This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Stefano Bigotto, Responsabile IT HR e Organizzazione, Prysmian Corrado Malfa, Responsabile Costo del Lavoro, Prysmian
3
AGENDA
Prysmian Group
HR Evolution System
Project Status
4
Prysmian Group
50 COUNTRIES 97 PLANTS ABOUT
22,000 PEOPLE SOME 8 €B
SALES 17 R&D CENTRES
No1 in cable solutions for the energy and
telecommunication business, with a strong position
in high technology, innovation-driven market
segments
5
PARTNER IN WORLD CLASS TECHNOLOGY-DRIVEN PROJECTS
No fear of heights Taking safety and elevator travelling to new heights, we have installed cables in the tallest man-made structure in the world.
Connecting huge infrastructures Linking two electricity grid stations in Abu Dhabi, we play an important role in developing the Emirate’s power transmission system.
Euro 2012 on Air 200 km of cables in the Ukraine’s Donbass Arena make EURO 2012 available in High Definition and 3D television.
Connecting Australia Through a high speed communication network we are bringing fibre to 93% of Australia’s premises.
A more sustainable business Being involved in major offshore wind farm projects, we make it possible to bring renewable energy to thousand homes.
Strategic Submarine links Hudson, Trans Bay and Neptune Projects, together with Western Link, are lighting the most strategic areas in USA and UK.
In Space Our customized wires and cables are able to show nearly half the planet and provide detailed views of climate change trends.
Expanding in Offshore Oil Supporting Petrobras in the main Brazilian oilfields, we lie at the heart of the Oil&Gas industry major developments.
6 Corporate Presentation | Prysmian Group | 13th July 2011
HR Evolution System
7
Starting Point
• Lack of integration of HR and Organization basic information: no global repository for employees’ master data and labour cost/working hours
• Limited and unflexible reporting functionalities prevent easy and quick access to employees’ data, often moving HR focus from management/analysis activities to unstructured/time consuming data gathering and interpretation
• No common process for Headcount, Labour Cost & Worked Hours Reporting
• Labour Cost monitoring/budgeting effectiveness limited by information availability; no per employee cost prevents in-depth analysis and benchmarking
8
Project Objectives
• To design a common and reliable international database with a defined dataset of information regarding the Headcount and the Labour cost of Prysmian Group (both white and blue collars). In a global view this database will be the source for the future HCM System.
• To manage both MP/forecast and actual data inside the same system in order to have quick and well-framed comparisons. Today the information is mainly managed via mail and based on a poor excel platform.
• Training / sharing with the HR managers the Group basic principles and rules concerning Headcount / Labour cost planning and controlling; to integrate and educate all colleagues to cost control mind-set.
• To generate and give both to central and local HR an automatic Reporting System useful to support the decision-making process.
• To have only one source of information and to avoid double data entry and subsequent reconciliation process (e.g. Controlling for headcount and Operations for hours worked).
9
Oracle DB
(O
rac
le)
Pla
nn
ing
&
Re
po
rtin
g
FDQM, ODI
SAP FI
Feed
ing
S
yste
ms
Excel
SAP COPA
Fro
nt
En
d
Financial Reporting
…
HR
PL
AN
NIN
G
Planning
ET
L
Web Analysis Smart View
CO
NS
OL
IDA
TE
D
RE
PO
RT
ING
& F
INA
NC
IAL
CO
NS
OL
IDA
TIO
N
HFM
Essbase
HR Evolution System Architecture
10
Actual Consolidation & Reporting Process Overview
4. ADJUSTMENTS
& ACCRUALS
Countries Admin Adjust original data
2. DATAWAREHOUSE
Administrators checks rejects
3. FDQM
DATA IMPORT
DATA VALIDATION
DATA EXPORT
Load Masterdata and Data
1.DATA SOURCE
Payroll\
Time
Hyperion
Finance
Other
• Masterdata
• Labor Cost
• Working Hours
• Allocation BU %
• Functional Area &
Macro Activities
• Costs Center
Hierarchy
• Total Sales
• Total Fixed Cost
• Total Fix Cost ex.
