four cross-hairs on the wall.
Image Area
3M™ FoldingWall MountMounting Template
For use with:
SCP715, SCP717,
SCP740
SCP715, SCP717
SCP740
Using the appropriate bit, drill 4 holes for the 5.3 mounting lag bolt anchors. Install the short anchors in the upper holes, and the long anchors in the lower holes.
Note: Use a 1/2” masonry drill bit for solid concrete walls or a 3/16” drill bit for wood walls. Do not use anchors for wood walls, only use screws.
Using a 3/8” socket, install the 2 short (upper) 5.4 mounting lag bolts, leaving 1/2” (13 mm) of the screw protruding from the wall. Do not install the long (lower) lag bolts.
1/2"(13 mm)
Attach to Wall6.0 Hang the wall mount base on the mounting lag bolts. 6.1 Using a 3/8" socket, tighten the mounting lag bolts securely.
Install the long mounting lag bolts through the 6.2 leveling screws and tighten securely.
Skip to Step 9.6.3
3M7.0 ™ Wall Mount Bracket Installation(For Use With Concrete Block or Stud Walls)
Determine desired size and location of projected 7.1 image and mark the location of the top and center of the image.
Align template with mounting holes in bracket and 7.2 secure to bracket with tape.
Locate the “top of image” line of the template for 7.3 the desired image size and then align “top of image” and “image center line” lines with the location of the desired image size. Mark positions for four mounting holes according to the next step.
Image Area
3M™ FoldingWall MountMounting Template
For use with:
SCP715, SCP717,
SCP740
SCP715, SCP717
SCP740
Align with holesin bracket
Concrete block walls:7.4
Mark the hole positions in the vertical joints between the concrete blocks and then using a 1/2" (13 mm) bit, drill 4 holes 1-5/8" (41 mm) deep into the vertical joints between the concrete blocks. Install 4 long anchors in the holes.
CAUTIONTo reduce the risk associated with impact:
short lag anchors.
16 in
(406 mm)
4X LONG
Stud walls:
Mark the holes at the center of the studs and then using a 3/16" (5 mm) bit, drill 4 holes 1-1/2" (38 mm) deep through the wall into the studs.
Using a 3/8" socket, attach the bracket to the wall 7.5using 4 short mounting lag bolts.
Attach Wall Mount Base to Bracket8.0Using a screwdriver, install the two short mounting 8.1screws with washers in the mounting bracket leaving 1/2” (13 mm) of the screw protruding from the bracket. Do not install the long (lower) mounting screws yet.
2X
Hang the wall mount base on the mounting screws. 8.2Using a screwdriver, tighten the mounting screws securely.
Install the long mounting screws through the leveling 8.3screws and tighten securely.
2X
Install Security Kit (Optional)9.0Attach the optional security cable by either locking 9.1it to the mounting bracket security slot (1), looping it through the mounting bracket (2) or looping it through the screw-mount anchor point (3).
1 2 3
Note: If using the screw-mount anchor point, secure the anchor point before attaching the cable.
Feed the security lock cable through the arm. Secure 9.2about 6 inches (150 mm) from the end of the existing cable bundle using a cable tie.
Route the security cable alongside the bundled cables 9.3and attach using cable ties.
Connect Power Extension Cable10.0Connect the power extension cable as shown. Secure 10.1with cable ties.
Connect Audio Cables 11.0(SCPFWMMSV2 only)Connect the power and audio cables to the 11.1connections inside the cover.
Power Audio
Slide the cover over the arm. Attach the power and 11.2audio cables to the existing cable bundle using a cable tie. Leave 10–12” (250–300 mm) slack cable.
Pull the cable bundle through the hole at the end of 14.4the arm extension.
Connect the cables to the projector according to the 14.5Quick Start Guide.
Attach the optional security cable to the projector.14.6
Align Projector15.0Power on unit and change image size by adjusting the 15.1arm extension in or out.
Adjust projector aim by loosening the thumb screw.15.2
Adjust vertical image position by removing the cover, 15.3loosening the lower mounting lag bolts or mounting screws, and adjusting the leveling screws. Tighten the lower mounting lag bolts or screws when finished, and replace the cover.
To adjust horizontal image position: 15.41. Remove the cover. 2. Loosen the adjustment and locking screws. 3. Move the arm left or right to the desired position. 4. Tighten the adjustment and locking screws to secure the arm in the new position. 5. Replace the cover when finished.
Adjustment Screw
Locking Screw
22 of 38
Important Notice
guaranteed.use.
Warranty; Limited Remedy; Limited Liability.
practice or custom or trade usage.
Projector Systems
6801 River Place Blvd.Austin, TX 78726800 328 1371www.3M.com/meetings
Safety InstructionsPlease read and follow all safety information contained in these instructions prior to installation and use of the folding or fi xed wall mounts. Retain these instructions for future reference.
Intended Use
The folding wall mount is intended to provide wall mounting of the 3M™ Super Close Projection System SCP700 Series projectors to the wall as described in the Installation Instructions. It is expected that all installers and users be fully aware of safe operation of this product. Other applications have not been evaluated by 3M and may lead to an unsafe condition.
Explanation of Signal Word Consequences
WARNING: Indicates a potentially hazardous situation, which if not avoided, could result in death or serious injury and/or property damage.
CAUTION: Indicates a potentially hazardous situation, which if not avoided, may result in minor or moderate injury and/or property damage.
Summary of device labels containing safety information
Caution: Pinch Hazard
Warning: Do not hang on the product
Attention: Read Accompanying Documentation
Caution: Hot Surface
Warning: Do not look into the projector lamp
WARNINGTo reduce the risk associated with all applicable hazards:
Installation Instructions and Product Safety Guide prior to installing, using or servicing the wall mount. Retain these instructions for future reference.
To reduce the risk associated with choking:
materials.
To reduce the risk associated with impact:
installation instructions for details).
is properly reinforced.
mounted projector around children.
of the wall mount.
Projection System SCP700 Series projectors only. It has not
tightened and that no damage has occurred. Repair or replace all issues found prior to further use.
Optional Accessories2.0 3M™ Wall Mount Bracket (78-6969-9962-8)
3M™ Wall Mount Bracket Security Cable (78-6969-9961-0)
Solid Wall Installation3.0 (For Concrete Block or Stud Walls, Skip to Step 4)
Determine desired size and location of projected 3.1 image and mark the location of the top and center of the image.
Locate the “top of image” line of the template for 3.2 the desired image size and then align “top of image” and “image center line” lines with the location of the desired image size. Then mark the positions of the template’s four cross-hairs on the wall.
Image Area
3M™ FoldingWall MountMounting Template
For use with:
SCP715, SCP717,
SCP740
SCP715, SCP717
SCP740
Using the appropriate bit, drill 4 holes for the 3.3 mounting lag bolt anchors. Install the short anchors in the holes. Do not install the lag bolts at this time.
Note: Use a 1/2” masonry drill bit for solid concrete walls or a 3/16” drill bit for wood walls. Do not use anchors for wood walls, only use screws.
Skip to Step 5.3.4
3M4.0 ™ Wall Mount Bracket Installation(For Use With Concrete Block or Stud Walls)
Determine desired size and location of projected 4.1 image and mark the location of the top and center of the image.
Align template with mounting holes in bracket and 4.2 secure to bracket with tape.
Locate the “top of image” line of the template for 4.3 the desired image size and then align “top of image” and “image center line” lines with the location of the desired image size. Mark positions for four mounting holes according to the next step.
Image Area
3M™ FoldingWall MountMounting Template
For use with:
SCP715, SCP717,
SCP740
SCP715, SCP717
SCP740
Align with holesin bracket
Concrete block walls:4.4
Mark the hole positions in the vertical joints between the concrete blocks and then using a 1/2" (13 mm) bit, drill 4 holes 1-5/8" (41 mm) deep into the vertical joints between the concrete blocks. Install 4 long anchors in the holes.
Mark the holes at the center of the studs and then using a 3/16" (5 mm) bit, drill 4 holes 1-1/2" (38 mm) deep through the wall into the studs.
4X
1/2–5/8"(13–16 mm)
Using a 3/8" socket, attach the bracket to the wall 4.5using 4 short mounting lag bolts.
Route Cables5.0Feed power, VGA and USB cables through the base 5.1section of the arm. Bundle the cables and secure about 6 inches (150 mm) from the end using a cable tie.
~6"(150 mm)
Install Security Kit (Optional)6.0Attach the optional security cable by either locking 6.1it to the mounting bracket security slot (1), looping it through the mounting bracket (2) or looping it through screw-mount anchor point (3).
1 2 3
Note: If using the screw-mount anchor point, secure the anchor point before attaching the cable.
Feed the security lock cable through the arm. Secure 6.2about 6 inches (150 mm) from the end of the existing cable bundle using a cable tie.
~6"(150 mm)
Mount Base to Wall7.0Position the wall mount over the mounting screw 7.1anchors or mounting bracket. Install and tighten the 4 mounting screws/mounting lag bolts firmly.
Pull the cable bundle through the hole at the end of 9.4the arm extension.
Connect the cables to the projector according to the 9.5Quick Start Guide.
Attach the optional security cable to the projector.9.6
Align Projector10.0Power on unit and change image size by adjusting the 10.1arm extension in or out.
Adjust projector aim by loosening the thumb screw.10.2
Adjust vertical image position by turning the leveling 10.3screw.
Adjust horizontal image position by loosening the 10.4four mounting screws and adjusting the base left or right. Tighten the mounting screws when finished.
30 of 38
Important Notice
guaranteed.use.
Warranty; Limited Remedy; Limited Liability.
practice or custom or trade usage.
Projector Systems
6801 River Place Blvd.Austin, TX 78726800 328 1371www.3M.com/meetings
Yes No Was screen or whiteboard previously installed?
Yes No If not has projection area been defined and clearly marked with masking tape for future installation?
Yes No Has projector been installed?
Yes No Was the Accessory Wall Mount Bracket used?
Yes No Has the I/O module been installed (if required)?
Yes No Was the Annotation pod installed (if required)?
Yes No Have the cables been neatly secured and routed?
Yes No Has the projector been properly aligned to project a square image on the screen?
Yes No Has the Annotation Software been loaded onto the meeting room PC and the CD been provided to the customer?
Yes No Did the Annotation Software launch and recognize the attached Annotation pod?
Yes No Has the system been calibrated to the expected screen size and position?
Yes No Have the following tasks been performed successfully using the Annotation Pen? 1. Open eBeam Scrapbook file (requires PC mouse selection for first launch) and make
full screen using pen (maximize the window) 2. Test APPLICATION Icon in top left corner (Figure 1) 3. Test FILE menu item (Figure 2) 4. Test MINIMIZE icon (top right) (Figure 3 ) 5. Test RESTORE icon (top right) (Figure 3) 6. Test CLOSE icon (top right) (Figure 3) 7. Exit 3M Digital Annotation software (close software)
Yes No Have the tools been put away and the installation site cleaned?
Yes No Has this checklist been reviewed with the customer for any additional actions needed (please ask they sign below)?
Please explain any “No” answer: ________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________
I accept the installation.
____________________________ ________________________ ___________ Signature Title Date