SOCIEDAD MINERA CERRO VERDE S.A.A. CERRO VERDE PRODUCTION UNIT
EXPANSION
PROJECT NO. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
CONSTRUCTION SPECIFICATION
DOCUMENT NO. 240K-C2-CS-15-022 REV. C
08 MAY 2012
-
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 2 of 18
This page is intentionally blank.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 3 of 18
TABLE OF CONTENTS
1.
GENERAL......................................................................................................................................................
5 1.1 Summary
..........................................................................................................................................5
1.2 References
.......................................................................................................................................6
1.3 Submittals
.........................................................................................................................................8
1.4 Quality Assurance
............................................................................................................................8
1.5 Site Conditions
.................................................................................................................................9
2.
PRODUCTS.................................................................................................................................................
10 2.1 Materials
.........................................................................................................................................10
2.2 Design Criteria
................................................................................................................................10
2.3 Surface Preparation and Painting
..................................................................................................11
2.4 Material Handling, Inspection and Storage
....................................................................................11
2.5 Inspection and Testing
...................................................................................................................11
3. EXECUTION
................................................................................................................................................
12 3.1 Preparation
.....................................................................................................................................13
3.2
Erection...........................................................................................................................................13
3.3 Setting Base Plates
........................................................................................................................14
3.4 Bolted Connections
........................................................................................................................14
3.5 Welded Connections
......................................................................................................................15
3.6 Correction of Errors
........................................................................................................................15
3.7 Steel Joists
.....................................................................................................................................15
3.8 Floor Plate and Grating
..................................................................................................................16
3.9 Metal Decking for Floors and Roofs
...............................................................................................16
3.10 Shear
Connectors...........................................................................................................................16
3.11 Coating
Repairs..............................................................................................................................16
4.
ATTACHMENTS..........................................................................................................................................
17
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 4 of 18
This page is intentionally blank.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 5 of 18
1. GENERAL
1.1 Summary
A. Scope of Specification
This specification prescribes the minimum requirements for the
labor, material, equipment and services for the erection of
structural and miscellaneous steel.
These facilities shall include, but not be limited to the
following:
1. Erection the structural steel, including touch-up paint
2. Supply and installation of leveling plates and shims
3. Supply of welding consumables
4. Supply and installation of temporary bracing during
erection
5. Erection of miscellaneous steel not cast in concrete
6. Quality control including inspection and testing
B. Work Not Included
1. Installation of miscellaneous steel in concrete
2. Supply and fabrication of structural steel
C. Related Documents
The following documents describe items of related work:
240K-C2-CS-15-021 Fabrication of Structural and Miscellaneous
Steel
240K-C2-CS-15-012 Grouts
240K-C2-ES-55-02 Paint
240K-C2-DC-10-002 General Site Conditions Design Criteria
Coordinate work prescribed by this specification with work
prescribed by the above listed specifications.
D. Definitions
1. Buyer: The party that awards the contract to erector. The
buyer may be the owner or owner's authorized agent.
2. Erector: The party responsible for erection of structural and
miscellaneous steel.
3. Owner: The owner of the proposed structure.
4. Contractor: In the context of this specification it is the
party awarded the contract by the buyer. Used interchangeably with:
erector.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 6 of 18
1.2 References
The publications listed below form part of this specification to
the extent referenced in this specification. If there is a
discrepancy between the references and the specifications, the
specifications shall govern. Referenced publications shall be the
latest revisions and addendum in effect on the date of the Purchase
Order, unless otherwise noted. Short titles will be used herein
when appropriate.
