Preliminary Design for South LRT Extension – Century Park to Ellerslie Road 23 AVENUE GRADE SEPARATION ● LRT IN MEDIAN UNDER 23 AVENUE ● LIMITED RIGHT OF WAY ● SPLIT NORTHBOUND AND SOUTHBOUND LANES ● PROFILE OF LRT UNDER 23 AVENUE ● GEOTECHNICAL CONCERNS ● STORMWATER MANAGEMENT ● IMPACTS ON EXISTING BERM
13
Embed
23 AVENUE GRADE SEPARATION - Edmonton · 23 AVENUE GRADE SEPARATION ... AND STATION . Preliminary Design for South LRT Extension – Century Park to Ellerslie Road SCHEDULE • FALL
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
23 AVENUE GRADE SEPARATION● LRT IN MEDIAN UNDER 23 AVENUE
● LIMITED RIGHT OF WAY
● SPLIT NORTHBOUND AND SOUTHBOUND LANES
● PROFILE OF LRT UNDER 23 AVENUE
● GEOTECHNICAL CONCERNS
● STORMWATER MANAGEMENT
● IMPACTS ON EXISTING BERM
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
IMPACTS ON EXISTING BERM
OPTION 2 – NOISE WALL ADJACENT TO LRT
OPTION 1 – NOISE WALL ON PROPERTY LINE
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
23 AVENUE GRADE SEPARATION
•
111 STREET •
111 Street will be realigned to the west for construction staging
•
23 AVENUE•
23 Avenue will be realigned to the north for construction staging
CONSTRUCTION STAGING
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
BLACKMUD CREEK OPTION 1
MULTI-USE TRAIL ON LRT BRIDGE
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
BLACKMUD CREEK OPTION 2
MULTI-USE TRAIL ON SEPARATE BRIDGE
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
3 – SPAN BRIDGE
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
STEEL ARCH BRIDGE
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
SEPARATE MULTI-USE TRAIL BRIDGE
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
TWIN BROOKS (12 AVENUE – 9 AVENUE)
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
9 AVENUE – SOUTH ANTHONY HENDAY DRIVE OPTION 1
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
9 AVENUE – SOUTH ANTHONY HENDAY DRIVE OPTION 2
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
PARK AND RIDE AND STATION
Preliminary Design for South LRT Extension –Century Park to Ellerslie Road
SCHEDULE
•
FALL 2009 •
PUBLIC OPEN HOUSE - OCTOBER 8 (4-8pm), ELLERSLIE RUGBY CLUB.
•
CONTINUE ENGINEERING DESIGN.
•
SECOND SIP MEETING (DATE TO BE DETERMINED)
•
EARLY 2010•
PUBLIC INFORMATION SESSION (DATE AND LOCATION TO BE DETERMINED) .