7/30/2019 2G Cluster Optmization Sample Report
1/16
Pulse Information Technologies
1
Title 2G Cluster Drive Test Report
Network : XXXXX
Phase : XX
Drive Date : XX/XX/XXXX to XX/XX/XXXX
Report Date : XX/XX/XXXX
Signature
Prepared by Checked by(PULSE) Approved by(Operator)
7/30/2019 2G Cluster Optmization Sample Report
2/16
Pulse Information Technologies
2
Contents
1. EXECUTIVE SUMMARY. ..................................................................................................................................................... 32. TEST SETUP. ........................................................................................................................................................................... 33. DT PERFORMANCE. ............................................................................................................................................................ 4
3.1 2GRX LEVEL VARIATION (IDLE). ........................................................................................................................................ 43.2 2GRX LEVEL VARIATION (DEDICATED MODE).................................................................................................................... 53.3
2GRX QUALITY VARIATION. ............................................................................................................................................... 6
3.4 TIMING ADVANCE(TA) VARIATION. ..................................................................................................................................... 73.5 BAD EVENTS: ...................................................................................................................................................................... 8
4. ANALYSIS & RECOMMENDATION FOR BAD EVENTS/PATCHES ...................................................................... 94.1 IDLE UECOVERAGESAMPLE PATCHES -01 ...................................................................................................................... 94.2 DEDICATED MODE UECOVERAGESAMPLE PATCHES -01 .............................................................................................. 104.3 DEDICATED MODE UEQUALITYSAMPLE PATCHES -01 ............................................................... ................................... 114.4 DEDICATED MODE UEDROPPED CALLSAMPLE PATCHES-01 ................................................................ ......................... 124.5 DEDICATED MODE UEHANDOVERFAILURESAMPLE PATCHES-01 ................................................................................ 134.6 DEDICATED MODE UEBLOCKED CALLSAMPLE PATCHES-01 ................................................................ ......................... 144.7 DEDICATED MODE UEPING-PONG HANDOVERSAMPLE PATCHES-01 ............................................................................ 15
5. CONCLUSION ..................................................................................................................................................................... 16
7/30/2019 2G Cluster Optmization Sample Report
3/16
Pulse Information Technologies
3
1. Executive Summary.This document is a report for the sample cluster drive in "xxxx" area. This will provide all the
issues found in the field during the drive test with root cause analysis.
The following activities have been taken during the network optimization of mentioned Cluster.
Physical Verification of Sites for any discrepancies in implementation versus planning data.
Parameter consistency checks and implementation of Change Requests if required.
Coverage optimization by means of physical changes at site.
Neighbor Relations Added & Deleted during optimization.
2. Test Setup.Following devices and tools used during this cluster drive & Optimization to analyze network
performance by means of accessibility, mobility & retain ability.
Devices Configuration
Device Type of Mode Duration Comments
MS1 Idle 2G Locked From Start to End
MS2 Voice Call 2G Locked 30 Sec. Call/ 10 Sec idle between
calls to allow reselection
MS3 Voice Call 2G Locked30 Min. Call/10 Sec idle between
calls to allow reselection
MS4 Scanner 2G Scanner
Tools;
TEMS Investigation 13.1 TEMS Discovery 3.2.1 MapInfo professional 11.0 Actix Analyzer 4.05
7/30/2019 2G Cluster Optmization Sample Report
4/16
Pulse Information Technologies
4
3. DT Performance.3.1 2G Rx Level variation (Idle).
Figure 3.1.1 : 2G Idle Rx Level Variation
Figure 3.1.2 : Histogram view of 2G Idle Rx Level Variation
7/30/2019 2G Cluster Optmization Sample Report
5/16
Pulse Information Technologies
5
3.2 2G Rx Level variation (Dedicated Mode).
Figure 3.2.1 : 2G Dedicated Rx Level Variation
Figure 3.2.2 : Histogram view of 2G Dedicated Rx Level
7/30/2019 2G Cluster Optmization Sample Report
6/16
Pulse Information Technologies
6
3.3 2G Rx Quality variation.
Figure 3.3.1 : 2G Rx Quality Variation
Figure 3.3.2 : Histogram view of 2G Rx Quality
7/30/2019 2G Cluster Optmization Sample Report
7/16
Pulse Information Technologies
7
3.4 Timing Advance(TA) variation.
Figure 3.4.1 : Timing Advance Variation
Figure 3.4.1 : Histogram view of Timing Advance Variation
7/30/2019 2G Cluster Optmization Sample Report
8/16
Pulse Information Technologies
8
3.5 Bad Events:
TBALE 3.5.1 : Event KPI & Cluster Acceptance LevelIntegrity Events & Impairments No. of Occurrences
CS Accessibility
Call Attempts Xxx
Call Setup failures Xxx
CSR (Target 99.99%) Xxx
Mobility
Handover Attempt Xxx
Handover Failures Xxx
HSR (Target 99.5%) Xxx
Location update attempt Xxx
Location update failures Xxx
LAC Update SR (Target 99.99%) Xxx
Retain abilityCall Setup Complete Xxx
Drop Call (Target 99.3%) Xxx
7/30/2019 2G Cluster Optmization Sample Report
9/16
Pulse Information Technologies
9
4. Analysis & Recommendation for Bad events/patches4.1 Idle UE Coverage Sample Patches -01
Analysis Approach:
1. Physical optimization : The building obstructions in coverage path of main serving cell must be checked since this
is dense urban cluster.
