Top Banner
Andreas Voß, Pierburg GmbH iViP Symposium, 25. April 2007, Wolfsburg Global Engineering Change Management using SAP Records Management
44
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 25_1330b_Kohlhoff-Vo_

Andreas Voß, Pierburg GmbHiViP Symposium, 25. April 2007, Wolfsburg

Global Engineering Change Management usingSAP Records Management

Page 2: 25_1330b_Kohlhoff-Vo_

2© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Agenda

Table of Content

1. Pierburg GmbH – The Company

2. Initial Situation and Requirements

3. Solution in Detail

4. Next Steps

Page 3: 25_1330b_Kohlhoff-Vo_

3© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

1. Pierburg GmbH – The Company

1. Pierburg GmbH – The Company

Page 4: 25_1330b_Kohlhoff-Vo_

4© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Rheinmetall Group

Rheinmetall Defense

Revenue: € 2.000 Mill.Employees: 11.700

Revenue: € 1.400 Mill.Employees: 6.800

Leading European Defense Companyfor Military Technology

Leading Supplier for EngineComponents and Systems

Rheinmetall AGRevenue 2005: € 3.400 Mill., Employees: 18.500

1. Pierburg GmbH – The Company

Page 5: 25_1330b_Kohlhoff-Vo_

5© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Structure of Kolbenschmidt-Pierburg Group

Revenue :638 Mill.€Employees :5.779

KS Piston

Revenue :171 Mill €Employees :1.015

KS SlideBearing

Revenue :210 Mill.€Employees :1.007

KS AluminumTechnology

Revenue :160 Mill.€Employees :375

Engine Service

Revenue:903 Mill.€Employees:3.483

Pierburg

Kolbenschmidt Pierburg AGRevenue 2005: 2.0 Bill. € , Employess: 11.700

1. Pierburg GmbH – The Company

Page 6: 25_1330b_Kohlhoff-Vo_

6© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Worldwide Locations

Spain:Abadiano

France:Thionville

Germany:Nettetal

Germany:Berlin

Germany:Hartha

China:Shanghai

Italy:Lanciano

Brasil:Nova Odessa

USA:Fountain Inn, SC

Italy:Livorno

Czech:Ústí nad Labem

GermanyNeuss

1. Pierburg GmbH – The Company

Page 7: 25_1330b_Kohlhoff-Vo_

7© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Development Locations Europe

Thionville

Neuss,Central Engineering Center

Berlin

Hartha

Livorno

1. Pierburg GmbH – The Company

Page 8: 25_1330b_Kohlhoff-Vo_

8© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Pierburg – Information Technology

SAP R/3 4.6 C Automotive(CO, FI, MM, WM, PP, QM, PM, SD, PS, DMS)

SAP ERP 5.0 Human Resources (HR)(PM, PY, PT, OM)

SAP Advanced Planer & Optimizer (APO)(DS, DP)

SAP Records Management (RM)

ERP

Central, global SAP-SystemCATIAUNIGRAPHICSPro/EIdeas

SMARTEAMSAP

CAD

PLM

IT-OutsourcingIBM Mittelstand Systeme GmbH

Mail + PortalLotus Notes/DominoSAP Enterprise Portal

1. Pierburg GmbH – The Company

Page 9: 25_1330b_Kohlhoff-Vo_

9© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

2. Initial Situation and Requirements

2. Initial Situation and Requirements

Page 10: 25_1330b_Kohlhoff-Vo_

10© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Initial Situation – IT Tools

Lotus Notes based tool for change managementNo integration with master data in SAP R/3

Material master

Bill of material

Document Info Record

Change master, etc.

No integration to transaction data(Stock, etc.)

