ANALISA SNI
Table
ProfilWFBERATCBERATLBERATUUkuranBERATM'BTGM'BTGM'BTGM'BTG600 200 11
181341608200 75 20 3.29.2755.62100 1015.1090.606.565 42
56.8341.00500 200 10 1689.61075.2150 75 20 4.5116680
89.6657.967.575 40 57.5545.30496 199 9 1479.5954150 65 20
3.27.5145.0670 77.3844.28880 45 57.8347.00450 200 9 1476912150 50
20 3.26.7640.5670 55.2731.6310100 50 59.3756.20446 199 8
1266.2794.4150 50 20 2.34.9629.7660 65.4232.5212120 55
612.5075.00400 200 9 1366792125 50 20 3.26.1336.7860
54.5227.1014140 60 716.1797.00396 199 7 1156.6679.2125 50 20
2.34.5127.0650 53.7722.6216160 65 7.519.25115.50350 175 7
1149.6595.2100 50 20 3.25.53350 43.0218.1018180 70 822.58271.00346
174 6 941.4496.8100 50 20 2.64.5527.340 42.4214.5220200 75
8.525.83310.00300 150 6.5 936.7440.4100 50 20 2.34.0624.3640
31.8210.8922220 80 930.92371.00298 149 5.5 83238424240 85
9.534.17410.00250 125 6 929.6355.226260 90 1038.00456.00248 124 5
825.7308.4HBERATPELAT POLOS28280 85 1041.67500.00200 100 5.5
821.3255.6M'BTG1 mm per lembar23.3678830300 100 1046.33556.00198 99
4.5 718.2218.4100 10017.33333333332081 mm per m27.8532320 100
1459.50714.00150 75 5 714168125 125 5 918.522240400 110
1471.83862.00125 125 6.5 923.8333333333286PELAT BORDES / CHECKERED
PLATE12.5125 65 613.4080.40besi betonBERAT150 150 7 1031.53782.3
mm5915150 75 6.518.67112.00M'BTG175 275 7 1131.53783 mm7515180 75
721.33128.0060.2218412.662092200 200 8 1241.58333333334993.2
mm79.620200 80 7.524.67148.0080.3943844.732608250 250 9
1472.41666666678694.5 mm11025250 90 934.67208.00100.6162257.3947300
300 10 159411286 mm14530350 100 1043.83526.00120.88736410.648368350
350 12 1613716448 mm195161.57753618.930432400 450 13 2117220649
mm215192.2245722526.694867222.98252935.790348233.2598302539.117963253.8514062546.216875284.83120457.974448315.9219222571.063067326.31014475.721728
&APage &P
UPAH & BAHANDAFTAR STANDAR HARGA SATUAN DASAR PEMBANGUNAN
TAHUN 2006PEMERINTAH KABUPATEN KUTAI KARTANEGARANOJENIS UPAHHARGA
UPAHSATUANHARGAINDEXRp.REALKOTA/ESKALASI1P e k e r j a40,000.001
Org/hr/8jam4000012Pekerja Setengah Terampil45,000.001
Org/hr/8jam4500013Pekerja Terampil55,000.001
Org/hr/8jam5500014Tukang Batu Setengah Terampil45,000.001
Org/hr/8jam4500015Tukang Batu Terampil50,000.001
Org/hr/8jam5000016Kepala Tukang Batu65,000.001
Org/hr/8jam6500017Tukang Kayu Setengah Terampil45,000.001
Org/hr/8jam4500018Tukang Kayu Terampil50,000.001
Org/hr/8jam5000019Kepala Tukang Kayu65,000.001
Org/hr/8jam65000110Tukang Cat/Pelitur Setengah Terampil42,500.001
Org/hr/8jam42500111Tukang Cat/Pelitur Terampil50,000.001
Org/hr/8jam50000112Kepala Tukang Cat/Pelitur65,000.001
Org/hr/8jam65000113Tukang Besi Beton Setengah Terampil45,000.001
Org/hr/8jam45000114Tukang Besi Beton Terampil50,000.001
Org/hr/8jam50000115Kepala Tukang Besi Beton65,000.001
Org/hr/8jam65000116Tukang Besi Beton Profil Setengah
Terampil45,000.001 Org/hr/8jam45000117Tukang Besi Beton Profil
Terampil50,000.001 Org/hr/8jam50000118Kepala Tukang Besi Beton
Profil55,000.001 Org/hr/8jam55000119M a n d o r70,000.001
Org/hr/8jam700001DAFTAR STANDAR HARGA SATUAN DASAR PEMBANGUNAN
TAHUN 2006PEMERINTAH KABUPATEN KUTAI KARTANEGARANOJENIS
BAHANSATUANHARGA BAHANHARGAINDEXRp.REALKOTA/ESKALASIBAHAN AGREGAT
KASAR, BAHANPEREKAT DAN BAHAN JADINYA1Pasir
Urugm370,000.0070,0001Sirtum3150,000.00150,0001Pasir
Pasangm3240,000.00240,0001Pasir Betonm3250,000.00250,0001Batu Pecah
Mesin 1/2m3250,000.00250,0001Batu Pecah Mesin
2/3m3250,000.00250,0001Batu Pecah Mesin 3/5m3250,000.00250,0001Batu
Pecah Mesin 5/7m3250,000.00250,0001Batu Belah
Pondasim3175,000.00175,0001Batu Tempel Hitamm280,000.0080,0001Bata
merah kelas Ibh500.005001Inter Blok Natural 6
cmm225,000.0025,0001Paving Blok natural 8
cmm228,000.0028,0001Paving Blok Warna 6 cmm230,000.0030,0001Kanstin
Paving Blokm130,000.0030,0001Glass Blockm215,000.0015,0001Semen PC
Tiga Roda / 50 kgzak40,000.0040,0001Semen
Putihkg3,500.003,5001Semen warnakg3,500.003,5001Aspal (ESO) 1 Drum
150 kgkg8,000.008,00011BAHAN FINISHING :1LABURAN , PENGISI DAN
ALATNYA1Plamir Tembok Ex. Paragonkg18,000.0018,0001Cat Tembok
Sanlexkg5,100.005,1001Rool Cat Tembokbh15,000.0015,0001Kape
Tembokbh5,000.005,0001Kape Kayubh5,000.005,0001Soligneum 1 Blek5
ltr12,000.0012,0001Kwas 3 "bh7,500.007,5001Otem (Pewarna
Plitur)bks1,000.001,0001Spirtusltr2,500.002,5001Bahan Plitur Kripik
(Sirlak India)kg6,000.006,0001Dempul Halus/ Infra (Wood
Filler)/Imprakg21,500.0021,5001Terpentinltr2,000.002,0001Tinerltr18,000.0018,0001Ampelaslbr2,500.002,5001Dempul
Kayu Cap Kucingkg9,500.009,5001Dempul Kayu
Aviankg6,000.006,0001Meni Kayu/
Besikg20,000.0020,0001Sincromatkg60,000.0060,0001Cat Kayu
pinoguarkg24,000.0024,0001Cat Besi Seivkg60,000.0060,0001Cat Kayu
Aviankg45,000.0045,0001Cat Besi Duco Danaglos /
ICIkg130,000.00130,0001Lem Kayu Putih (Fox)kg8,500.008,5001Lem Kayu
Kuning (AIBON)kg14,000.0014,00011BAHAN KAYU BERIKUT BAHAN
JADINYA1Kayu Terentangm3310,000.00310,0001Kayu Balok Borneo
Superm31,700,000.001,700,0001Kayu papan Borneo
Superm31,700,000.001,700,0001Kayu kaso 5/7 Borneo
Superm31,700,000.001,700,0001Kayu 5/10 kayu awet kls
Im31,700,000.001,700,0001Kayu Awet Kls
Im31,250,000.001,250,0001Kayu KAMPERm33,600,000.003,600,0001Kayu
Balok Rasamalam32,100,000.002,100,0001Kayu papan
Rasamalam32,100,000.002,100,0001Kayu Balok Kamper Medan
(Kruing)m31,600,000.001,600,0001Kayu Papan Kamper Medan
(Kruing)m31,600,000.001,600,0001Kayu Balok Kamper
Banjarm32,100,000.002,100,0001Kayu Papan Kamper
Banjarm32,100,000.002,100,0001Kayu Balok Kamper
Samarindam35,500,000.005,500,0001Kayu Papan Kamper
Samarindam35,500,000.005,500,0001Kayu Jati
jabarm37,000,000.007,000,0001Dolken 5 s/d 7bt7,000.007,0001Dolken 7
s/d 10 / kaso 4/6 untuk stootworkbt11,500.0011,5001List Profil
kamper 1 cmm11,000.001,0001List Profil kamper 2 cm
(45x45)m12,750.002,7501Kayu Reng 2/3 Borneo
