BEFORE
Jul 23, 2015
Lowell Project
2,000 SF
$ 168,000
3 month Duration
Original consultant and contractor removed from project. Scope re-evaluated to fit owners needs and budget guidelines. Modifications included valuable energy-efficient sustainable elements.
Washtenaw Project
3,300 SF
$ 290,000
5 month Duration
Increased 1,100 SF to 3,300 SF with added 2nd story. New 2-car garage, 3 new baths, 20’ x 10’ finished basement. Custom cabinetry in kitchen and living area, new granite countertops. New mechanical systems, new windows and extensive masonry repairs.
West 103rd Street
3,000 SF
$ 60,000
2 month Duration
Vinyl windows installed and exterior building scraped, primed and re-painted. New oak floors installed in kitchen/dining area with existing wood floors re-sanded. Gourmet kitchen and 2 new bathrooms with cabinets and entire home re-wired to 200 amp service.
Hollywood Street
2,500 SF
$ 270,000
5 month Duration
This home was taken down to the foundation to build a new modern 2 story framed home with a detached garage. New kitchen, 2 full baths and concrete poured flooring was installed in addition to Hardi-board siding, aluminum windows and TPO roofing system.
West Grace Street
1,600 SF
$ 45,000
2 month Duration
Kitchen and master suite make-over. Moroccan Walnut flooring, espresso stained maple cabinets, granite counter-tops, subway tile backsplash and porcelain tile in bathroom. Upgraded to 200 amp electrical service and various lighting throughout.
West Thomas Street
2,000 SF
$ 180,000
5 month Duration
4-Unit building where owner duplexed his unit with unfinished attic. 2 new bedrooms and 2 new bath were added. All mechanicals replaced-plumbing, electrical and HVAC. Renovated kitchen with cabinetry, tile backsplash, quartz counter tops and new appliances.