C ÐGENIVAR CONSTRUCTION SITE MEET¡NG #2 MEETING SUMMARY Construction Site Meeting #2 Anaerobic Treatment ol Septage/Corn Stover and Blosollds to Produce Blogas, Electrlcal Power and Treated Blosollds Townshlp of Georglan Bluffs and Townshlp of Chatsworth Date: Thursday, May27,2010 Tlme 9:15 a.m. Proiect: os.03-012-11-os Locatlon: Project Site Attendeee: ill 5ifffiy:ii:ri"'Ä:;fi"?$iffi'l',;liio* Mr. Eugene Säuka, CHFour Biogas lnc. Mr. Justin Tudor, CHFour Biogas lnc. Mr. Dean Patch, Bahler Mr. Max Bahler, Bahler Mr. Marvin Weppler, Roads Superintendent, Township of Chatsworth Mr. Rick Winìers, Director of Public Works, Township of Georgian Bluffs Mr. Ross Slaughter, P. Eng., GENIVAR Consuttants Lp Mr. Chrls Wilson, P. Eng., GENIVAR Consultants Lp Ms. Corie DeGrool, GENIVAR Consultants Lp DleÌrlbutlon: Those Present, Mr. Benjamin Strahler, Maple Reinders Prepared By: Chris Wilson, P.Eng. The following items wEre discussed at ths Construction Site Meeting #2 for the contrart for the anaerobic treatmant ol septage/com stovar and biosollds produco biogas, el€ctrical power and tteatod biosolíds for the Township of Georgian Blufls and the Township of Chatswofth: Actlon Bv: 1. The Minutes lrom Construction Site Meeting #1 were reviewed and the following comments were provided in reference to the iterns in the Minutes. 1. GENIVAR has submitted a letter to the Owsn Sound District Office of the Ministry of Environment to receive consent from the District Manager that the works can receive wast€ other than hauled sewag€ and waste agricultural projects to operate the pasteurizer or utilize othef waste feed into the anaerobic dþestar. Cunently, no response has been received from the Dístrict Manager. Once a response is received, a completed application will be submitted to the MOE, Toronto office as well as the Owen Sound distric{ otlice. The application for the Air and Noise Approval was compteted by CHFour and has been received by GENIVAR. GENIVAR will submit the apptication to the MOE. 2, The Chief Building Official for Georgian Bluffs met with GENIVAR to review the contract drawíngs. No major concems were lound by the CBO and the building permit for the project would be issued by the Municipality. GENIVAR OWEN SOUND 945 Third Avenue East, Suile 212, Owen Sound, Ontario N4K 2K8 TEl.: (519) 97€-7612 Fax (519) 37ô,8OOB
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
8/10/2019 35. Construction Meeting #2 May 27, 2010