3 rd QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES Presented by: Sibusiso Xaba Director-General: Arts and Culture Date: 26/02/2014
59

3 rd QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

Jan 19, 2016

Download

Documents

Kimi

3 rd QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES. Presented by: Sibusiso Xaba Director-General: Arts and Culture Date: 26/02/2014. PRESENTATION OUTLINE. Key h ighlights Summary of total budget vs. expenditure per programme and economic classification - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

3rd QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

Presented by: Sibusiso Xaba

Director-General: Arts and Culture

Date: 26/02/2014

Page 2: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

2

PRESENTATION OUTLINE

Key highlights Summary of total budget vs. expenditure per programme and

economic classification Explanation of expenditure variance per economic classification Performance overview against predetermined objectives Performance against ENE performance indicators Performance against other key APP indicators Explanation of underperformance Review of public entities’ performance and expenditure List of acronyms and abbreviations

2

Page 3: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

3

KEY HIGHLIGHTINSTALLED AND UNVEILED NELSON MANDELA STATUE IN

DECEMBER 2013

6

Page 4: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

4

KEY HIGHLIGHTS

Job Opportunities Created Since the beginning of the 2013/14 financial year, the Department has created

5531 job opportunities through its services delivery initiatives.

Policy and Legislative Frameworks Approval of the National Policy on the Digitisation of the Heritage Resources by

the Minister on the 27th of October 2013. Approval of the National Heritage Human Resources Development Strategy by

the Minister on the 4th of November 2013. Published two Gazettes on the geographical names on the 2nd of October 2013

and 6th of December 2013. To date, the Department has received 92 name change applications and the Minister has approved 83 of those applications.

Conducted two Archival Outreach Programmes in Eastern Cape from the 28th of October to 01 November 2013 AND the Northern Cape from the 04th to 08th of November 2013. Through this programme, the Department managed to reach 359 people in the Eastern Cape Province and 578 people in the Northern Cape Province.

Approval of the National Archives Digitisation Strategy.

4

Page 5: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

5

SOUTH AFRICAN LITERACY AWARDS, NOVEMBER 2013

11

Page 6: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

6

KEY HIGHLIGHTS

Infrastructure Development Built 3 new libraries in Perdekop (Mpumalanga), Nkqubela and KwaNonqaba

(Western Cape) Funded 11 infrastructure projects against a planned target of 9 projects within

the allocated budget: • Robben Island: Repair and maintenance of sewer services • Robben Island: Power House - maintenance of the base load generator• Robben Island: Blue Stone quarry and walkway restoration• Afrikaanstaal Museum: Upgrading workers change room• Ncome Museum: Construction of phase 2• Transvaal Museum: Management Plan - appointment of specialist• Iziko Museum of South Africa: Construction of a storage facility in the court

yard• Transvaal Museum: Installation of a second chiller• National Museum: Walk in firearm safe• National English Literary Museum: Construction of the museum• National Library South Africa: Provision of facilities for the disabled

5

Page 7: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

7

MINISTER ADDRESSING THE COMMUNITY IN IVORY PARK AS PART OF HIS PUBLIC ENGAGEMENT PROGRAMME, OCTOBER

2013

9

Page 8: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

8

MINISTERIAL IMBIZO- JHB IN IVORY PARK, OCTOBER 2013

15

Page 9: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

9

KEY HIGHLIGHTS

Human Resource Development Trained 70 officials in Archives & Records Management from the 7th to

the 18th of October 2013 as part of the Post-Conflict Reconstruction and Development Programme efforts with the Democratic Republic of Congo (DRC).

Hosted 10th Annual Oral History Conference in Northern Cape Provincial Archives in Kimberley from the 8th to the 11th of October 2013.

