8/10/2019 30. Construction Meeting #0 Jan 26, 2010
1/6
GENIVAR
PRE.CONSTRUCTION
MEETING
SUMMARY
Date:
Tuesda
January26,2010
Tlme:
11:00
a.m. to 1:30
p.m.
Pre-Construction
Meeting
Anaeroblc
Treatment
of
Septage/Corn
Stover
and
Blosollds
to
Produce
Blogas,
Electrlcal
Power
and
Treated Blosolids
Townshlp of
Georglan
Bluffs
and
Townshlp of
Chatsworth
Proct
0S-03-012-11-OS
Locatlon:
Genvar Consultants
LP
Owen Sound
Attendecs:
Ml:
?[ rffiiii.H,l.3, it;[,ff,'fl',
,
Mr.
Benjamin
Strehler,
CHFour
Biogas
lnc.
Mr.
Eugene
Suka, CHFour
Biogas lnc.
Mr. David
Bahter,
Batiments
Bahter
Mr. Will Moore,
CAO/Clerk, Township
of
Chatsworth
Mr. Rick
Winters,
Drector of Public
Works,
Township
of
Georgian Bluffs
Mr.
Ross
Slaughter,
P.Eng.,
GENIVAR
Consultants
Lp
Mr.
Chris Wilson,
P.Eng.,
GENVAR
Consultants
Lp
Ms. Corrie OeGroot, GENIVAR Consultants
Lp
Ms.
Manjusha
Naidu,
GENIVAR
Consultants
Lp
Dlslrlbutlon:
ThosePresent
Paul
Kundrat,
Maple Reinders
Constructors
Limited
BillWhite,
CAO, Township
of Georgian
Bluffs
Preparud
By:
Chris Wilson,
P.Eng.
The
following
items
were
discussed
at the
Pre-Construction
Meating
for the
contract for
th anaerobic
treatmnt
of
septage/corn
stover
and
biosolids
to
produce
biogas,
electrical
powr
and treatod
biosolids
for
the Township
of Georgian
Bluffs
and the Township
ol
Chatsworth:
Preliminary
revised
conslruction
drawlngs
were
provided
by
email to
Maple
Reinders
on
January
25,
2010.
During
the
pro-construction
meeting,
preliminary
copies
of the revised
construction
specifications
were
given
to
Maple
Beinders
and CH4.
Genivar
is
to
provide
finalized
construction
drawings
and
specifications
to
Maple
Reinders
by
February
5, 2010.
Bonding
for
the
contract will
be
provided
approximately
10 business
days after the final
contract
drawings
and
specifications
aro
provided
to
Maple
Reinders.
All correspondence
for
the contract is
to
be
provided
through
Maple
Reinders.
A lst
of the
key
contacts
for the
contract
will
be
compteted
by
Genivar, including
mailing
addresses,
phone numbsrs
and
addresses.
The
list
will
be
provided
to the
p@ect
team.
Notification
to
the Ministry
ol
Labour
of
tha
project
will
be completed
by
Maple
Reindars.
An occupational
health
and
salety form,
to
be
compfeled
by
Mapla
Reinders,
will
be
provided
by
Genivar.
Actlon
Bv:
Genivar
.
5.
Maple
Reinders
Genivar
Maple Reinders
Genivar/Maple
Reinders
owEN
SOUND 945
Third Avenue
Eaat,
Suito 212,
Owen
Sound, ontado
N4K 2Ks
et.:
(519)
g77612
Fax
(S19)
976-000g
8/10/2019 30. Construction Meeting #0 Jan 26, 2010
2/6
Preonskrctbn
Meoting *
f
Anerobb
Treanonr
ol
Septag/ElosolkCom
Stalks
to
Poduc
Eiogas,
Eleclrilal
powr
and
Treated
Bsollds
-
Towrislip
of Goorglan
8lus
and fowrship
of
Chais$orth
Actlon
Bv:
6. No
gas'
underground
hydro,
TV
or
Belr
Lnes
are
rocated
on the
constructlon
sit.
7.
on'site
underground
piping
includes
the
existing
pvc
DR3s
sewer
which lransfers dumped septage
to
the
existng
aeraton
cell
and
lagoons.