Superm11,500.001,5001Kayu Reng 3/4 Borneo Superm13,000.003,0001kayu
ulinm31,650,000.001,650,00011BAHAN PENUTUP RANGKA PLAPON1Bahan
Plapon Eternit 4
mmlbr42,500.0042,5001Kalsiboardlbr38,000.0038,0001List Kayu 4 /
4btng18,000.0018,0001List Kayu 5 / 5btng27,000.0027,0001Gypsum 9
mmlbr75,000.0075,00011BAHAN KAYU LAPIS1Triplek 3 mm 120 x
240lbr33,000.0033,0001Triplek 4 mm 120 x
240lbr39,000.0039,0001Triplek 6 mm 120 x
240lbr42,000.0042,0001Multiplek 12 mm 120 x
240lbr112,500.00112,5001Multiplek 12 mm ukuran
pintulbr236,250.00236,2501Teak Wood 4 mm 120
x240lbr75,000.0075,0001Formikalbr69,000.0069,00011BAHAN LANTAI DAN
PELAPIS DINDING1Keramik lantai 20 x 20 Putih Polos
"MULIA"m245,000.0045,0001Keramik dinding 20 x 25 Putih Polos
"MULIA"m248,000.0048,0001Keramik 30X30 Putih Polos
"MULIA"m246,000.0046,0001Lantai Pear Stonem289,000.0089,0001Floor
Hardener Ferofax sekualitas Metaltopkg60,000.0060,00011G. BAHAN
SALURAN AIR KOTOR / BERSIH1Grafel U 20 cmm'20,000.0020,0001Grafel U
30 cmm'30,000.0030,0001Buis Beton dia. 20 cm ( 1 m
)m'45,000.0045,0001Buis Beton dia.30 cm (1 m
)m'60,000.0060,00011BAHAN LOGAM DAN BAHAN JADINYA1Besi Beton U-24
Rata-ratakg14,000.0014,0001Pagar BRC T.120 Lengkap
Tiangm1132,000.00132,0001Pagar BRC T.175 Lengkap
Tiangm1612,500.00612,5001Besi Canalkg14,000.0014,0001Besi Siku
Lkg14,000.0014,0001Besi IWF DN SIIkg14,000.0014,0001Besi
HWFkg14,000.0014,0001Besi platkg14,000.0014,0001Kawat
Betonkg19,500.0019,5001Kawat Durikg12,500.0012,5001Seng plat BJLS
28 ( lebar = 90 cm )m135,000.0035,0001Seng Glb BJLS
28lbr20,500.0020,5001Ram kawatm235,000.0035,00011BAHAN KACA1Kaca
polos 3 mm (ASAHI)m257,000.0057,0001Kaca polos 5 mm
(ASAHI)m265,000.0065,0001Cerminm289,000.0089,00011BAHAN PAKU DAN
MUR BAUT1Paku biasakg15,000.0015,0001Paku hak Pj. 15
cmbh6,000.006,00011BAHAN PERPIPAAN1Pipa GIP Medium B dia.
1/2"bt17,000.0017,0001Pipa GIP Medium B dia.
3/4"bt23,000.0023,0001Pipa GIP Medium B dia.
1"bt25,000.0025,0001Pipa GIP Medium B dia. 1
1/2"bt43,000.0043,0001Pipa GIP Medium B dia.
2"bt60,000.0060,0001Pipa PVC MASPION ABU dia. 2"
(AW)bt75,000.0075,0001Pipa PVC MASPION ABU dia. 3"
(AW)bt140,000.00140,0001Pipa PVC MASPION ABU dia. 4"
(AW)bt230,000.00230,0001Grefel beton 1/2 dia. 30
cmm130,000.0030,00011BAHAN SANITAIR DAN PERPIPAAN1Stop Kran 3/4 "
KITbh75,000.0075,0001Stop Kran 1 1/2 " KITbh125,000.00125,0001Kran
bebek Sun Ei 1/2 "bh85,000.0085,0001Floor
drainbh20,000.0020,0001Wastafel Lengkap Toto Type L
34bh350,000.00350,0001Closet Jongkok Standard Putih Poslin
INAunit125,000.00125,0001closet duduk ex
totounit1,050,000.001,050,0001kran air
1/2"bh37,300.0037,3001showerunit250,000.00250,0001kichensinkunit250,000.00250,00011BAHAN
PENUTUP ATAP1Genteng Palentongbh1,000.001,0001Wuwung
Gentengbh18,500.0018,5001Atap genteng Morando
glazurbh2,000.002,0001Wuwung Genteng morando
glazurbh4,000.004,0001Genteng Ex KIA (11 bh
)m258,685.0058,68511BAHAN ELEKTRIKAL1Saklar Broko Tunggal Standard
(1Phase)bh16,000.0016,0001Saklar Broko Seri Standard (1
Phase)bh16,000.0016,0001Stop Kontak Broko Standard (1
Phase)bh9,000.009,0001Lampu Neon TL Philip 1 X 36 W Type
TKIbh17,500.0017,5001Pentanahan Penangkal Petir lengkap bak
kontrolttk900,000.00900,0001pipa kabelbt8,000.008,0001Kabel NYY 2 X
2,5 mm Primam14,000.004,0001Kabel NYY 3 X 2,5 mm
PrimaM15,000.005,000111BAHAN ALAT PENGGANTUNG DAN KUNCI1Kunci 2
Slaagbh75,000.0075,0001Kunci KM Bulat
ALPAbh75,000.0075,0001Espanyolet/Slot Tanambh30,000.0030,0001Hak
Angin Kait Jendela Biasa ( Kait )bh15,000.0015,0001Engsel Pintu
Arch Standardbh6,000.006,0001Engsel Jendela
Archbh4,000.004,0001Pasang roda type 61. K/ N ex
Hendersonbh65,000.0065,000111BAHAN PENGHISAP AIR SUMUR DALAM1Mesin
Pompa Air 400 W - Sanyounit650,000.000.011BAHAN PENAMPUNG
AIR1Tangki Air Fiber Glass 0.5 m3 ( Pinguinl
)bh1,200,000.000.01Tangki Air Fiber Glass 2000 liter ( Pinguinl
)bh1,900,000.000.01Bak km Fiber 50 X 50bh125,000.00125,0001
Harga Upah Bahan AlatDAFTAR HARGA SATUANNOJENIS UPAHHARGA
UPAHSATUANIndex kotaHARGA
REALREFERENSIRp.Rp.JakartaRp.1Mandor63,500OH163,500TEX= daftar yang
harus diisiPekerja40,000OH140,000TEX= index kotaPekerja
las45,0000145,000Pelaksana40,0000140,000contoh pengisian index
kotaPengawas las50,000OH150,000misal kita akan membuat rap wilayah
surabayaTukang50,0000150,000adalah 10% dari harga kota
bandungTukang cat45,0000145,000angka yang diisi adalah 1,1Tukang
gerinda45,000OH145,000Tukang las55,000OH155,000CatatanJuru
ukur80,000OH180,000jika anda akan merubah penulisan jenis
bahanTeknisi80,0000180,000didalam penulisannya harus sama
antaraOperator mesin63,5000163,500penulisan jenis bahan pada sheet
hrg uph+bhn0.001dan sheet analisa
pek0.0010.0010.0010.0010.0010.0010.0010.001NOJENIS
BAHANSPESIFIKASIHARGA BAHANSATUANIndex kotaHARGA
REALREFERENSIKLASIFIKASIRp.Rp.Jakarta11Acetylin @ 45
kg175,000tbg1175,0002Amplas5,500015,5003Apron73,265bh173,2654Bahan
las thermit847,000set1847,0005Bahan pengisi110,00001110,0006Balas
batu pecah 2/6 di
quarry140,000m31140,0007Baling-baling22,7000122,700BAHAN FINISHING
: LABURAN , PENGISI DAN ALATNYA8Bambu dia. 8-10 x 400-550
cm11,5000111,5009Bantalan beton lengkap dengan
penambat457,000btg1457,00010Bantalan kayu biasa ukuran
13x22x200405,00001405,00011Bantalan kayu jembatan ukuran
18x22x200625,00001625,00012Batu pecah130,00001130,00013Batu gerinda
MP12406,875bh1406,875BAHAN FINISHING : LABURAN , PENGISI DAN
ALATNYA14Batu gerinda tangan52,100bh152,10015Batu gerinda
profil270,000bh1270,00016Batu pecah 2/3140,00001140,00017Batu pecah
kricak 1/2140,00001140,00018Baut bantalan dia. 19, p = 270
mm23,6500123,65019Baut glugu25,1000125,10020Baut
IRJ55,0000155,00021Baut Isol55,0000155,00022Baut kopel dia. 19 mm p
= 400 mm29,7000129,70023Baut kopel dia. 19 mm p = 700
mm29,7000129,70024Baut kopel dia. 19 mm p = 800
mm29,7000129,700BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN
JADINYA25Baut lasplaat (fishplate)55,0000155,000BAHAN AGREGAT
KASAR, BAHAN PEREKAT DAN BAHAN JADINYA26Baut/mur3,000013,000BAHAN
AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA27Baut keling
diameter 19 - 45 mm9,600019,60028Baut kaki gongsol diameter
21-160215,00001215,00029Baut kupingan gongsol diameter
19-558,500018,50030Baut sindik24,0000124,00031Cat Jembatan
(Epoxy)0.001BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN
JADINYA32Begel glugu26,0000126,000BAHAN AGREGAT KASAR, BAHAN
PEREKAT DAN BAHAN JADINYA33Begel rel bendel dia. 19
mm33,0000133,000BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN
JADINYA34Bensin4,500lt14,500BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN
BAHAN JADINYA35Bensin campur4,750lt14,750BAHAN AGREGAT KASAR, BAHAN
PEREKAT DAN BAHAN JADINYA36Brander
pemanas1,480,000set11,480,000BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN
BAHAN JADINYA37Bor kayu60,000buah160,000BAHAN AGREGAT KASAR, BAHAN
PEREKAT DAN BAHAN JADINYA38Bor
rel200,00001200,00039Cetok12,0000112,00040Cincin
glugu45,0000145,00041Conector galvanis 4
mm11,0000111,00042Cookes11,5000111,50043Dempul20,5000120,50044Dongkrak
alignment beam4,235,000bh14,235,00045Elektroda untuk
layer40,250kg140,250BAHAN FINISHING : LABURAN , PENGISI DAN
ALATNYA46Elektroda untuk pengeras75,000kg175,000BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA47Ember7,500017,500BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA48Gemuk21,0000121,000BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA49Gergaji besi
standar23,5000123,500BAHAN FINISHING : LABURAN , PENGISI DAN
ALATNYA50Jeligen air, ember+lap15,0000115,000BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA51Kabel las 0,8
mm75,0000175,00052Kacamata Gerinda45,0000145,000BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA53Kacamata las45,000bh145,00054Kain
bendera15,0000115,00055Kain lap5,750lb15,75056Kawat diameter 5
mm13,500kg113,50057Kawat las elektroda27,5000127,50058Kawat
pral19,5000119,50059Kek besi cookes37,0000137,00060Kikir segi empat
1.5"22,000bh122,00061Kuas uk. 3"13,5000113,50062Kunci baut
lasplaat70,000bh170,00063Kunci inggris 12"93,5000193,50064Kunci
ring / pas45,000set145,00065Kunci tirefon66,500bh166,50066Lampu
semboyan177,10001177,10067Lasplaat sambung
R.42146,75001146,75068Lasplaat sambung R.5474,5000174,50069Lasplaat
Isol299,70001299,70070Linggis140,000bh1140,00071LPG 12
kg60,0000160,00072LPG 46 kg192,500tbg1192,50073Masker
Las60,0000160,00074Minyak Tanah2,500012,50075Mistar kusus untuk
gurinda125,00001125,00076Mistar pelurus rel 1
m440,000bh1440,00077Mold
Tembaga354,20001354,20078Oksigen75,000tbg175,00079Oli Meditrain
409,500019,50080Oli SAE 2025,8500125,85081Oli SAE
30-4016,0000116,00082Oli SAE 4016,000lt116,00083Oli SAE
9032,4500132,45084P3K125,00001125,00085Pahat
ganjal7,700bh17,70086Paku10,0000110,00087Paku
maskrum11,5000111,50088Paku seng11,5000111,500BAHAN AGREGAT KASAR,
BAHAN PEREKAT DAN BAHAN JADINYA89Palu 4 kg70,000bh170,000BAHAN
AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA90Palu
Ketrek22,0000122,00091Palu konde 1 kg33,000bh133,00092Palu/ martil
4 kg49,5000149,50093Pandpuller99,000bh199,00094Pandrol
R.4226,0000126,00095Pandrol R.5426,6000126,60096Pasak 6
mm35,5000135,50097Pasir90,0000190,00098Pasir
sirtu87,5000187,50099Pasir urug
darat130,00001130,000100Paslin15,0000115,000101Pelat tembaga
penghalang125,00001125,000102Pemegang
elektroda150,00001150,000103Penetran cleaner 400
ml124,45001124,450104Penetran developer 400
ml73,2000173,200105Penetran revolfer 400 ml124,45001124,450106Plat
landas219,00001219,000107Ram kawat29,0000129,000108Regulator
acetylin480,000bh1480,000109Regulator
LPG75,000bh175,000110Regulator
oksigen120,000bh1120,000111Residu15,0000115,000112Sarung tangan
panjang35,000set135,000113Sarung tangan
pendek25,000set125,000114Sekop10,000bh110,000115Senteleng
bambu54,0000154,000BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN
JADINYA116Sepatu glugu27,5000127,500117Sepatu
las105,000set1105,000118Sikat
baja10,000bh110,000119Solar4,200lt14,200120Stopwatch240,000bh1240,000121Tabung
pemanas elektroda175,00001175,000122Tambang manila dia 19
mm27,5000127,500123Tangkai martil7,500017,500124Tenda plastik 4x4
m89,000lb189,000125Ter11,500kg111,500126Thermometer145,00001145,000127Tirefon45,0000145,000128Vaselin5,500015,500129Zat
asam110,00001110,00011111111NOSEWA ALAT/TESTSEWA ALATSATUANIndex
kotaHARGA REALREFERENSIRp.Rp.Jakarta11Alat
bantu75,750buah175,750Menhub SE.01 Tahun 20082Generator
set1,478,750jam11,478,750Menhub SE.01 Tahun 20083Mesin gerinda
MP12144,500jam1144,500Menhub SE.01 Tahun 20084Mesin gerinda
tangan31,125jam131,125Menhub SE.01 Tahun 20085Mesin weldshear
manual72,600jam172,600Menhub SE.01 Tahun 20086Wheel
loader288,000jam1288,0007Mesin las 400 Amp150,000jam1150,000Dirtek
PT. KA8Test ultrasonic termasuk akomodasi
petugas25,000ttk125,000Dirtek PT. KA9Transportasi untuk pekerjaan
las50,000unit150,00010Pengaman operasional untuk pekerjaan
las5,000unit15,00011Biaya operasi MTT 09-16
CAT9,511kali19,511Dirtek PT. KA12Biaya operasi MTT 07-16 G, MTT
08-16 GS plain track7,018017,018Dirtek PT. KA13Biaya operasi MTT
08-16 GS di lengkung bergongsol8,894018,894Dirtek PT. KA14Biaya
operasi PBR 200-40013,976kali113,976Dirtek PT. KA15Biaya operasi
VDM 800-800 GS4,780kali14,780Dirtek PT. KA16Biaya pengelasan dengan
mesin las FBW K 355 APT624,60201624,602Dirtek PT. KA17Biaya
pengerukan dengan TG 80-4107,08501107,085Dirtek PT. KANOBIAYA
ANGKUT DENGAN KERETAHargaHARGA BAHANSATUANIndex kotaHARGA
REALREFERENSIRp.Rp.Jakarta11Biaya administrasi angkutan balas
dengan KAm312,090m3112,090Direksi PT. KAReduksi per ton
balas5000Reduksi per m3 balas7500Biaya angkutan balas berdasarkan
B330600PPn10% per ton3060PPn10% per m345902Biaya administrasi
angkutan dengan KA484,000ton1484,000Direksi PT.
