Top Banner
page 1 2 nd Philippine-German Solar Energy Forum PV Hybrid Systems 6-10 May 2013, Manila Ingo Meyer I VP Sales & Marketing b+w Electronics Systems GmbH & Co. KG Oberhausen, Germany
24

2nd philippine german solar energy forum manila 2013 may 6-10

May 10, 2015

Download

Technology

Ingo Meyer

The presentation was given at the 2nd Philippine-German Solar Energy Forum in Manila organized by GPCCI describing PV-Hybrid solutions and benefits for existing and green field telecom cell sites.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2nd philippine german solar energy forum manila 2013 may 6-10

page 1

2nd Philippine-German Solar Energy Forum

PV Hybrid Systems

6-10 May 2013, Manila Ingo Meyer I VP Sales & Marketing

b+w Electronics Systems GmbH & Co. KG

Oberhausen, Germany

Page 2: 2nd philippine german solar energy forum manila 2013 may 6-10

page 2 May 14, 2013

PV-Hybrid DC Power Solutions For Unstable Grids On Telecom Wireless Sites

Page 3: 2nd philippine german solar energy forum manila 2013 may 6-10

page 3

Established in 1980 Central design and manufacturing in Oberhausen Production of power systems opened in 1992 Nokia OEM partner for power units since 1992 Delivered over 100.000 power distribution units since 1992 Delivered over 70.000 systems since 1992 Quality Standards: ISO 9001:2000, ISO 14001 Up to maximum 1.000 Systems per month

May 14, 2013

b+w Experience

Page 4: 2nd philippine german solar energy forum manila 2013 may 6-10

page 4

Headquarters, Oberhausen

May 14, 2013

b+w Experience

Page 5: 2nd philippine german solar energy forum manila 2013 may 6-10

page 5

b+w Facility

May 14, 2013

• 4.700m² production

• 3.500m² storage

• 2.100m² offices

• 190m² laboratory

• 170m² training center

• Technologies: AWT, Integration

• Quality Standards:

• DIN EN ISO 9001:2000

• DIN EN ISO 14001

• 200 up to maximum 1.000 Systems per month

Page 6: 2nd philippine german solar energy forum manila 2013 may 6-10

page 6

*Source: Capgemini, Telecom, Media & Entertainment

Operating costs of tower infrastructure, like diesel generators, air-conditioning equipment, and security and site rentals, form a significant portion of nearly 60% of site expenses.*

60% of site expenses

May 14, 2013

Situation On Telecom Wireless Sites

Page 7: 2nd philippine german solar energy forum manila 2013 may 6-10

page 7

Source: Money Week 2012 4 17

Oil prices have been on everyone's mind, having spiked 141% over the last 3 years.

USD

141%

May 14, 2013

Oil Prices Go Up

Page 8: 2nd philippine german solar energy forum manila 2013 may 6-10

page 8

Existing Site Solution: With PV-Hybrid Power Components Adapting To Infrastructure

May 14, 2013

Page 9: 2nd philippine german solar energy forum manila 2013 may 6-10

page 9

OPEX calculation shows more than 70% energy saving with a PV-Hybrid power solution vs. a shelter powered by diesel genset 24/7.

70% energy saving

May 14, 2013

Case Study Nigeria: PV-Hybrid Solution Vs. Shelter 70% savings

Page 10: 2nd philippine german solar energy forum manila 2013 may 6-10

page 10 May 14, 2013

Green Field Site Solution: With SolarCube Low Energy Passively Cooled Outdoor Cabinet

Page 11: 2nd philippine german solar energy forum manila 2013 may 6-10

page 11

Material lifting Cabinet installed

May 14, 2013

Case Study India: SolarCube Installation

Page 12: 2nd philippine german solar energy forum manila 2013 may 6-10

page 12

Equipment installed in progress Equipment installed

May 14, 2013

Case Study India: SolarCube Installation

Page 13: 2nd philippine german solar energy forum manila 2013 may 6-10

page 13

Final integrated cabinet with equipment

May 14, 2013

Case Study India: SolarCube Installation

Page 14: 2nd philippine german solar energy forum manila 2013 may 6-10

page 14

Note: Battery Capacity for Conventional shelter is High to cater to 8 hrs Backup. In case if Integrated shelter is having the same BB AH, the Consumption will increase by 0.35W/ Day as float charging.

