41 22 FITTINGS, FINISHES AND APPLIANCES 裝置、裝修物料及設備 2. INTERIOR FINISHES a. Lobby Entrance Lift Lobby (G/F) Wall : Wood veneer, vinyl wall covering and metal panels up to the bottom line of gypsum board false ceiling. Floor : Natural stone & mosaic to the exposed surface. Ceiling : Partly gypsum board false ceiling with emulsion paint finish and partly wood fins feature ceiling. 1. EXTERIOR FINISHES a. External Wall Podium mainly finished with curtain wall system, external wall tiles, artificial stone tiles, aluminium claddings. Tower mainly finished with external wall tiles and aluminium cladding; part of 43/F finished with curtain wall system. b. Window All windows of tower finished with PVF2 coating and fixed with grey tinted glass. c. Bay Window Natural stone window sills. d. Planter External of planter at podium floors finished partly with natural stone and partly with external wall tiles. e. Verandah or Balcony (i) Balcony is fitted with glass balustrade. Wall : external wall tiles and aluminium cladding. Floor : floor tiles and composite wood deck. Ceiling : aluminium panel. (ii) Balcony is covered. (iii) There is no verandah. f. Drying Facilities for Clothing Nil Residential Floor Lift Lobby Wall : Wood veneer, grey mirror panels, vinyl wall covering, and metal panels up to the bottom line of gypsum board false ceiling. Floor : Natural stone to the exposed surface. Ceiling : Partly gypsum board false ceiling with emulsion paint finish and partly wood veneer false ceiling. b. Internal Wall and Ceiling Wall : Partly wood veneer panel accent wall and partly plastered and painted with emulsion paint to exposed surface. Ceiling : Gypsum board false ceiling with emulsion paint finish and partly finished with emulsion paint to the exposed surface. c. Internal Floor Engineered timber flooring and timber skirting.
17
Embed
22 FITTINGS, FINISHES AND APPLIANCES 裝置、裝修物料 ...€¦ · 41 22 FITTINGS, FINISHES AND APPLIANCES 裝置、裝修物料及設備 2. INTERIOR FINISHES a. Lobby Entrance
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
41
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
2. INTERIOR FINISHES
a. Lobby
Entrance Lift Lobby (G/F) Wall : Wood veneer, vinyl wall covering and metal panels up to the bottom line of gypsum board false ceiling.
Floor : Natural stone & mosaic to the exposed surface.Ceiling : Partly gypsum board false ceiling with emulsion paint finish and partly wood fins feature
ceiling.
Residential Floor Lift Lobby Wall : Wood veneer, grey mirror panels, vinyl wall covering, and metal panels up to the bottom line of gypsum board false ceiling.
Floor : Natural stone to the exposed surface.Ceiling : Partly gypsum board false ceiling with emulsion paint finish and partly wood veneer false
ceiling.
b. Internal Wall and Ceiling Wall : Partly wood veneer panel accent wall and partly plastered and painted with emulsion paint to exposed surface up to the bottom line of false ceiling.
Ceiling : Gypsum board false ceiling with emulsion paint finish and partly finished with emulsion paint to the exposed surface.
c. Internal Floor Engineered timber flooring and timber skirting.
1. EXTERIOR FINISHES
a. External Wall Podium mainly finished with curtain wall system, external wall tiles, artificial stone tiles, aluminium claddings.Tower mainly finished with external wall tiles and aluminium cladding; part of 43/F finished with curtain wall system.
b. Window All windows of tower finished with PVF2 coating and fixed with grey tinted glass.
c. Bay Window Natural stone window sills.
d. Planter External of planter at podium floors finished partly with natural stone and partly with external wall tiles.
e. Verandah or Balcony (i) Balcony is fitted with glass balustrade. Wall : external wall tiles and aluminium cladding. Floor : floor tiles and composite wood deck. Ceiling : aluminium panel.(ii) Balcony is covered.(iii) There is no verandah.
f. Drying Facilities for Clothing Nil
Residential Floor Lift Lobby Wall : Wood veneer, grey mirror panels, vinyl wall covering, and metal panels up to the bottom line of gypsum board false ceiling.
Floor : Natural stone to the exposed surface.Ceiling : Partly gypsum board false ceiling with emulsion paint finish and partly wood veneer false
ceiling.
b. Internal Wall and Ceiling Wall : Partly wood veneer panel accent wall and partly plastered and painted with emulsion paint to exposed surface.
Ceiling : Gypsum board false ceiling with emulsion paint finish and partly finished with emulsion paint to the exposed surface.
c. Internal Floor Engineered timber flooring and timber skirting.