KA0.0010.0010.0010.0010.001
asep toni:untuk mengganti index kotauntuk mengganti index
kotauntuk mengganti index kotauntuk mengganti index kota
ANALISA PEKANALISA HHARGA SATUANNOU R A I A NKOEFKOEF
RAPSATHARGA
SATJUMLAHTOTALbahanupahalat/angkutbahanupahalat/angkutABDD'EFGHI=D'xFJ=D'xGK=D'xHL=I+J+K1.00034
00 00TRANSPORTASI34 01 00OPERATION AND MAINTENANCE OF
TRANSPORTATION34 01 23OPERATION AND MAINTENANCE OF RAILWAYS34 01
23.13Membongkar Sepur dan Mengumpulkan Bekas Bongkaran (Track
Removal and Salvage)- Melepas alat penambat- Mengumpulkan bekas
bongkaran di sisi jalan rel (luar ruang bebas)34 01
23.13.100Membongkar sepur bantalan kayu/besi34 01
23.13.1101m'spMembongkar sepur rel
R250.004,635.000.004,635.00UpahMandor0.01000.010OH63,500.00635Pekerja0.10000.100OH40,000.004,00034
01 23.13.1201m'spMembongkar sepur rel
R330.005,435.000.005,435.00UpahMandor0.01000.010OH63,500.00635Pekerja0.12000.120OH40,000.004,80034
01 23.13.1301m'spMembongkar sepur rel
R420.006,235.000.006,235.00UpahMandor0.01000.010OH63,500.00635Pekerja0.14000.140OH40,000.005,60034
01 23.13.1401m'spMembongkar sepur rel
R500.007,442.000.007,442.00UpahMandor0.01200.012OH63,500.00762Pekerja0.16700.167OH40,000.006,68034
01 23.13.1501m'spMembongkar sepur rel
R540.008,025.500.008,025.50UpahMandor0.01300.013OH63,500.00826Pekerja0.18000.180OH40,000.007,20034
01 23.13.200Membongkar sepur bantalan beton34 01
23.13.2101m'spMembongkar sepur rel
R420.0027,434.000.0027,434.00UpahMandor0.04400.044OH63,500.002,794Pekerja0.61600.616OH40,000.0024,64034
01 23.13.2201m'spMembongkar sepur rel
R500.0032,622.000.0032,622.00UpahMandor0.05200.052OH63,500.003,302Pekerja0.73300.733OH40,000.0029,32034
01 23.13.2201m'spMembongkar sepur rel
R540.0035,299.500.0035,299.50UpahMandor0.05700.057OH63,500.003,620Pekerja0.79200.792OH40,000.0031,68034
01 23.81Mengganti Bantalan (Track Crosstie Replacement)34 01
23.81.100Mengganti bantalan kayu dengan bantalan kayu- Melepas alat
penambat dan memasang kembali- Mengorek balas dan memecok kembali
sapai padat, kecuali jembatan- Mengebor bantalan dan mengeter pada
bagain alat penambat- Mengeluarkan bantalan lama dan memasukkan
yang baru yang telah tersedia di lokasi34 01 23.81.1101btgMengganti
bantalan kayu dengan bantalan kayu di LINTAS
BEBAS0.009,740.006,103.5015,843.50UpahMandor0.04000.040OH63,500.002,540Pekerja0.18000.180OH40,000.007,200AlatBor
kayu0.10000.100buah60,000.006,000Ter0.00900.009kg11,500.0010434 01
23.81.1201btgMengganti bantalan kayu dengan bantalan kayu di
EMPLASEMEN tidak ada peron, sepur
utama0.0011,175.006,103.5017,278.50UpahMandor0.05000.050OH63,500.003,175Pekerja0.20000.200OH40,000.008,000AlatBor
kayu0.10000.100buah60,000.006,000Ter0.00900.009kg11,500.0010434 01
23.81.1301btgMengganti bantalan kayu dengan bantalan kayu di
EMPLASEMEN pada
peron0.0016,762.506,103.5022,866.00UpahMandor0.07500.075OH63,500.004,763Pekerja0.30000.300OH40,000.0012,000AlatBor
kayu0.10000.100buah60,000.006,000Ter0.00900.009kg11,500.0010434 01
23.81.1401btgMengganti bantalan kayu dengan bantalan kayu di
JEMBATAN
DLURUNG0.0021,587.506,103.5027,691.00UpahMandor0.02500.025OH63,500.001,588Pekerja0.50000.500OH40,000.0020,000AlatBor
kayu0.10000.100buah60,000.006,000Ter0.00900.009kg11,500.0010434 01
23.81.1501btgMengganti bantalan kayu dengan bantalan kayu di
JEMBATAN
DINDING0.0038,857.506,103.5044,961.00UpahMandor0.04500.045OH63,500.002,858Pekerja0.90000.900OH40,000.0036,000AlatBor
kayu0.10000.100buah60,000.006,000Ter0.00900.009kg11,500.0010434 01
23.81.200Mengganti bantalan kayu/besi dengan bantalan besi- Melepas
alat penambat dan mengeluarkan bantalan lama- Mengorek balas dan
memecok kembali sampai padat- Memasang bantalan besi34 01
23.81.3101btgMengganti bantalan kayu/besi dengan bantalan besi di
LINTAS
BEBAS0.009,740.000.009,740.00UpahMandor0.04000.040OH63,500.002,540Pekerja0.18000.180OH40,000.007,20034
01 23.81.3201btgMengganti bantalan kayu/besi dengan bantalan besi
di EMPLASEMEN tidak ada peron, sepur
utama0.0011,175.000.0011,175.00UpahMandor0.05000.050OH63,500.003,175Pekerja0.20000.200OH40,000.008,00034
01 23.81.3301btgMengganti bantalan kayu/besi dengan bantalan besi
di EMPLASEMEN pada
peron0.0016,762.500.0016,762.50UpahMandor0.07500.075OH63,500.004,763Pekerja0.30000.300OH40,000.0012,00034
01 23.81.300Mengganti bantalan kayu/besi dengan bantalan beton-
Melepas alat penambat dan mengeluarkan bantalan lama- Mengorek
balas dan memecok kembali sampai padat- Memasang bantalan34 01
23.81.3101btgMengganti bantalan kayu/besi dengan bantalan beton di
LINTAS
BEBAS0.0029,220.000.0029,220.00UpahMandor0.12000.120OH63,500.007,620Pekerja0.54000.540OH40,000.0021,60034
01 23.81.3201btgMengganti bantalan kayu/besi dengan bantalan beton
di EMPLASEMEN tidak ada peron, sepur
utama0.0033,525.000.0033,525.00UpahMandor0.15000.150OH63,500.009,525Pekerja0.60000.600OH40,000.0024,00034
01 23.81.3301btgMengganti bantalan kayu/besi dengan bantalan beton
di EMPLASEMEN pada
peron0.0050,287.500.0050,287.50UpahMandor0.22500.225OH63,500.0014,288Pekerja0.90000.900OH40,000.0036,00034
01 23.81.400Mengganti bantalan beton dengan bantalan beton- Melepas
alat penambat dan mengeluarkan bantalan lama- Mengorek balas dan
memecok kembali sampai padat- Memasang bantalan34 01
23.81.4101btgMengganti bantalan beton dengan bantalan beton di
LINTAS
BEBAS0.0038,960.000.0038,960.00UpahMandor0.16000.160OH63,500.0010,160Pekerja0.72000.720OH40,000.0028,80034
01 23.81.4201btgMengganti bantalan beton dengan bantalan beton di
EMPLASEMEN tidak ada peron, sepur
utama0.0044,700.000.0044,700.00UpahMandor0.20000.200OH63,500.0012,700Pekerja0.80000.800OH40,000.0032,00034
01 23.81.4301btgMengganti bantalan beton dengan bantalan beton di
EMPLASEMEN pada
peron0.0067,050.000.0067,050.00UpahMandor0.30000.300OH63,500.0019,050Pekerja1.20001.200OH40,000.0048,00034
