Top Banner
20th January 2003 TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe
5

20th January 2003TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe.

Mar 27, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 20th January 2003TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe.

20th January 2003 TTF 2 Review Meeting Schloss Salzau

1

Status of the TTF-2 RF System

M. Ebertfor

MHFp & MHFe

Page 2: 20th January 2003TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe.

20th January 2003 TTF 2 Review Meeting Schloss Salzau

2

Planned RF DistributionACC 6 ACC 5 ACC 4 ACC 3 ACC 2 ACC 1 RF-Gun

Mod 3 (5 MW)

Mod 4 (10 MW)

Mod 5 (5 MW)

Mod 2 (5 MW)Mod 1 (5 MW)

nur für Testzwecke

2 x 3 MW

~ 4 MW

2 MW

> 2 MW

3-dB-Hybrid

Phasenschieber

5 MW, >20°

-Längenausgleich

~1 MW~4 MW

Mod 6 (10 MW)

Reserve, assembly in Spring

´03

Page 3: 20th January 2003TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe.

20th January 2003 TTF 2 Review Meeting Schloss Salzau

3

Temporary RF Distribution(for rf test)

ACC 6

(not installed in Feb 03)

ACC 5 ACC 4 ACC 3Module

1* (passiv)

Test-Superstruktur

(passiv)RF-Gun

Mod 3 (5 MW)

Mod 4 (10 MW)

Mod 5 (5 MW)

Mod 2 (5 MW)Mod 1 (5 MW)

nur für Testzwecke

2 x 2 MW

2 x 2 MW

Page 4: 20th January 2003TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe.

20th January 2003 TTF 2 Review Meeting Schloss Salzau

4

Last Week´s Status

of Waveguid

e Assembly

ACC 5 ACC 4 ACC 3ACC 1* (passiv)

Test-Superstruktur

(passiv)RF-GunACC 6

Page 5: 20th January 2003TTF 2 Review Meeting Schloss Salzau 1 Status of the TTF-2 RF System M. Ebert for MHFp & MHFe.

20th January 2003 TTF 2 Review Meeting Schloss Salzau

5

Status of Klystron / Modulator 4 & 5Klystron 4 (10MW)

•Prototype tube installed•Tested at 10MW, 1.5ms, 10Hz•Stable operation up to 8 MW•Upgrading of RF-Interlock for improved control system interface is under way ( but necessary computers are not ordered yet)

•Work could be finished in 2 months

Klystron 5 (5 MW)•Tested at 120kV, 1.5ms, 1Hz without rf•Upgraded RF-Interlock installedStill to be done:•Full power rf test•Control system communication (necessary computers are not ordered yet)

•Work could be finished in 2 months