ACI American Concrete Institute
360-05 Specification for Structural Buildings, March 9, 2005
AISC American Institute of Steel Construction
ANSI/AISC 360-05 Specification for Structural Buildings, March
9, 2005
ANSI/AISC 340-05 Seismic Provisions for Structural Steel
Buildings, March 9, 2005 and Supplement No. 1, November 16,
2005
Code of Standard Practice for Steel Buildings and Bridges, March
18, 2005
Specification for Structural Joints using ASTM A325 or A490
Bolts, June 30, 2004, Research Council on Structural Connections,
Committee A.1
Manual of Steel Construction, Thirteenth Edition, 2005
AISI American Iron and Steel Institute
Specifications for the Design of Cold Formed Structural
Members
ASCE American Society of Civil Engineers
ASCE/SEI 7-05 Minimum Design Loads for Buildings and other
Structures
ASTM American Society for Testing and Materials
A1 Standard Specification for Carbon Steel Tie Rails
A6/A6M Standard Specification for General Requirements for
Rolled Steel Plates, Shapes, Sheet Piling, and Bars for Structural
Used
A36/A36M Standard Specification for Structural Steel
A53 Standard Specification for Pipe, Steel, Black and Hot Dipped
Zinc-Coated Welded and Seamless
A153 Standard Specification for Zinc Coating (Hot-Dip) on Iron
and Steel Hardware
A307 Standard Specification for Carbon Steel Bolts and Studs,
60,000 psi Tensile Strength
A325 Specification for High-Strength Bolts for Structural Steel
Joints
A325M Standard Specification for High-Strength Bolts for
Structural Steel Joints (Metric)
A490 Standard Specification for Heat Treated Steel Structural
Bolts, 150 ksi Minimum Tensile Strength
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 7 of 18
A490M Standard Specification for High-Strength Steel Bolts
Classes 10.9 and 10.9.3, for Structural Steel Joints (Metric)
A500 Standard Specification for Cold-Formed Welded and Seamless
Carbon Steel Structural Tubing in Rounds and Shapes
A501 Standard Specification for Hot Formed Welded and Seamless
Carbon Steel Structural Tubing
A563 Standard Specification for Carbon and Alloy Steel Nuts
A563M Standard Specification for Carbon and Alloy Steel Nuts
(Metric)
A572/A572M Standard Specification for High Strength Low Alloy
Columbiun Vanadium Steel of Structural Quality
A759 Standard Specification for Carbon Steel Crane Rails
A780 Standard Practice for Repair of Damaged and uncoated Areas
of Hot-Dip Galvanized Coating
A786/786M Standard Specification for Rolled Steel Floor
Plates
A992/A992M Standard Specification for Steel for Structural
Shapes for use in Building Framing.
A1011/A1011M Standard Specification for Steel, Sheet and Strip,
Hot-Rolled, Carbon, Structural, High Strength Low-Alloy, High
Strength Low-Alloy with Improved Formability, and Ultra High
Strength
B695 Standard Specification for Coatings of Zinc Mechanically
Deposited on Iron and Steel
E329 Standard Practice for Use in the Evaluation, Testing and
Inspection Agencies Used in Construction
F436 Standard Specification for Hardened Steel Washers
F436M Standard Specification for Hardened Steel Washers
(Metric)
F844 Standard Specification for washers, steel, plain, (flat)
unhardened for general use.
F959 Standard Specification for Compressible Washer Type Direct
Tension Indicators for Use with Structural Fasteners
F1554 Standard Specification for Anchor Bolts, Steel, 36, 55 and
105 ksi Yield Strength
F1852 Standard Specification for Twist Off Type Tension Control
Structural Bolt/Nut/Washer Assemblies, Steel Heat Treated, 120/105
ksi Minimum Tensile Strength
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 8 of 18
AWS American Welding Society
D1.1 Structural Welding Code
QC1 Standards and Guide for Qualification and Certification of
Welding Inspectors
ICC International Code Council
International Building Code (IBC), 2006 Edition
MSHA Mine Safety and Health Administration
NAAMM National Association of Architectural Metal
Manufacturers
MBG 531-00 Metal Bar Grating Manual, Sixth Edition, February 21,
2001
OSHA Occupational Safety and Health Administration
CFR 1910D: Occupational Safety & Health Standards Walking
Working Surfaces, Code of Federal Regulations Title 30 (CFR 29)
Part 1910 Subpart D, OSHA 2000
SJI Steel Joist Institute
Specification for Open Web Joists
1.3 Submittals
A. All documentation submitted by Supplier shall be in
accordance with the attached Supplier Drawing and Data Commitment
form.