01 23.96Mengganti dan Menguras Balas34 01 23.96.1001m3Mengeluarkan
balas
kotor0.0063,175.000.0063,175.00UpahMandor0.05000.050OH63,500.003,175Pekerja1.50001.500OH40,000.0060,00034
01 23.96.2001m3Mengayak balas kotor dan memasukkan kembali balas
bersih -25%0.0030,158.750.0030,158.75- Balas telah dikeluarkan dari
jalan rel- Balas bersih dimasukkan kembali ke jalan rel
(-25%)UpahMandor0.00250.003OH63,500.00159Pekerja0.75000.750OH40,000.0030,00034
01 23.96.300Membuang balas kotor34 01 23.96.3101m3Membuang balas
kotor dengan jarak max 30
m0.000.000.000.00UpahPekerja0.33000.330OH40,000.0013,200Mandor0.01000.010OH63,500.0063534
01 23.96.3201m.m3Membuang balas kotor dengan jarak >30
m0.000.000.000.0034 01 23.96.4001m3Memasukkan BALAS PASIR BARU dan
mendandang/memecok balas batu pecah untuk kec. KA 5
km/jam0.0042,095.500.0042,095.50UpahMandor0.03300.033OH63,500.002,096Pekerja1.00001.000OH40,000.0040,00034
01 23.96.5001m3Memasukkan BALAS BARU dan mendandang/memecok balas
batu pecah untuk kec. KA 5
km/jam0.0034,754.500.0034,754.50UpahMandor0.02700.027OH63,500.001,715Pekerja0.82600.826OH40,000.0033,04034
01 23.96.600Menambah balas34 01 23.96.6101m3Menambah balas pasir
baru tanpa
mendandang/memecok0.008,635.000.008,635.00UpahMandor0.01000.010OH63,500.00635Pekerja0.20000.200OH40,000.008,00034
01 23.96.6201m3Menambah balas baru tanpa
mendandang/memecok0.0010,793.750.0010,793.75UpahMandor0.01250.013OH63,500.00794Pekerja0.25000.250OH40,000.0010,00034
10 00JALAN REL (RAILWAYS)34 11 00RAIL TRACKS34 11 13TRACK RAILS34
11 13.13Muat dan Bongkar34 11 13.13.100Muat dan bongkar rel34 11
13.13.1101mMuat dan bongkar rel R42675.003,323.000.000.00BahanKawat
diameter 5
mm0.05000.050kg13,500.00675UpahMandor0.02600.026OH63,500.001,651Pekerja0.04180.042OH40,000.001,672TransportBiaya
administrasi angkutan rel dengan KA0.04200.042ton0.000.034 11
13.13.1201mMuat dan bongkar rel R54675.003,851.000.000.00BahanKawat
diameter 5
mm0.05000.050kg13,500.00675UpahMandor0.02600.026OH63,500.001,651Pekerja0.05500.055OH40,000.002,200TransportBiaya
administrasi angkutan rel dengan KA0.05440.054ton0.000.034 11
13.13.200Muat dan bongkar wesel34 11 13.13.2101unitMuat dan bongkar
wesel R54135,000.001,226,737.500.001,361,737.50BahanKawat diameter
5
mm10.000010.000kg13,500.00135,000UpahMandor0.92500.925OH63,500.0058,738Pekerja29.200029.200OH40,000.001,168,000TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11
13.13.300Muat dan bongkar wesel inggris34 11 13.13.3101unitMuat dan
bongkar wesel inggris
R54202,500.001,814,737.500.002,017,237.50BahanKawat diameter 5
mm15.000015.000kg13,500.00202,500UpahMandor0.92500.925OH63,500.0058,738Pekerja43.900043.900OH40,000.001,756,000TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11
13.13.400Muat dan bongkar bantalan34 11 13.13.4101btgMuat dan
bongkar bantalan
kayu/besi0.003,700.000.003,700.00UpahPekerja0.09250.093OH40,000.003,700TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11
13.13.4201btgMuat dan bongkar bantalan
beton0.000.000.000.00UpahPekerja0.000OH40,000.000.0TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11
13.13.500Muat dan bongkar alat-alat kecil bangunan atas34 11
13.13.5101kgMuat dan bongkar alat-alat kecil bangunan
atas0.00372.000.00372.00UpahPekerja0.00930.009OH40,000.00372TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11
13.13.600Muat dan bongkar Lain-lain34 11 13.13.6101m3Muat dan
bongkar batu
kali0.0026,960.450.0026,960.45UpahMandor0.01670.017OH63,500.001,060Pekerja0.64750.648OH40,000.0025,900TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11
13.13.6201m3Muat dan bongkar
tanah0.0023,025.500.0023,025.50UpahMandor0.01300.013OH63,500.00826Pekerja0.55500.555OH40,000.0022,200TransportBiaya
administrasi angkutan dengan KA0.000ton484,000.000.034 11 16WELDED
TRACK RAILS34 11 16.13In-Track Butt-Welded Track Rail34 11 16.13
100Las Elektroda untuk rel R33 dan R4234 11 16.13.1101titikLas
elektroda untuk rel R33 dan R42 dikerjakan siang
hari156,832.5049,450.0093,823.50300,106.00Bahan
pendukungSolar7.00007.000lt4,200.0029,400.00Oksigen0.15000.150tbg75,000.0011,250.00Acetylin
@ 45 kg0.07000.070tbg175,000.0012,250.00Bensin
campur1.50001.500lt4,750.007,125.00Oli SAE
400.05000.050lt16,000.00800.00Kain
lap0.05000.050lb5,750.00287.50Tenda plastik 4x4
m0.01000.010lb89,000.00890.00Regulator
oksigen0.00500.005bh120,000.00600.00Regulator
acetylin0.00500.005bh480,000.002,400.00Batu gerinda
tangan0.30000.300bh52,100.0015,630.00Batu gerinda
profil0.02000.020bh270,000.005,400.00Elektroda untuk
layer1.20001.200kg40,250.0048,300.00Elektroda untuk
pengeras0.30000.300kg75,000.0022,500.00Alat kerjaPalu konde 1
kg0.01000.010bh33,000.00330.00Palu 4
kg0.00400.004bh70,000.00280.00Pahat
ganjal0.01000.010bh7,700.0077.00Sikat
baja0.05000.050bh10,000.00500.00Kacamata
las0.01000.010bh45,000.00450.00Sarung tangan
panjang0.01000.010set35,000.00350.00Sarung tangan
pendek0.01000.010set25,000.00250.00Mold
tembaga0.01000.010354,200.003,542.00Kunci ring /
pas0.00200.002set45,000.0090.00Linggis0.00600.006bh140,000.00840.00Mistar
pelurus rel 1 m0.00100.001bh440,000.00440.00Kunci
tirefon0.00100.001bh66,500.0066.50Kunci baut
lasplaat0.00200.002bh70,000.00140.00Pandpuller0.00200.002bh99,000.00198.00Brander
pemanas0.00900.009set1,480,000.0013,320.00Sepatu
las0.01000.010set105,000.001,050.00Sewa mesinMesin las 400
Amp0.20000.200jam150,000.0030,000.00Mesin gerinda
MP120.20000.200jam144,500.0028,900.00UpahPengawas
las0.00900.009OH50,000.00450Tukang
las0.35000.350OH55,000.0019,250Tukang
gerinda0.35000.350OH45,000.0015,750Pekerja0.35000.350OH40,000.0014,000Lain-lainTransportasi
untuk pekerjaan las0.20000.200unit50,000.0010,000Pengaman
operasional untuk pekerjaan las0.60000.600unit5,000.003,00034 11
