GE Power & Water Technical Specification g CONFIDENTIAL – GE Proprietary Information DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved Page 1 /18 Spec # 109W4197 Originator 204058515 Revision A TMPL0001 Master Specification Template Rev. (G) Foundation Load Specification for Wind Turbine Generator Systems GE 2.x-120 DFIG 50Hz / 60Hz 2.x MW Rated Power 120 m Rotor Diameter with LM 58.7 Blade 110m HH IEC WTGS Class S Standard Weather (Based on IEC III) The Seller, GE Power and Water, shall hereinafter be referred to as “GE”
18
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water Technical Specification g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 1 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Foundation Load Specification for Wind

Turbine Generator Systems

GE 2.x-120 DFIG 50Hz / 60Hz

2.x MW Rated Power 120 m Rotor Diameter

with

LM 58.7 Blade 110m HH

IEC WTGS Class S

Standard Weather (Based on IEC III)

The Seller, GE Power and Water, shall hereinafter be referred to as “GE”

Page 2: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 2 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Copyright and patent rights

This document is to be treated confidentially. It may only be made accessible to authorized persons. It may only be

made available to third parties with the expressed written consent of GE.

This document is copyrighted within the meaning of the Copyright Act. The transmission and reproduction of the docu-

ments, also in extracts, as well as the exploitation and communication of the contents are not allowed without express

written consent. Contraventions are liable to prosecution and compensation for damage. We reserve all rights for the

exercise of commercial patent rights.

Change List

Rev. Date (y/m/d)/ Author

Affected Pages

Change

– 2013/03/22 204058515

all New document per PCW0004905-W893D16

A 2013/06/25 204012213

4

all

11

11

12

17

17

17

17

17

17

17

17

Updated template

1) Removed section ‘Checklist foundation design’

2) Revised table and figure numbering

3) Moved section ‘Dynamic Stiffness of the Foundation’ to section 2

4) Moved section ‘Maximum Allowed Inclination for Additional Load Con-sideration ‘ to section 3

5) Moved section ‘Connection between tower and foundation’ to section 4

6) Removed section ‘Boundary conditions for the foundation’

7) Removed section ‘Technical Documentation’

8) Removed section ‘Note regarding standards’

9) Removed section ‘References’

10) Removed section ‘Enclosures’

11) Added section 5 ‘Additional Information’

12) Added section 6 ‘References – General’

13) Added section 7 ‘References – GE Internal’

Revised document per PCW0004905-W893D20

Page 3: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 3 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Table of Contents

Copyright and patent rights ..................................................................................................................................................................................................................... 2

Change List ......................................................................................................................................................................................................................................................... 2

Table of Contents............................................................................................................................................................................................................................................ 3

1 Loads for the foundation design ............................................................................................................................................................................................. 4

1.1 Extreme Loads.............................................................................................................................................................................................................................. 4

1.2 Load case for check against lift-off of the foundation ........................................................................................................................................ 6

1.3 Load case for check against overturning .................................................................................................................................................................... 6

1.4 Load case for check against sliding ................................................................................................................................................................................ 7

1.5 Load case for check against shear failure .................................................................................................................................................................. 7

1.6 Load case for check against tension loading in the piles .................................................................................................................................. 7

1.7 Earthquake Loads ...................................................................................................................................................................................................................... 7

1.8 Fatigue Loads ............................................................................................................................................................................................................................... 8

1.9 Load Spectra Procedure with a Constant Mean Value ....................................................................................................................................... 8

1.10 Procedure using Markov Matrices ...........................................................................................................................................................................11

2 Dynamic Stiffness of the Foundation..................................................................................................................................................................................11

3 Maximum Allowed Inclination for Additional Load Consideration ...................................................................................................................11

4 Connection between tower and foundation ..................................................................................................................................................................12

5 Additional Information .................................................................................................................................................................................................................17

6 References - General ....................................................................................................................................................................................................................17

7 References – GE Internal ............................................................................................................................................................................................................17

8 Approval ................................................................................................................................................................................................................................................18

Page 4: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 4 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

