Top Banner
document.xlsx Site Data & Test Report-Node B New Site Circle AIRTEL KENYA Strategic Partner NOKIA Date of Installation DD-MM-YY Date of Integration DD-MM-YY Date of Commissioning DD-MM-YY Site Name KIHARA_RED_HILL_ROAD Airtel 2G Site ID KBU065 Airtel 3G Site ID Tower company Site ID N/A SACFA ID N/A Site Lat/Long UMTS Band for Node B 900/2100 Type (GBT/RTT/RTP/IBS) GBT Type of Node B (HSPA / MIMO ) N/A Name of Infra Provider (Tower Company) N/A Anchor Operator N/A Sharing Opco 1 N/A Sharing Opco 2 N/A Sharing Opco 3 N/A Sharing Opco 4 N/A N/A Sites Layout Attached Acceptance KPI Attached Standared Node AT Documents attached Site Photographs for RF & EMF Attached EMF Compliance Format Attached Site Address N/A City Nairobi Site Owner Details N/A Name N/A Address N/A Mobile Numbers : N/A Landline Number (R) : N/A Landline Number (O) : N/A Signoff : Project Manager ( Airtel ) Project Manager (SP) Mob Number Mob Number Sign Sign Name Name Date : Date : Infra Shared(Tower / DG / Shelter / AC / AC Mains / DC Btys etc)
32

2G Telecom and SCFT Kihara Red Hill (1)

Jan 11, 2016

Download

Documents

Mayfun09

2g
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2G Telecom and SCFT Kihara Red Hill (1)

document.xlsx

Site Data & Test Report-Node B New Site

Circle AIRTEL KENYAStrategic Partner NOKIADate of Installation DD-MM-YYDate of Integration DD-MM-YYDate of Commissioning DD-MM-YY

Site Name KIHARA_RED_HILL_ROADAirtel 2G Site ID KBU065Airtel 3G Site IDTower company Site ID N/ASACFA ID N/ASite Lat/LongUMTS Band for Node B 900/2100

Type (GBT/RTT/RTP/IBS) GBTType of Node B (HSPA / MIMO ) N/A

Name of Infra Provider (Tower Company) N/AAnchor Operator N/ASharing Opco 1 N/ASharing Opco 2 N/A

Sharing Opco 3 N/A

Sharing Opco 4 N/A

N/A

Sites Layout Attached Acceptance KPI AttachedStandared Node AT Documents attached Site Photographs for RF & EMF AttachedEMF Compliance Format Attached

Site Address N/A

City Nairobi

Site Owner Details N/AName N/AAddress N/AMobile Numbers : N/ALandline Number (R) : N/ALandline Number (O) : N/A

Signoff :

Project Manager ( Airtel ) Project Manager (SP)

Mob Number Mob Number

Sign Sign

Name Name

Date : Date :

Infra Shared(Tower / DG / Shelter / AC / AC Mains / DC Btys etc)

Page 2: 2G Telecom and SCFT Kihara Red Hill (1)

document.xlsx

S.NoNode B

Activity Planned Actual Remarks 1 Site ID: KBU065 SITE ID KBU065 SITE ID KBU065

2 Site Name: KIHARA_RED_HILL_ROAD SITE NAME KIHARA_RED_HILL_ROAD SITE NAME KIHARA_RED_HILL_ROAD

3 BTS B Product Type (Configuration) - Indoor/Outdoor/Split Type OUTDOOR

4BTS B Hardware Details FLEXI MRBase Unit (Model No) N/ATower Unit (Model No) N/A

5 Site Address: N/A

6 Region and Circle: AIRTEL KENYA

7Latitude : -1.21944 -1.21944 NOT SHIFTEDLongitude : 36.77855 36.77855 NOT SHIFTED

8 Feeder Cable Type

Sector 1 Fiber

Sector 2 Fiber

Sector 3 Fiber

9 Feeder Cable Length

Sector 1

Sector 2

Sector 3

10 Power Output

Sector 1

Sector 2

Sector 3

11 BTS Material Check List Attached PAT ATTACHED

12 PAT ATTACHED

15 Test Handset Details Model Serial Number Phone Number SIM Number

FILL FILL FILL

16 Service Test

Voice call PASS

GPRS service test PASS

EDGE service test PASS

SMS Service test PASS

17

Antenna System DetailsItem List Sector 1 Sector 2 Sector 3 Sector 4

Planned Actual Planned Actual Planned Actual PlannedGSM Antenna Type Andrew Andrew Andrew Andrew Andrew Andrew