16.13.1201titikLas elektroda untuk rel R33 dan R42 dikerjakan malam
hari156,832.501,088,043.000.000.00Bahan pendukung (34 11
16.13.110)156,832.50Alat kerja & Sewa mesinSewa mesinSewa mesin
(34 11 16.19.110)1.00001.0000.000.00Generator
set0.25000.250jam1,478,750.00369,687.50UpahPengawas
las0.37500.375OH50,000.0018,750Tukang
las0.75000.750OH55,000.0041,250Tukang
gerinda0.70000.700OH45,000.0031,500Pekerja1.12501.125OH40,000.0045,00034
11 16.13 200Las Elektroda untuk rel R50 dan R5434 11
16.13.2101titikLas elektroda untuk rel R50 dan R54 dikerjakan siang
hari168,357.5049,450.0093,823.50311,631.00Bahan
pendukungSolar7.00007.000lt4,200.0029,400.00Oksigen0.15000.150tbg75,000.0011,250.00Acetylin
@ 45 kg0.07000.070tbg175,000.0012,250.00Bensin
campur1.50001.500lt4,750.007,125.00Oli SAE
400.05000.050lt16,000.00800.00Kain
lap0.05000.050lb5,750.00287.50Tenda plastik 4x4
m0.01000.010lb89,000.00890.00Regulator
oksigen0.00500.005bh120,000.00600.00Regulator
acetylin0.00500.005bh480,000.002,400.00Batu gerinda
tangan0.30000.300bh52,100.0015,630.00Batu gerinda
profil0.02000.020bh270,000.005,400.00Elektroda untuk
layer1.30001.300kg40,250.0052,325.00Elektroda untuk
pengeras0.40000.400kg75,000.0030,000.00Alat kerjaPalu konde 1
kg0.01000.010bh33,000.00330.00Palu 4
kg0.00400.004bh70,000.00280.00Pahat
ganjal0.01000.010bh7,700.0077.00Sikat
baja0.05000.050bh10,000.00500.00Kacamata
las0.01000.010bh45,000.00450.00Sarung tangan
panjang0.01000.010set35,000.00350.00Sarung tangan
pendek0.01000.010set25,000.00250.00Mold
tembaga0.01000.010354,200.003,542.00Kunci ring /
pas0.00200.002set45,000.0090.00Linggis0.00600.006bh140,000.00840.00Mistar
pelurus rel 1 m0.00100.001bh440,000.00440.00Kunci
tirefon0.00100.001bh66,500.0066.50Kunci baut
lasplaat0.00200.002bh70,000.00140.00Pandpuller0.00200.002bh99,000.00198.00Brander
pemanas0.00900.009set1,480,000.0013,320.00Sepatu
las0.01000.010set105,000.001,050.00Sewa mesinMesin las 400
Amp0.20000.200jam150,000.0030,000.00Mesin gerinda
MP120.20000.200jam144,500.0028,900.00UpahPengawas
las0.00900.009OH50,000.00450Tukang
las0.35000.350OH55,000.0019,250Tukang
gerinda0.35000.350OH45,000.0015,750Pekerja0.35000.350OH40,000.0014,000Lain-lainTransportasi
untuk pekerjaan las0.20000.200unit50,000.0010,000Pengaman
operasional untuk pekerjaan las0.60000.600unit5,000.003,00034 11
16.13.2201titikLas elektroda untuk rel R50 dan R54 dikerjakan malam
hari168,357.50623,643.000.000.00Bahan pendukung (34 11
16.13.210)168,357.50Alat kerja & Sewa mesinSewa mesinSewa mesin
(34 11 16.19.210)1.00001.0000.000.00Generator
set0.25000.250jam1,478,750.00369,687.50UpahPengawas
las0.37500.375OH50,000.0018,750Tukang
las0.75000.750OH55,000.0041,250Tukang
gerinda0.70000.700OH45,000.0031,500Pekerja1.12501.125OH40,000.0045,00034
11 16.16Pressure-Welded Track Rail34 11 16.19Thermite-Welded Track
Rail34 11 16.19.100Las Thermit34 11 16.19.1101titikLas thermit
termasuk test ultrasonic dikerjakan siang
hari897,805.0092,500.00124,913.231,115,218.23Bahan
pendukungOksigen0.15000.150tbg75,000.0011,250.00LPG 46
kg0.03000.030tbg192,500.005,775.00Bensin1.50001.500lt4,500.006,750.00Oli
SAE 400.06000.060lt16,000.00960.00Kain
lap0.02000.020lb5,750.00115.00Tenda plastik 4x4
m0.01000.010lb89,000.00890.00Batu gerinda
MP120.04000.040bh406,875.0016,275.00Batu gerinda
tangan0.15000.150bh52,100.007,815.00Regulator
oksigen0.00500.005bh120,000.00600.00Regulator
LPG0.00500.005bh75,000.00375.00Bahan lasBahan las
thermit1.00001.000set847,000.00847,000.00Alat kerjaPalu konde 1
kg0.01000.010bh33,000.00330.00Palu 4
kg0.00400.004bh70,000.00280.00Pahat
ganjal0.01500.015bh7,700.00115.50Sikat
baja0.05000.050bh10,000.00500.00Kacamata
las0.01000.010bh45,000.00450.00Sarung tangan
panjang0.03000.030set35,000.001,050.00Sarung tangan
pendek0.03000.030set25,000.00750.00Apron0.01500.015bh73,265.001,098.98Sekop0.01500.015bh10,000.00150.00Kunci
Inggris 12"0.00200.002set93,500.00187.00Kunci ring /
pas0.00200.002set45,000.0090.00Linggis0.00600.006bh140,000.00840.00Mistar
pelurus rel 1 m0.00100.001bh440,000.00440.00Kikir segi empat
1.5"0.02000.020bh22,000.00440.00Kunci
tirefon0.00100.001bh66,500.0066.50Kunci baut
lasplaat0.00100.001bh70,000.0070.00Stopwatch0.00100.001bh240,000.00240.00Pandpuller0.00100.001bh99,000.0099.00Brander
pemanas0.00900.009set1,480,000.0013,320.00Sepatu
las0.00100.001set105,000.00105.00Dongkrak alignment
beam0.00100.001bh4,235,000.004,235.00Sewa mesinMesin gerinda
MP120.25000.250jam144,500.0036,125.00Mesin gerinda
tangan0.25000.250jam31,125.007,781.25Mesin weldshear
manual0.25000.250jam72,600.0018,150.00UpahPengawas
las0.25000.250OH50,000.0012,500Tukang
las0.50000.500OH55,000.0027,500Tukang
gerinda0.50000.500OH45,000.0022,500Pekerja0.75000.750OH40,000.0030,000Lain-lainTransportasi
untuk pekerjaan las0.20000.200unit50,000.0010,000Pengaman
operasional untuk pekerjaan las0.60000.600unit5,000.003,000TestTest
ultrasonic termasuk akomodasi
petugas1.00001.000ttk25,000.0025,00034 11 16.19.1201titikLas
thermit termasuk test ultrasonic dikerjakan malam
hari897,805.00136,500.00494,600.731,528,905.73Bahan pendukung (34
11 16.19.110)897,805.00Alat kerja & Sewa mesinSewa mesin 34 11
16.19.1101.00001.000ls124,913.23124,913.23Generator
set0.25000.250jam1,478,750.00369,687.50UpahPengawas
las0.37500.375OH50,000.0018,750Tukang
las0.75000.750OH55,000.0041,250Tukang
gerinda0.70000.700OH45,000.0031,500Pekerja1.12501.125OH40,000.0045,00034
11 19TRACK RAIL JOINTS34 11 23SPECIAL TRACK WORK34 11 26BALLASTED
TRACK RAIL34 11 26.13Track Rail Ballast34 11 26.13.1001m3Balas batu
pecah 2/6 termasuk bongkar dan ecer di
lokasi140,000.0014,571.5017,850.00172,421.50BahanBalas batu pecah
2/6 di quarry1.00001.000m3140,000.00140,000.00Upah bongkar dan ecer
di
lokasiMandor0.00900.009OH63,500.00572Pekerja0.35000.350OH40,000.0014,000Upah