Depreciation
• EBITDA
• Contribution
Margin
Countries set up data from local systems
Import from Hfm systems
Monthly
If Needed
Integrated
Oracle Platform
Reporting
Country users Data analysis via web form and via reporting
Hyperion HR
11
Actual Consolidation & Reporting Hyperion HR vs Hyperion Finance
Hyperion HR Hyperion Finance
Oracle Platform
Labor Cost Matching
Labor Cost KPI
In the as is scenario, the interaction between
Hyperion Planning and Hyperion FM is managed
through Financial Reporting
12
Actual Consolidation & Reporting Hyperion HR vs Hyperion Finance
Hyperion HR Hyperion Finance
Oracle Platform
Labor Cost Matching
Labor Cost KPI
In the as is scenario, the interaction between
Hyperion Planning and Hyperion FM is managed
through Financial Reporting
13
Actual Consolidation & Reporting Hyperion HR vs Hyperion Finance
Hyperion HR Hyperion Finance
To Be Labor Costs
Oracle Platform
Labor Cost Matching
Labor Cost KPI
In the as is scenario, the interaction between
Hyperion Planning and Hyperion FM is managed
through Hyperion Financial Reporting
In the to be scenario, the labor cost figures will be
sent directly from Planning to HFM through Hyperion
FDQM
14
HR Evolution Dimensions of Analysis
Type of Contract
Business Unit
Level
Functional Area
Function
Direct \Indirect
Fix \ Variable
Employee
Account
HC
KPI
Macro Activity
LC & WH
Single version of the truth:
•Employee-level cost / hours / hc allows reporting and
analysis of the same underlying information at
different consolidation level and with multiple views
•Standardized analysis report at both local and group
level
•HR – Finance – Operation certified data integation
Entity
Country
Site
Legal entity
Cost Center
Level
15
Data Validation Phase (1/2)
During the loading process, the system perfoms validation rules to check all input data Users can use end-user reporting to verify the output of the validation process
Import Export
DATA VALIDATION
HR EVOLUTION
16
Validation Report provides a summary of the loaded data (FTE, LC, WH).
Data Validation Phase (2/2)
17
Check Forms use conditional formatting to represent potential incoherent data. The user can drill down to employee-level detailed information
In Red Blue collars associated to White Collars macro activities
Data Quality Check Forms
18
Available Reporting Tools:
– Hyperion Financial Reporting
– Dashboard Excel via Smart View
Reporting
19
HR Reporting KPI detail
Scenario
Actual CountryLegal
Entity Site\Plant
Cost
CenterFunction
Macro
Activities
Business
Unit
Contract
Type Level
Head Count X X X X X X X X X
FTE X X X X X X X X X
HC for Working Hours X X X X X X X X X
HC For Labor Cost X X X X X X X X X
From External X X X X X X X X X
From Lab to Staff IN X X X X X X X X X
From Part Time to Full Time IN X X X X X X X X X
From Agency to Temp IN X X X X X X X X X
From Agency to Perm IN X X X X X X X X X
From Temp to Perm IN X X X X X X X X X
From Non Op IN X X X X X X X X X
to External X X X X X X X X X
From Staff to Lab OUT X X X X X X X X X
From Agency to Temp OUT X X X X X X X X X
From Agency to Perm OUT X X X X X X X X X
From Full Time to Part Time OUT X X X X X X X X X
From Temp to Perm OUT X X X X X X X X X
From Non Op OUT X X X X X X X X X
Theoretical Days Worked With Open Factory X X X X X X X X X
Factory Opening Days X X X X X X X X X
Factory Closure Days X X X X X X X X X
Rest Days X X X X X X X X X
Average Hours Worked per Days X X X X X X X X X
Hours Effectively worked X X X X X X X X X
Contractual Hours X X X X X X X X X
Free Vacation X X X X X X X X X
Overtime X X X X X X X X X
Absenteeism X X X X X X X X X
Working Hours
Movement
Headcount
KPI's /SUPPLEMENTARY INFORMATION
KPI's /Supplementary Information
Description
Details
20
HR Reporting KPI detail
Scenario
Actual CountryLegal
Entity Site\Plant
Cost
CenterFunction
Macro
Activities
Business
Unit
Contract
Type Level
Total Labor Cost X X X X X X X X X
Total Monthly Pay X X X X X X X X X
Base Salary X X X X X X X X X
Overtime X X X X X X X X X
Incentives and Bonus X X X X X X X X X
Legal Contribution X X X X X X X X X
Allowances X X X X X X X X X
Vacation\Holiday Accrual X X X X X X X X X
EBDA per Headcount X X X
Contribution Margin per Headcount X X X
Sales per Headcount X X X
Labor cost per Contribution Margin X X X
Labor fixed cost Vs Total Fixed costs X X X
Total HC Vs White Collar HC X X X
Manufacturing Blue Collar HC Vs Operation White Collar HC X X X
Per capita hours effectively worked X X X X X X X X X
% Of Overtime X X X X X X X X X
% of Absence for Sickness X X X X X X X X X
% of Absence for Injury X X X X X X X X X
% of Absence for Other X X X X X X X X X
Total Absenteeism X X X X X X X X X
Labor Cost
KPI's /SUPPLEMENTARY INFORMATION
KPI's /Supplementary Information
Description
Details
KPI
21
Reporting
22
Reporting
23
23
Variazione Costo del
Lavoro
24
24
Analisi delle Teste per BU
25
26 Corporate Presentation | Prysmian Group | 13th July 2011