Diagnostic Measurements on High Voltage Cables Dr. Michael Krüger (c) OMICRON
40

30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

May 02, 2017

Download

Documents

bcqbao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Diagnostic Measurements on High Voltage Cables

Dr. Michael Krüger (c) OMICRON

Page 2: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Commissioning of a 220kV Cable Cable

2

Page 3: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Commissioning of a 220kV Cable Overview

3

Page 4: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Commissioning of a 220kV Cable Section 1

4

Page 5: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Cable Joint with Screen Terminals

5

Page 6: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Check of the PD Measurement System

6

Page 7: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Test Setup

7

Page 8: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Measurement Principle at the Link Box

8

Page 9: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Mounting PD Instruments at a Link Box In the open Land during Day

9

Page 10: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Mounting PD Instruments at a Link Box In the open Land during Day

10

Page 11: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Link Box and Optical Fibre Cable

11

Page 12: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Preparing the Optical Fibre Cable

12

Page 13: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Mounting PD Instruments at a Link Box In the open Land during Day

13

MPD600

Optical Fibre

HFCT

Page 14: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Mounting PD Instruments at a Link Box Besides the High Way during Day

14

Page 15: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Mounting PD Instruments at a Link Box On the High Way during Night

15

Page 16: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Performance Check at a Link Box

16

Optical Fibre

Page 17: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

HFCT’s at the End Terminations

17 Outdoor termination GIS termination

Page 18: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

High Voltage Test Source

18

Page 19: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

High Voltage Lead to the Cable Termination

19

Page 20: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Diesel Generator

20

Page 21: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Test Voltage

21

Page 22: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Display of the High Voltage Source

22

Page 23: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

PD Measurement Frequency Range Wideband PD Measurment System

23

Noise spectrum and PD measurement bandwidth (3,5-4,5MHz)

Page 24: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Damping of Impulses Along the Cable Measurement Frequency Range: 3,5 - 4,5 MHz

24

Coupling capacitor Cable termination Joint 1-2

Joint 2-3 Joint 3-4 Joint 4-5

Page 25: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Damping of Impulses Along the Cable At different Frequencies

25

Page 26: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Switching Impulses from the HV Test Source

26

Page 27: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Gating off the Noise Impulses Gating Unit connected to Antenna in the HV Test Source

27

Gating

Page 28: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Overview of all Channels at 180kV

28

Coupling capacitor

Cable end termination

Joint 1-2 Joint 2-3 Joint 3-4

Joint 6-7 Joint 7-8 Joint 8-9 Joint 4-5 Joint 5-6

Joint 11-12 Joint 12-13 Cable GIS termination

Joint 9-10 Joint 10-11

Gating unit

Page 29: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

On-Line PD Measurement on a Transformer-GIS - Cable Connection (GIS Side)

29

2 1

3

Page 30: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Calibration with 1000pC on the GIS Side

30

Page 31: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Calibration with 1000pC on the GIS Side

31

Page 32: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Online PD Measurement at the GIS Side with 3-Channels

32

yellow phase GIS

red phase GIS

blue phase GIS

Page 33: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Sensors 1, 2 and 3 at GIS the Side and Sensor 4 at the Transformer Side

33

4 100m

Page 34: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Sensor 4 at the Transformer Side

34

Page 35: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

PD Measurement at the GIS and the Transformer Side with 4-Channels

35

blue phase GIS

blue phase Tr

yellow phase GIS

Page 36: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

PD Measurement at GIS and TR Side Trigger=TR Side - Delay on GIS Side

36

delayed signal blue phase GIS

trigger = blue phase Tr

Page 37: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

PD Measurement at GIS and TR Side Trigger=GIS Side - Leading Signal on TR

37

leading signal blue phase TR

trigger = blue phase GIS

Page 38: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Jumper between Oil/Oil Bushing and Cable Termination

38

Page 39: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

Jumper between Oil/Oil Bushing and Cable Termination

39

Page 40: 30_KRUEGER_Cable Diagnosis and monitoring case studies.pdf

[email protected]