ON GRID SITE- GSM SOLO ( Solar+Battery Bank+SEB)

May 14, 2013

Case Study India: SolarCube Vs. Shelter 50% savings

Page 15: 2nd philippine german solar energy forum manila 2013 may 6-10

page 15

50% energy saving

May 14, 2013

Case Study India: SolarCube Vs. Shelter 50% savings

Page 16: 2nd philippine german solar energy forum manila 2013 may 6-10

page 16

Shelter, Brazil SolarCube, Brazil

May 14, 2013

Case Study Brazil: SolarCube Vs. Shelter 87% savings

Page 17: 2nd philippine german solar energy forum manila 2013 may 6-10

page 17

W h kWh Shelter/Y SolarCube/Y Delta

Base station 600 24 14,4 5.256 5256

Aircon 5.000 24 120 43.800 0

Fan 100 24 2,4 0 876

Transformer 38 24 0,91 332,9 0

Transformer HE 17 24 0,41 0 148,9

Battery Lead 92 24 2,2 805,9 0

Batter Li-Ion 23 24 0,55 0 201,48

Rectifier (losses) 60 24 1,44 525,6 0

Rectifier LP (losses)

36 24 0,86 0 315,4

Total kWh/Y 50.720,4 6.797,78 -87%

W h kWh Shelter/Y SolarCube/Y Delta

Base station 600 24 14,4 5.256 5256

Aircon 5.000 24 120 43.800 0

Fan 100 24 2,4 0 876

Transformer 38 24 0,91 332,9 0

Transformer HE 17 24 0,41 0 148,9

Battery Lead 92 24 2,2 805,9 0

Batter Li-Ion 23 24 0,55 0 201,48

Rectifier (losses) 60 24 1,44 525,6 0

Rectifier LP (losses)

36 24 0,86 0 315,4

Total kWh/Y 50.720,4 6.797,78 -87%

May 14, 2013

Case Study Brazil: SolarCube Vs. Shelter 87% savings

Page 18: 2nd philippine german solar energy forum manila 2013 may 6-10

page 18

OPEX calculation from EADS shows a 87% energy saving with SolarCube vs. a Shelter.

87% energy saving

May 14, 2013

Case Study Brazil: SolarCube Vs. Shelter 87% savings

Page 19: 2nd philippine german solar energy forum manila 2013 may 6-10

page 19 May 14, 2013

Green Field Site Solution: SolarCube + HybridCube Independent DC Power Supply

Page 20: 2nd philippine german solar energy forum manila 2013 may 6-10

page 20

The b+w HybridCube is a compact independent off grid DC power supply system for outdoor telecom equipment utilising solar panels, diesel generator and batteries.

May 14, 2013

HybridCube Independent DC Power Supply

Page 21: 2nd philippine german solar energy forum manila 2013 may 6-10

page 21 May 14, 2013

Break Even Expected At 2-3 Years

Page 22: 2nd philippine german solar energy forum manila 2013 may 6-10

page 22

Conventional Shelters with DG Sets SolarCube Low Energy Passively Cooled Outdoor Cabinet

HybridCube Hybrid Power Independent DC PowerSupply

May 14, 2013

Our Solution For A Typical Green Field Telecom Tower Infrastructure

Page 23: 2nd philippine german solar energy forum manila 2013 may 6-10

page 23

Your questions please?

May 14, 2013

The Customer Benefits

Page 24: 2nd philippine german solar energy forum manila 2013 may 6-10

page 24 May 14, 2013

Contact: Ingo Meyer

VP Sales & Marketing

b+w Electronic Systems GmbH & Co. KG

Zur Eisenhuette 11

D-46047 Oberhausen

Mobile: +49 163 2626675

Mail to: [email protected]

www.b-w.com