B. Requirements
1. Inspection and Quality Control Reports shall be submitted to
Buyers Representative on the same day the tests are made. Each Test
Report shall have a definite statement indicating compliance or
noncompliance with the specifications. The fabricator's inspectors
shall be qualified and certified as AWS Certified Welding
Inspectors in accordance with AWS D1.1 or AWS QC1 or shall be
trained and working under the supervision of an AWS Certified
Welding Inspector.
2. A copy of each pre-qualified welding procedure intended to be
used in the work shall be submitted before the start of
welding.
3. A certificate of qualification shall be submitted for each
welder, welding operator, and tacker employed on the work.
4. Supplier's certificate stating conformity of the welding
filler materials to this specification shall be submitted to the
Buyers Representative.
5. Assembly lift plan as required by OSHA.
1.4 Quality Assurance
A. Refer to Section 1.1C Related Documents and Section 2.3
Inspection and Tests.
B. Supplier shall not substitute major component sub-suppliers
after award of a Purchase Order without Buyers written
approval.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 9 of 18
C.Supplier shall be solely and entirely responsible for the
process performance of the equipment and systems. Supplier shall
guarantee that the equipment will operate satisfactorily to the
conditions and requirements of this specification and data
sheets.
D.C. The Contractor shall have a written Quality Control Program
and Inspection Procedures document that shall provide details of
how compliance with the requirements of this specification and the
shop and erection drawings shall be achieved. The Contractor shall
maintain a complete up-to-date set of erection drawings at the
jobsite.
E.D. All welding procedures and individual welders shall be
qualified in accordance with the requirements of AWS D1.1.
F.E. All welding inspectors shall be qualified and certified as
AWS Certified Welding Inspectors in accordance with the
requirements of AWS D1.1.
G.F. The Contractor's inspector shall inspect all materials,
installations, and workmanship of the Contractor, as well as those
of any of the Contractor's subcontractors or vendors, to ensure
conformance with all requirements of this specification and the
design drawings.
H.G. Buyer shall have the right to inspect all materials,
installations, and workmanship supplied by the Contractor and shall
have unrestricted right of access to the Contractor's work
areas.
I.H. Buyer may reject any improper, inferior, defective, or
unsuitable materials, installations, and workmanship of the
Contractor. Any rejected materials, installations, and workmanship
shall be repaired or replaced by the Contractor, in accordance with
Buyer instructions at no cost to the Buyer.
J.I. The Contractor shall provide all inspection tools and shall
provide inspection access facilities such as platforms, ladders,
and scaffolds as requested by Buyer.
K.J. Inspection tools and calibration records for tools used by
the Contractor shall be maintained and available for examination by
Buyer.
L.K. Buyer reserves the right to witness any tests or
inspections which he considers necessary to ensure that components
conform to Quality Assurance requirements. Supplier shall notify
Buyer in advance of all tests and grant free access to
manufacturing facilities, including those of his sub-suppliers, for
such inspections.
M.L. Supplier shall supply Buyer with the complete list of
documentation that Supplier intends to produce for review. Such
documents shall cover manufacturing, quality control, inspection
procedures, deficiency evaluation and correction.
N.M. Inspection reports shall be made available for inspection
by the Buyer.
O.N. All defects in excess of agreed acceptance criteria shall
be reported immediately to the Buyer by Supplier and evaluated by
Suppliers engineering departments for possible corrective action.
All corrections proposed shall be subject to Buyers approval.
