Andreas Voß, Pierburg GmbH iViP Symposium, 25. April 2007, Wolfsburg Global Engineering Change Management using SAP Records Management
Feb 17, 2016
Andreas Voß, Pierburg GmbHiViP Symposium, 25. April 2007, Wolfsburg
Global Engineering Change Management usingSAP Records Management
2© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Agenda
Table of Content
1. Pierburg GmbH – The Company
2. Initial Situation and Requirements
3. Solution in Detail
4. Next Steps
3© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
1. Pierburg GmbH – The Company
1. Pierburg GmbH – The Company
4© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Rheinmetall Group
Rheinmetall Defense
Revenue: € 2.000 Mill.Employees: 11.700
Revenue: € 1.400 Mill.Employees: 6.800
Leading European Defense Companyfor Military Technology
Leading Supplier for EngineComponents and Systems
Rheinmetall AGRevenue 2005: € 3.400 Mill., Employees: 18.500
1. Pierburg GmbH – The Company
5© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Structure of Kolbenschmidt-Pierburg Group
Revenue :638 Mill.€Employees :5.779
KS Piston
Revenue :171 Mill €Employees :1.015
KS SlideBearing
Revenue :210 Mill.€Employees :1.007
KS AluminumTechnology
Revenue :160 Mill.€Employees :375
Engine Service
Revenue:903 Mill.€Employees:3.483
Pierburg
Kolbenschmidt Pierburg AGRevenue 2005: 2.0 Bill. € , Employess: 11.700
1. Pierburg GmbH – The Company
6© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Worldwide Locations
Spain:Abadiano
France:Thionville
Germany:Nettetal
Germany:Berlin
Germany:Hartha
China:Shanghai
Italy:Lanciano
Brasil:Nova Odessa
USA:Fountain Inn, SC
Italy:Livorno
Czech:Ústí nad Labem
GermanyNeuss
1. Pierburg GmbH – The Company
7© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Development Locations Europe
Thionville
Neuss,Central Engineering Center
Berlin
Hartha
Livorno
1. Pierburg GmbH – The Company
8© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Pierburg – Information Technology
SAP R/3 4.6 C Automotive(CO, FI, MM, WM, PP, QM, PM, SD, PS, DMS)
SAP ERP 5.0 Human Resources (HR)(PM, PY, PT, OM)
SAP Advanced Planer & Optimizer (APO)(DS, DP)
SAP Records Management (RM)
ERP
Central, global SAP-SystemCATIAUNIGRAPHICSPro/EIdeas
SMARTEAMSAP
CAD
PLM
IT-OutsourcingIBM Mittelstand Systeme GmbH
Mail + PortalLotus Notes/DominoSAP Enterprise Portal
1. Pierburg GmbH – The Company
9© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
2. Initial Situation and Requirements
2. Initial Situation and Requirements
10© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Initial Situation – IT Tools
Lotus Notes based tool for change managementNo integration with master data in SAP R/3
Material master
Bill of material
Document Info Record
Change master, etc.
No integration to transaction data(Stock, etc.)
No Integration with various functions(e.g. Where-used-list)
Inflexible Workflows
2. Initial Situation and Requirements
11© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Forwarding of Information (Costing,Change Notification, ...) asExcel Attachment
KE DURCHGEFÜHRT
JA NEIN
EMPB Freigabemuster v. Lieferant
JA NEIN JA NEIN
A N
Dokum ent-Nr. T/B S ZI FO DA SY 3D CAD-KD-Umgebung A/D W N V
2.04434.06.0 - E S -
D-2 04434 000 01 - 06 A0 PZD C X Pierburg -
3.04434.06.0 - E S -
D-3 04434 000 01 - 06 A1 PZD C X Pierburg -
- - - -
D-6 01062 050 01 - 11 A1 PZD C X Pierburg -
7.01062.05.0 11 S S -
- - - - PZD S - SAP -
NR Produkt-Nr. NR
1 7.01062.05.0 5
2 63 7
4 8 AGS
Blatt 1 von 1
2.04434.05.0
3.04434.05.0
-
-
Kunde: DAEWOO P-PBQ 1/2/12
12Typ: EDR-Di P-PBA 11/12
P-PBL 11/12 Änderungs numm er
Produkt: DKS P-PBF 11/2/3526344
P-ZC1/P-EZL2 genehm igt: Gläßer
P-EZL21
S-ZP / P-ZL2 PSP-Element-Nr.: A-000065-01-S2-02Änderung der Fase am Gehäuse D-3 04434 000von 0,8 x 45 grad in 0,4 x 45 grad und Kantenbruch 0,15 mm hinzu
EINSATZTERMIN :13.05.05
Bearbeiter: Witta
P-ZB / P-ZS2 Datum: 06.04.2005
Produkt-Nr. Verteiler Änderungsgrund / Bem erkung Konstr.Gr.:
8
7
6
5
siehe Anlage4
P-PB - STÜCKLISTE
siehe Zeichnung3
P-PB - REGELKLAPPE
siehe Zeichnung +Stückliste2
P-PB siehe Rohteil GEHAEUSE
siehe Zeichnung +Stückliste1
P-PB ENAC-AlSi12Cu1(Fe)df DINEN1706 GEHAEUSE
BenennungÄnderungs-
beschreibung
Verw endungAlte Mat.-Nr.