No Integration with various functions(e.g. Where-used-list)

Inflexible Workflows

2. Initial Situation and Requirements

Page 11: 25_1330b_Kohlhoff-Vo_

11© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Forwarding of Information (Costing,Change Notification, ...) asExcel Attachment

KE DURCHGEFÜHRT

JA NEIN

EMPB Freigabemuster v. Lieferant

JA NEIN JA NEIN

A N

Dokum ent-Nr. T/B S ZI FO DA SY 3D CAD-KD-Umgebung A/D W N V

2.04434.06.0 - E S -

D-2 04434 000 01 - 06 A0 PZD C X Pierburg -

3.04434.06.0 - E S -

D-3 04434 000 01 - 06 A1 PZD C X Pierburg -

- - - -

D-6 01062 050 01 - 11 A1 PZD C X Pierburg -

7.01062.05.0 11 S S -

- - - - PZD S - SAP -

NR Produkt-Nr. NR

1 7.01062.05.0 5

2 63 7

4 8 AGS

Blatt 1 von 1

2.04434.05.0

3.04434.05.0

-

-

Kunde: DAEWOO P-PBQ 1/2/12

12Typ: EDR-Di P-PBA 11/12

P-PBL 11/12 Änderungs numm er

Produkt: DKS P-PBF 11/2/3526344

P-ZC1/P-EZL2 genehm igt: Gläßer

P-EZL21

S-ZP / P-ZL2 PSP-Element-Nr.: A-000065-01-S2-02Änderung der Fase am Gehäuse D-3 04434 000von 0,8 x 45 grad in 0,4 x 45 grad und Kantenbruch 0,15 mm hinzu

EINSATZTERMIN :13.05.05

Bearbeiter: Witta

P-ZB / P-ZS2 Datum: 06.04.2005

Produkt-Nr. Verteiler Änderungsgrund / Bem erkung Konstr.Gr.:

8

7

6

5

siehe Anlage4

P-PB - STÜCKLISTE

siehe Zeichnung3

P-PB - REGELKLAPPE

siehe Zeichnung +Stückliste2

P-PB siehe Rohteil GEHAEUSE

siehe Zeichnung +Stückliste1

P-PB ENAC-AlSi12Cu1(Fe)df DINEN1706 GEHAEUSE

BenennungÄnderungs-

beschreibung

Verw endungAlte Mat.-Nr.

Pierburg Kunde

Zeile

Material-Nr. TI Status PW L Werkstoff

Änderungsanweisung (AEA)Techn. Freigabe: EMPB Freigabemuster / Ergänzungsmusterung an Kunde

L = Lieferanten geb. DA = Dokumentenart AGS = ÄnderungsgrundschlüsselT/B = Teil / Blatt FO = Format A / D = Archiv. / Dokumentationspf licht V = VerschrottenPW = Produktionsw erk ZI = Zeichenindex 3D = 3-D Modell N = NacharbeitenTI = Teileindex S = Seite SY = Erstellungssystem W = in w eiteren Verw endungen

X X

X

X

Kunde

Einlauf WerkzeugMaterial-Nr. ------------------

Dokument-Nr. Inves tition KST ± TE/% ± €/%

2.04434.06.0

D-2 04434 000

3.04434.06.0

D-3 04434 000

NR Erzeugnis-Nr NR Erzeugnis-Nr NR Abteilung Nam e Datum

1 7.01062.05.0 5 9

2 6 10

3 7 11

4 8 12

Ja Vertrieb /Controlling

Unterschrift:

GEHAEUSE

GEHAEUSE

06

06

Anreger:Pierburg

Kostenübernahme:Kostenermittlung (KE)

in € Pierburg Lieferant

Zeile ZI Benennung

Men

ge SKD Bem erkung /geplanter ÄnderungseinsatzMaterial-Nr. Neu

Dokument-Nr. Alt

AuslaufZI

MEK €/%Fertigung

12.04434.05.0 EFD-2 04434 00 EF

1 05Gehaeuse als Gussteil undBearbeitung istEigenfertigung.