Antenna Type ( Part Code ) DBXLH-6565B-VTM DBXLH-6565B-VTM DBXLH-6565B-VTM DBXLH-6565B-VTM DBXLH-6565B-VTM DBXLH-6565B-VTM Antenna Quantity 1 1 1 1 1 1Antenna Height (AGL) 57.5 57.5 57.5 57.5 57.5 57.5Azimuth 0 0 120 120 240 240Electrical Downtilt 0 0 0 0 0 0Mechanical Downtilt 2 2 2 2 2 2

TMA

BCCH SCAN BCCH BCCH BCCH

TX Power ( On Top of BTS Cabinet )

18

Sector/ Cell Feeder Type Feeder Length (m) Measured VSWR Test Pass / FailSector 1 N/A N/A N/A

Sector 2 N/A N/A N/A

Sector 3 N/A N/A N/ASector 4 N/A N/A N/A

19

Mention Yes / NoFor Node B Cabinet PAT ATTACHED PAT ATTACHED PAT ATTACHED

PAT ATTACHED PAT ATTACHED PAT ATTACHED

For UMTS Antenns PAT ATTACHED PAT ATTACHED PAT ATTACHEDFor TMA's PAT ATTACHED PAT ATTACHED PAT ATTACHEDFor Indoor Unit PAT ATTACHED PAT ATTACHED PAT ATTACHEDFor Outdoor Unit PAT ATTACHED PAT ATTACHED PAT ATTACHED

20 Earthing check for 2G equipment N/A

21 EMF Testing

Method Adopted

N/A

Compliance (Yes/No) N/A22 Wiring Diagram Enclosed Yes/No

23 GSM Alarm Verification

Critical Alarms Yes/No Yes/No Yes/NoTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTo be filled PAT ATTACHED PAT ATTACHED PAT ATTACHEDTMA Alarm

24 Attach Prediction Plots (Annexure 1) Yes/No N/A

25 Attach Drive Test Plots and Stats - Yes/No YES

26 Attach Walk Test Report for IBS Yes/No N/A ONLY FOR IBS

27 Yes/No N/A

28 Cell Design Data Yes/No YES

29 Drive Test Report (SCFT Checklist Completed) Yes/No YES

30 Parameter discrepancy Audit Report Yes/No AVAILABLE IF REQUIRED

31 Drive Test Log Files Yes/No AVAILABLE IF REQUIRED

32 Passive/Active AT Report Yes/No YES

33 2G>3G Neighbor Definition Audit Report Yes/No N/A

34 Core Side Snapshot for LAC/RAC Definition Yes/No NO

35 Complete BTS Configuration Snapshot Yes/No

36 Yes/No N/A

37 GSM ND report verified for KPIs checks Yes/No YES

Signoff :

Project Manager ( Airtel ) Project Manager (SP)

Date :Mobile Number: Mobile Number:

Telecom Material Check List verified against planned Material (Please attach the List )

GSM Cable Return loss, Cable Loss & VSWR Measurements :

Labelling done for All GSM and TX equipments Installed

For all Cables & Accessories

To be checked on IGB and OGB

To be checked on IGB and OGB

Coverage Certified to be in line with Prediction( Cluster Level)

COCO/IP Information(Ethernet Backhaul) with TXM BW Details

Page 3: 2G Telecom and SCFT Kihara Red Hill (1)

79

Site ID: 1465 Site Name: KIHARA_RED_HILL_ROAD Cell ID: 11465, 21465, 31465

New Site: Site Connected to RNC: yes

Others: Last Drive Performed:

No. Activity/Process MS1 MS2 MS3 Dongle cell 1 cell 2 cell 3 result Remarks

plan Check plan Check plan Check

Idle

1 MNC Y 3 03 03 03 03 03

2 MCC Y 639 639 639 639 639 639

3 LAC Y 70 70 70 70 70 704 RAC Y 245 245 245 245 245 245

5 SDCCH Y6 CCCH Y7 BCCH Y 108 108 121 121 118 118

8 TCH Y9 EDGE Enabeld Y Y Y Y Y Y Y Y Y Y

10 GPRS Y Y Y Y Y Y Y Y Y Y

Voice 11 Voice Call Setup Success rate (MO & MT) Y Y Y y 100 100 100

Nearest point testing

12 Nearest Dst for testing Y Y Y Y 78 63 107

13 RX level at above point Y Y Y Y -68 -64 -70

14 Rx Qual at above point Y Y Y Y -2 -3 -3

Data15 GPRS throughput Y Y Y Y 44 35 47

16 EDGE throguput Y Y Y Y 78.3 Kbps 76.1 Kbps 78.7 Kbps

Handover 17 Handover Function Y Y Y Y Y Y Y

18 Intra site handover Y Y Y Y Y Y Y

19 Inter celll handover Y Y Y Y Y Y Y

20 Latency Y Y Y Y 502 ms 491 ms 556 ms

21 Packet drop Y Y Y Y N N N

Remarks (Comments):