Maple
Reinders
is
to
perlorm
investigativ
digs
(as
required),
to
locate
the sewer
prior
to
construction
commncing
on
site
(speciflcafly
at the location
of the
prosed
bar
seen).
8.
An
overall
construction
schedule
wilt
be
provided
by
Maple
Reinders,
which
will
include
the construction
schedule
for
cHi.
cnstruction
of
the
bar
screen
chamber
should
bE
scheduled
in correspondence
with
lhe
Township
ol
Georgian
Bluffs to
timit
ths
downtime
fbr
the
exisling
sewage
pipe.
9.
As
per
cornments
from
Mr. Rick
winters,
Township
ol
Georgian
Blutfs
clearing
and
grubbing
of
the
enflre
constructiori
site
wilf likely be
completed
byth
end of February,2010.
10.
Maple
Reindors stimates
that
construction
wi[
likely
begin
Aprit
t,
2010,
after mobilization
ol
equipment
and
tralers
beginning
mio-March,
2010.
11.
cH4's
preliminary
design
of
the design
build
biogas
components
should
be completed
by mid-February,
2010
and
provided
io
Genivar
for
review.
Final
design
documents
will
likely
be
provided
to
Genivar by
March
1,2010.
12.
cH4 is responsibte
for
obtaining
any
air
and
noise
approval
requirements
for the_100
kw
biogas
generator.
Genivar
win apjly tor
revised
preliminary
c
of A
for
sewage
based
on
submitting
'rvised
design briel.
13.
Maple Reinders
projecl
manager
and
site
supervisor
will
be Mr.
Eric
slaa.
A
second
site
supervisor
has not been'selecteo to
dato.
Maple
Reinders
is
to
provide
Genivar with
the
contact
information
for
their
additional
site
supervisor
onc
selected.
14.
Maple Reinders
s
to
provide
Genivar
with
a list
of all its
subcontractors,
as
wellas
CH4's subcontractors.
15.
Maple
Reinders is
to
provide
Genivar
with
a
list
ol
its
material
suppl6rs
for
major items
such
as
concrote
and
gravel/
granular
B maleriai.'
The
soils
consultant
for
materials
and
backfllltesting
is Peto
Maccallum
out
ol
Kitchener.
Maple
Heinders
and
cH4 havareceived
a
copy
of
the
soils
report.
An
additional
correspondence
letter
from
Peto
lvtCaltum
has
been
recelved
by
Genivar
which
will
be fonvarded
to
Maple
Beinders
concerning
the
digestate
storage
tank
tocation.
16.
Genlvar
s
to
submiilo
the municipalities
a
proposed sgn board layout.
After
approval
by
the municipalities,
the
sign
Uoard
layout
wi
be
submitted to
Maple
Reinders
for
construction.
The tocato
of lhe
sign
board will
be selected
by
the
municipalitos.
17.
A site
office for
Maple
Reinders
will
be
provided
on
site.
18,
Genivar
will
provide
a site works
diary
to
bs
located
on site
at all times.
19'
shop
drawings
are to
be submitted
in
digitalformat
by Maple
Renders,
addressed
to Mr.
chris wilson,
Genivar.
some
shop
drawings
will
be
Maple Reinders
Maple
Reinders/
Township
of Georgian
Bluffs
Townshlp
of
Georgian
Bluffs
Maple
Relnders
cH4
CHdGenivar
Maple Reinders
Maple
Reinders
Maple
Reinders/Genivar
Genvarownship of
Georgian
Bluffs/Township
of
Chatsworth/Maple
Reinders
Genivar
8/10/2019 30. Construction Meeting #0 Jan 26, 2010
3/6
Pre-Constntion
Meting
#l
Anaroblc.
Tratment
of
sptage/BbsoliJs/Com
Stalks
to
Prcdrrce
Btogss,
Electrical
power
and
Treated
Bioeoq-Tovrnship
ol Georgian
Blulfs
and
Townshp
of Chaisuorth
20,
2't.
available
for revew
on
FTP
(File
Transfer
protocol)
sites.
