7'-2 1 4 " BG.15.77m BG.10.35m(33.96') BG.10.45m(34.28') BG.10.82m(35.50') BG.12.42m BG.12.09m(39.67') IBG.10.76m(35.30') IBG.10.93m(35.87') IBG.11.24m(36.89') IBG.11.31m(37.10') IBG.12.12m(39.76') IBG.12.15m(39.88') IBG.12.33m(40.47') IBG.10.88m(35.70') IBG.11.67m(38.29') BG.13.24m(43.44') BG 13.24M (51.74') BG 12.42M (40.75' PARKING ENTRY SERVICE PARKING UNDER GROUND PARKING FOUNDATION EXISTING BASEMENT FOUNDATION WEST WING FOUNDATION el. 65.25' 3rd FLOOR LEVEL (19.89m) el. 56.41' 2nd FLOOR LEVEL (17.19m) el. 47.58' MAIN FLOOR LEVEL (14.50m) el. 38.13' BASEMENT LEVEL (11.65m) 11'-7" 8'-10" 8'-10" 9'-5 1/2" 9'-3" 57 11 1/2" 10'-0" el. 28.88' SUBBASEMENT LEVEL (8.80m) el. 76.83' 4th FLOOR LEVEL (23.42m) el. 86.83' ROOF LEVEL (26.46m) 5'-9" 5'-9" 234'-0" 234'-0" 15'-10" 15'-10" 12'-0" 12'-0" 10'-6" 10'-6" 11'-6" 11'-6" 12'-4" 12'-4" 16'-7" 16'-7" 14'-8" 14'-8" 12'-4" 12'-4" 11'-3" 11'-3" 11'-3" 11'-3" 18'-0" 18'-0" 15'-11" 15'-11" 12'-4" 12'-4" 18'-2 1/2" 18'-2 1/2" 12'-2" 12'-2" 11'-0" 11'-0" 12'-4 1/2" 12'-4 1/2" 6e 4e 3e 1e 10 9 8 7 6 5 4 3 2 1 6w 4w 3w 2w 1w 5 3 6 4 1 8 4 1 1 3 4 5 6 7 EAST PROPERTY LINE EAST SETBACK LINE WEST PROPERTY LINE WEST SETBACK LINE T.O. PARAPET 78.41' T.O.PARAPET 89.31' T.O. PARAPET 74.50' (EXISTING) TOP 78.41' T.O.PARAPET 89.31' Proposed North Elevation Point Grey Private Hospital Expansion STUART HOWARD MEMBERS AIBC - RAIC - AIA S H A ARCHITECTS INC. STUART HOWARD MEMBERS AIBC - RAIC - AIA S H A ARCHITECTS INC. Sheet: 0 5 10 20 30 50 ft 0 5 10 20 30 50 ft 3.03 Drawing: Date: February 17, 2012 WALL FINISHING SCHEDULE GREEN WALL LEDGESTONE - GRAY STONE SIDING MASONRY PANELS GLAZED SPANDREL PANELS PREFINISHED GRAY ALUMINUM PANELS GLAZED GUARDRAIL GLAZED CANOPY STEEL STAIR 1 3 5 6 4 2 7 9