8/3/2019 2nd River Basin Stakeholder Workshop: Presentation http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 1/12 RETA 6470 Update nd  Workshop 4-Ps River Basin Cambodia 12-14 August 2010 Dennis Von Custodio TA Coordinator and IWRM Specialist (Consultant) 1/18 ADB RETA 6470
12

2nd River Basin Stakeholder Workshop: Presentation

Apr 06, 2018

Download

Documents

adbwaterforall
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 1/12

RETA 6470 Update

nd  Workshop4-Ps River Basin Cambodia

12-14 August 2010

Dennis Von Custodio

TA Coordinator and IWRMSpecialist (Consultant)

1/18

ADB RETA 6470

Page 2: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 2/12

Context

RETA 6470: Managing Water in Asia's River Basins:Charting Progress and Facilitating Investment

 

• RBO knowledge service

• IWRM performance assessment

• RBO performance improvement

ADB

Page 3: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 3/12

ADB’s Water Financing Program

 

Urban WaterRural Water Basin Water

 Focuses on investments to improve health and livelihoods in rural communities, including those forwater supply and sanitation, and irrigation and drainage

Urban WaterConcentrates on sustaining economic growth in cities through investments in water supply, sanitation

an wastewater management, an env ronmenta mprovementBasin Water

Promotes IWRM, covering healthy rivers through investments in infrastructure and management ofmultifunctional water regulation and hydropower facilities, flood management, watershed andwetlands conservation

http://www.adb.org/Water/WFP/investment.asp

Page 4: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 4/12

RETA 6470 – 5 pilot basins

Baitarani,Orissa

Vu Ghia-Thu Bon,Viet Nam

4-Ps,Cambodia

e u,

Philippines

Bengawan Solo,Indonesia

Baitarani Solo CentralCebu

4Ps VGTB

Catchment2

14,218 16,100 480 12,470 10,350

6/22

 

population 4,400,000 16,000,000 210,325 163,000 1,400,000

Page 5: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 5/12

-

Mekong River

Tonle Sap

4-Ps River Basin

2/18

4 main Preks and their streams connecting to the MekongRiver

Page 6: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 6/12

RETA 6470 Activities

in the 4Ps River Basin

• national consultant engaged

• documents prepared insupport to 4-Ps basindevelopment andmanagement

- draft IWRM investmentroadmap

- draft river basin profile

- case studies on goodIWRM practices

•  

workshops: (i) 18-20 Jan,Kratie; and (ii) 12-14 Aug,Mondulkiri

Page 7: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 7/12

1st Basin Stakeholder Workshop, 4-Ps River Basin,

Cambodia, 18-20 January 2010

66 total participants

-   ,

Cebu (PHI) and Vu Gia–Thu Bon (VIE), ADB consultants- national level: CNMC; Ministries of Agriculture, Industry

and Mines, Forestr and Fisheries, Environment, Plannin ,Rural Development, Water Resources and Meteorology

- local level: Kratie and Mondulkiri Provinces; line

agencies/sector departments; local community

- national consultant

9/18

Page 8: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 8/12

1st Basin Stakeholder Workshop, 4-Ps River

Basin, Cambodia, 18-20 January 2010

• initial ideas on IWRM development needs,options and potential for the four PreksIWRM investment roadma

More inputs on the draft IWRM

stakeholder workshop!

9/18

Page 9: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 9/12

1st Basin Stakeholder Workshop, 4-Ps River Basin,18-20 January 2010

Half-day study visit

Kohsakrom irrigation scheme and dialogue with

farmers

Visit to Prek Kampi (driving along the Mekong

River) – tourism development in the basinrelated to dolphin spotting

Page 10: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 10/12

Status of Implementation – In comparison

Progress by Pilot Basin

OutputsPP Baitarani Solo C Cebu 4Ps VGTB

Over-all progress 25 pct 70 pct 90 pct 90 pct 25 pct

Kick-off meeting 10 Aug ’09 Apr ’09 Sep ’09 Feb ’09 Feb ’09

Basin profile outline 10 Aug ’09 Apr ’09 Sep ’09 May ’09 Mar ’09

1st stakeholder workshop 20 X May ’09 May ’10 Jan ’10 x

Roadmap outline 10 X Sep ’09 Jun ’10 Jun ’10 x

’ ’ 

Consolidated basin profile 5 X X x X x

Consolidated roadmap 5 x X x X x

Case studies 1=5 pp, SPS-4 SPS-5, 10, 3 case SPS-2, 9 SPS-14

>1=10 pp, s u es

Country assessmentoutline

10 x Jun ’10 July ’10 Dec ’09 x

pp = percentage point

Page 11: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 11/12

Key Messages in IWRM Implementation

• Political will is a key for IWRM success

• oca now e ge s mpor an o a ress wa erchallenges

• Active community involvement in the development andmanagement of the river basin is crucial

• Capacity of the 4Ps RBO should be strengthened

Page 12: 2nd River Basin Stakeholder Workshop: Presentation

8/3/2019 2nd River Basin Stakeholder Workshop: Presentation

http://slidepdf.com/reader/full/2nd-river-basin-stakeholder-workshop-presentation 12/12

Thank You!

20/20