P.O. Materials shall be new and in good condition at time of
fabrication and satisfy the quality requirements of this
specification.
1.5 Site Conditions
Refer to Section 1.1C Related Documents.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 10 of 18
2. PRODUCTS
2.1 Materials
A. All materials supplied by the Contractor shall conform to
specification 240K-C2-CS-15-021 Fabrication of Structural and
Miscellaneous Steel.
B. Low hydrogen welding electrodes with a tensile strength of
483 MPa (70 ksi) shall be used. Electrodes shall be compatible with
the welding process and with the materials being welded.
C. Grout for column base plates shall be per specification
240K-C2-CS-15-021 Grouts.
D. High strength bolts and load indicating washers shall be
furnished by U.S. manufacturer or Buyer approved substitute.
2.2 Design Criteria
A. Connections - General
1. Bolted connections for primary structural members shall be
made with minimum 19 mm (3/4 of an inch) diameter high strength
bolts conforming to ASTM A325 in bearing type connections with
threads included in the shear plane unless noted otherwise as
slip-critical (friction-type) connection. The design and assembly
of high strength bolted connections shall be in accordance with
AISC Specification for Structural Joints Using ASTM A325 or A490
Bolts. High strength bolted connections shall be indicated clearly
on the erection drawings.
2. For the odd areas where High Strength Tension Control (Twist
Off) bolts are unsuitable and substituted by high strength heavy
hex head slip-critical connections, tighten bolts by either of the
following:
a. Turn-of-nut method
b. Direct tension indicating devices (preferred)
c. Job calibrated wrench method
3. For job calibrated wrench method, wrench calibration shall be
checked at least once each working day to ensure accuracy. For
turn-of-the-nut method, match-mark nut and bolt before final
tightening to provide visual means of noting nut rotation. For DTI
method, use the indicating devices as directed by the manufacturer
and in accordance with Paragraph 8.d.4, Direct Tension Indicator
Tightening, of the Specification for Structural Joints using ASTM
A325 or A490 Bolts, as approved by the Research Council on
Structural Connections and endorsed by AISC and in accordance with
ASTM F959. Inspect to check tension as well as snug-tightness of
plies. AISC specified slip-critical allowable based on surface
conditions shall be used. Connection material subjected to tension
forces shall be checked for prying action.
4. Bolted connections for secondary members (such as purlins,
girts, and stair framing) may be made with 19 mm (3/4 of an inch)
diameter machine bolts as bearing type connections (type N)
conforming to ASTM A307 with the following exceptions. Bolts for
stair bracing, handrails, and toe plates shall be 16 mm (5/8 of an
inch) in diameter, conforming to ASTM A307 unless noted
otherwise.
B. Bracing Connections
1. Fasten horizontal bracing to intermediate beams to eliminate
sag, and connect cross bracings at the intersection point.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 11 of 18
C. Welding
1. Welding, including procedures, appearance, and quality of
welds, and methods for correcting welding work, shall be in
conformance with AWS D1.1 and prequalified procedures accepted by
Buyer.
2. Temperature of base metal to be welded shall conform to
minimum preheat and interpass temperatures outlined in AWS D1.1 for
the appropriate welding process and steel specification.
3. Minimum size of fillet welds shall be per Table J2.4 of AISC
Manual of Steel Construction 13th Edition, but no smaller than 5 mm
(3/16 of an inch), except as otherwise shown or noted on the design
drawings.
4. Assemble and weld built-up sections by methods that will
produce true alignment of axis without warp.
5. Seal weld all contact surfaces.
2.3 Surface Preparation and Painting
A. Surface preparation for painting and galvanizing of
structural steel shall be in accordance with the 240K-C2-ES-55-02
Paint. Bolt surface preparation and finish shall match the
connected steelwork.
