2020 Highlands Construction Project Nominations March 7, 2020
2020 Highlands Construction Project Nominations
March 7, 2020
The Construction Project
Nominations/Selection Process
Survey –Determine which project gains the most support to enter detailed planning phase.
• **Using Survey Monkey
• Results published to HOA NabrNetwork
Detailed project planning
• Scope - including drawings and lot plans
• Schedule
• Cost – including final price, funding source(s), affect on dues (if any)
Full HOA Vote
• Approve / Reject Vote based on final plan
• Each household receives 1 vote
If Accepted, Contract Award & Execution
• Finalize contract with vendor
• Obtain necessary permits
• Begin construction
• Develop HOA policies (e.g. key cards, if applicable
Q1 2020 Q2 2020 Q3 2020
**The current survey serves only to inform the Board on which project to
prioritize in terms of detailed planning and funding efforts. The final vote will
simply be a yes/no formal ballot.
(weather / project dependent)
2020 Highland’s Construction Projects Nominations
Project #1 – Multi-Sport Court
Project #2 – Gazebo
Project #3 – Walking Track
Project #4 – Landscaping at Stirling / Muirfield Open Space
Project #5 - Pool
PROJECT #1 – MULTI-SPORT COURT
Project #1Project: Multi-Sport Court
Description: This 50’x150’multi-sport court includes anti-slip tiles. Multi-sport court can be used for basketball, hockey, volleyball, futsal, and tennis.
Cost: $75,000 - $88,000 (does not include the walking track)
HOA Dues: No increase to HOA dues
Maintenance: Minimal maintenance costs
Location: Pavilion open space to the bottom left
Duration: 6-8 weeks for completion
Project #1 (cont.) Approximate location for pool or Multi-Sport Court
PROJECT #2 – GAZEBO
Project #2Project: Gazebo
Description: 12’x12 wooden Gazebo including landscaping around the gazebo, and motion sensor lighting
Cost: $13,000 - $20,000
HOA Dues: No increase to HOA dues
Maintenance: Minimal maintenance costs
Location: Stirling and Muirfield open space (exact location to be determined)
Duration: 4-6 weeks of completion
Gazebo
PROJECT #3 – Walking Track
Project #3
Project: Walking Track
Description: 800 LF x 5’ wide asphalt walking track
Cost: $26,000 - $30,000
HOA Dues: No increase to HOA dues
Maintenance: Minimal maintenance costs
Location: Pavilion open space lower area. Around the outside edge of the property
Duration: 2-4 weeks of completion
PROJECT #4 – Landscaping At Stirling/Muirfield Open Space
Project #4
Project: Landscaping at Stirling/Muirfield Open Space
Description: Furnish and install shade trees (Cleveland Pear or Autumn Maple) boarding the corner edge of the open space
Cost: $5,000 - $12,000
HOA Dues: No Increase
Maintenance: No maintenance costs
Location: Stirling / Muirfield open space
Duration: 1-3 weeks of completion
PROJECT #5 – Pool
Project #5Project: Heated Community Pool & Restroom Facility
Description: 40’x60’ swimming pool – 31/2 – 5 ft deep
Cost: $200,000 - $250,000
HOA Dues: Increase dues. Additional *$15-20/month
*Depends on funding options & Optional Lifeguard – See Chart
Maintenance: Average $960 – $1,800/year
Location: Pavilion open space to the bottom left
Duration: 7-9 weeks for completion
Funding Options:
1) Use existing HOA funds AND obtain a loan to make up deficient funds, or
2) One-time assessment of $915+ per Unit
Security:
-Fence w/ key fob entry system.
-Required phone.
-Possible security cameras.
*Estimates are based on research conducted by the board and property management. Final expenses will be providedfor final approval.
# of Units 164
Assessment
Option
Loan
Option
Annual Dues Increase $30,220 $31,295
Per Unit/month $15 $16
Utilities
Electric $3,000 $3,000
Telephone $720 $720
Water $2,000 $2,000
Total Utilities Expenses $5,720 $5,720
General & Adm Expenses
Loan Payment $0 $1,075
Insurance $2,000 $2,000
Annual Maintenance Expenses $1,000 $1,000
Pool Services
CPO $1,500 $1,500
Lifeguard $18,000 $18,000
Total General & Admin $22,500 $23,575
Total Pool Expenses $28,220 $29,295
Reserve $2,000 $2,000
Total common expenses $30,220 $31,295
Comments
One time assessment - $915 per unit
Loan - $150K, 6.5% Interest Rate, 20 year term
Estimated Annual Expenses
Income
Click Here to take the survey
Thank you!
Please take the survey.
With this survey, you’ll be asked to rank the
improvement options by level of importance or desire. It
is important to note that your survey feedback does not
constitute a vote to proceed or not proceed with any
construction, but rather to inform the Board where
efforts should be focused in order to develop final plans
and cost estimates for a final “yes / no” vote, to be held
at a later date.
The survey will be available through March 31st,