3D-P in Action 0.2 Case Study: Intersection Control
6

3D-P In Action Case study. Intersection control

Aug 06, 2015

Download

Technology

3D-P Australia
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 3D-P In Action Case study. Intersection control

3D-P in Action

0.2

Case Study: Intersection Control

Page 2: 3D-P In Action Case study. Intersection control

• Busy intersection across haul road due to new construction

• Traffic signals in place but want to prioritize production vehicles

Customer Scenario

• First responder radio solution would require truck down time for installation & interfere with mining ops network

• Customer disabled traffic signals and manually controlled intersection:

• Two security guards at intersection 24/7• Haul truck drivers radio upon approach• Guards manually lower gates to halt crossroad traffic

• Is there a better way to control the intersection?

Page 3: 3D-P In Action Case study. Intersection control

• Application deployed on each haul truck IEP determines if it is approaching the intersection based on GPS position

• When approaching, a notification is transmitted to IEP installed at traffic light using existing radio network

• IEP at traffic light sends a control signal to ensure haul truck receives a green light

3D-P solution

3D-P IEP onHaul Truck

3D-P IEP at traffic light

Wireless network

Point-to-PointConnection

Haul truck detection application

On-machine geo aware application

Traffic light control signal

GPS

Page 4: 3D-P In Action Case study. Intersection control

Custom Solution example: Vehicle Traffic Control

Geofence Geofence

Page 5: 3D-P In Action Case study. Intersection control

Cost effective – no new HW required unlike first responder radio solution

Saved manpower – security guards can be redeployed elsewhere

Improved safety – no more manual control of haul road intersection

No truck down time – all software was deployed over-the-air

Benefits

Improved productivity – no truck stoppages to slow down productivity; reduced wear & tear

No interference – integrated into existing mining operations wireless network

Low cost, high gain – nearly $1.5M in annualized savings

Page 6: 3D-P In Action Case study. Intersection control

THANK-YOU!

WWW.3D-P.COM