42
d. Bathroom Wall : Glass & mirror panel, tiles up to the bottom line of gypsum board false ceiling.Floor : Natural stone to the exposed surface.Ceiling : Gypsum board false ceilings with emulsion paint.Store Room Lavatory : Floor is finished with floor tile and wall is finished with tile running up to ceiling,
emulsion paint to ceiling. (For 43/F Unit A & B only)e. Kitchen Wall : Glass panel, wood veneer panel (For Unit D only), and tiles up to the bottom line
of gypsum board false ceiling.Floor : Engineered timber flooring and timber skirting.Ceiling : Gypsum board false ceilings with emulsion paint.Cooking Bench : Solid - surfacing material countertop.
3. INTERIOR FITTINGS
a. Doors
Main Entrance Door Fire-rated solid core timber veneered door, fitted with eye viewer, door closer, fingerprint lockset and door stopper.
Bedroom Door Hollow core timber veneered, fitted with lockset and door stopper.
Bathroom Door (5/F to 21/F, 23/F to 42/F)
(Unit B & C) hollow core timber veneered, fitted with lockset and door stopper and (Unit A, C & D) glass sliding door with metal frame and fitted with lockset.
Bathroom Door (43/F) Glass sliding door with metal frame and fitted with lockset.Store Room Lavatory: hollow core timber veneered fitted with lockset and door stopper.
Kitchen Door (5/F to 21/F, 23/F to 42/F)
(Unit C & D) glass sliding door with metal frame.
Kitchen Door (43/F) Glass sliding door with metal frame.
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
43
b. Bathroom (5/F to 21/F, 23/F to 42/F)
Fitted with natural stone countertop and sanitary wares and fittings include chrome plated wash basin mixer, chrome plated shower set, vitreous china wash basin, vitreous china water closet, chrome plated towel bar, chrome plated paper holder, timber mirror cabinet, lighting fixture, walk-in shower with tempered glass enclosure, chrome plated shower fixtures, ventilation system and natural stone onsen bathtub (1210mm(L) x 760mm(W) x 430mm(H) for 5-15/F Unit C Master Bathroom only), (1260mm(L) x 760mm(W) x 430mm(H) for 16-30/F Unit C Master Bathroom only), (1310mm(L) x 760mm(W) x 430mm(H) for 31-42/F Unit C Master Bathroom only). Electric instant water heater is provided (For Unit B only). Copper water pipes are provided for cold water supply and copper water pipes with thermal insulation are provided for hot water supply. For the appliances provision and brand names, please refer to “Appliances Schedule”.
Bathroom (43/F)(except store room lavatory)
Fitted with natural stone countertop and sanitary wares and fittings include chrome plated wash basin mixer, chrome plated shower set, vitreous china wash basin, vitreous china water closet, chrome plated towel bar, chrome plated paper holder, timber mirror cabinet, lighting fixture, acrylic bathtub (1500mm(L) x 700mm(W) x 370mm(H) for Master Bathroom in Unit A and Unit B only), walk-in shower with tempered glass enclosure (For Bathroom in Unit A and Unit B, for Master Bathroom in Unit B only), chrome plated shower fixtures and ventilation system. Gas water heater is provided (For Unit A only). Copper water pipes are provided for cold water supply and copper water pipes with thermal insulation are provided for hot water supply. For the appliances provision and brand names, please refer to “Appliances Schedule”.
c. Kitchen(5/F to 21/F, 23/F to 42/F)
Wooden cabinet fitted with wooden cabinet door panel, artificial stone surfacing material countertop, stainless steel sink with chrome plated sink mixer, induction hob (For Unit A & B only), gas hob (For Unit A, C & D only), cooker hood, microwave oven, refrigerator and washer / dryer. Electric instant water heater is provided (For Unit B only). Gas water heater is provided (For Unit C & D only). Copper water pipes are provided for cold water supply and copper water pipes with thermal insulation are provided for hot water supply. For the appliances provision and brand names, please refer to “Appliances Schedule”.
