Top Banner
2019 Brake Tests: Initial Analysis Jim Follum September 19, 2019 PNNL-SA-147531
15

2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

Mar 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

2019 Brake Tests:Initial Analysis

Jim Follum

September 19, 2019

PNNL-SA-147531

Page 2: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

2

• BPA has performed system tests over the past decade

• Large disturbances excite system dynamics, providing valuable data

▪ Insertion of Chief Joseph Dynamic Braking Resistor

▪ Probing signal injection modulates flow on the PDCI

Background

Chief Joseph Dynamic Braking Resistor. Image courtesy of BPA.

Page 3: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

3

Test Series A: Calibration Checks on PDCI Probing Signals

Step A0 [16:10] Celilo instrumentation check using +20MW waveform (10 seconds) and -20 MW (10 seconds). Check proper function of PSG using Celilo/Sylmar DC metering.

Step A1 [16:15] Calibration check on MSF-1/5/2/100 for ±20 MW noise probing for a duration of one period (100 seconds). Adjust PSG scaling if needed.

Step A4 [16:30] Apply MSF-0.1/4x for ±20 MW single frequency sine wave for four cycles. (1 period)

Step A5 [16:35] Apply MSF-0.3/4x for ±20 MW single frequency sine wave for four cycles. (1 period)

Step A6 [16:40] Apply MSF-0.7/4x for ±20 MW single frequency sine wave for four cycles. (1 period)

Step A7 [16:45] Apply MSF-1.0/4x for ±20 MW single frequency sine wave for four cycles. (1 period)

Test Series B: Noise Probing

Step B1 [17:10] Measurement of ambient noise conditions

Step B2 [17:30] Apply a +20 MW MSF-1/5/2/100 for a duration of 12 periods (20 minutes).

Test Series C: Chief Joseph brake insertion (Afternoon)

Step C1 [21:14] Apply Chief Joseph braking resistor

Step C2 [21:20] Apply a +20 MW MSF-1/5/2/100 for a duration of 12 periods (20 minutes).

Step C3 [21:44] Apply Chief Joseph braking resistor

Notes:

• (Times are in UTC and reflect the testing plan)

• PSG = Probing Signal Generator

• MSF = Multi-Sine Fitted

• Tests conducted May 7 and August 21, 2019

• Presented results focus on Test Series C

Testing Procedure

Page 4: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

4

Big Eddy – Celilo MW FlowSteps A0-A1: Instrumentation/Calibration Checks

Page 5: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

5

Big Eddy – Celilo MW FlowSteps A4-A7: Single Frequency Sinusoids

Page 6: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

6

Big Eddy – Celilo MW FlowStep B2: Noise Probing

Full Signal

(12 periods)

Zoomed In

Frequency Domain

Page 7: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

7

Derived Frequency at all SubstationsSteps C1 and C3: Brake Insertions

Page 8: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

8

• Archive Walker

▪ Ingests, processes, and exports PMU data

▪ Detects ringdowns

▪ Implements mode meter

• Oscillation Baselining and Analysis Tool (OBAT)

▪ Performs ringdown analysis

▪ Displays mode shape geographically

Tools

Page 9: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

9

Setup

• Input Signals

▪ Linear combinations of voltage angles

▪ Voltage angles from 21 substations in BPA

▪ Voltage angles are used to derive frequency deviations using first-order derivative filter

• Modes

▪ North-South A (NS-A)

➢ Typical frequency ~ 0.25 Hz

➢ Alberta vs System

➢ British Columbia and Pacific Northwest swing with Alberta

▪ North-South B (NS-B)

➢ Typical frequency ~ 0.38 Hz

➢ Alberta vs British Columbia and Northern US vs Southern US

Page 10: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

10

Methods

• Ringdown

▪ Prony analysis

▪ OBAT also includes VARPRO and Matrix Pencil – results should be validated in future work

▪ Results presented for linear combinations and all substations

▪ Consistent results from two brake insertions provide validation

• Mode Meter

▪ Yule-Walker algorithm for ambient data analysis

➢ Not suitable for use during PDCI probing

➢ Care required to include ringdowns

➢ Estimates are only reported during ambient conditions

▪ Input signals and model orders match BPA setup

▪ Results provide validation for ringdown results

Page 11: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

11

May 7 Results

Notes:

• MM = Mode Meter

• Lin Combo = Prony applied to linear combination of signals

• All Sigs = Prony applied to all 21 signals

North-South A North-South B

Page 12: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

12

August 21 Results

Notes:

• MM = Mode Meter

• Lin Combo = Prony applied to linear combination of signals

• All Sigs = Prony applied to all 21 signals

North-South A North-South B

Page 13: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

Typical OBAT Results: Fit and Shape for NS-A and NS-B

Page 14: 2019 Brake Tests: Initial Analysis - 2019 Brake Tests Initial Analysis.pdfOBAT also includes VARPRO and Matrix Pencil –results should be validated in future work Results presented

14

Discussion

Observations

• Mode meter estimates generally agree with ringdown analyses

• As expected, modes were well-damped during tests

• North-South A mode not sufficiently excited by brake insertions for reliable ringdown (Prony) analysis

• Good data quality

Recommended Additional Steps

• Ringdown analysis with VARPRO, Matrix Pencil, etc.

• Apply mode meter algorithms that:

▪ Incorporate probing signals to improve estimates

▪ Handle ringdowns in robust implementation

▪ Estimate mode shape

• Evaluate mode shape using non-parametric methods, e.g., Empirical Transfer Function Estimation (ETFE)

• Include PMUs from a wider area