23.04343.05.0 EF

D-3 04434 000 EF1 05

3

4

5

6

7

8

P-EZL 21

Art der Änderung / Bemerkung BEARB.: Exner

Erzeugnis-Nr K.GR:

PSP-Element-Nr.: A-000065-01-S2-02Änderung der Fase am Gehäuse D-3 04434 000von 0,8 x 45 grad in 0,4 x 45 grad und Kantenbruch 0,15 mm hinzu

GEPR.: Gläßer

DATUM: 04.04.05

KE-NR.: 526344

1 von 1

Erzeugnis: DKS ERS.F.KE-NR.

Typ: EDR-DiBl.

Kunde: DAEWOO

ÄnderungsanweisungGenehmigung Nein Datum:

Blatt

X

2. Initial Situation and Requirements

Page 12: 25_1330b_Kohlhoff-Vo_

12© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Requirement for a New Solution

System based management of „Change Forms“ change request,change order, etc.

Integration of master and transaction Data

Flexible workflow control

Management of related documents

Extensive reporting

Mail integration with Lotus Notes

Support of international locations

SAP based solution, since SAP is strategic platform for Pierburg

2. Initial Situation and Requirements

Page 13: 25_1330b_Kohlhoff-Vo_

13© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

3. Solution in Detail

3. Solution in Detail

Page 14: 25_1330b_Kohlhoff-Vo_

14© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Phases of Engineering Change Process

ECR (EngineeringChange Request)

ECI (EngineeringChange

Implementation)

MCI (ManufacturingChange

Implementation)ECN (Engineering

Change Notification)

M1Change Request

issued

M2ECN

release

M3ECR

released

M5Change

completed

M4ECI

completed

Responsibility: BU Responsibility: Plant

3. Solution in Detail

Page 15: 25_1330b_Kohlhoff-Vo_

15© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

ECR (EngineeringChange Request)

ECI (EngineeringChange

Implementation)

MCI (ManufacturingChange

Implementation)ECN (Engineering

Change Notification)

3. Solution in Detail

Phases of Engineering Change Process

Responsibility: BU Responsibility: Plant

M1Change Request

issued

M2ECN

release

M3ECR

released

M5Change

completed

M4ECI

completed

Page 16: 25_1330b_Kohlhoff-Vo_

16© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Basic Data

Pierburg specificdata fields

3. Solution in Detail

Page 17: 25_1330b_Kohlhoff-Vo_

17© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Basic Data

Integration of „Original“ SAPdata fields-> Input help-> Data validation

3. Solution in Detail

Page 18: 25_1330b_Kohlhoff-Vo_

18© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Collect Affected Parts –ATO-Cockpit (AusTauschObjekt)

-> Input material numbers to be exchanged-> Input help, data validation

3. Solution in Detail

Page 19: 25_1330b_Kohlhoff-Vo_

19© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Plants

1. Read plant specific records of materials

2. Display in ATOC 3. Automat. read of „virtual attributes“

3. Solution in Detail

Page 20: 25_1330b_Kohlhoff-Vo_

20© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Integrated “Where-Used-List“

1. Call “Where-Used-List“ from ATOC

2. Store “Where-Used-List” in VN Cockpit

Original Direct Predecessor Usage

3. Solution in Detail

Page 21: 25_1330b_Kohlhoff-Vo_

21© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

3. Evaluate Usage w.r.t. change relevance

3. Solution in Detail

Integrated “Where-Used-List“

Page 22: 25_1330b_Kohlhoff-Vo_

22© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

4. Transfer of affected materials into ATOC (change scope)

3. Solution in Detail

Integrated “Where-Used-List“

Page 23: 25_1330b_Kohlhoff-Vo_

23© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Detailed Information (Customer, Stock, ...)