B. Structural steel shall remain unpainted in the following
areas:
1. Where concrete and steel are in contact
2. At contact areas to be field-welded
3. Crane rails
4. Surfaces of friction-type connecting (unless primed with
Buyer approved primer)
5. As noted on drawings
C. Touch-up Painting
After erection, touch up shop coatings of structural steel
damaged during erection, as well as field welds, nuts, bolts, and
anchor bolts using materials and procedures per specifications and
manufacturers recommendations.
2.4 Material Handling, Inspection and Storage
A. All materials designated for the care, custody, and control
of the Contractor shall be received, unloaded, stored, and
otherwise handled in a manner that will not cause overstress, wrap,
twist, or other damage.
B. Take precautions to prevent damage to preventive coatings on
surfaces of materials.
C. All materials shall be inspected by the Contractor
immediately after receipt to ensure that the materials are not
damaged, to verify that all items on the packing list have been
supplied, and to ensure that all documentation has been
received.
D. If any damage is discovered, or any parts, components, or
documentation are missing or otherwise defective, the occurrence
shall be immediately reported to Buyer in writing.
E. Store and protect materials at the site from the damage,
deterioration, and corrosion.
2.5 Inspection and Testing
A. Perform tests and inspections in accordance with the approved
Inspection and Test Plan.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 12 of 18
B. Contractor shall provide inspection personnel with safe means
of access to materials and facilities involved in the quality
assurance and control work. Contractor also shall provide
facilities normally on hand as required to assist in the quality
assurance and control work.
C. Buyer reserves the right to remove test specimens from any
portion of the work to verify the quality of the welding. Supplier,
at own expense, shall repair or replace any base metal or filler
metal found to be defective. Method of repair shall be approved by
the Buyer.
D. Nondestructive Examination (NDE)
Generally, NDE, methods, acceptance criteria, and additional
requirements shall be as follows:
1. Visual Examination
a. Visual examination procedures shall be in accordance with AWS
D1.1.
b. Supplier shall visually inspect all completed welds.
2. NDT Examination
a. The minimum extent of NDT (magnetic particle, ultrasonic,
radiographic, etc.) inspection shall be as follows:
(1) Full penetration welds 100 percent
(2) Partial penetration welds 50 percent
(3) Fillets welds 25 percent
b. Inspection of welds on dynamically loaded structures will be
as noted on the design drawings.
c. Buyer shall reserve the right to request any other method of
NDE for any corrective work performed by Contractor or in course of
the work.
3. Perform radiographic and ultrasonic testing when required by
Buyer in accordance with AWS D1.1. If the testing indicates
deficiency, costs of the testing and remedial work shall be
incurred by the contractor.
E. Buyer reserves the right at any time before final acceptance
of the structural steel work to reject any portions of the work not
in conformance with specified requirements. Buyer has sole
authority to issue directives concerning defective structural
steelwork.
F. Structural steel fabrication may be inspected and tested
during all phases.
G. Bolted connections shall be inspected and tested in
accordance with the recommendations of AISC Specification for
Structural Joints using ASTM A325 or ASTM A490 Bolts, as approved
by the Research Council on Structural Connections.
H. Testing Agency shall meet and follow the requirements of ASTM
E329, Recommended Practice for Inspection and Testing Agencies for
Concrete, Steel, and Bituminous Materials as used in
Construction.
I. Inspect field-welded shear connector studs per AWS D1.1, Part
F.
3. EXECUTION
All work shall be in accordance with OSHA safety requirements.
All work shall be in accordance with the AISC Specification for
Structural Steel Buildings, subject to modification by this
specification, the design drawings, state or local laws, and
building codes.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 13 of 18
3.1 Preparation
A. Contractor shall verify anchor bolt locations at the jobsite
before commencement of erection of structural steelwork.
B. If it is required that any part of the structural steel be
temporarily omitted to allow for installation of equipment or other
work, the structural steel so affected shall be installed in
accordance with erection procedures and sequences to be outlined by
Buyer before the erection of that portion of steel.