1 Loads for the foundation design

The following loads include inertia, mass and aerodynamic forces acting on the rotor and hub. They also include forces caused by accelerations or other dynamic reactions. Partial safety factors for the loads have been applied. All additional safety factors (e.g. on materials, uncertainty of calculation method, etc.) have to be applied according to the regulations. The loads in this document for the foundation design are calculated with a full dynamic simulation program called Flex 5. The loads are given in the coordinate system shown in Figure 1. The extreme loads for the hub height of 110 m are given at h= 1.30m above top of soil elevation. Loads have to be recalcu-lated for the different heights of the foundation - upper and lower edge of the foundation.

y

x

z

Figure 1: Coordinate System

All loads are shown with and without partial safety factors in the tables and they are directly ready for use in the founda-tion engineer’s calculations. An additional load due to a misalignment of the tower of 8 mm/m has to be considered. For more details refer to chapter 3.

1.1 Extreme Loads

The following tables show controlling load cases (with and without partial safety factors), with all of the conditions that comprise the load case occurring simultaneously. The load cases for the following WTGS are referenced as follows: 2.x-120 DFIG 110m HH IEC S LM58.7 SW 50 Hz – [3] 2.x-120 DFIG 110m HH IEC S LM58.7 SW 60 Hz – [4] The foundation has to be designed according to the specific country regulations. The proper final design values of partial safety factors for material properties and country specific minimum partial safety factors on loads must also be applied to these loads. γγγγF = value of partial safety factor for load factor design as required per International Electrotechnical Commission (IEC).

Page 5: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 5 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

50 Hz

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] γ γ γ γ [-] Vhub [m/s] Vdir [deg]

DLC 7.1 4449.8 -20.4 267.8 -1161.4 15197.8 -421.7 268.6 15203.9 1.00 44.5 8.2

DLC 6.2 4190.2 -858.8 24.4 -2106.1 -4555.4 79600.4 859.1 79729.4 1.00 47.3 75.2

DLC 1.5 4265.0 11.4 661.6 -683.2 68617.1 1181.4 661.7 68627.3 1.00 10.1 -8.0

DLC 2.2 4270.5 -151.8 396.9 -5753.7 39023.1 20636.7 424.9 44143.0 1.00 10.4 8.0

DLC 2.2 4207.7 37.5 -645.9 1324.7 -71715.4 -2339.7 647.0 71753.6 1.00 10.4 8.0

DLC 6.2 4160.2 -831.5 84.5 -2705.6 -4346.0 80037.5 835.8 80155.3 1.00 39.8 28.3

DLC 6.2 4166.4 858.7 87.7 2363.5 1796.5 -79762.1 863.2 79782.5 1.00 48.0 -63.0

DLC 6.2 4158.1 -832.6 74.9 -2758.6 -4955.0 80008.2 836.0 80162.7 1.00 40.3 28.6

Table 1: Extreme loads; 2.x-120 DFIG 110mHH IEC S 50 Hz LM58.7 SW; excluding partial safety factor.

60 Hz

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] γγγγ [-] Vhub [m/s] Vdir [deg]

DLC 7.1 4448.0 1.3 258.1 -1242.6 14808.8 -967.2 258.1 14840.1 1.00 44.5 8.2

DLC 6.2 4193.5 -870.1 26.5 -2157.4 -4310.0 79840.5 870.5 79956.3 1.00 46.9 74.1

DLC 2.2 4214.7 -3.5 -666.6 1251.6 -73278.6 -771.8 666.6 73281.2 1.00 10.4 8.0

DLC 2.2 4189.0 16.9 -143.7 6202.1 -15153.3 -366.4 144.7 15158.2 1.00 10.4 -8.0

DLC 2.2 4213.3 16.1 -664.1 1182.3 -73312.2 -1639.3 664.3 73330.5 1.00 10.4 8.0

DLC 6.2 4190.4 -866.1 23.8 -2118.5 -4569.5 79889.3 866.5 80019.8 1.00 47.3 75.2

DLC 6.2 4193.5 -870.1 26.5 -2157.4 -4310.0 79840.5 870.5 79956.3 1.00 46.9 74.1

DLC 6.2 4190.4 -866.1 23.8 -2118.5 -4569.5 79889.3 866.5 80019.8 1.00 47.3 75.2

Table 2: Extreme loads; 2.x-120 DFIG 110m HH IEC S 60 Hz LM58.7 SW; excluding partial safety factor.