Shop
drawings
will
tikely
start
to be
submitted
in
earty
March,
2010 witir
approximately
5
to 10
working
days
tumaround
by
Genivar.
Maple Reinders is to submit to Genivar
their
standad contingency plan
for
dealing
with hazardous
spills
and
other
environmental
coniamiation
ssues.
All
traffic
to
the
sit should
come
lrom
lhe east
along
side Road
o, and
not
through
the nearby
villages.
Half
toad
restrciions
are in
place
until
May,
but there
may
be some
leniency
from
the
Township
of
Georgian
Bluffs.
Disposal
of
surplus
excavated
material
will
be
on
site,
wilh
no material
haulad
off
site. Topsolwifi
be stockpiled
in
a
setected
tocation
on
site
once
construction
bsgins.
Maple
Reinders
will implement
a
cuufill
program.
A
pre-construc'tion
report
shall
be
completed
by
Genivar
prior
to
clearing
and
grubbing
of
the site
and
after ctearing nd grubbin of thesite prior to construction work being
started.
A
copy
of
th repowill
be
locatd
at
the
sit office
and
wilt
also
be
distributeiJio
tne
prot
team.
Monthly
payment
certificates
will
be
completed
with
a cut
otf
date for
submittal
of the
25h
of each
month.
Montirty
site visits
will
generally
be
completed
prior
to the. request
lor
paynent
being
submitted
to
vrify
work
completed.
Maple
Reindors
slated
they
will
provide
a
progress
report
each month
including pictures
and
discussions
concerning
wnat
work
was
cupleted.
This
progress
repon
will
bs
emailed
to the
roject
team
members.
Requests
for
payment
are
to
be
addressed'to
Mr.
Chris
Wilson,
Genivar.
For
extra
work,
the
request
for
quotation
process
will
be
completed
wilh
Genivar requesting
pricing
from
Maple
einderE.
A chang'e
order
to
complste
tho work
will be issued
based
upon
the agreed
pric.
l.urglce
for
rhe
projecr
will
be
cumpteted
at
th
same
tme
as
bonding.
All risk
insurance
was
dlscussed
to
b
mainlained
until
th
commissioning
period
for
the conlract
was
complete.
Additional
work
to be
organized
by municipalities (i.e.
separate
from
the
contract)
will
be
to complete
the installation
of
the
well
pump
and
construction
of
lho
new
well.
Mr.
Rick
winters,
Township
oi
Georgian
Bluffs
will begin
the
quotation
process
for
the work.
The
first
site
construction
meeting
was
agreed
to
be held
on April
2g,
2010
at
10:00
a.m.
There
was
discussion
with
cH4
on
the
requirements
for
their
MCC
and
PLg.
lt.was
mads
apparenr
rhat
the
3 m
of
wall
space
ailocated
lor
their equipment requirernents
wilf be
suitable.
As
per
comments
from
Maple
Renders,
the main
electricalline
into
the
control
and
dewatering
building
should
be relocated
to
the
northeast
comer-of
the building
so that
it
does
not
overlap
an
procss
piping
on
site.
This
was
agreed
to be
completed
by
the
project
ieam.
There
was
discussion
conceming
how
to
empty
the
digestate
storage
tank, including
suction,
pipe
and
discharg
-ppe
lation,
mixig
requrements,
and
building
up
of soil
for
ramp
ccess.
Genivar
is
to
look
nto
this issue.
Acllon
Bv:
Maple Reinders
Maple
Reinders/Township
of
Georgian
Blutfs
Maple Reinders
Genivar
Maple
Reinders/Genivar
Maple
Reinders/Genivar
Maple
Reinders
Township
of
Georgian
BluffslTownship
of
Chatsworth
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
Genivar
8/10/2019 30. Construction Meeting #0 Jan 26, 2010
4/6
Pre
Conslrrction
Meting Jt't
Anagrobic
Treanonl
ot Sptag/Absoli,Voom
Stalks to
Produce
Elogas,
Electri:8|
Ponrr
and
ffeglgqgqgqfids
-_Towrsh
of Georgian Blufls
and
Township
of Chats'rcrttt
Paoe
4
33.
As
per
discussion
with
CH4,
an area
ol
the
proiecl
site
is
requred
for a
biogas
cooling bed,
to cool
tho
gas
pror
to
th6
iogas
gonsrator.
Tho
approxmate
size
required
is
20 ft
x
50 ft
(6.1
m
x 1S.2
m)
tor
a
100 kW
biogas
generator.
Genivar
is
to
revise the contract
drawings
to
reflect
the
selected
location for
the
biogas
cooling
bed
between
the
dgester
and
the control
and dewatering
building/hydrollzer.
Genivar
is
to look
into
providing
a
double door
for
lhe
drum scren
room
for removal
of the
drum
scren, if
required.
24 hour leakage
testing
will
be
provided
for
each
of the
concrete tanks
on
site,
including
the
dgester,
hydrolizer
tank, digestate
storag
tank
and FOG
tank.
Water utilized
to
perform
th
tosting in
one tank
should
be
utilized
in
the
other tanks.
The
digester
and
hydrolizer
will
be
provided
with
an uttrasonic
transducer
for level
measurement
and
for alarming
requirements.
A
float
switch will
be
provided
in
the
digestate
storage tank
to
provide
a
high alarm
signal.
Ventilation
ducting for
the
pasteurizer
unit
is
to be
provided
to tha odour
control unit.
Odours
only
occur when
the FOG
tank is
belng
filled.
Maple
Reinders is
to contact
Baycor
(drum
screen
supplier) concerning
the
odour control
reguirements
for
the drum
screen.
There
was
som
concsm
that
the digestate
storage
tank will
produce
odours.
CH4
statd
lhat
odourE
are not normally
producd,
but
sometimes they can
happen.
CH4
stated that
the
destate
storage
tank
could
be covered
as needed.
CH4s design
submittal
shall
show
a
list
of
required
alarms
and
continuous monitoring
parameters
for
their specific
equipment.
Control
requiremants
for
the
drum
screen/polymer
system
are
to
be
provided
by Mle Reinders.
A
separate control panel provided by
Eaycor
is
not required,
other then
a
general
electrical
panel.
The
backwashing
procedure
for
the drurn
scren may
require
additional
storage and
also a booster
pump
to
provide
the
worse
case
scenario
flow
requirement.
Maple Beinders is
to dscuss
with
Baycor
concemng
these
requirements.
Maple Reinders
is
to
discuss with
Baycor
conceming
the best
design for
lhe
transfer
pumps
to
provide
dewatered
septage
to the
digester
and
hydrolizer.
An inline
system
could
possibly
be
provided
with
progressive
cavity
pumps,
thereby
eliminating
a
sump. Thls
shoutd
also
remove
any issues with
odour after
lhe
drum
screen.
It
was
proposed
by Maple
Reinders
to install
a
flushing
connecton
to
tha hydrolizer,
provided
via
use of a
Y'connection
and isolation
valves.
Normal
flow
to the
hydrolizer
will be by
gravity.
lt
is
tikety
that
the
transfer
pipe
from
the separator
to th
hydrolizer
will
be
just
below
grade.
Therefore,
lhe
pipe
will ba
required
to
be insulated.
Genivar
is
to
discuss
furthar with
Maple
Reinders
regarding
the flushing
connection.
A
recrculation
lne from
the digester
to
the
hydrolizer
is
to be
shown on
tho contract
drawings
and
tho
process
flow
diagram.
The line
size
will
be
150
mm diameter.
CH4 s
to
provide
an updated single
line dlagram
to
Genvar.
Actlon
Bv:
Genivar
Genivar
Maple
Feinders
cH4
Maple Rinders
Maple
Relnders
Maple
Reinders/Genivar
Genivar
37.
41.
42.
cH4
8/10/2019 30. Construction Meeting #0 Jan 26, 2010
5/6
i.
Prs-Constructon
Meeting
f I
fl19g*
Tr*enr
ot
septag/Bo6ork
vcom
starks
ro
prodrrce
Biogas,
Erctri.r
power
and
r
feated
Eaosotc
-
Tovnshlp
of Geofgian
qlus
ard roflnship
ol
chalsr,rcrth
44.
cH4
is
to
provde
a
lst
to
Genivar
of the
proposed
loads
to be
met
by
oxfemal
powel(i.e.-emergency
genorator),
io maintain
the biologi
requirements
of
the
biogas
system.