3.2 Erection
A. Any circumstances discovered by the Contractor, which affect
progression, performance or completion of the Contractor's work
activities such as, discrepancies between the erection/shop
drawings and the delivered steel members, incorrectly fabricated
steel members, or incomplete or unacceptable work of other
Contractors affecting the Contractor's work, shall be immediately
reported to Buyer in writing.
B. Any damage caused during erection shall be reported to Buyer.
Corrective measures shall be completed as directed by Buyer.
C. Erection of steel joists shall conform to the requirements of
the Steel Joist Institute.
D. Temporary erection loads or permanent loads shall not be
placed on any incomplete portions of the structure being erected
unless the Contractor can demonstrate by analysis that the
contemplated action is safe.
E. Loose timbers, metal sheeting, bolt buckets, tools, debris,
and temporary scaffolding shall be kept restrained or removed from
work areas. The Contractor shall be responsible for securing all
equipment and materials within the Contractor's care, custody, and
control during the erection operation.
F. The Contractor shall maintain the job site in clean and safe
condition at all times, and shall properly dispose of, off
premises, all crating, waste materials, and other refuse which has
accumulated as a result of Contractor's activities under this
specification.
G. Structural Stability
1. The Contractor shall at all times be responsible for the
adequacy and installation of any temporary bracing or guy cables
required to counteract loadings imposed during erection. This
responsibility shall also include temporary bracing required to
ensure safe and stable conditions of partially completed structural
assemblies.
2. The structure shall be plumbed, leveled, and braced before
any final bolted or welded connections are made.
H. Field Correction of fabrication by gas-cutting is not
permitted without prior written authorization of Buyer.
I. Contractor may perform moderate amount of reaming, chipping,
and cutting with prior approval by Buyer to allow proper fit-up of
structural steel members. Errors that prevent the proper assembly
of the structure shall be immediately reported to Buyer.
J. Erection tolerances shall not exceed those given in paragraph
7.11 of Code of Standard Practice for Steel Buildings and
Bridges.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 14 of 18
3.3 Setting Base Plates
The Contractor shall provide the following:
A. Clean the top of bearing surfaces and bottom of base plates.
Provide and set leveling nuts, leveling plates, or steel shims
beneath column base plates to correct positions, elevations, and
locations as shown on the erection drawings.
B. Grout base plates. Grouting shall be performed as soon as
possible after the columns are plumbed and before any large axial
loads or moments are applied to the base plate
C. Tighten anchor bolts after grout has set.
3.4 Bolted Connections
A. Connections to be made in the field shall be bolted, except
where field-welding is indicated on the design drawing.
B. All bolted connections shall be made with High Strength
Tension Control (Twist Off) Bolts in accordance with the AISC
Specification for Structural Joints Using ASTM A325 or A490 Bolts,
except as noted below. High strength heavy hex head structural
bolts shall substitute for High Strength Tension Control (Twist
Off) bolts in the following connections:
1. Removable members where specified on design drawings.
2. Where designed bolt size is larger than 28 mm (1- inches). 3.
Where space is restricted to permit use of installation tool for
Tension Control (Twist Off)
bolts.
4. Where LeJeune bolts or equal are unavailable in quantities
required by Project.
5. Classified areas where use of electric tools is not
permitted.
C. Drift punching to match unaligned holes will not be
permitted.
D. With prior approval from Buyer, make enlargement of holes
necessary to make connections resulting from misfit by reaming or
drilling. Do not enlarge holes by flame cutting, burning, or by use
of drift pins.
E. Use bolts of larger diameter when bolt hole diameter exceeds
the bolt diameter by more than 1.6 mm (1/16 of an inch).
F. The procedure for installing high strength bolts in the field
shall be the same as outlined in Section 2.2 of this
specification.