50 Hz

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] γγγγ [-] Vhub [m/s] Vdir [deg]

DLC 8.1 6431.8 50.9 191.3 917.0 9456.7 -4860.4 198.0 10632.6 1.50 19.8 -22.5

DLC 6.2 4609.3 -944.6 26.8 -2316.7 -5011.0 87560.4 945.0 87703.7 1.10 47.3 75.2

DLC 1.5 5757.8 15.3 893.2 -922.3 92633.1 1594.8 893.4 92646.8 1.35 10.1 -8.0

DLC 2.2 4697.5 -167.0 436.6 -6329.0 42925.4 22700.3 467.4 48558.1 1.10 10.4 8.0

DLC 1.6 5766.2 -32.9 883.9 -1329.5 92788.0 7247.9 884.5 93070.7 1.35 12.5 -8.0

DLC 6.2 4576.2 -914.7 93.0 -2976.2 -4780.6 88041.3 919.4 88171.0 1.10 39.8 28.3

DLC 6.2 4583.1 944.6 96.5 2599.9 1976.2 -87738.3 949.5 87760.6 1.10 48.0 -63.0

DLC 1.6 5767.1 -33.8 883.0 -1298.4 92785.2 7368.0 883.6 93077.3 1.35 12.4 -8.0

Table 3: Extreme loads; 2.x-120 DFIG 110m HH IEC S 50 Hz LM58.7 SW; including partial safety factor.

Page 6: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 6 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

60 Hz

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] γγγγ [-] Vhub [m/s] Vdir [deg]

DLC 8.1 6431.8 50.9 191.3 917.0 9456.7 -4860.4 198.0 10632.7 1.50 19.8 -22.5

DLC 6.2 4612.9 -957.1 29.1 -2373.1 -4741.0 87824.5 957.5 87952.4 1.10 46.9 74.1

DLC 1.5 5752.9 14.4 892.4 -863.6 92242.1 1947.6 892.5 92262.7 1.35 10.0 -8.0

DLC 2.2 4607.9 18.5 -158.0 6822.4 -16668.6 -403.0 159.1 16673.5 1.10 10.4 -8.0

DLC 1.5 5750.3 -10.6 879.4 -1183.7 92607.9 3432.0 879.5 92671.5 1.35 10.3 -8.0

DLC 6.2 4609.4 -952.8 26.2 -2330.4 -5026.5 87878.2 953.1 88021.8 1.10 47.3 75.2

DLC 6.2 4612.9 -957.1 29.1 -2373.1 -4741.0 87824.5 957.5 87952.4 1.10 46.9 74.1

DLC 1.6 5764.0 -35.9 884.1 -1119.2 92398.7 7540.6 884.8 92705.9 1.35 12.5 0.0

Table 4: Extreme loads; 2.x-120 DFIG 110m HH IEC S 60 Hz LM58.7 SW; including partial safety factor.

1.2 Load case for check against lift-off of the foundation

To ensure proper foundation stiffness during operation, the foundation is not allowed to lift-off of the subsoil for the fol-lowing loads. These loads are provided at the tower base ring bottom flange and the check has to be done with the loads extrapolated to the foundation bottom.

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] F [-]

DLC 1.0; 50 Hz 4259.8 -26.2 402.6 -21.7 42086.0 5020.8 403.4 42384.4 1.00

DLC 3.1; 60 Hz 4260.8 -28.1 411.5 97.7 4260.8 5084.0 412.5 43261.7 1.00

Table 5: Load cases for check against foundation lift-off; 2.x-120 DFIG 110m HH IEC S LM58.7 SW.

1.3 Load case for check against overturning

To ensure the stability of the foundation, the foundation is only allowed to lift-off up to its centerline for the following load cases. These loads are provided at the tower base ring bottom flange and the check has to be done with the loads extrapolated to the foundation bottom.

