Transcript
C.P. l P .O. 560 148, AVENUE PERREAULT VAL D'OR (QUEBEC) J9P 4P5 TEL.: (819) 824-4337
LABORATOIRE 2.14855 TECK010
LTtE
BOURLAMAQUE ASSAY LABORATORIES LTD.
TUN7 DRA GOLD MINES
Shamrock
fCHANTILLONS SAMPLES
RECU DERECEIVED FROM . .Me™. ..J,...Mul lan .
CERTIFICAT D'ANALYSES CERTIFICATE OF ANALYSIS
53100
VAL D'OR, QUE?, ....September 8 , 9 89
ANALYSES -, , ASSAYS ..../....AU.
Sample No.
2401240224032404240524062407
Au oz/ton
TraceNil
0.004TraceTraceTrace
Nil
2. 14055
HEC5IVED
APR l 6 1991
MINING LANDS SECTION
ANALYSTE l A SSAYER
'C.P. l P .O. 660 148, AVENUE PERREAULT VAL D'OR (QUEBEC) J9P 4P5 TEL.: (819) 824-4337 FAX: (8191824-4745
LABORATOIRE D'ANALYSE BOURLAMAQUE
BOURLAMAQUE ASSAY LABORATORIES LTD,
TUNDRA GOLD MINES
Shamrock
ECHANTILLONS Rock SAMPLES ......,....."?.9..?.
SECEIV" FROM .....M en.n. J......
CERTIFICAT D'ANALYSES CERTIFICATE OF ANALYSIS
NO 53187^
VAL D'OR, QUE', . ...,.^^.^.9.^S...^.............. 1 9
TOWNSHIP F007AGESRT F007A6EENTECKTECKTECKTECKTECKTECKTECKTECKTECK7ECK7ECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKTECKi C :--i-.
Mining ActReport of Work 2*. 1^05(Expenditures, Subsection 77(19)) 900
Type Of Work Performed
i,, jj ^fc i^l 1^
Address *.
Performed By
——Yvyv" V^VXK'Mr- y-o*.*^. y——x -^^Name and Address of Author (of Submission) Date When Work was Performed
fiTc\ SK |?\ v*Pay l Mo, l "Vf. roay l Mo. l Ve?
Ail the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. •See Note No. 1 on reverse side
Mining Claim No ol Days Mining Claim No. of Days Mining Claim No. of Day* Mining Claim TJo. o( Days
Mining Claim No. of Days Mining Claim No ol Days Mining~Claim No of Days Mining Claim No ol Days Mining Claim No. of Days Mining Claim No ol Days
Mining Claim No ol Days Mining Claim No of Days Mining Claim No ol Days Mining Claim No. olDays Mining Claim No. of Days Mining Claim No. ol Days
InstructionsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column (below)____________________
Calculation of Expenditure Days Credits Total Expenditures_____
sTotal
Days CreditsTotal Number of Mining Claims Covered
JW this Report of Work
Mining Claims (List in numerical sequence). If space is insufficient, attach schedules with required informationExpend. \- a ;'t *~- Prefix
WAY l 6 1991
Total Number of Days f iotai Number ot days ciaimea
Certification of Beneficial Interest 'See Note r^. t. v,, i nverse sidel hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder._____ ^^^
Certification Verifying Report of Workhereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed
during and/or after its completion and the annexed report Is true.rmed the work or witnessed same
Name and Address of Person Certifying
-\V^.fV "S v
For Office Use Only
Dat/Approved as Recorded ial ManageT, Mining Lands \
878 (89/06)
•Note No. 1Where work e.g. overburden drilling crosses a claim boundary, indicate the number of assessment days performed on each claim.
Where the work performed is greater than the work applied to contiguous claims, specify the claim(s) that the work assignment should be calculated on.
•Note No. 2Examples of beneficial interest are unrecorded transfers, option agreements, memorandum of agreements, etc. with respect to the mining claims.
vA
ro OD
f*
f--'
^s
o* (O
rv v t\J
* w tO o
rw
fv
* OD ro
rv
01 CM
. ^ r
2
- i b V s.
-^
01s
™09
* ®
8
-c^^^^^^
-*01
Vo
•"os
v
M (
C -
Ci
.
\
Oyi^
* ,1 H
i-
-"-
5 O)
OD
\ -t cs \
c \
HO
\
sSX
- ot
Kjl
(oy^
O^
OOB
010)*
- OB
OD
^
Dntejo
Ministry ofNorthern Developmentand Mines
Report of Work Mining Act (Expenditures, Subsection 77(19))
Instructions- Please type or print.- Refer lo Subsection 77(19), the Mining Act lor assessment work
requirements and maximum credits allowed under this Subsection.- Technical Reports, map* and proof of expenditure* In duplicate
should be submitted to Mining Lands Section, Mineral Development and Lands Branch.
Type of Work Performed Mining Division Township or Area
Prospector's tfcence No.Recorded Holder
Address Telephone No. J
Work Performed By
Name and Address of Author (of Submission)
2- 14055^Date When Work was PerformedFrom: ^ i To:O\. CfN. ^ \ \\ \S
Pay l Mo. l VT j Day | Mo.
All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. 'See Note No. 1 on reverse side
Mining Claim No. of Days Mining Claim No of Days Mining Claim No. ol Day*k -*flti
Mining Claim No. ol Days
Mining Claim No of Days Mining Claim No of Days Mining Claim No. of Days Mining Claim No of Days Mining Claim No. of Dayi Mining Claim - No. ol Days
Mining Claim No. ol Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No ol Days Mining Claim No. of Days Mining Claim No of Days
InstructionsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column (below).____________________
Calculation of Expenditure Days Credits Total Expenditures^^^^^
Total Days Credits.