Collaborative arts education projects in partnership with the Department of Basic Education were conducted in Gauteng Province:

• Segarona Schools Art Festival, Clayville Community Hall

• 100 Schools Arts and Theatre Education in Johannesburg, Braamfontein

7

Page 10: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

10

KEY HIGHLIGHTS

International Relations

Participated in the International Festival of African Fashion (FIMA) from 18th to the 26th of November 2013 as part of bilateral with Niger. South African designers were nominated for awards (i.e. Mr JJ Schoeman and Mr Slyvester Salata).

Participated in the 10th edition of the Southern Arab Democratic Republic Festival from the 8th to the 13th of October 2013.

Held workshops with Universities and Academia on the Beijing Treaty on Audio-visual Performances in Cape Town on the 7th of October 2013.

Hosted 3 workshops on the Convention on Cultural Diversity in East London (1st November 2013); Kimberley (7th November 2013) and Pretoria (2nd of December 2013).

8

Page 11: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

11

DEPUTY MINISTER DURING IMBIZO IN LIMPOPO, DECEMBER 2013

30

Page 12: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

12

KEY HIGHLIGHTS

International Relations Continued…

Participated in Joint Bilateral Commissions towards developing and servicing bilateral agreements with Rwanda, Iran, Niger, Saudi Arabia and Ghana.

Facilitated a Ministerial visit and signed-off a Programme of Collaboration (PoC) with Angola from the 04th to the 8th of October 2013.

Trained 70 officials in Archives & Records Management from the 7th to the 18th of October 2013 as part of the Post-Conflict Reconstruction and Development Programme efforts with the Democratic Republic of Congo (DRC).

Minister Mashatile participated at the 6th Edition of the Forum d’Avignon International meetings which was held from the 21st to the 23rd November in France.

10

Page 13: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

13

LAUNCH OF THE FREEDOM DAY CAMPAIGNS- “FREEDOM FRIDAYS”

26

Page 14: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

14

SUMMARY OF TOTAL BUDGET VS EXPENDITURE PER PROGRAMME AND ECONOMIC CLASSIFICATION

12

Page 15: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

15

SUMMARY OF TOTAL BUDGET VS EXPENDITURE PER PROGRAMME

13

Programme Adjusted Appropriation

2013/14

ExpenditureDecember

2013

Total Available

%Spent

R’000 R’000 R’000

Administration 234,017 204,765 29,252 88%

Performing Arts 629,699 428,301 201,398 68%

National Language Services

123,692 83,077 40,615 67%

Cultural Development 221,896 171,053 50,843 77%

Heritage Promotion 867,379 504,763 362,616 58%

National Archives and Library Services

838,094 615,277 222,817 73%

Grand Total 2,914,777 2,007,236 907,541 69%

Page 16: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

16

SUMMARY OF TOTAL BUDGET VS EXPENDITURE PER ECONOMIC CLASSIFICATION

14

Economic Classification Adjusted Appropriation

2013/14

ExpenditureDecember 2013

Total Available

%Spent

R’000 R’000 R’000

Compensation 196,364 144,442 51,922 74%

Goods & Services (include Payments for Financial Assets)

420,069 299,165 120,904 71%

Provinces & Municipalities Conditional Grant

597,786 469,510 128,276 79%

Departmental Agencies & Accounts (Current)

1,026,394 770,541 255,853 75%

Foreign Government Organ 1,000 750 250 75%

Departmental Agencies & Accounts (Capital Works)

509,512 194,124 315,388 38%

Non Profit Org 13,581 10,183 3,398 75%

Capital Assets 6,979 6,178 801 89%

Grand Total 2,914,777 2,007,236 907,541 69%

Page 17: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

17

EXPLANATION OF EXPENDITURE VARIANCE PER ECONOMIC CLASSIFICATION

16

Page 18: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

18

Economic classification Description of the line item Reason for variance

Compensation of Employees The line item includes remuneration in cash, social contributions by the employer, basic wages and salaries, overtime, remuneration of nightshift, cost of living allowances, house allowances, bonuses, pension, medical aid etc.