SP Signature Bharti Signature: Date:

Page 4: 2G Telecom and SCFT Kihara Red Hill (1)

drive

map

Rx-level Coverage Map per Sitedr

ive m

ap

C/I PLOT

Idle-ServRxLevIdle (dBm)

Below -105 (0) 0.0%

>= -105 to < -95 (0) 0.0%

>= -95 to < -85 (10) 1.3%

>= -85 to < -75 (66) 8.4%

>= -75 to < -65 (140) 17.9%

Above -65 (567) 72.4%

Idle-ServC2I (N/A)

Below 5.000000 (4) 0.5%

>= 5.000000 to < 8.000000 (15) 2.0%

>= 8.000000 to < 12.000000 (32) 4.2%

>= 12.000000 to < 18.000000 (110) 14.5%

Above 18.000000 (600) 78.8%

Page 5: 2G Telecom and SCFT Kihara Red Hill (1)

drive

map

QUAL PLOT

drive

map

Longcall-ServRxQualSub (RxQual)

Below 4 (521) 87.1%

>= 4 to < 6 (65) 10.9%

>= 6 to < 7 (12) 2.0%

Page 6: 2G Telecom and SCFT Kihara Red Hill (1)

drive

map

BCCH coverage map per sitedr

ive m

ap

Data RLC through put plot

Idle-ServBCCH (ARFCN)

108 (356) 44.7%

118 (68) 8.5%

121 (281) 35.3%

112 (29) 3.6%

124 (62) 7.8%

Page 7: 2G Telecom and SCFT Kihara Red Hill (1)

drive

map

EVENT HANDOVER

Data-RLC_Throughput_DL (kbps)

Below 16.00 (207) 32.2% >= 16.00 to < 32.00 (50) 7.8% >= 32.00 to < 64.00 (72) 11.2% >= 64.00 to < 100.00 (66) 10.3% >= 100.00 to < 150.00 (155) 24.1% Above 150.00 (92) 14.3%

Page 8: 2G Telecom and SCFT Kihara Red Hill (1)

EVENT CELL RESLECTION

Longcall-EventHandoverOK (EVENT)

U 1 (7) 1.1%

Page 9: 2G Telecom and SCFT Kihara Red Hill (1)

2G TO 3G n 3G TO 2G CELL RELECTION

Dual Mode-Uu_CellReselection (EVENT)

U 1 (11) 2.1%

Page 10: 2G Telecom and SCFT Kihara Red Hill (1)

Remarks (Comments): RSCP Coverage check till first handover or coverage dies out (whichever happens earlier)

NSN Signature: Bharti Signature: Date:

Dual Mode-Uu_IRAT_Reselection3G2G (EVENT)

3G-2G Reselection (1) 0.2%

Dual Mode-Uu_IRAT_Reselection2G3G (EVENT)

3G-2G Reselection (2) 0.4%

Page 11: 2G Telecom and SCFT Kihara Red Hill (1)
Page 12: 2G Telecom and SCFT Kihara Red Hill (1)
Page 13: 2G Telecom and SCFT Kihara Red Hill (1)
Page 14: 2G Telecom and SCFT Kihara Red Hill (1)
Page 15: 2G Telecom and SCFT Kihara Red Hill (1)
Page 16: 2G Telecom and SCFT Kihara Red Hill (1)
Page 17: 2G Telecom and SCFT Kihara Red Hill (1)
Page 18: 2G Telecom and SCFT Kihara Red Hill (1)

PRE POSTKPI Type Site Cell 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 29-Nov 30-Nov 1-Dec 2-Dec

TRAFFIC +/- 10% XX xxx

RxQual (0-4)

RxQual DL (0-4) Monitoring

RxQual UL (0-4) Monitoring

SD Blocking

TCH Blocking

TCH Drop

SD Drop

HOSR

Handover Incoming Monitoring

Handover Outgoing Monitoring

TASR

Hard Blocking

Soft Blocking

RASR Monitoring

Data Volume +/- 20%

TBF Drop

Edge Throughput

NSN Signature: Bharti Signature: Date:

Page 19: 2G Telecom and SCFT Kihara Red Hill (1)

POST3-Dec

Page 20: 2G Telecom and SCFT Kihara Red Hill (1)

Event

Blocked Call 0 0.00%

Call Attempt 62 100%

Call Setup 62 100.00%

Dropped Call 0 0.00%

Call Success 62 100%

Voice Call Drop Rate 0 0.00%

Call setup Success Rate 100.00% 100%

1.2 Long Call

Information Element Range % of Meas. Total Samples

Rx Qual sub 0-4 87.1% 521 598

Rx Qual sub 4-6 10.9% 65 598

Rx Qual sub >6 2.0% 12 598

C-I 0-5 0.50% 4 1651C-I 5-8 2.00% 15 1651C-I 8-12 4.20% 32 1651C-I 1218 14.50% 110 1651C-I >18 78.80% 600 1651Handover 7 n/a 7 n/a