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] F [-]

DLC 6.2; 50 Hz 4158.1 -832.6 74.9 -2758.6 -4955.0 80008.2 836.0 80162.7 1.00

DLC 6.2; 60 Hz 4190.4 -866.1 23.8 -2118.5 -4569.5 79889.3 866.5 80019.8 1.00

Table 6: Load case for check against overturning; 2.x-120 DFIG 110m HH IEC S LM58.7 SW.

Page 7: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 7 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

1.4 Load case for check against sliding

To ensure the stability of the foundation, the foundation is not allowed to slide for the following load cases. These loads are provided at the tower base ring bottom flange and the check has to be done with the loads extrapolated to the foundation bottom.

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] γγγγF [-]

DLC 6.2; 50 Hz 4166.4 858.7 87.7 2363.5 1796.5 -79762.1 863.2 79782.5 1.00

DLC 2.2; 50 Hz 4270.5 -151.8 396.9 -5753.7 39023.1 20636.7 424.9 44143.0 1.00

DLC 6.2; 60 Hz 4193.5 -870.1 26.5 -2157.4 -4310.0 79840.5 870.5 79956.3 1.00

DLC 2.2; 60 Hz 4189.0 16.9 -143.7 6202.1 -15153.3 -366.4 144.7 15158.2 1.00

Table 7: Load case for check against sliding; 2.x-120 DFIG 110m HH IEC S LM58.7 SW.

1.5 Load case for check against shear failure

To ensure the stability of the foundation, the foundation has to be checked of shear failure for the soil specified in the geotechnical report. These loads are provided at the tower base ring bottom flange and the check has to be done with the loads extrapolated to the foundation bottom.

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] F [-]

DLC 1.6; 50 Hz 5767.1 -33.8 883.0 -1298.4 92785.2 7368.0 883.6 93077.3 1.35

DLC 1.6; 60 Hz 5764.0 -35.9 884.1 -1119.2 92398.7 7540.6 884.8 92705.9 1.35

Table 8: Load case for check against shear failure; 2.x-120 DFIG 110m HH IEC S LM58.7 SW.

1.6 Load case for check against tension loading in the piles

No tension loading is allowed in the piles for the following load combination, unless dynamic and fatigue loading is ex-plicitly considered in the design of the piles, including all dynamic soil-pile interaction effects. These loads are provided at the tower base ring bottom flange:

Load case Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] Fr [kN] Mr [kNm] γγγγF [-]

DLC 1.1; 50 Hz 4264.9 -22.5 476.3 -19.8 47377.1 4544.3 476.8 47594.5 1.00

DLC 1.1; 60 Hz 4268.2 -17.7 469.0 11.5 47008.2 4449.3 469.3 47218.2 1.00

Table 9: Load cases for check against pile tension loading; 2.x-120 DFIG 110m HH IEC S LM58.7 SW.

1.7 Earthquake Loads

Site specific seismic loads at the base of the tower structure can be provided by GE upon request. The request should include the applicable code, and the site specific seismic parameters (e.g., design peak ground acceleration (PGA) or equivalent as per the code, soil type, etc.)

Page 8: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 8 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

1.8 Fatigue Loads

The fatigue loads that result from the operation of the turbine are given as load spectra at the tower base ring flange. The partial safety factor on loads included in the fatigue spectra is 1.0. The combined safety factors (including partial safety factors on loads and material) on these loads to be used are:

• Fatigue check of concrete according to CEB-FIB Model Code 1990: o γF·γSd·γC = 1.65.

• Fatigue check of reinforcement bars acc. to CEB-FIB Model Code 1990: o γF·γSd·γC = 1.265.

• Fatigue check of embedded steel parts acc. to Eurocode 3 and IEC 61400: o γF·γM = 1.265.

• Fatigue check of embedded steel parts acc. to Eurocode 3 and DIBt-Guidelines: o γF·γM = 1.25.

1.9 Load Spectra Procedure with a Constant Mean Value

The load spectra are provided separately in the following document. The unit of force is kN and the unit of moment is kNm for the values provided in the files.