Proper Azimuth & tilts must be applied and impact must be also checked then and there. Recommendations for new site or cell splitting or external power booster (Downlink).
2. Parameter optimization : Enhancing the parameter control downlink power boost technology. The serving cell idle BA list (Neighbor list) & access permitted parameter (NCCPERM)
must be rechecked in order to have proper cell resection.
Cell resection controlling parameters (CRO, TO and PT) can be tuned so that cell wouldinitiate the resection at proper condition. Bot operator defined default values also will be
also taken into consideration.
7/30/2019 2G Cluster Optmization Sample Report
10/16
Pulse Information Technologies
10
4.2 Dedicated Mode UE Coverage Sample Patches -01
Analysis Approach:
1 Physical optimization : Identify the best server & Proper Azimuth/tilts must be ensured. Alarm free RBS operation must be ensured (reading RBS Alarm log). The building obstructions in coverage path of main serving cell must be checked (cell
relocation may require) since this is dense urban cluster.
According to the coverage demand & subscriber density, the antenna type can be changed Recommendations for new site or cell splitting or external power booster (Downlink).
2 Parameter optimization : BA list & Neighbor tuning. RBS & Channel power control parameters retune(Ex: BSPWRB, BSPWRB,BSPWRMIN so )
7/30/2019 2G Cluster Optmization Sample Report
11/16
Pulse Information Technologies
11
4.3 Dedicated Mode UE Quality Sample Patches -01
Analysis Approach:
1 Physical optimization : Interferer Identification & Elimination of overshooting cells (Can be double checked by cell
level measurement report recoding) with proper tilt planning.
Frequency reuses pattern analysis & new BCCH/BSIC planning.2 Parameter optimization : Interferer channel power control parameters retune. Improving performance by fine tune the better cell handover parameters. Hooping, AMR and HR/FR controlling parameter retune.
7/30/2019 2G Cluster Optmization Sample Report
12/16
Pulse Information Technologies
12
4.4 Dedicated Mode UE Dropped call Sample Patches-01
Analysis Approach:
Dropped call reasons (Ex: Hardware issue, Quality issue, Signaling issue, traffic demandanalysis so on...) identification & proper remedies.
Monitoring Call drops rate for busy and non-busy hours using row stats. Cable SWAP tracing, identification & rectification (all the way from dTRU to Antenna
Tx/Rx Port).
Uplink interference analysis & recommendation for TMA.
Call trace log analysis.
7/30/2019 2G Cluster Optmization Sample Report
13/16
Pulse Information Technologies
13
4.5 Dedicated Mode UE Handover Failure Sample Patches-01
Analysis Approach:
Handover Failure causal (Ex: Hardware issue, TCH unavailability, BA list tuning, Missingneighbor etc) identification & proper remedies.
Monitoring handover attempt & HSR for busy and non-busy hours using row stats. Cable SWAP tracing, identification & rectification (all the way from dTRU to Antenna
Tx/Rx Port).
Uplink interference analysis & recommendation for TMA.
Impairments analysis in handover control parameters.
7/30/2019 2G Cluster Optmization Sample Report
14/16
Pulse Information Technologies
14
4.6 Dedicated Mode UE Blocked Call Sample Patches-01
Analysis Approach:
Resource Availability analysis (Ex: SDCCH, TCH & PDCH) & recommendations forcapacity expansion.
HCS parameter tuning for dual band cell or different channel group.
Optimizing the availability of resources with a proper parameter tuning (Ex: AMR/HR/FR& Dynamic PDCH allocations).
7/30/2019 2G Cluster Optmization Sample Report
15/16
Pulse Information Technologies
15
4.7 Dedicated Mode UE Ping-Pong Handover Sample Patches-01
Analysis Approach:
The overlapping coverage zone of serving cell & candidate cells must be identified &restricted properly with proper Azimuth/tilt planning.
Locating parameter also can be used to tune the handover performance.
7/30/2019 2G Cluster Optmization Sample Report
16/16
Pulse Information Technologies
5. ConclusionThe report shows the clear picture of the 2G network performance according to the cluster DriveTest carried out. The above mentioned bad patches and the events were thoroughly analyzed withthe drive test logs, OSS KPI and the RNC parameter configurations and the recommendationshave been made.
Once you approved the recommendations we will do the necessary modifications and then the DTwill be carried out to show the network performance has improved.
****End of Document***