KPI General Meaning Targets CS RRC Setup and Access Completion Ratio Cell BBH >=96% Cell BBH >=96% Cell BBH <=1% PS and HS RAB Setup Success Rate Cell BBH >=96.5% CS and Video RAB Setup Success Rate Cell BBH >=96.5% Voice Drop Call Rate CS NBH <=1.75% PS Drop Call Rate RAB drop (R99 only) PDP Busy Hour <2% HS Drop Call Rate RAB drops pertaining to HS PDP Busy Hour <2% Including IRAT per call CS BBH IRAT : >95% Best of three days out of five days (excluding Saturday and Sunday). (Greenfield) 80% of the KPIs are must to pass the Final Site AT. Above KPIs shall be applicable for new 3G circles. (Green Field Circle+ Existing NSN Signature: Bharti Signature: Time Period for measurement Existing Cells achieved KPI in case of infill site Achieved KPIs for new site Setup and Access should be taken for calculation including all types of congestion Successful CS RRC connections / Total CS RRC connection request PS (All Bearer) RRC Setup and Access Completion Ratio Setup and Access should be taken for calculation including all types of congestion Successful PS RRC connections / Total PS RRC connection request CS and PS (all Bearer) call blocking due to Call Admission Control Success RAB connection completion / Total RAB connection Request Success RAB connection completion / Total RAB connection Request RAB drop (with respect to the total number of calls ending in 3G), counting only the drops on the best serving cell including all AMR Drops CS Inter System Handover Success Rate( 3G - 2G, 2G-3G) Average HSDPA DL Throughput per user (Cell Data Busy Hour) HSDPA Download Throughput per user ( User perceived Throughput) Cell Data Busy Hour 1 Mbps and CQI 16 with more than 5 MB download If any KPI target for any respective cell is not achieved more than 1 months, Both the teams (Bharti and NSN) will validate the reasons and close. (Green Field Circle+ Existing Circle) For new Cell/Site addition in the existing cluster, Existing cells achieved KPIs should not degrade. Target of new cell shall be either as per the existing cluster achieved targets (Average of 5 working days) or above given targets for respective KPIs and the same will be achieved post for new site (Average of 5 working days). (Existing Circles)