• An amount of R144 million (74%) has been spent as at 31 December 2013.

• A total of 41 posts have been advertised since March 2013 (in three phases) and a total of 31 posts have been filled to date. The other posts are in process of being filled.

• Performance incentives (pay progression and performance bonuses) were processed in respect of employees on levels 1 – 12.

• No over/under expenditure is however anticipated based on the projected expenditure by March 2014.

17

Page 19: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

19

Economic Classification

Description of the line item Reason for variance

Goods and Services The item includes payments for all goods and services to be used by a government unit i.e. goods or services of a current nature, excluding purchases of capital assets.

• An amount of R299 million (71%) spent as at 31 December 2013.

• MGE funds allocated under Goods and Services. A virement approval of R61,5 million was granted by Treasury to shift funds to Transfer to Households and the movement of funds has been adjusted accordingly.

• Claims are not received in time from DPW to process the municipal services, sate and private owned leases transactions on behalf of DAC’s Public Entities.

18

Page 20: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

20

Economic Classification

Description of the line item Reason for variance

Provinces and Municipalities (Conditional Grant on Community Libraries)

The expenditure relates to the

transfers for the Conditional

grant on Community Libraries

and funds are transferred to

various Provinces quarterly

based on their business plans.

• An amount of R470 million

(79%) has been transferred

as at 31 December 2013

which is based on their

business plans.

• The detail of spending per

province is as follows:

19

Page 21: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

21

PROVINCES AND MUNICIPALITIES:CONDITIONAL GRANT ON COMMUNITY LIBRARIES

20

Page 22: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

22

Economic Classification

Description of the line item Reason for variance

Departmental Agencies & Accounts (Current Transfers)

This expenditure item relates to

subsidies to the Departments’

Public Entities. The Performing

Arts Institutions transfers are

processed quarterly, Libraries

and Heritage Institutions on a

monthly basis.

• An amount of R771 million

(75%) has been spent as at

31 December 2013. The

spending is in line with the

projected expenditure.

• No over/under expenditure is

however anticipated by March

2014.

21

Page 23: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

23

Economic Classification

Description of the line item Reason for variance

Departmental Agencies & Accounts (Capital Works)

This expenditure item relates to

maintenance, upgrade and

refurbishment of the Departments’

Playhouses, Museums and

Libraries as well as the

construction of Legacy Projects.

• An expenditure of R194 million

(38%) has been incurred as at

31 December 2013.

• The under spending is due to

DPW submitting claims late.

22

Page 24: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

24

Economic Classification

Description of the line item Reason for variance

Non Profit InstitutionsThis expenditure relates to

subsidies to BASA, Blind SA and

Engelenburg Arts Collection.

• The expenditure of R10,1

million (75%) as at 31

December 2013. The

spending is in line with the

guideline percentage and

projected expenditure.

• No over/under expenditure is

however anticipated by March

2014.

23

Page 25: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

25

Economic Classification

Description of the line item Reason for variance

HouseholdsThis expenditure item relates to

all the financial assistance

projects that the Department fund

during the financial year.

• An amount of R112 million

(79%) has been spent as at 31

December 2013.

• The spending is in line with

the planned project.

• No over/under expenditure is

anticipated by March 2014.

24

Page 26: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

26

Economic Classification

Description of the line item Reason for variance

Capital AssetsThis budget relates to the

purchasing of machinery and

equipment including the IT

equipment as well as acquisition of

a building and other fixed

structures.

• An expenditure of R6,1 million

(89%) has been spent as at 31

December 2013.

• The expenditure will be

monitored to curb the over

expenditure.

