Agenda for Meeting to discuss Roll-out of Parcel management System to be held on 25-03-2008. ***** A meeting will be held in Railway Board on 25 th March 2008, at 10:30 am, to discuss the roll – out of PMS on Golden Quadrilateral and its diagonals (proposed in Works programme 2008-09). The agenda points will be: 1. Finalisation of Parcel Way Bill and Delivery Gate proforma (Proformas attached at Annexure I and II) 2 Finalisation of Locations/Stations (proposed List of sanctioned corridors at Annexure- III, and list of proposed locations / stations at Annexure – IIIa Railways may suggest additions and deletions) 3 Submission of Information by Zonal Railways on the format prepared by CRIS (Format attached, Annexure – IV) 4 Completion of minor infrastructure works by zonal Railways (minor civil, electrical etc. Annexure – IIIb) 5 Finalisation of tender for supply of Hardware, networking equipment and LAN (Bar code stickers, PW Bill Stationery, Bar code and PW Bill printers, Electronic Weighing Machines may be charged to revenue, Annexure – V) 6 Completion of site readiness with regard to LAN at sites. 7 Roll out strategy for 119 stations of Phase-I 8 Roll out strategy for 105 stations in Phase-II 9 Milestones for Parcel Management System at major stations (Annexure – VI)
13
Embed
25-03-2008. A meeting will be held in Railway Board on 25 · PDF fileA meeting will be held in Railway Board on 25th March 2008, at 10:30 am, to discuss the roll ... 90 Mumbai CST
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Agenda for Meeting to discuss Roll-out of Parcel management System to be held on 25-03-2008.
*****
A meeting will be held in Railway Board on 25th March 2008, at 10:30 am, to
discuss the roll – out of PMS on Golden Quadrilateral and its diagonals (proposed in
Works programme 2008-09). The agenda points will be:
1. Finalisation of Parcel Way Bill and Delivery Gate proforma (Proformas
attached at Annexure I and II)
2 Finalisation of Locations/Stations (proposed List of sanctioned
corridors at Annexure- III, and list of proposed locations / stations at
Annexure – IIIa Railways may suggest additions and deletions)
3 Submission of Information by Zonal Railways on the format prepared
by CRIS (Format attached, Annexure – IV)
4 Completion of minor infrastructure works by zonal Railways (minor
civil, electrical etc. Annexure – IIIb)
5 Finalisation of tender for supply of Hardware, networking equipment
and LAN (Bar code stickers, PW Bill Stationery, Bar code and PW Bill
printers, Electronic Weighing Machines may be charged to revenue,
Annexure – V)
6 Completion of site readiness with regard to LAN at sites.
7 Roll out strategy for 119 stations of Phase-I
8 Roll out strategy for 105 stations in Phase-II
9 Milestones for Parcel Management System at major stations
(Annexure – VI)
Annexure – I
Annexure – II
Annexure – III
S.No. Corridor No. of stations
Platforms
1 New Delhi-Mumbai 16 84 2 Chennai-Mumbai 18 104 3 New Delhi-Howrah (with Bar coding) 24 117 4 Mumbai – Bangalore-Chennai (with Bar
coding) 23 94
5 Howrah – Chennai (with Bar coding) 17 76 6 Jammu Tawi-Kanyakumari (with Bar