Kitchen (43/F) Wooden cabinet fitted with wooden cabinet door panel, artificial surfacing material countertop, stainless steel sink with chrome plated sink mixer, built in barbecue grill and gas hob, cooker hood, microwave oven, oven, steam oven, washer / dryer, coffee machine, fridge-freezer and wine cellar. Gas water heater is provided (For Unit B only). Copper water pipes are provided for cold water supply and copper water pipes with thermal insulation are provided for hot water supply. For the appliances provision and brand names, please refer to “Appliances Schedule”.
d. Bedroom Nil
e. Telephone Telephone outlets are provided for Living Room, Dining Room & Bedrooms. For the number and location of connection points, please refer to the “Schedule of Mechanical & Electrical Provisions” and “Mechanical & Electrical Provision Plan”.
f. Aerials TV & FM outlets for local TV & FM radio programme are provided for Living Room, Dining Room & Bedrooms. For the number and location of connection points, please refer to the “Schedule of Mechanical & Electrical Provisions” and “Mechanical & Electrical Provision Plan”.
g. Electrical Installations Conduits for lighting and power points are provided for all units. Conduits are partly concealed and partly exposed 1. Single phase electricity supply with miniature circuit breaker distribution board (MCB) is provided at 5/F - 42/F Unit A, C & D. Three phases electricity supply with MCB is provided in the following units: 5/F - 42/F Unit B and 43/F. For the number and location of power points and air-conditioning points, please refer to the “Schedule of Mechanical & Electrical Provisions” and “Mechanical & Electrical Provision Plan”.
h. Gas Supply Individual gas meter with gas piping is provided and connected to gas cooker and individual gas water heater in the following units: 5/F - 42/F Unit A, C & D and 43/F.
i. Washing Machine Connection Point
Drain point and water point are provided for the washing machine in Kitchen in the following units: 5/F - 42/F Unit A, B, C & D and 43/F Unit B. The drain point and water point are provided for washing machine in Bathroom of 43/F Unit A. For the location of water inlet and outlet connection points for washing machine, please refer to the “Mechanical & Electrical Provision Plan”.
j. Water Supply Copper water pipes are provided for cold water supply and copper water pipes with thermal insulation are provided for hot water supply. Water pipes are partly concealed and partly exposed 2.Bathroom & Kitchen of 5/F - 42/F Unit AHot water supplied by gas water heater is installed next to the bathroom.Bathroom & Kitchen of 5/F - 42/F Unit C & 43/F Unit BHot water supplied by gas water heater is installed at Kitchen.Bathroom & Kitchen of 5/F - 42/F Unit DHot water supplied by gas water heater is installed under sink of kitchen.Bathroom & Kitchen of 43/F Unit AHot water supplied by gas water heater is installed at bathroom.Bathroom of 5/F - 42/F Unit BHot water supplied by electric instant water heater is installed at bathroom.Kitchen of 5/F - 42/F Unit BHot water supplied by electric instant water heater is installed at kitchen.
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
44
6. APPLIANCES SCHEDULE
For 5/F to 21/F, 23/F to 42/F
Location Appliances Units apply Brand Model No. (if any)
Living Room, Dining Room, Bedroom and Store Room
Split Type Air-conditioner
Bedroom 1 of Unit A Daikin Indoor Unit: FTN50JV18Outdoor Unit: RN50JV1
Microwave Oven Unit A, B, C & D Siemens HF15M564HK
Washer / Dryer Unit A, B, C & D Siemens WK14D320GB
Refrigerator Unit A & C Siemens KI38VA00HK
Refrigerator Unit D Siemens KU15RA65
Freezer Unit D Siemens GU15DA55
Under-counter Refrigerator
Unit B Siemens KU15LA65
Bathroom Exhaust Fan Unit A, C & D Panasonic FV-18NS3H
Unit B Panasonic FV-18NF3H
Gas Water Heater Unit A TGC TRJW161TFL
Electric Instantaneous Water Heater
Unit B Stiebel Eltron HDB-E 21 Si
4. MISCELLANEOUS
a. Lifts 2 Nos. of “Hitachi” lifts (model no.:VFI-II-900-CO150) are installed for this development and serving from G/F to all residential floors.
b. Letter Box Letter boxes finished with stainless steel are installed at the G/F main entrance lobby.
c. Refuse Collection Refuse Room is provided in the common area of each residential floor; Refuse Storage Material Chamber is provided on G/F for collection of refuse by cleaners.
d. Water Meter, Electricity Meter and Gas Meter
Individual gas meters are provided in the following units: 5/F - 42/F Unit A, C & D and 43/F. Separate meters of water and electricity for each individual unit are provided in common meter rooms.
5. SECURITY FACILITIES
a. Security System CCTV system is provided at G/F entrance lobby, 1/F lift lobby, recreational facilities, covered landscape, staircase exit at G/F & roof floor and all lift cars. CCTV system is connecting to the caretaker's counter.
b. Access Control System Visitor panel with “Octopus Card” access reader and security door lock are provided at the Residential Entrance on G/F, 2/F & 3/F. "Octopus Card" access reader are provided in each lift car.