25

Page 27: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

27

1

PERFORMANCE OVERVIEW AGAINST PREDETERMINED OBJECTIVES

Page 28: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

28

THIRD QUARTER PERFORMANCE OVERVIEW

27

Page 29: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

29

COMPARISON OF FIRST, SECOND AND THIRD QUARTERS 2013-14 FY

28

Page 30: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

30

PROGRAMME-SPECIFIC PERFORMANCE

29

Page 31: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

31

PERFORMANCE AGAINST ENE INDICATORS

31

Page 32: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

32

SELECTED ENE INDICATORS

PERFORMANCE INDICATOR

2013/14 TARGET

3RD QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of arts practitioners placed in schools

160 Interim progressreport and a plan for 2014/15

Interim Progress Report on placement of 160 of 200 Artists/Arts practitioners in schools, has been generated.

We foresee placing an additional 50 Artists in schools by January 2014.

Number of public art programmes supported

9 4 programmes implemented

4 programmes were not implemented. Programmes have been identified and we still finalising the MoAs.

The projects will be implement before end of March 2014.

Number of jobs created through leveraging off partnerships, work streams of public art and touring ventures per year

1150 N/A 621 Other projects from which other jobs will be generated will be rolled out in the fourth quarter.

Number of language practice bursaries awarded per year

280 Monitoring visits to universities

336 bursaries have been awarded to date. Monitoring visits to universities are ongoing

UNISA registered more students as results of low registration fees as compared to other tertiary institutions.

32

Page 33: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

33

SELECTED ENE INDICATORS

PERFORMANCE INDICATOR

2013/14 TARGET 3RD QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of flags and poles installed at schools per year

2500 900 0 The omnibus service providers were appointed at the end of the 3rd quarter.

Number of handheld flags distributed per year

100 000 30 000 215 000 flags distributed during the memorial activities leading up to the state funeral for former President Nelson Mandela

Target exceeded due Memorial activities of leading up to the State Funeral for former President Nelson Mandela

Number of heritage(legacy/monuments)projects supported per year

2 OR Tambo:earth works andsuperstructurecompleted

OR Tambo:earth works andsuperstructure not completed. However permit application forms submitted to SAHRA.

Contractor to be appointed as soon as there is a decision on the revised budget. SAHRA contacted to expedite the process

Centenary: appointment of all service providers

Drakensburg promotion was appointed to manage the centenary

33

Page 34: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

34

SELECTED ENE INDICATORSPERFORMANCE

INDICATOR2013/14 TARGET

3rd QUARTER TARGET

PROGRESS VARIANCE/COMMENTS OR PROGRESS DESCRIPTION

Number of bursaries in heritage studies awarded per year

106 Selectioninterviews for new bursary recipients

Selection completed and provisional letters of award were sent to all recipients

Number of jobs created in the Heritage sector per year

9382 2 082 1450 jobs created during the celebration of the 2013 Day of Reconciliation.

Number of communitylibraries upgraded per year

40 10 3 Libraries were upgraded as follow;

2 Northern Cape (Kuruman, Lukhanyisweni), 1 KwaZulu-Natal ( Nquthu)

Eastern Cape has deferred all its upgrade projects to 2014/ 2015 due to budget shortcomings.- Limpopo has completed the assessment of libraries to be upgraded and concluded not to continue with the 8 identified projects because the estimates exceed the actual budget

Number of new community libraries built per year

16 2 3 new libraries were built in Perdekop (Mpumalanga), Nkqubela and KwaNonqaba (Western Cape)

34

Page 35: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

35

SELECTED ENE INDICATORSPERFORMANCE

INDICATOR2013/14 TARGET 3rd QUARTER

TARGETPROGRESS VARIANCE/COMMENTS

or PROGRESS DESCRIPTION

Number of jobs created through support to arts,culture and heritage events per year

9832 N/A 2103 jobs were created during the reporting period

Number of touring venture projects supported per year

5 Reports onsupported touringprojects

The budget submission approved for the implementation of Touring Venture programme through selected performing arts institutions as well as other financial support to other independent touring productions

Number of cultural events supported per year

39 13 13 cultural events were undertaken in the third quarter i.e Launch of the Older Persons Week, Amahlubi Celebration etc

35

Page 36: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

36

PERFORMANCE AGAINST OTHER KEY APP INDICATORS

36

Page 37: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

37

PROGRAMME 1: ADMINISTRATION

OBJECTIVE: To provide core support services to the department to ensure the realisation of enhanced governance and accountability

PERFORMANCE INDICATOR

3rd QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

% of service providers paid within 30 days

100% 100% of service providers paid within 30 days.