Handover Failure 0 n/a 0 n/a

Handover Success 7 n/a 7 n/a

Handover Success Rate 100.00% n/a 100% n/a

2G to 3G Reselection yes n/a n/a n/a

RX Level (Dbm) Sample

0 to -65 567 72.4%

-65 to -75 140 17.9%

-75 to -85 66 8.4%

-85 to -95 10 1.3%

-95 to -105 0 0.0%

<-105 0 0.0%

Rx qual(db) Sample

0-4 521 87.1%

4-6 65 10.9%

6-7 12 2.0%

1.1 Short Call

#[No. of samples]

% Measurement

No. of Samples/Coun

t

1.3  Event Statistic

Percentage (%)

Percentage (%)

Page 21: 2G Telecom and SCFT Kihara Red Hill (1)

EDGE Throughput Sample

<16 252 40.8%

16-32 138 22.3%

32-64 75 12.1%

64-100 47 7.6%

100-150 32 5.2%

>150 74 12.0%

NSN Signature: Bharti Signature: Date:

Percentage (%)

Page 22: 2G Telecom and SCFT Kihara Red Hill (1)

Handover DT Summary

Cell-Log File Count Cell1-4 Cell2-6 Cell3-2

Draw handovers tested:

Sector 1 to 2 Y Y Y

Sector 2 to 3 Y Y Y

Sector 3 to 1 Y Y Y

Sector 1 to 3

Sector 3 to 2 Y Y Y

Sector 2 to 1 Y Y Y

Handover to 1st order Neighbor Y Y Y

HANDOVER to Tier – 1(2G-2G)Neighbor Cells, Voice

Serving Cell ID NCC BCC Remarks

11465 21431 112 2 3 Y ATTEMPT

21431 11465 108 2 0 Y ATTEMPT

11465 21465 118 2 6 Y ATTEMPT

21465 34916 109 0 5 Y ATTEMPT

34916 21465 118 2 6 Y

NSN Signature: Bharti Signature: Date:

Neighbor Cell ID

Neighbor Cell BCCH

Incoming HO 1-Tier

Outgoing HO 1-Tier

Page 23: 2G Telecom and SCFT Kihara Red Hill (1)
Page 24: 2G Telecom and SCFT Kihara Red Hill (1)
Page 25: 2G Telecom and SCFT Kihara Red Hill (1)

The purpose of this test is to verify that each sector is radiating and is able to complete a call

request from a test UE.

Sector ID BCCH

11465 108 22 0 2.7 Pass

21465 121 20 0 2.5 Pass

31465 118 20 0 2.8 Pass

The purpose of this test is to verify that each sector is able to complete

a video call request from a test UE.

Sector ID BCCH Success

11465 108 10 10 100% Pass

21465 121 10 10 100% Pass

31465 118 10 10 100% Pass

The purpose of this test is to verify that a cell is able to complete a PS (Data)

download using R99. This test is carried out on each sector of the site.

Sector ID BCCH File size Latency

11465 108 1 MB 78.3 Kbp/s 10 100% 502 ms

21465 121 1 MB 76.1 Kbp/s 10 100% 491 ms

31465 118 1 MB 78.7 Kbp/s 10 100% 556 ms

NSN Signature: Bharti Signature: Date:

1     Call Setup Testing for Each Sector1)   Voice call for each sector

No of calls

Drop Call Rate

Call Setup time

Pass / Fail

2)   GPRS for each sector

No of calls

Success rate

Pass / Fail

3)   EDGE download for each sector

Mean Throughput

No of Calls

Success rate

Page 26: 2G Telecom and SCFT Kihara Red Hill (1)

The purpose of this test is to verify that each sector is radiating and is able to complete a call

Date:

Page 27: 2G Telecom and SCFT Kihara Red Hill (1)

Panaromic Photos

0° 30°

60° 90°

120° 150°

Panaromic Photos

180° 210°

240° 270°

300° 330°

Page 28: 2G Telecom and SCFT Kihara Red Hill (1)

Sector Photos

Sector1 Sector 2-

Sector 3 Tower Photo

B1 photo B2 photo B3 photo B4 photo

NSN Signature: Bharti Signature:

Page 29: 2G Telecom and SCFT Kihara Red Hill (1)
Page 30: 2G Telecom and SCFT Kihara Red Hill (1)

Bharti Signature: Date: