    Generic Documents for theDesign, Build, Operate

    Contract for aSolid Waste Facility

  • 8/13/2019 3Generic Documents

    2/26

    Agenda

    1. Overview

    2. Review of Documents Pre-Qualification Documents Bidding Documents DBO Contract

  • 8/13/2019 3Generic Documents

    3/26

    Overview

    Procurement Documents

    Pre-Qualification Documents

    Bidding Documents

    Annex A Bid Form Bidders Price Form and Price Schedules Bid Security Form Performance Security Form Bank Guarantee Form Advance Payment Format of Curriculum Vitae Form for Clarification Questions

    Annex B: Draft Contract

  • 8/13/2019 3Generic Documents

    4/26

    Overview

    Contract Documents

    Form of Contract General Conditions to the Contract Appendices to the General Conditions:

    1. Special Conditions of Contract2. Terms and Procedures of Payment3. Technical Specifications consisting of,

    Appendix 3A Design-Build ServicesAppendix 3B Operations Services

    Appendix 3C Technical Standards

  • 8/13/2019 3Generic Documents

    5/26

    Overview

    Contract Documents (continued)

    4. Site Appendix5. Service Area Appendix6. Liquidated Damages Appendix

    7. Operators Expertise Appendix 8. Operators Bid

  • 8/13/2019 3Generic Documents

    6/26

    Pre-Qualification Documents

    Sources

    SDB Works Prequalification

    as amended for management contracts, leases etc.

    similar changes as those made in management contracts,leases etc.

    GITA and PITA approach used

  • 8/13/2019 3Generic Documents

    7/26

    Pre-Qualification Documents

    Pre-Qualification Documents Review

  • 8/13/2019 3Generic Documents

    8/26

    Pre-Qualification Documents

    Key Issues

    evaluation of applications based on solid waste facilitydesign, build and operations experience, financial position,personnel capabilities and litigation history

    subcontractors experience may be considered

  • 8/13/2019 3Generic Documents

    9/26

    Pre-Qualification Documents

    Pre-Qualification Criteria

    Applicants must demonstrate general experiencedesigning, building, operating and maintaining a solidwaste facility

    for a certain length of time with a minimum average annual turnover

    Applicants must demonstrate experience in a certainnumber and type of solid waste disposal projects orassignments

  • 8/13/2019 3Generic Documents

    10/26

    Pre-Qualification Documents

    Pre-Qualification Criteria (continued)

    Applicants must demonstrate financial strengthrequirements

    adequate cash flow for the contract adequate cash flow for works in progress and

    future contract commitments

    Applicants must provide information with respect to management structure candidates for key positions

  • 8/13/2019 3Generic Documents

    11/26

    Pre-Qualification Documents

    Pre-Qualification Criteria (continued)

    Applicants must provide information about legal matters,including:

    litigation or arbitration in the past 5 years labour relations issues criminal or environmental prosecutions

  • 8/13/2019 3Generic Documents

    12/26

    Bidding Documents

    Bidding Documents Review

  • 8/13/2019 3Generic Documents

    13/26

    Bidding Documents

    Key Issues - Bids

    Bidders submit Technical Section consisting of Design-Build Workplan Operations Workplan Staffing Plan

    Bidders submit Financial Section consisting of PriceSchedules

    Technical and Financial Sections submitted in sameenvelope

  • 8/13/2019 3Generic Documents

    14/26

    Bidding Documents

    Key Issues - Bid Evaluation

    preliminary examination of bids

    technical aspects of each Bid evaluated with respect to thefollowing factors:

    the Design-Build Workplan the Operations Workplan the Staffing Plan

    price evaluation to ensure substantialresponsiveness

  • 8/13/2019 3Generic Documents

    15/26

    Bidding Documents

    Key Issues - Award

    award is to the Bidder whose Bid has been determined tobe substantially responsive and has the lowest evaluatedBid Price

  • 8/13/2019 3Generic Documents

    16/26

    Design, Build, Operate Contract

    Sources

    FIDIC

    existing standard World Bank bidding documents

    existing management and operating contracts

  • 8/13/2019 3Generic Documents

    17/26

    Design, Build, Operate Contract

    General Conditions Key Issues

    Contract Term, Timing and Completion

    Obligations of the Operator and the Owner(quality, governing law, site access etc.)

    Contract Price and Payment(incentives, liquidated damages, securities,taxes and duties)

    Intellectual Property(copyright in design-build)

  • 8/13/2019 3Generic Documents

    18/26

    Design, Build, Operate Contract

    General Conditions - Key Issues

    Contract Administration and Supervision(Design-Build supervision, Operations supervision,Engineers duties etc.)

    Representatives, Staff and Subcontracting(Owners rep, Operators rep, personnel, existingstaff)

    Liability and Risk Distribution(defects, limitation of liability, indemnification,insurance, force majeure etc.)

  • 8/13/2019 3Generic Documents

    19/26

    Design, Build, Operate Contract

    General Conditions - Key Issues

    Change in Contract Elements(change to Design-Build Services, change orderprocesses)

    Suspension and Termination(rules with respect to both suspension of work andtermination of the Contract)

  • 8/13/2019 3Generic Documents

    20/26

    Design, Build, Operate Contract

    Key Appendices Technical Specifications

    Design-Build Appendix(setting out services to be provided in the Design-Build period)

    Operations Services Appendix(outlining all operations responsibilities)

    Technical Standards Appendix

    (outlining all technical standards -most areproject specific)

    Operation of existing facilities, if any

  • 8/13/2019 3Generic Documents

    21/26

    Design, Build, Operate Contract

    Key Appendices - Contract Price Adjustment

    to be drafted on a project-by-project basis

    long term provisions for the adjustment of price forOperations Services over time

  • 8/13/2019 3Generic Documents

    22/26

    Design, Build, Operate Contract

    Key Appendices Incentive Compensation

    to be drafted on a project-by-project basis

    intended to be used to encourage operationsachievements

  • 8/13/2019 3Generic Documents

    23/26

    Design, Build, Operate Contract

    Key Appendices Existing Staff

    to be drafted on a project-by-project basis

    intended to be used to deal with circumstances where

    there are existing staff

    this will be dependent on the local law

  • 8/13/2019 3Generic Documents

    24/26

    Design, Build, Operate Contract

    Key Appendices Liquidated Damages

    sets out the failures of the Operator to meet theTechnical Standards that will give rise toLiquidated Damages

    establishes the amounts of Liquidated Damagesthat will apply

  • 8/13/2019 3Generic Documents

    25/26

    Design, Build, Operate Contract

    Key Appendices Operators Expertise

    Operator must have all expertise required to carryout the Services

    describes the areas of expertise the Operator musthave

  • 8/13/2019 3Generic Documents

    26/26

    Generic Documents for theDesign, Build, Operate

    Contract for aSolid Waste Facility