Transcript
  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    1/20

    Ifnu Setiadi Gunawan

    Micro Hydro Basic Knowledge and Potential

    of Micro Hydro Power (MHP)Site Reconnaissance

    the Training Programme on Renewable Energy :

    Micro Hydro Power for Rural Development in ASEAN Region

    Bandung, 18

    25 June, 2012

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    2/20

    Site Recconaissance

    On Potensial Site On Demand Site

    Identification of System Layout

    Confirmation of Design Discharge

    Selection of Civil Structures Location

    Confirmation of the Head

    Selection of the Generating System

    Crossflow, Pelton, PAT, Propeller, etc

    Selection of Power Demand

    Facilities

    Examination of Demand & Supply Balance

    Rough Project Cost

    EstimationProject Implementation Stage

    unbalance unbalance

    balance

    FLOWC

    HAR

    TOF

    MHPPROJECTPLANNING

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    3/20

    to investigate potential sites and supply area in order to evaluate the

    feasibility of projects and get information for electrification planning.

    Activities in site reconnaissance are :

    to measure water discharge and head that could be utilized for micro-

    hydropower generation.

    Investigations of intake site, waterway route, powerhouse site and

    transmission route etc.

    Power demand survey.

    Collecting socio-economic data such as number of households and publicfacilities in supply area, availability of local industries which will use

    electricity, solvency of local people for electricity and the acceptability of local

    people to the electrification scheme.

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    4/20

    As advance information, 1/50,000 topographic maps are prepared to

    check the topography of the target site and villages, the catchment

    area, villages distribution and access road. More accurate

    information on site accessibility could be collected by contacting

    local people concerned

    Check list and interview sheet are also prepared for each site

    reconnaissance.

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    5/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    6/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    7/20

    (1) Access conditions to reach project site & transportation of equipment

    (2) Situation of existing system and future plan.

    (3) Situation of river water utilization

    (4) Existence of other development plans/projects in terms of roads,

    farmland, housing and tourism, etc. which may affect the planned project

    site and/or its surrounding area.

    (5) Civil structures in adjacent area and materials used. Most civil structures

    of a micro hydropower plant are similar to those of irrigation facilities and

    road drainage facilities. The materials used for these structurers are often

    available or can be obtained near the planned project site.

    (6) Presence of natural topographical features and existing structures usable

    for power generation. When an existing irrigation channel or similar is

    used (including widening and/or reinforcement) as a waterway for powerstation, it is necessary to check the cross-section, gradient and current

    water conveyance volume, etc. of such a channel.

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    8/20

    1. Topography survey to establish a waterway

    route and other relevant information for theplanning of a micro-hydropower plant.

    2. Measurement River Flow. However, when river

    flow data is difficult to obtain, it is preferable to

    measure the river discharge in the dry season,

    by means of simple method, to confirm the

    appropriateness of the estimated flow duration.

    Ideally the project can derive Flow Duration

    Curve for better design.

    3. Measurement of Head. The head between the

    intake point and the headtank and the head

    between the headtank and the outlet point

    should be measured. At the initial planning

    stage, however, it may be sufficient to measurethe head between the planned headtank

    location and the outlet level.

    4. Demand Survey :

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    9/20

    (1) Location

    The suitable route and distance, etc. to each power

    demand facility should be surveyed to examine theoptimal transmission and distribution lines.

    (2) Owners

    The opinions and intentions of the owners of power

    demand facilities regarding the introduction of a new

    power supply source should be clarified.

    (3) Types and required quality of equipment

    The situation of power use by equipment (for power,heating, lighting and electrical control, etc.) and the

    required level of accuracy (in terms of the allowable

    voltage fluctuation and frequency fluctuation) should be

    surveyed.

    (4) Equipment capacity, etc.

    The equipment capacity, power consumption level and

    electricity tariff (or estimated electricity tariff in the caseof planning) should be surveyed.

    (5) Likely problems associated with power cut

    The likely problems and financial losses associated with

    a power cut to power demand facilities should be

    surveyed.

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    10/20

    w

    ab

    cd

    e

    A (cross section area) = W x H (average)

    H (average) = ( a+b+c+d+e) / 5

    Q = A x VmQ in m3/s

    A in m2

    Vm in m/s

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    11/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    12/20

    Stop watch to measure

    time taken (t) by float to

    travel distance L

    Chart the cross-sectional

    area at both ends. The

    average cross-sectional

    area is Amean

    L

    Average velocity (Vmean)

    Use section or

    count squares to

    estimate the cross-

    sectional area

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    13/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    14/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    15/20

    Using clear Hose

    Water Level

    Theodolite/Total Stasion

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    16/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    17/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    18/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    19/20

  • 7/29/2019 2.b. Micro Hydro Basic Knowledge and Potential - Site Reconnaisance - Ifnu Setiadi

    20/20

    Thank you