Filename: Load Spectra_2.x-120 DFIG_110mHH_IEC_S(3)_50 Hz_LM 58.7_SW_Rev00.xlsx

(Refer to GE Drawing 109W4193)

Figure 2: Load spectra 2.x-120 DFIG 110m HH IEC S 50 Hz LM58.7 SW for bending moment and torsion

Page 9: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 9 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Figure 3: Load Spectra 2.x-120 DFIG 110m HH IEC S 50 Hz LM58.7 SW for vertical force and thrust force

Filename: Load Spectra_2.x-120 DFIG_110mHH_IEC_S(3)_60 Hz_LM 58.7_SW_Rev00.xlsx

(Refer to GE Drawing 109W4194)

Figure 4: Load spectra 2.x-120 DFIG 110m HH IEC S 60 Hz LM58.7 SW for bending moment and torsion

Page 10: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 10 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Figure 5: Load Spectra 2.x-120 DFIG 110m HH IEC S 60 Hz LM58.7 SW for vertical force and thrust force. Mean loads at rated wind speed (constant for all load cycles)

Load at Tower Base Fx [kN] Fy [kN] Fz [kN] Mx [kNm] My [kNm] Mz [kNm] γγγγF [-]

50 Hz

Mean Wind Speed: 10.4 m/s

Turbulence Intensity: 15.6%

4257.0 -4.5 346.0 68.0 36470.0 2600.0 1.0

60 Hz

Mean Wind Speed: 10.4 m/s

Turbulence Intensity: 15.6% 4257.0 -4.5 345.0 68.4 36350.0 2595.0 1.0

Table 10: Mean loads at rated wind speed (for use with the fatigue load spectra files). 2.x-120 DFIG 110m HH IEC S LM58.7 SW

Page 11: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 11 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

1.10 Procedure using Markov Matrices

The Markov matrix of the fatigue loads contains mean values and ranges for all cycles. The use of the Markov matrix is therefore more accurate than the use of load spectra and a constant mean value for all load cycles. The Markov Matri-ces files to be used are available electronically:

Filename: Markov_Matrices_2.x-120 DFIG_110mHH_IEC_S(3)_50 Hz_LM 58.7_SW_Rev00.xlsx

(Refer to GE drawing 109W4195)

Filename: Markov_Matrices_2.x-120 DFIG_110mHH_IEC_S(3)_60 Hz_LM 58.7_SW_Rev00.xlsx

(Refer to GE drawing 109W4196)

Loads at Tower

Base My [kNm] Mx [kNm] Fz [kN] Fx [kN]

50 Hz 50 Hz_MY 0405 50 Hz_MX 0404 50 Hz_FZ 0403 50 Hz_FX 0401

60 Hz 60 Hz_MY 0405 60 Hz_MX 0404 60 Hz_FZ 0403 60 Hz_FX 0401

Table 11: Fatigue loads (Markov Matrices). 2.x-120 DFIG 110m HH IEC S LM58.7 SW.

2 Dynamic Stiffness of the Foundation

The minimum values for the dynamic foundation stiffness that have to be achieved are:

kϕϕϕϕ,min = 7.0 . 107 kNm/rad; kyz,min = 1.0 . 103 kN/mm

The minimum value for the static foundation stiffness that has to be achieved is 1/5 of the dynamic stiffness:

kϕϕϕϕ,stat,min = 1.4 . 107 kNm/rad

These values are for spread (raft) type foundations or mat plus deep piling type systems only. For the special case of short pole type foundations consult GE for the specific stiffness requirements. Short pole type foundation means drilled single shaft, monopile, caisson, bored piles or the proprietary design-“Patrick and Henderson Foundation” systems.

3 Maximum Allowed Inclination for Additional Load Consideration

Maximum allowed inclination caused by non-uniform settlement of the foundation, inaccurateness of installation, and tower axis misalignment:

• Uneven settlement due to non uniform soil properties across the foundation: 3mm/m (0.17°)

• Inaccurate installation: 3mm/m (0.17°)

• Tower axis misalignment due to solar irradiation: 2mm/m(0.11°)

To account for the impact from the total misalignment of 8 mm/m on the foundation design an additional moment of 2343 kNm has to be added at the foundation upper edge with appropriate partial safety factors.