muat ke gerbong dengan loader max 30 mWheel
loader0.02000.020jam288,000.005,760Upah muat ke gerbong dengan
orangPekerja0.33000.330OH0.0Transport dengan KABiaya administrasi
angkutan balas dengan KA1.00001.000m312,090.0012,09034 11
26.16Track Rail Subballast34 11 29EMBEDDED TRACK RAIL34 11 33TRACK
CROSS TIES34 11 33.13Concrete Track Cross Ties34 11
33.13.1001btgBantalan beton lengkap dengan
penambat1.00001.000btg457,000.00457,000.000.000.00457,000.0034 11
33.13.2001m'spMengangkut dan mengecer
bantalan0.0010,114.5575.7510,190.30UpahMandor0.03330.033OH63,500.002,115Pekerja0.20000.200OH40,000.008,000AlatAlat
bantu0.00100.001buah75,750.007634 11 33.16Timber Track Cross Ties34
11 33.19Resillient Track Cross Ties34 11 36TRACK RAIL FASTENERS34
11 36.13Direct-Fixation Fasteners34 11 43TRACK LAYING- Mengecer
bantalan- Menyetel rel di atas bantalan- Memasang alat penambat-
Memasang plat sambung (las plaat)34 11 43.13Track Laying dengan
Bantalan Kayu34 11 43.13.100Track laying dengan bantalan kayu34 11
43.13.1101m'spTrack laying
R420.0016,952.5010,072.5027,025.00UpahMandor0.01500.015OH63,500.00953Pekerja0.40000.400OH40,000.0016,000AlatBor
kayu0.16500.165buah60,000.009,900Ter0.01500.015kg11,500.0017334 11
43.13.1201m'spTrack laying
R540.0021,766.5010,072.5031,839.00UpahMandor0.01900.019OH63,500.001,207Pekerja0.51400.514OH40,000.0020,560AlatBor
kayu0.16500.165buah60,000.009,900Ter0.01500.015kg11,500.0017334 11
43.16Track Laying dengan Bantalan Beton34 11 43.16.100Track laying
dengan bantalan beton34 11 43.16.1101m'spTrack laying
R420.0074,591.000.0074,591.00UpahMandor0.06600.066OH63,500.004,191Pekerja1.76001.760OH40,000.0070,40034
11 43.16.1201m'spTrack laying
R540.0095,788.600.0095,788.60UpahMandor0.08360.084OH63,500.005,309Pekerja2.26202.262OH40,000.0090,48034
11 46ANGKAT LESTRENG34 11 46.13Pada Jalan Rel Operasi34 11
46.13.100Angkat lestreng pada jalan rel yang baru diganti balasnya
pada BANTALAN KAYU(Dikerjakan setelah dilalui minimum oleh 2 KA
pada kecepatan sebelumnya)34 11 46.13.1101m'spAngkat lestreng untuk
kecepatan KA 20 km/jam dari kec 5 km/jam dengan
manual0.0011,587.500.0011,587.50UpahMandor0.02500.025OH63,500.001,588Pekerja0.25000.250OH40,000.0010,00034
11 46.13.1201m'spAngkat lestreng untuk kecepatan KA 40 km/jam dari
kec 20
km/jam0.0021,175.000.0021,175.00UpahMandor0.05000.050OH63,500.003,175Pekerja0.45000.450OH40,000.0018,00034
11 46.13.1301m'spAngkat lestreng untuk kecepatan KA 60 km/jam dari
kec 40
km/jam0.0023,175.000.0023,175.00UpahMandor0.05000.050OH63,500.003,175Pekerja0.50000.500OH40,000.0020,00034
11 46.13.200Angkat lestreng pada jalan rel yang baru diganti
balasnya pada BANTALAN BESI(Dikerjakan setelah dilalui minimum oleh
2 KA pada kecepatan sebelumnya)34 11 46.13.2101m'spAngkat lestreng
untuk kecepatan KA 20 km/jam dari kec 5 km/jam dengan
manual0.0012,978.000.0012,978.00UpahMandor0.02800.028OH63,500.001,778Pekerja0.28000.280OH40,000.0011,20034
11 46.13.2201m'spAngkat lestreng untuk kecepatan KA 40 km/jam dari
kec 20
km/jam0.0023,292.500.0023,292.50UpahMandor0.05500.055OH63,500.003,493Pekerja0.49500.495OH40,000.0019,80034
11 46.13.2301m'spAngkat lestreng untuk kecepatan KA 60 km/jam dari
kec 40
km/jam0.0025,492.500.0025,492.50UpahMandor0.05500.055OH63,500.003,493Pekerja0.55000.550OH40,000.0022,00034
11 46.13.300Angkat lestreng pada jalan rel yang baru diganti
balasnya pada BANTALAN BETON(Dikerjakan setelah dilalui minimum
oleh 2 KA pada kecepatan sebelumnya)34 11 46.13.3101m'spAngkat
lestreng untuk kecepatan KA 20 km/jam dari kec 5 km/jam dengan
manual0.0017,613.000.0017,613.00UpahMandor0.03800.038OH63,500.002,413Pekerja0.38000.380OH40,000.0015,20034
11 46.13.3201m'spAngkat lestreng untuk kecepatan KA 40 km/jam dari
kec 20
km/jam0.0031,962.500.0031,962.50UpahMandor0.07500.075OH63,500.004,763Pekerja0.68000.680OH40,000.0027,20034
11 46.13.3301m'spAngkat lestreng untuk kecepatan KA 60 km/jam dari
kec 40
km/jam0.0034,762.500.0034,762.50UpahMandor0.07500.075OH63,500.004,763Pekerja0.75000.750OH40,000.0030,00034
11 46.16Pada Jalan Rel Baru atau Direhabilitasi34 11
46.16.100Angkat lestreng pada jalan rel BANTALAN KAYU(Dikerjakan
setelah dilalui minimum oleh 2 KA pada kecepatan sebelumnya)34 11
46.16.1101m'spAngkat lestreng untuk kecepatan KA 20
km/jam0.007,670.000.007,670.00UpahMandor0.02000.020OH63,500.001,270Pekerja0.16000.160OH40,000.006,40034
11 46.16.1201m'spAngkat lestreng untuk kecepatan KA 40
km/jam0.0015,340.000.0015,340.00UpahMandor0.04000.040OH63,500.002,540Pekerja0.32000.320OH40,000.0012,80034
11 46.16.1301m'spAngkat lestreng untuk kecepatan KA 60
km/jam0.0019,340.000.0019,340.00UpahMandor0.04000.040OH63,500.002,540Pekerja0.42000.420OH40,000.0016,80034
11 46.16.200Angkat lestreng pada jalan rel yang baru diganti
balasnya pada BANTALAN BESI(Dikerjakan setelah dilalui minimum oleh
2 KA pada kecepatan sebelumnya)34 11 46.16.2101m'spAngkat lestreng
untuk kecepatan KA 20 km/jam dari kec 5 km/jam dengan
manual0.008,437.000.008,437.00UpahMandor0.02200.022OH63,500.001,397Pekerja0.17600.176OH40,000.007,04034
11 46.16.2201m'spAngkat lestreng untuk kecepatan KA 40 km/jam dari
kec 20
km/jam0.0016,874.000.0016,874.00UpahMandor0.04400.044OH63,500.002,794Pekerja0.35200.352OH40,000.0014,08034
11 46.16.2301m'spAngkat lestreng untuk kecepatan KA 60 km/jam dari
kec 40
km/jam0.0021,274.000.0021,274.00UpahMandor0.04400.044OH63,500.002,794Pekerja0.46200.462OH40,000.0018,48034
11 46.16.300Angkat lestreng pada jalan rel yang baru diganti
balasnya pada BANTALAN BETON(Dikerjakan setelah dilalui minimum
oleh 2 KA pada kecepatan sebelumnya)34 11 46.16.3101m'spAngkat
lestreng untuk kecepatan KA 20 km/jam dari kec 5 km/jam dengan
manual0.0017,613.000.0017,613.00UpahMandor0.03800.038OH63,500.002,413Pekerja0.38000.380OH40,000.0015,20034