Emergency power
will
be
provrded
by
a
rented
stan_dby
generator in the
casc
wnri tne biogas
generatorhas
failed,
as
wellas
normalpowr.
45.
4
copy
of
the
preliminary
revised
contract
specifications,
including
the
Form
of
render,
and
a
template
payment
ceititicate
has
een
proioed
to
Mapte
Reinders
and
cH4
for
review.
Maple
Reinders
and
c4
are
to
provide
Genivar
with
any comments
or correcons
to
the Form
of
Tender
and
payment
certificate.
46.
CH4
explained
lhal
approximatety
4oo/o
of
the
cost
of
the
biogas
gneator
is
required
when
ordering
the
unit.
50lo
is
due
on
delveri
to
ste
and 10% is
due
after
commissioning.
The
40olo
required
at
ordding
works
out
to be
an approximate
cost
of
$95,000,
which
must
be
paid
u
front
by
cH4
Mr.
wiil trroore
and
Rick
winters
are
to
noiiry
tn
Township
of
chatsworth
and
Georglan
Blutfs
cotncils
conenrnini
this
pp-payment
requirement.
The
company
which
manufacturer
the
blogas
genorator
is
Martin Machnery
locaied
n
Latham,
Missouri.
The
next
council
meeting
lor
aac
municipallty
ls
on
wednesday,
February
3,
2010.
cH4
arso
made-apparent
that
ie
delivery
time
fof
ihe
biog
ggnerator
could
be
up
lo 6
months
from
ordering.
f
tne
generator
47.
cH4 infomed
the
project
tam
that
the
delivery
time
lor
the
biogas
generator
coutd
take
up
to
6
months
frn
ordeiing.
Maple
Reindrs
and
CH4
are working
to
resolve
this issue.
48.
The
meeling
ended
at
approximatety
i:30
p.m.
Actlon
Bv:
cH4
Maple
Reinders/CH4
Townshlp
ol
Georglan
Bluffs/Township
of
Chatsworth
Maple
Reinders/CH4
lf
there
are
any errors
or
omissions
in the
above
minutes,
please
contact
the undersigned.
Prepared
by:
GENIVAR
Consultante
LP
Chris
S. Wilson,
P. Eng.
Environmental
Engineer
/mmw.
8/10/2019 30. Construction Meeting #0 Jan 26, 2010
6/6
col{TACTUST
coNTFACt
0$00.012-1
1
-os
AT{AEROBIC
TREATIIENT
OF
SEPTAGE/COR}I
STOVEB/
BtosouDs
To PRODUCE
B|OGAS,
ELECTRICAL
POITIEB
AilD
IREATED
BOSUDS
CONTACTNAIIE
COTPAilY
P}IONE
F(
E
ltL
Eric
Sha
Maple
Reinders
Constructors
fE,
0t1(:
906.8214844
Cell: 4l55o.ols
9os-921-4822
Eenjamin
Strohler
FlFour
Bogas
lnc,
untc:
13.224-gfl0g
Cell:
613-6'tt-9516
613-?2+12
Eugene
SAuka
l-lFour Biog6
lnc.
Ofli.
619-224-9308-
_
CelL
61S897-9092
613-224-16/.2
osztul(a@
kellrnoneorino,com
Ross
Slaughtef
Chris
Wilson
Corrs
Docroot
(',NlvA
Consultants
Lp
GENIVAR
Consultants
Lp
GENIVAR
Consultants
Lp
offco:
519376-762,
ext.
226
Celh
51$378-4626
Otlica: 519376.7612,
ext. 2OB
Offco:
51937&76i2,
ri.
A56
Cel[
5t93790180
rr.itlo-{r(rg
519376-8008
519376-8008
ross.slauohlr
@
oBnvar.com
chris.wilson
@
oenvr.com
corrie.degroot
@oenivar.com
Bick
Winters
Townshlp
ol
Georgian
Blufls-
51$37e2729
519372-1620
nrrinters
@060roianbluff
s.on.ca