Pierburg Kunde
Zeile
Material-Nr. TI Status PW L Werkstoff
Änderungsanweisung (AEA)Techn. Freigabe: EMPB Freigabemuster / Ergänzungsmusterung an Kunde
L = Lieferanten geb. DA = Dokumentenart AGS = ÄnderungsgrundschlüsselT/B = Teil / Blatt FO = Format A / D = Archiv. / Dokumentationspf licht V = VerschrottenPW = Produktionsw erk ZI = Zeichenindex 3D = 3-D Modell N = NacharbeitenTI = Teileindex S = Seite SY = Erstellungssystem W = in w eiteren Verw endungen
X X
X
X
Kunde
Einlauf WerkzeugMaterial-Nr. ------------------
Dokument-Nr. Inves tition KST ± TE/% ± €/%
2.04434.06.0
D-2 04434 000
3.04434.06.0
D-3 04434 000
NR Erzeugnis-Nr NR Erzeugnis-Nr NR Abteilung Nam e Datum
1 7.01062.05.0 5 9
2 6 10
3 7 11
4 8 12
Ja Vertrieb /Controlling
Unterschrift:
GEHAEUSE
GEHAEUSE
06
06
Anreger:Pierburg
Kostenübernahme:Kostenermittlung (KE)
in € Pierburg Lieferant
Zeile ZI Benennung
Men
ge SKD Bem erkung /geplanter ÄnderungseinsatzMaterial-Nr. Neu
Dokument-Nr. Alt
AuslaufZI
MEK €/%Fertigung
12.04434.05.0 EFD-2 04434 00 EF
1 05Gehaeuse als Gussteil undBearbeitung istEigenfertigung.
23.04343.05.0 EF
D-3 04434 000 EF1 05
3
4
5
6
7
8
P-EZL 21
Art der Änderung / Bemerkung BEARB.: Exner
Erzeugnis-Nr K.GR:
PSP-Element-Nr.: A-000065-01-S2-02Änderung der Fase am Gehäuse D-3 04434 000von 0,8 x 45 grad in 0,4 x 45 grad und Kantenbruch 0,15 mm hinzu
GEPR.: Gläßer
DATUM: 04.04.05
KE-NR.: 526344
1 von 1
Erzeugnis: DKS ERS.F.KE-NR.
Typ: EDR-DiBl.
Kunde: DAEWOO
ÄnderungsanweisungGenehmigung Nein Datum:
Blatt
X
2. Initial Situation and Requirements
12© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Requirement for a New Solution
System based management of „Change Forms“ change request,change order, etc.