Number of training opportunities provided

150 A total of 198 training interventions were rolled out during the 3rd quarter

Some of the training interventions that were targeted for the 2nd quarter were only rolled out in the 3rd quarter

% of people with disabilities

1.80% 1.8% people with disabilities

Ensuring that at least two more PWD are appointed before the end of the current financial year.

% of reported service delivery complaints internally resolved within the set parameters

100% 100% cases as per Presidential Hotline were resolved.

% spent against approved budget

70 An expenditure of R2, 007 billion (69%) cumulatively has been incurred versus the adjusted appropriation

The Capital Works expenditure will improve as the Project Support Team is addressing projects still in progress. (ii) DAC to engage DPW to submit claims on time for processing.

37

Page 38: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

38

PROGRAMME 1: ADMINISTRATION

OBJECTIVE: To provide core support services to the department to ensure the realisation of enhanced governance and accountability

PERFORMANCE INDICATOR

3rd QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

% Vacancy Rate (relative to approved structure)

12% 7.8% vacancy rate. Most of the posts that were advertised since April 2013 were filled in the 3rd quarter

% of capital works budget spent

75% Overall capital works expenditure is at 43%

Under spent funds from poor performing projects will be redirected to new projects by end of February 2014

Number of media liaison initiatives implemented

3 More than 3 Media liaison initiatives were implemented ;

•Briefing on Mandela Gun Film, •Dr Beyers Naude Memorial Unveiling, •Chief Albert Luthuli Memorial Lecture, •Rahim Moosa Memorial Unveiling, •Oral History Conference, Reconciliation

38

Page 39: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

39

PROGRAMME 2: PERFORMING ARTS

OBJECTIVE: To promote arts & culture in SA and mainstream its role in social developmentPERFORMANCE INDICATOR

3rd QUARTER TARGET PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of targeted groups enrichment programmes supported

4 programmes supported 2 Youth Programme was held in 2 provinces, in partnership with youth empowerment projects of Guff-Guff Youth Development (KZN) and Winterveldt Arts & Culture Forum (Gauteng).

2 Target Groups programmes were held: i). Older Person's Week hosted on the 3rd of October 2013 at Freedom Park Museum. ii) Zwakala Awards 2013 hosted on the 25th October 2013 at the University of Johannesburg.

Number of trendsetters placed in province

Quarter reports received The activation of the programme is on hold until contracts and payments are done to the Service Provider. The programme will be rolled-out before end of March 2014

Women, people with disabilities and senior citizens/elderly economic empowerment workshops

2 Women, people with disabilities and senior citizens/elderly economic empowerment workshops

Women Empowerment Workshop held at Badplaas, Mpumalanga on the 17th October 2013.

Women Empowerment Workshop held at Thohoyandou, Limpopo on the 5th October 2013

39

Page 40: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

40

PROGRAMME 3: NATIONAL LANGUAGE SERVICE

OBJECTIVE: To develop, promote and protect all official language through policy formulation and implementation.

PERFORMANCE INDICATOR

3rd QUARTER TARGET PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of terminologies developed per domain

ARTS AND CULTURE INT. PHASE 872 terminologies developed

ARTS AND CULTURE INT. PHASE 872 terminologies developed as expected.

Target Achieved

HSEMS INT. PHASE 2898 terminologies developed

HSEMS INT. PHASE 2898 terminologies developed as expected.

Target Achieved

LIFE ORIENTATION INT. PHASE 1491 terminologies developed

LIFE ORIENTATION INT. PHASE 1491 terminologies developed as expected.