3. Solution in Detail

Page 24: 25_1330b_Kohlhoff-Vo_

24© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Documents for Material (e.g. Drawing)

3. Solution in Detail

Page 25: 25_1330b_Kohlhoff-Vo_

25© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Team Definition / Distribution List

3. Solution in Detail

Page 26: 25_1330b_Kohlhoff-Vo_

26© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Release Change Request

3. Solution in Detail

Page 27: 25_1330b_Kohlhoff-Vo_

27© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Process Route

Initiate follow-on tasks

3. Solution in Detail

Page 28: 25_1330b_Kohlhoff-Vo_

28© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Information im Mailsystem

Drill-down to change case

3. Solution in Detail

Page 29: 25_1330b_Kohlhoff-Vo_

29© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

ECR (EngineeringChange Request)

ECI (EngineeringChange

Implementation)

MCI (ManufacturingChange

Implementation)ECN (Engineering

Change Notification)

3. Solution in Detail

M1Change Request

issued

M2ECN

release

M3ECR

released

M5Change

completed

M4ECI

completed

Responsibility: BU Responsibility: Plant

Phases of Engineering Change Process

Page 30: 25_1330b_Kohlhoff-Vo_

30© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Complete Process Route

Extension of the process route by authorized user-> sequential-> parallel-> template or single step-> directly to user or roles from the project team

3. Solution in Detail

Page 31: 25_1330b_Kohlhoff-Vo_

31© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Compile Information from Departments(eval. documents, costs, ...)

Status dependent Layout: here: Costing

3. Solution in Detail

Page 32: 25_1330b_Kohlhoff-Vo_

32© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Create Attachments

3. Solution in Detail

Page 33: 25_1330b_Kohlhoff-Vo_

33© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Change/Display Attachments

3. Solution in Detail

Page 34: 25_1330b_Kohlhoff-Vo_

34© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

ECR (EngineeringChange Request)

ECI (EngineeringChange

Implementation)

MCI (ManufacturingChange

Implementation)ECN (Engineering

Change Notification)

3. Solution in Detail

Phases of Engineering Change Process

Responsibility: BU Responsibility: Plant

M1Change Request

issued

M2ECN

release

M3ECR

released

M5Change

completed

M4ECI

completed

Page 35: 25_1330b_Kohlhoff-Vo_

35© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Creation of Change Master Record

3. Solution in Detail

Page 36: 25_1330b_Kohlhoff-Vo_

36© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Definition of Change Package

3. Solution in Detail

Page 37: 25_1330b_Kohlhoff-Vo_

37© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Maintenance of Material Master

3. Solution in Detail

Page 38: 25_1330b_Kohlhoff-Vo_

38© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

3. Solution in Detail

Maintenance of Material Master

Page 39: 25_1330b_Kohlhoff-Vo_

39© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

ECR (EngineeringChange Request)

ECI (EngineeringChange

Implementation)

MCI (ManufacturingChange

Implementation)ECN (Engineering

Change Notification)

3. Solution in Detail

M1Change Request

issued

M2ECN

release

M3ECR

released

M5Change

completed

M4ECI

completed

Phases of Engineering Change Process

Responsibility: BU Responsibility: Plant

Page 40: 25_1330b_Kohlhoff-Vo_

40© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Same Technical Procedure as inPrevious Phases

Extension of Process Routes (via single items or templates)

Input of Data in ATOC

Drill-Down to Maintenance Transactions

Documentation of Change Status by Advancement of StatusControl Net

3. Solution in Detail

Page 41: 25_1330b_Kohlhoff-Vo_

41© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

4. Next Steps

4. Next Steps

Page 42: 25_1330b_Kohlhoff-Vo_

42© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Goal 2007 ff.: Implementation of SAPRM as an Integration Platform for ....

Market

Strategy

Technology

Pre-DSelectionProcess

Pre-DAdvance

Development

PDPProduct

Development

ECMEng. ChangeManagement

LiPLicense

Management

PTPProduction

Transfer???

4. Next Steps

Page 43: 25_1330b_Kohlhoff-Vo_

43© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Solution Scenarios

4. Next Steps

The presented solution is a Pierburg specific projectsolution

ILC PROSTEP offers components as a productFurther information is with ILC PROSTEP

Page 44: 25_1330b_Kohlhoff-Vo_

44© Pierburg GmbH 2005 – Schutzvermerk ISO 16016 beachten.

Questions ?

End

Contact:

Andreas Voß

Mail: [email protected]