Integration of master and transaction Data
Flexible workflow control
Management of related documents
Extensive reporting
Mail integration with Lotus Notes
Support of international locations
SAP based solution, since SAP is strategic platform for Pierburg
2. Initial Situation and Requirements
13© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
3. Solution in Detail
3. Solution in Detail
14© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Phases of Engineering Change Process
ECR (EngineeringChange Request)
ECI (EngineeringChange
Implementation)
MCI (ManufacturingChange
Implementation)ECN (Engineering
Change Notification)
M1Change Request
issued
M2ECN
release
M3ECR
released
M5Change
completed
M4ECI
completed
Responsibility: BU Responsibility: Plant
3. Solution in Detail
15© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
ECR (EngineeringChange Request)
ECI (EngineeringChange
Implementation)
MCI (ManufacturingChange
Implementation)ECN (Engineering
Change Notification)
3. Solution in Detail
Phases of Engineering Change Process
Responsibility: BU Responsibility: Plant
M1Change Request
issued
M2ECN
release
M3ECR
released
M5Change
completed
M4ECI
completed
16© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Basic Data
Pierburg specificdata fields
3. Solution in Detail
17© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Basic Data
Integration of „Original“ SAPdata fields-> Input help-> Data validation
3. Solution in Detail
18© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Collect Affected Parts –ATO-Cockpit (AusTauschObjekt)
-> Input material numbers to be exchanged-> Input help, data validation
3. Solution in Detail
19© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Plants
1. Read plant specific records of materials
2. Display in ATOC 3. Automat. read of „virtual attributes“
3. Solution in Detail
20© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Integrated “Where-Used-List“
1. Call “Where-Used-List“ from ATOC
2. Store “Where-Used-List” in VN Cockpit
Original Direct Predecessor Usage
3. Solution in Detail
21© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
3. Evaluate Usage w.r.t. change relevance
3. Solution in Detail
Integrated “Where-Used-List“
22© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
4. Transfer of affected materials into ATOC (change scope)
3. Solution in Detail
Integrated “Where-Used-List“
23© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Detailed Information (Customer, Stock, ...)
3. Solution in Detail
24© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Documents for Material (e.g. Drawing)
3. Solution in Detail
25© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Team Definition / Distribution List
3. Solution in Detail
26© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Release Change Request
3. Solution in Detail
27© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Process Route
Initiate follow-on tasks
3. Solution in Detail
28© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Information im Mailsystem
Drill-down to change case
3. Solution in Detail
29© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
ECR (EngineeringChange Request)
ECI (EngineeringChange
Implementation)
MCI (ManufacturingChange
Implementation)ECN (Engineering
Change Notification)
3. Solution in Detail
M1Change Request
issued
M2ECN
release
M3ECR
released
M5Change
completed
M4ECI
completed
Responsibility: BU Responsibility: Plant
Phases of Engineering Change Process
30© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Complete Process Route
Extension of the process route by authorized user-> sequential-> parallel-> template or single step-> directly to user or roles from the project team
3. Solution in Detail
31© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Compile Information from Departments(eval. documents, costs, ...)
Status dependent Layout: here: Costing
3. Solution in Detail
33© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Change/Display Attachments
3. Solution in Detail
34© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
ECR (EngineeringChange Request)
ECI (EngineeringChange
Implementation)
MCI (ManufacturingChange
Implementation)ECN (Engineering
Change Notification)
3. Solution in Detail
Phases of Engineering Change Process
Responsibility: BU Responsibility: Plant
M1Change Request
issued
M2ECN
release
M3ECR
released
M5Change
completed
M4ECI
completed
35© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Creation of Change Master Record
3. Solution in Detail
36© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Definition of Change Package
3. Solution in Detail
37© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Maintenance of Material Master
3. Solution in Detail
38© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
3. Solution in Detail
Maintenance of Material Master
39© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
ECR (EngineeringChange Request)
ECI (EngineeringChange
Implementation)
MCI (ManufacturingChange
Implementation)ECN (Engineering
Change Notification)
3. Solution in Detail
M1Change Request
issued
M2ECN
release
M3ECR
released
M5Change
completed
M4ECI
completed
Phases of Engineering Change Process
Responsibility: BU Responsibility: Plant
40© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Same Technical Procedure as inPrevious Phases
Extension of Process Routes (via single items or templates)
Input of Data in ATOC
Drill-Down to Maintenance Transactions
Documentation of Change Status by Advancement of StatusControl Net
3. Solution in Detail
42© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Goal 2007 ff.: Implementation of SAPRM as an Integration Platform for ....
Market
Strategy
Technology
Pre-DSelectionProcess
Pre-DAdvance
Development
PDPProduct
Development
ECMEng. ChangeManagement
LiPLicense
Management
PTPProduction
Transfer???
4. Next Steps
43© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Solution Scenarios
4. Next Steps
The presented solution is a Pierburg specific projectsolution
ILC PROSTEP offers components as a productFurther information is with ILC PROSTEP
44© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.
Questions ?
End
Contact:
Andreas Voß
Mail: [email protected]