Target Achieved

ELECTION 700 terminologies developed

ELECTION 7000 terminologies verified. Final consultative meetings for Elections held in 10 official languages.

Target Achieved

40

Page 41: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

41

PROGRAMME 3: NATIONAL LANGUAGE SERVICE

OBJECTIVE: To develop, promote and protect all official language through policy formulation and implementation.

PERFORMANCE INDICATOR

3rd QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of terminologies developed per domain

MATHS SNR. PHASE 925 terminologies developed as expected.

MATHS SNR. PHASE 925 terminologies developed as expected

Target Achieved

Number of official documents translated into and edited in all official languages

284 documents 100 documents translated/edited as per clients' specifications

Fewer request for translation of documents were received from the clients than expected

41

Page 42: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

42

PROGRAMME 4: CULTURAL DEVELOPMENT

OBJECTIVE: To improve development opportunities for SA Arts & Culture, through partnerships to ensure sustainability of the sectorPERFORMANCE INDICATOR

3rd QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

National Art Bank (NAB) established

Start processof registeringlegal entity

Proposals for the research of establishing the entity were evaluated by the BEC.

Submission drafted regarding alternative proposal for Art Bank

NaCISA established Secure strategic partnerships and submit report on NaCISA activities by 30 December 2013

Conceptual framework under development and strategic partnership underway with University of the Witwatersrand

Number of continental events participated in

1 Participated in the International Festival of African Fashion (FIMA) from 18 - 26 November 2013 as part of initiating a bilateral relations with Niger

DAC Framework on ODA developed and approved

Consultations ODA Workshop held on the 17-19 November with National Treasury & provinces for an update on new international funding trends & modalities in order to assist SA as a middle-income country to respond to ODA that will be received henceforth.

42

Page 43: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

43

PROGRAMME 5: HERITAGE PROMOTION

OBJECTIVE: Preserve, protect and promote SA’s cultural & heritage through policies for socio-economic development, social cohesion and national identity

PERFORMANCE INDICATOR

3RD QUARTER TARGET

PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of policies/ legislative instruments developed and/or reviewed to achieve the objective

Costing of National Museums Policy completed by 31December 2013

Costing of National Museums Policy not completed however, budget submission and Terms of Reference submitted for approval

Alignment of the White Paper and the Museums Policy. Service provider to be appointed by end February 2014 to complete costing exercise.

Presentationof National Living Heritage Policy torelevant portfoliocommittees by 31December 2013

Presentation of policy torelevant portfolio committees by 31 December 2013 was not done however Policy and Cabinet Memorandum approved by Minister.

Minister to be requested to approve and sign a letter requesting inclusion of presentation on the Agenda of relevant Portfolio Committee.

Presentation of Underwater Cultural Policy torelevant portfolio committees by 31 December 2013

Presentation of policy to relevant portfolio committees by 31 December 2013 was don’t done however Policy and Cabinet Memorandum was submitted to Minister

Minister to be requested to approve and sign a letter requesting inclusion of presentation on the Agenda of relevant Portfolio Committee.

43

Page 44: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

44

PROGRAMME 5: HERITAGE PROMOTION

OBJECTIVE: Preserve, protect and promote SA’s cultural & heritage through policies for socio-economic development, social cohesion and national identityPERFORMANCE INDICATOR

3RD QUARTER TARGET PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of national days hosted

Day of Reconciliationcelebrated 16 December 2013

The 2013 Day of Reconciliation was hosted on the 16th December 2013 at the Union Buildings, Pretoria

Number of Government Gazettes published on geographical names

One GovernmentGazette published

Published two Gazettes on the geographical names on the 2nd of October 2013 and 6th of December 2013. To date, the Department has received 92 applications and the Minister approved 83 applications.

Number of legacy projects developed

Union Buildings: Mandela Statue − casting intobronze

Casting completed and statue unveiled at the Union Buildings on 16 December 2013.