Total Number of Mining Claims Covered by this Report of Work
Mining Claims (List in numerical sequence). If space is insufficient, attach schedules with required informationMining Claim 'Expend. Mining Claim
Prefix
^
Number - a r-r r ~ Prefix
Qfi^iTKVi ~~^^^SS^ ^'io^tThTSSS h^O^\Tu y\ O^3 A '
0^-^^v —
o^VXoV *^\^rt oW^ ~~
1 v ^^
Total Number o! Days Performed
Certification
NumberExpend. Days Cr.
Mining ClaimPrefix Number
^ILlKSMiESOW
Expend. Days Cr.
REAP
Mining ClaimPrefix
CEPRIG
Number
/ED
991
Expend. Days Cr.
AM 1C v.i-1 .1 li nviTotal Number of Days Claimed I TpMi *Mf*tH WV fol *-
SVi,^ IV5? fiof Beneficiaj Interest "See Note Nu. c. u .i levuise side | \ \
1 hereby certify that, at the time the work was performed, the claims covered in this report Date 1 Rpcordji He *r of work were recorded in the current recorded holder's name or held under a beneficial interest *. ^- \ \ f* 1 by the current recorded holder. vKS^'Ov\ Vx\ 1 \ ' Jit L
Certification
CiatfrlBd"aI a "Future Date
Yir Agent (Signature)
\l - —Verifying Report of Work N 3 \ "V^ \J
1 hereby certify that 1 have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true. ^^/x.Name and Address of Person Certifying 1 \ f\ 1
Telephone No. Date cirtlflettByUslgHature)
V^v, 1^0^ i a\ V^SS^ S^~~5RKA* ^ayX^Offi^V i- 'A-VllVv if'—' — —'^ Received Stamb L/^
For Office Use Only f^ 1Total Days
Cr. RecordedDate Recorded Mining Recorder
Date Approved as Recorded Provincial Manager, Mining Lands
31 fi
• t ;"i
PR 11
JflTKE^ | 'VISION '
fin i. 20H-,cVED 1
878 (89/06)
•Note No. 1Where work e.g. overburden drilling crosses a claim boundary, indicate the number of assessment days performed on each claim.Where the work performed is greater than the work applied to contiguous claims, specify the claim(s) that the work assignment should be calculated on.
•Note No. 2 ;VExamples of beneficial interest are unrecorded transfers, option agreements, memorandum of agreements, etc. with respect to the mining claims.
Bernhardt Twp. M.327
/7
KIRKLAND
l ' ~i "~ ~ —— —
899 , LI0494B 3
.L-_ —- ~— * ^^* *^^^fc ^^^^
- 4 'T."" eT lLI0496I2 \
1135908 L982704 l r"~
L ^-^--- — -T" ^-
982 70/ 982702
^——L-——— r- J
2856 6934 ^
289'Kirkland. Lake
9823^7
7 Tlim
1049061
53 8 2 lJ137447 M G 50
V ^^894053 9 l 07
343 M83^ f342832'34 28M
J 340
\\fi* 342855
H R. 7 69 '\L 504 1RL503 '. L C
6 6 3 C•IHI439
6368062973
* ^23737
HR 548
H R'.547 \ 2929
l6\36799 l 636600
S\ 7583 ft \ , ft \
J \ ^____V^ V
H R 7\54 \ 4372 L ft \495739-i \ 495738 '
758,5 7 \ 476233
420 L L. 1895 i___i___\ 1 6710
- f ^ ———f- 1*-
D | A Al u
* 16292
p -*
e
L ! C T p ; .•' i ---! . - . . , , i
L A R D E R L A KM i N ; N
i*C. 'Si f : C''.'
S O A L L
VFT~ SV[ D f. ,. r V '" M 1 7 j M
R A! L ~- A rs
T 1 ; w r v i IMFVX-t- 'H Of-; '
NOTES
s f own f HUE '.i, for siime
claim L.5779 - Mining 9 ighfs to Sec 36 o f f he Mining A ct ' R S.u. '950;
WITHDRAWN F ^OM S TAKING
SURFACE RIGHTS WITHDRAWN FROM S TAKING
SECT/ON ^3/70 ORDER NO. W76/8O
SURFACE AND Mf^fWG RIGHTS WfTHDRAWN
STAK/NG SECT/OW 36/80 O RDER N O.
SURfACf-ANO MINfNC fflC/fTS - WfTHOR/.WfV FftQM
SECT-JQJV —— 36/80 NO W B/QCORDER NO. 0-20/88 OPENS PART W-OB/8G
SURFACE AND MINING R/GHTS WITHDRAWN FROM
STAKING SECTION 36/80 ORDER NO W'9/66 ORDER NO. 0-22'68LOPEN-S PAR! OF W9/66
ORDER NO. 0-U9-90NR OPENS NOV 15/90
p M/^ Lj^Q /^ /Q jy A/f?
ORDER"NO'0-33/as OPENS w-so/e?
MINING PIGHTS WITHDRAWN Fr,OW STAKING SECTION 36/80 ORDER NO. W-22/8S
. ORDEK NO.O-L'7-90 NER OPENS W-L2/89NR
/.
WiTilDRAWN'STAKING SUBJECT TO PENDiHG-RROCF JO
ftAWN FROM-STftKthS NR '
ORDER NO.O-LII/90 OPENS W-L3/89NR
THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER. MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HEREON