Page 12: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 12 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

4 Connection between tower and foundation

The connection between tower and foundation is established with a combination of a Tower base ring with T-flange and anchor bolts. This tower base ring is going to be fixed with the anchor bolts (124 bolts M48; Grade 8.8, and an embedded anchor ring, which are concreted in the foundation. The tower base ring, the anchor bolts and the bottom anchor ring need to be placed (hanging) with a support structure over the cleaning layer (thin concrete protection layer over subsoil). After that the reinforcing and the concrete will be installed.

The tower base ring is already calculated so that the foundation engineer need only to calculate the grouted joint, the pre-stress of the bolts and the anchor ring in the concrete foundation.

Figure 6, 7 and 8 show the tower base ring, anchor bolts and embedded ring when supplied by GE (for projects in North America, only the tower base ring is provided by GE; the Figure 7 and 8 parts are by provided by the customer).

NOTE: The projection of the bolts is critical and has to be aligned with the position of the tower base ring!! Anchor bolts are to be elongated using a bolt tensioning cylinder. Bolts which do not have the required projection above top of con-crete foundation can be useless when the bolt tensioning device is not able to fit on them for bolt stretching.

NOTE: The final as fabricated outer diameter of the anchor bolts is critical, verify against exact tower flange hole size prior to concreting in the foundation anchors. NOTE: The threaded parts of all the anchor bolts are to be protected before concreting against getting concrete on them, e.g. by masking with tape or covering with protective caps! This protection should also remain on the bolts until after grouting to protect the threads from the grout spills.

Page 13: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 13 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Figure 6: Tower Base Ring Geometry 110m HH

Material Shell: S355 J0; Top Flange: S355 J2-Z25+N; Bottom T-Flange: S355 NL-Z35+N

Page 14: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 14 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Figure 7: Anchor Bolt Geometry,

Material: Anchor Bolt: Grade 8.8

Page 15: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 15 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Figure 8: Anchor Ring Geometry 110m HH, Material: Anchor Ring: S355 J2-Z15

Page 16: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 16 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

Figure 9: System Overview 110m HH

Page 17: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 17 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

5 Additional Information

For information on the foundation design, detailing, and execution including foundation boundary conditions including subsoil properties, spring constants for raft foundations, deep piling foundations, and short-pole foundation, a foundation design check list, etc. - refer to [2].

6 References - General

[1] Empfehlungen des Arbeitskreises 1.4 „Baugrunddynamik“ der Deutschen Gesellschaft für Geotechnik e.V. (DGGT), Mai 1998. Bautechnik 75 (1998), Nr. 10, S. 792-805

[2] Technical Specification Wind Turbine Generator Systems All Types, Information on the Design, Detailing and Execution of the Foundation for the Wind Turbine Generator System, GE Drawing 109W4732

7 References – GE Internal

[3] Dajana Schnorrenberg (GE Energy): 2.53_120_50Hz_LOA_allComp_IECSb_110HH_LM58.7L4S4.00. Enxx.pdf; Certi-fication Loading Document, GE Energy 2.53-120, 2.53 MW Rated Power / 120 m Rotor Diameter with GE 58.7 Blade / 110m Hub Height, IEC WTGS Class S, Revision 0, Date 03.08.2013

[4] Dajana Schnorrenberg (GE Energy): 2.53_120_60Hz_LOA_allComp_IECSb_110HH_LM58.7L4S4.00. Enxx.pdf; Certi-fication Loading Document, GE Energy 2.53-120, 2.53 MW Rated Power / 120 m Rotor Diameter with GE 58.7 Blade / 110m Hub Height, IEC WTGS Class S, Revision 0, Date 03.13.2013

Page 18: 3.3.1a_Foundation 110m_109W4197_A

GE Power & Water g

CONFIDENTIAL – GE Proprietary Information

DO NOT COPY without written consent from GE Power & Water. UNCONTROLLED when printed or submitted electronically. ©2013 GE Power & Water. All rights reserved

Page 18 /18 Spec # 109W4197 Originator 204058515 Revision A

TMPL0001 Master Specification Template Rev. (G)

8 Approval

Approved1: 2013/06/25 Scott Wittchen Date

(yyyy/mm/dd) Name

(Engineer)