44

Page 45: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

45

PROGRAMME 6: ARCHIVES AND LIBRARY SERVICE

OBJECTIVE: Archives and record managementPERFORMANCE INDICATOR

3RD QUARTER TARGET PROGRESS VARIANCE/COMMENTS or PROGRESS DESCRIPTION

Number of new libraries built

2 3 new libraries were built in Perdekop (Mpumalanga), Nkqubela and KwaNonqaba (Western Cape)

Number of Oral History Conferences workshops/seminars organised

1 Oral History Conferences workshops/seminars organised

Hosted 10th Annual Oral History Conference in Northern Cape Provincial Archives in Kimberley on the 8th -11th of October 2013

Number of audio-visual formats inventoried

100 150 Sound Recordings inventoried; 813 Videos Inventoried; 204 Films Inventoried. TOTAL 1167

Appointment of new archivists (additional capacity) in the units

Number of Archival outreach programmes presented

1Archival Outreach programme presented

2 Archival Outreach programmes undertaken in the Eastern Cape and the Northern Cape -(informing learners about archival services, functions & professions and available career options)

Number of Library materials purchased by provinces

90000 93 947 library materials were purchased

45

Page 46: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

46

EXPLANATIONS OF UNDERPERFORMANCE

During the period under review, the Department encountered a number of impediments that hindered the attainment of the planned targets; namely:The Department is awaiting an invitation from the Select Committee on Arts and Education to present the Charter for African Cultural Renaissance. This resulted to the underperformance on the ratification and approval of the Charter for African Cultural Renaissance.Two public entities functioning without councils (i.e. PANSALB and WINDYBROW) hindered attainment of 100% councils fully constituted at all public entities.Reluctance of provinces and other departments to commit to Social Cohesion initiatives hindered convening of the National Social Cohesion Feedback Summit Steering Committee to implement action plan.Slow procurement processesBudget cuts in the MGE programme and reprioritisation of fundsDependencies on other implementing agencies like DPW and provinces

46

Page 47: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

47

REVIEW OF PUBLIC ENTITIES PERFORMANCE AND

EXPENDITURE

47

Page 48: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

48

PERFORMING ARTS INSTITUTIONS

48

Page 49: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

49

HERITAGE INSTITUTIONS

49

Page 50: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

50

FUNDING BODIES

50

Page 51: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

51

LIBRARIES AND OTHER HERITAGE INSTITUTIONS

51

Page 52: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

52

52

Page 53: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

53

PERFORMANCE PER SECTOR

53

Page 54: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

5454

BUDGET ALLOCATION PER SECTOR

Page 55: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

55

TOTAL REVENUE AND EXPENDITURE TRENDS

55

Page 56: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

56

PERCENTAGE EXPENDITURE VERSUS REVENUE ACCRUED UP TO 30 SEPTEMBER 2013

56

Page 57: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

57

PROJECTED EXPENDITURE VERSUS REVENUE31 MARCH 2014

57

Page 58: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

58

58

THANK YOU

Page 59: 3 rd  QUARTER PERFORMANCE REPORT FOR THE DAC AND ITS PUBLIC ENTITIES

59

LIST OF ACRONYMS AND ABBREVIATIONS

List of Acronyms and Abbreviations

ITEM DESCRIPTION

BASA Business Arts South Africa

BEC Bid Evaluation Committee

DAC Department of Arts and Culture

DPW Department of Public Works

DRC Democratic Republic of Congo

EC Eastern Cape

FIMA International Festival of African Fashion

HSEMS Human, Social, Economic, and Management Sciences

KZN Kwa-Zulu Natal

MGE Mzansi Golden Economy

MoA Memorandum of Agreement

NC Northern Cape

ODA Overseas Development Assistance

PANSALB Pan South African Language Board

POC Programme of Collaboration

PWD People Living with Disability

SAHRA South African Heritage Resource Agency

UNISA University of South Africa

3