Ferrous Solutions Business Area
Pekka Erkkilä A ril 2010
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 2/20
World-class supplier of
ferroalloys
an
ferroussolutions
2
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 3/20
Main project types
Feasibility studiesProcess support services
ServicesP r o
pr i e
Plant audits
Equipment and plant upgrades
ar
y t e c h n
Basic and d etail engineeringFull supply, erection, construc tion
’
EPC / Turnkey €15-150 million, 15-36 months
l o g y i n c l
Commissionin g of the plantPerformance guaranteesPRIMA risk assessmentsTechnology package
€3-80 million, 10-36 months d e d i n
al l
as c eng neer ngProprietary and key equipmentErection and commissioningsupervisionTraining of cus tomers’ personnelPerformance guarantees
Equipment
pr o j e c t s
r s as ses smen
Design and engineeringProcurementInstallationTraining of c ustomers’ personn el
up to €10 million
CommissioningPerformance guarantees
3
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 4/20
Ferroalloys business line ,
4
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 5/20
Ferroalloys technologies
Processes and technologies•
• Agglomeration & Steel Belt Sintering
•Smelting in electric arc furnace
,
5
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 6/20
Outotec FeCr process & productsBAT technology in EuropeLow emissions Gas cleaning
Preheating kiln- CO-gas as fuel- Energy savings 500kWh/t
Grindingmill
- er - Solids 5mg/Nm 3
FilteringCeramec
- smelting furnace capacity +20%
Electrodeequipment
Gas cleaningCascade scrubber - Emissions <50mg/Nm 3
- Low maintenance
Gas cleaning
MixingMixer
Pelletisingdrum
Venturi scrubber - Emissions <50mg/Nm 3
- Low maintenance
Smelting furnace-- stable operation- high metal recovery
6
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 7/20
Ferroalloys technologies
• 12 pelletising and sintering plants for
• 1 steel belt sintering plant for niobium
7
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 8/20
Ferrous business line ,
8
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 9/20
References/ Capabilities
more than 400 sintering plants
more than 260 fluidised bed roasting plants
’ .
9
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 10/20
Large Current Projects in FerrousOutotec
offices
Gol e Gohar Iron ore
Caofeidian -EP
Iran
CVRD TubaraoEn ineerin for
4Mtpy Iron orepellet plant – TechnologyPackage
China
TISCO, IISCO,JINDAL,ROURKELA,DOURGAPUR8 Iron ore sinterplants - EP
Iron orepelletizing plant
Brazil
India
TISCO6Mtpy Iron orepellet plant - EP
CSAIron ore sinterplant - EPC
India
Brazil
10
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 11/20
CSA – Sinter Plant
11
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 12/20
PelletizingPlant Capacities• Between 0.6 and 7.5 Mtpy• Grate areas between 84 and 768m²
References• Total more than 70 pellet plants• Last contracts
• 2008 – 6.0 Mtpy plant for Tata Steel, India• 2008 – Technology Package for 4.0 Mtpy plant for Caufeidian, China
• 2006 – MBR: EP contract for 7.0 Mtpy plant• – .• 2005 – CVRD, Tubarao 8
Engineering and technical assistance for 7.0 Mtpy plant• 2005 – LKAB, Malmberget
.• 2003 – Gol e Gohar
Engineering and supply of a 5.0 Mtpy plant• 1998 – CVRD, São Luís, Brazil
‘ .
12
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 13/20
Typical Flowsheet
13
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 14/20
Experience: Projects during last 5 years
LKAB KK45.0 Mill . t/a
Technology/Supplier Installed AnnualCapacity
LKAB MK34.0 Mill . t/a
M-GOK5.0 Mill . t/a
u o ec rave ng
GratesOther TravelingGrates
45,0 million t/a
14,5 million t/a
JSWGIC5.0 Mill. t/a
Caofeidian4.0 Mill. t/a
Gol-e-Gohar 5.0 Mill. t/aGrate Kiln
WISCO
5.0 Mill . t/a
19,5 million t/a
. .
CVRD Sohar 4.5 Mill. t/a
BRPL4.0 Mill. t/a
Samarco 3 Paradee25%
Tubarão VIII
MBR7.0 Mill . t/a
. . a6.0 Mill. t/a
Tata Pellet6.0 Mill. t/a
57%18%
7.5 Mill. t/a Plant size >4mtpy, status 08/2008Outotec Other Traveling Grates Grate Kiln
14
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 15/20
Plant Capacities
Samarco 37
7.5 Million t/a
Samarco 2
Samarco 15
6
) [ m t p y ]
Tilden
Ijmuiden
4
i n g l e s
t r a n
d
Hamersley
Krivoi RogEagle Mountain
Wabush2
3
n t c a p a c
i t y (
Carol LakeRepublic
Malmberget 1Eagle Mills
1 P l a
1950 1960 1970 1980 1990 2000 2010
15
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 16/20
Samarco 3 …
7.500,000 t /aBF & DR pellets,768m² grate area
16
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 17/20
Outotec’s direct reduction processes
Pellets/Lum s FinesIron ore
GasCoalReductant
CircoredSL/RN Circofer Process
Product DRI
17
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 18/20
SL/RN references
Iscor, South Africa x , a
4.8 x 80 m
New Zealand Steel4 x 225,000 t/a reduced conc. & char 4.6 x 65 m
18
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 19/20
19
8/13/2019 23 Outotec Ferrous Solutions Business Area April2010
http://slidepdf.com/reader/full/23-outotec-ferrous-solutions-business-area-april2010 20/20
Circored HBI made in Trinidad
Over 300,000 t Circored HBIshipped and used for steelmaking
20