G. Bolts shall be kept in dry storage until needed in the
ironwork. Bolts 25 mm (1 inch) diameter and over must first have
Johnsons Stickwax #140 or equal applied to the threads before being
assembled. Any Bolts that have been exposed and have become dried
out or rusty before use must be rejected and cannot be used until
they have been cleaned and waxed with Johnsons Stickwax #140 or
equal.
H. All nuts for high-strength bolts shall be wax-dipped to
reduce torque during installation.
I. When assembled, all joint surfaces, including those adjacent
to the bolt heads, nuts, or washers, shall be free of burrs, dirt,
and other foreign materials that would prevent solid seating of
parts.
J. When impact wrenches are used, wrenches of adequate capacity
and sufficient air supply shall be provided by the Contractor to
perform the required tightening of each bolt.
K. The Contractor shall snug tight all A307 bolt assemblies.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 15 of 18
L. Mechanically galvanized bolts and nuts shall not be
intermixed with hot dip galvanized nuts and bolts.
M. A325 Bolts if previously fully tensioned shall not be reused,
nor shall they be used as fit-up bolts.
N. Contractor shall color code, die punch, or otherwise mark the
ends of torqued high strength heavy hex head structural bolts
indicating that the bolts have been properly tensioned and are
ready for inspection. This is not required for Tension Control
(Twist Off) bolts.
3.5 Welded Connections
A. Welding shall conform to AWS D1.1.
B. Field welding shall be as shown on the shop/erection
drawings.
C. Use welding electrodes with tensile strength of 483 MPa (70
ksi).
D. Supplier shall provide erection clips for fit-up of field
welded connections. Remove erection clips unless approved by
buyer.
E. Minimum fillet welds shall be per AISC Manual of Steel
Construction, Table J.2.4, but not less than 5 mm (3/16 of an
inch).
F. Welds to connection plates embedded in concrete shall be
deposited in a sequence that will minimize distortion of the
embedment to 3 mm ( of an inch) of flat or true.
G. The following nondestructive examinations are required for
Structural Welding:
1. As a minimum 5 percent of the total number of full
penetration welds shall be radiographed or ultrasonically examined
100 percent of the entire length of the weld(s) selected. The welds
selected for nondestructive examination must include the joints,
where identified on design drawings.
2. Five percent of the total number of fillet or partial
penetration welds shall be magnetic particle examined 100 percent
of the entire length of the weld(s) selected.
3. When a weld selected under Section 3.5G.1. or Section
3.5G.2., of this specification, is rejected, 2 additional welds
shall be subject to nondestructive examinations at the Contractor's
expense. This procedure of examining 2 welds for every weld
rejected shall continue until all welds examined are accepted. The
replaced welds shall be examined in accordance with Section 3.5G.1.
or Section 3.5G.2., of this specification, whichever is
applicable.
4. Welds selected to satisfy the 5 percent requirements shall be
selected by the Buyers representative and shall represent a sample
of each welder's work for each type of weld.
5. Contractor shall visually inspect all completed welds.
Undercutting beyond the limits of AWS D1.1, surface porosity, and
crack-like discontinuities shall be removed to sound metal and
repaired.
3.6 Correction of Errors
Fit-up errors shall be corrected only after prior approval from
Buyer and in accordance with the applicable AISC provisions and
Contract requirements.
3.7 Steel Joists
A. Erection of joists shall be in accordance with the Steel
Joist Institute specifications for the type of joist used, the
shop/erection drawings, and the design drawings.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 16 of 18
B. The Contractor shall make no modifications or repairs to
steel joists without prior written approval of Buyer.
C. Use of power driven or powder actuated fasteners in the
diagonal and bottom chord members of the joists are not
permitted.
3.8 Floor Plate and Grating
A. Floor plate or grating openings dimensioned on the design
drawings will be cut and banded in the shop. Un-dimensioned
openings shall be cut and banded in the field by the
Contractor.
B. The contractor shall fasten the grating and floor plate as
specified on the design drawings.