11 46.16.3201m'spAngkat lestreng untuk kecepatan KA 40 km/jam dari
kec 20
km/jam0.0031,962.500.0031,962.50UpahMandor0.07500.075OH63,500.004,763Pekerja0.68000.680OH40,000.0027,20034
11 46.16.3301m'spAngkat lestreng untuk kecepatan KA 60 km/jam dari
kec 40
km/jam0.0034,762.500.0034,762.50UpahMandor0.07500.075OH63,500.004,763Pekerja0.75000.750OH40,000.0030,00034
11 46.19Final Tamping(Dikerjakan setelah dilalui minimum oleh 2 KA
pada kec 20 km/jam)34 11 46.19.1001m'spAngkat lestreng untuk
kecepatan > KA 60 km/jam dengan MTT, PBR dan VDM (Final
Tamping)0.0016,800.0047,286.8064,086.80UpahJuru
ukur0.03500.035OH80,000.002,800Pekerja0.35000.350OH40,000.0014,000AlatBiaya
operasi MTT 09-16 CAT3.00003.000kali9,510.6028,532Biaya operasi PBR
200-4001.00001.000kali13,975.5013,976Biaya operasi VDM 800-800
GS1.00001.000kali4,779.504,780PERHATIAN !!!!PADA ANALISA INI
MENGGUNAKAN 2 KOOEFISIEN YANG BERBEDA1. Koefisien SNI = koefisien
yang dijadikan standar oleh pemerintah, data koefisien di peroleh
dari PUSLITBANG2. Koefisien RAP (Rencana Anggaran Proyek)
=Koefisien yang real di lapangan sesuai dengan analisa dari
berbagai proyek dan kesanggupan/penawaran Mandorkoefisien RAP sudah
teruji pada berbagai Proyek yang pernah saya laksanakanJika anda
ingin mengganti dengan Koefisien SNI, Anda tinggal mengganti ling
ke Koefisien SNIPADA ANALISA DI ATAS MENGGUNAKAN KOEFISIEN RAP
&RHalaman &P
RABTotal Harga0.0RENCANA ANGGARAN PELAKSANAANHarga
/m20.0PEKERJAAN TRACKLUAS BANGUNAN18PROYEKMATERIAL /M2 :0.0UPAH
/M2:0.0Total MATERIAL :0.0Total UPAH :0.0NOITEM
PEKERJAANVOLSATanalisaHARSATJUMLAH HARGAHARSATJUMLAH
HARGARealMATERIALMATERIALUPAHUPAH61.67IPEKERJAAN
PERSIAPAN1PEMBERSIHAN LAHAN12.00m200.00.00.00.02PENGUKURAN DAN
PASANG BOUWPLANK9.00m00.00.00.00.0SUB TOTAL 1IIPEKERJAAN
PEMBONGKARAN1Bongkar plat jalan setapak untuk dipakai
kembali18.00bh2Bongkar plesteran dibawah plat jalan
setapak3.00m23Bongkar kongliong0.90m300.00.00.00.04Bongkar dinding
partisi9.00m25Bongkar kusen aluminium untuk dipakai
kembali1.00bh6Bongkar daun pintu aluminium untuk dipakai
kembali1.00bhSUB TOTAL 1IIIPEKERJAAN TANAH DAN PONDASI1GALIAN
PONDASI12.40M300.00.00.00.02PONDASI CAKAR AYAM (4d8,d6-200)COR
BETON SITEMIX 1 : 2 :
30.51M300.00.00.00.0PEMBESIAN76.80KG00.00.00.00.0Besi 4d8KGBesi
d6-200KGBEKISTING9.22M200.00.00.00.02SLOOF 15/20 ( 4d8,d6-200 )COR
BETON SITEMIX 1 : 2 :
31.85M300.00.00.00.0PEMBESIAN277.50KG00.00.00.00.0Besi 4d8KGBesi
d6-200KGBEKISTING33.30M200.00.00.00.03URUGAN TANAH
KEMBALI12.40M300.00.00.00.0SUB TOTAL 2IIIPEKERJAAN STRUKTUR
BETON1KOLOM Praktis 10x10 4d8 / d6-20COR BETON SITEMIX 1 : 2 :
30.44M300.00.00.00.0PEMBESIAN66.00KG00.00.00.00.0Besi 6d8KGBesi
d6-200KGBEKISTING7.92M200.00.00.00.02KOLOM Struktur 10/ 20( 6d8,
d6-150)COR BETON SITEMIX 1 : 2 :
30.69M300.00.00.00.0PEMBESIAN103.50KG00.00.00.00.0Besi 4d8KGBesi
d6-200KGBEKISTING12.42M200.00.00.00.03RING BALOK 10/15 ( 4d8,
d6-200)COR BETON SITEMIX 1 : 2 :
31.21M300.00.00.00.0PEMBESIAN181.50KG00.00.00.00.0Besi 4d8KGBesi
d6-200KGBEKISTING21.78M200.00.00.00.04Plat atap T = 12 cm (d8-150)
2 lapisCOR BETON SITEMIX 1 : 2 :
31.02M300.00.00.00.0PEMBESIAN153.00KG00.00.00.00.0Besi 4d8KGBesi
d6-200KGBEKISTING18.36M200.00.00.00.05PELAT KANOPY 10 CM ( d8-150,
1 Lapis )COR BETON SITEMIX 1 : 2 :
30.86M300.00.00.00.0PEMBESIAN129.00KG00.00.00.00.0Besi
d8-200KGBEKISTING15.48M200.00.00.00.0SUB TOTAL 3IVPEKERJAAN
PASANGAN DAN PLESTERAN1PASANGAN BATA MERAH 1/2 BT
1:5216.00M200.00.00.00.02PLESTER 1:5 + ACI432.00M200.00.00.00.0SUB
TOTAL 4VPEKERJAAN KUSEN, PINTU, JENDELA , KACA DAN
ACCESSORIES1KUSEN PINTU DAN
JENDELA44.50MRp40,000Rp1,780,000Rp5,000Rp222,5002PINTU JATI PANEL
SOLID3.00UNITRp400,000Rp1,200,000Rp40,000Rp120,0003PINTU KACA
BINGKAI JATI2.00UNITRp350,000Rp700,000Rp40,000Rp80,0004DAUN JENDELA
BESAR2.00UNITRp200,000Rp400,000Rp15,000Rp30,0005DAUN JENDELA
KECIL2.00UNITRp150,000Rp300,000Rp15,000Rp30,0006HANDLE
PINTU5.00UNITRp120,000Rp600,0007SLOT DAUN
JENDELA8.00UNITRp15,000Rp120,0008HAK
ANGIN4.00UNITRp20,000Rp80,0009ENGSEL DAUN
PINTU15.00BHRp9,000Rp135,00010ENGSEL DAUN
JENDELA8.00BHRp8,000Rp64,00011KACA POLOS 5 MMM2SUB TOTAL
5VIPEKERJAAN ATAP1RANGKA ATAP BAJA
RINGAN50.00M2Rp135,000Rp6,750,0000.02LISPLANK
PAPAN16.00M'Rp30,000Rp480,000Rp3,000Rp48,0003PENUTUP ATAP
GENTENG50.00M2Rp58,000Rp2,900,000Rp6,500Rp325,0004NOK ATAP
GENTENG8.00M'Rp45,000Rp360,000Rp10,000Rp80,000SUB TOTAL
6VIIPEKERJAAN PLAFOND1RANGKA PLAFOND METAL
FOORING50.00M2Rp26,000Rp1,300,000Rp6,000Rp300,0002PLAFOND
GYPSUM50.00M2Rp21,000Rp1,050,000Rp4,000Rp200,000SUB TOTAL
7VIIIPEKERJAAN PELAPIS LANTAI DAN DINDING1PLUR
LANTAI50.00M20Rp21,000Rp1,050,000Rp4,000Rp200,0002KERAMIK LANTAI
UBUD CREAM 40X4038.30M2Rp32,000Rp1,225,600Rp6,000Rp229,8003KERAMIK
LANTAI KAMAR MANDI
20X202.70M2Rp28,000Rp75,600Rp6,000Rp16,2004KERAMIK LANTAI DAPUR
40x409.00M2Rp32,000Rp288,000Rp6,000Rp54,0005KERAMIK DINDING KAMAR
MANDI 20x20 ( T = 1.6 M )
POLISH6.10M2Rp32,500Rp198,250Rp6,000Rp36,600SUB TOTAL 8IXPEKERJAAN
PENGECATAN1CAT DINDING
INTERIOR368.00M2Rp6,000Rp2,208,000Rp1,500Rp552,0001CAT DINDING
EXTERIOR64.00M2Rp9,000Rp576,000Rp1,500Rp96,0002CAT
KUSEN44.50M'Rp15,000Rp667,500Rp3,500Rp155,7503CAT DAUN
PINTU3.00UNITRp60,000Rp180,000Rp17,000Rp51,0004CAT DAUN
JENDELA4.00UNITRp15,000Rp60,000Rp8,000Rp32,0005CAT
PLAFOND50.00M2Rp6,000Rp300,000Rp2,500Rp125,0006CAT LISPLANK
PAPAN16.00M'Rp12,000Rp192,000Rp2,500Rp40,000SUB TOTAL 9XPEKERJAAN
INSTALASI LISTRIK1INSTALASI TITIK
LAMPU10.00TTKRp70,000Rp700,000Rp20,000Rp200,0002INSTALASI STOP
KONTAK4.00TTKRp90,000Rp360,000Rp20,000Rp80,0003SAKLAR10.00BHRp8,000Rp80,0000.04STOP
KONTAK EX. BROCO4.00BHRp11,000Rp44,0000.05FITING
LAMPU10.00BHRp8,000Rp80,0000.0SUB TOTAL 10REAL
COSTDIBULATKANTERBILANG :
Page &P of &Nasep toni:panjang dinding