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
45
For 43/F
Location Appliances Units apply Brand Model No. (if any)
Living Room, Dining Room, Bedroom and Store Room
Split Type Air-conditioner
Bedrooms of Unit A & B Daikin Indoor Unit: FTN50JV18Outdoor Unit: RN50JV1
Bathroom / Store Room Lavatory Exhaust Fan Bathrooms of Unit A & B
Panasonic FV-20NS3H
Store Room Lavatory of Unit A & B
Panasonic FV-18NS3H
Gas Water Heater Unit A TGC TRJW221TFQL
The vendor undertakes that if lifts or appliances of the specified brand name or model number are not installed in the development, lifts or appliances of comparable quality will be installed.
Remarks : 1. Other than those parts of the conduits concealed within concrete, the rest of them are exposed. The exposed conduits may be covered or hidden by false ceilings, bulkheads, cabinets, claddings, non-concrete partition walls, designated pipe ducts or other materials.
2. Other than those parts of the water pipes concealed within concrete, the rest of them are exposed. The exposed water pipes may be covered or hidden by false ceilings, bulkheads, cabinets, claddings, non-concrete partition walls, designated pipe ducts or other materials.
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
46
2.室內裝修物料
a. 大堂
大廈入口大堂
(地下)
牆壁
地板
天花板
: 木紋木皮飾面、塑膠料牆布及金屬板至石膏板假天花底。
: 外露地台鋪砌天然石及馬賽克。
: 部份石膏板假天花表面髹上乳膠漆及部份特色木條天花。
住宅升降機大堂 牆壁
地板
天花板
: 木紋木皮飾面、灰鏡、塑膠料牆布及金屬板至石膏板假天花底。
: 外露地台鋪砌天然石。
: 部份石膏板假天花表面髹上乳膠漆及部份木紋木皮飾面假天花。
b. 內牆及天花板 牆壁
天花板
: 部份木紋木皮飾面特色牆及外露牆身部份批盪後再髹上乳膠漆。
: 石膏板假天花表面髹上乳膠漆,其餘部份天花表面髹上乳膠漆。
c. 內部地板 地板 : 複合木地板及木地腳線。
1.外部裝修物料
a. 外牆 基座主要為玻璃幕牆,外牆磚及仿石外牆磚,配鋁飾板。
大廈外牆主要鋪砌外牆磚及鋁飾板,43樓部份外牆為玻璃幕牆。
b. 窗 大廈窗選用氟碳噴塗鋁框連灰面玻璃。
c. 窗台 窗台面鋪砌天然石。
d. 花槽 基座花槽外部份鋪砌天然石及部份鋪砌外牆磚。
e. 陽台或露台 (i) 露台安裝玻璃欄杆。
外牆 : 鋪砌外牆磚及鋁飾板。
地板 : 鋪砌地磚及提供合成木板平台。
天花板 : 裝有鋁飾板。
(ii) 每個露台有覆蓋。
(iii) 沒有陽台。
f. 乾衣設施 沒有。
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
47
d. 浴室 牆壁
地板
天花板
儲物室廁所
: 玻璃及鏡飾面板及飾面牆磚至石膏板假天花底。
: 外露地台鋪砌天然石。
: 石膏板假天花髹上乳膠漆。
: 地台鋪砌地台磚和牆身鋪砌飾面牆磚至天花,天花髹乳膠漆。
(適用於43樓A及B單位)。
e. 廚房 牆壁
地板
天花板
灶台
: 玻璃及木紋木皮飾面板(適用於D單位)及牆磚至石膏板假天花底。
: 複合木地板及木腳線。
: 石膏板假天花髹上乳膠漆。
: 人造石檯面。
3.室內裝置
a. 門
大門 木紋木皮飾面防火實心木門配防盜眼、門鼓、指紋門鎖及門擋。
睡房門 木紋木皮飾面中空木門配門鎖及門擋。
浴室門
(5樓至21樓,23樓至42樓)
(B及C單位)木紋木皮飾面中空木門配門鎖及門擋及(A、C及D單位)金屬框玻璃趟門配門鎖。
浴室門(43樓) 金屬框玻璃趟門配門鎖;
儲物室廁所門木紋飾面中空木門配門鎖及門擋。
廚房門
(5樓至21樓,23樓至42樓)
(C及D單位)金屬框玻璃趟門。
廚房門(43樓) 金屬框玻璃趟門。
22 FITTINGS, FINISHES AND APPLIANCES裝置、裝修物料及設備
48
b. 浴室(5至21樓、23至42樓) 選用天然石檯面配以潔具包括鍍鉻洗手盆水龍頭、鍍鉻花灑套裝、搪瓷洗手盆、搪瓷坐厠、鍍鉻毛巾