3.9 Metal Decking for Floors and Roofs
A. Floor and roof deck sheets shall be installed in accordance
with the manufacturer's installation instructions and the design
drawings.
B. The Contractor shall repair all sags, deformations, holes,
and other irregularities.
C. Where damage has occurred to shop applied coatings on metal
deck, field touch-up shall be in accordance with the manufacturer's
recommendations.
3.10 Shear Connectors
A. All shear stud attachments shall be welded in strict
accordance with the manufacturer's recommendations for welding
procedure and welding equipment.
B. When 2 or more stud welding guns are operated from the same
power source, the Contractor shall interlock the guns so that only
one gun can be operated at a time to ensure that the power source
has fully recovered from making one weld before another weld is
started.
C. All ceramic insulators shall be removed from the base of the
studs after welding.
3.11 Coating Repairs
A. Repairs to shop applied galvanized items shall be as
follows:
1. All damages to galvanizing and the exposed sheared off ends
of all galvanized Tension Control (Twist Off) bolts shall be coated
after installation in accordance with ASTM A780 following the same
surface preparation procedure specified for repair of damaged
galvanized coatings.
2. Before repair of damaged galvanized coating, exposed
substrate metal shall be cleaned to bright metal and free of all
visual rust, oil or grease. Any non-adhering galvanizing shall be
removed to the extent that the surrounding galvanizing is integral
and adherent.
3. When surface defects exceed 2 percent of a member's area, the
defects shall be repaired by re-dipping the member in the zinc
bath.
4. Cold repair using an organic, zinc-rich coating is allowed if
the total damaged area is less than 1 percent of the total coated
area of the member being repaired and no single repair is greater
than 12.5 square centimeters or 300 mm long. The dry film thickness
shall be 2 to 3 mils and contain a minimum of 94 percent zinc dust
by weight.
5. Hot repairs shall be made in the shop if any of the following
conditions exist:
a. Total damaged area is greater than 1 but less than 2 percent
of the total coated area of the member being repaired.
b. Any single repair is at least 12.5 square centimeters in
area.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 17 of 18
c. Any single repair is 300 mm long or more.
6. Hot repair shall be made using zinc alloy rod or powder
manufactured for the repair of galvanized steel.
7. Flux, heavy ash or heavy dross inclusions shall be removed by
brushing, grinding, or filing as required.
B. Repairs to shop applied painted items:
1. All transport and erection damage to shop applied paint
coatings shall be repaired in accordance with Paint Specification
240K-C2-ES-55-02.
2. The exposed sheared off ends of all galvanized Tension
Control (Twist Off) bolts shall be coated after installation in
accordance with ASTM A780 following the same surface preparation
procedure specified for repair of damaged galvanized coatings.
4. ATTACHMENTS
Attachment 1 Contractor Data Requirements
End of Specification
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Project
Revision C Project No. A6CV
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 18 of 18
This page intentionally left blank.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 1 of3
Attachment 1 Contractor Data Requirements
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 2 of3
This page intentionally left blank.
-
Sociedad Minera Cerro Verde S.A.A. Document No.
240K-C2-CS-15-022 Cerro Verde Production Unit Expansion Revision C
Project No. A6CV Attachment 1
ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL
R:\103_PROJ_ADMIN\109_ENG
DOCS\109.8R_CS\15-Structural\240K-C2-CS-15-022_StructuralSteelErect\240K-C2-CS-15-022-C.doc
Page 3 of3
CONTRACTOR DATA REQUIREMENTS
1. The Contractor shall submit the following documents to Buyer
prior to start of erection: A. Safety Program B. Quality Control
Program and Inspection Procedures C. Welding Procedures
Qualification Test Reports D. Welding Procedures E. Assembly Lift
Plan(s)
2. If requested, the Contractor shall submit the following
documents to Buyer for Record Purpose: A. Quality Control
Inspections and test results B. Calibration or recalibration
performed on the tools or equipment used by Contractor during the
work