Top Banner
Gabbroic Intrusives Sediments Planned U/G Development (off-sec�on) L 5150 L 5165 -100 m -50 m Sec�on 1040 Sec�on 1030 Fenelon Gold Habanero Zone Longitudinal (10 m corridor) Looking Northeast October 09, 2018 TSX: WM 0 Metres 5 10 > 10 g/t Au 3-5 g/t Au 5-10 g/t Au Mineralized Drill Intersec�ons Habanero Zone Hole-ID g/t Au uncut (g/t Au cut*) True Width in metres 1-3 g/t Au 0.1-1 g/t Au < 0.1 g/t Au *Assays cut to 140 g/t Au VG Visible Gold (where assays pending) All drill intersecons reported as true width in metres Pre-2018 Drilling 2018 Drilling (assays pending where not coloured) Sec�on 0990 Sec�on 1000 Sec�on 0980 -150 m L 5180 L 5132 Underground Drilling September 2018 FA-17-23 5.42 (5.42) g/t Au 3.10 m FA-17-07 4.36 (4.36) g/t Au 2.76 m FA-17-27 80.38 (20.69) g/t Au 3.30 m FA-97-147 73.97 (73.97) g/t Au 0.34 m FA-17-019 14.32 (14.32) g/t Au 3.87 m FA-17-17 22.17 (22.17) g/t Au 3.15 m FA-17-25 6.54 (6.54) g/t Au 3.77 m FA-17-32 11.30 (11.30) g/t Au 0.50 m 18-0990-010 41.02 (41.02) g/t Au 4.99 m 18-0990-007 122.35 (35.45) g/t Au 2.95 m VG VG VG VG VG Surface Drilling Fall 2018 Underground Drilling Fall 2018 VG VG 18-0990-011 74.90 (57.09) g/t Au 5.21 m 18-0990-013 24.30 (24.30) g/t Au 4.67 m VG 18-0990-017 98.90 (47.45) g/t Au 1.63 m
1

20181009 Fig 2 Habanero Long - wallbridgemining.com 2_Habanero... · trusives ts Planned U/G Development (off-sec on) L 5150 L 5165-100 m-50 m Sec on 1030 Sec on 1040 Fenelon Gold

Oct 13, 2018

Download

Documents

dangtuyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 20181009 Fig 2 Habanero Long - wallbridgemining.com 2_Habanero... · trusives ts Planned U/G Development (off-sec on) L 5150 L 5165-100 m-50 m Sec on 1030 Sec on 1040 Fenelon Gold

Gabbroic IntrusivesSediments

Planned U/G Development(off-sec�on)

L 5150

L 5165

-100 m

-50 m

Sec�

on 1

040

Sec�

on 1

030

Fenelon Gold Habanero Zone

Longitudinal (10 m corridor) Looking NortheastOctober 09, 2018

TSX: WM

0

Metres

5 10

> 10 g/t Au

3-5 g/t Au

5-10 g/t Au

Mineralized Drill Intersec�onsHabanero Zone

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

1-3 g/t Au

0.1-1 g/t Au

< 0.1 g/t Au

*Assays cut to 140 g/t Au

VG Visible Gold (where assays pending)

All drill intersections reported as true width in metres

Pre-2018 Drilling

2018 Drilling(assays pending where not coloured)

Sec�

on 0

990

Sec�

on 1

000

Sec�

on 0

980

-150 m

L 5180

L 5132

Underground DrillingSeptember 2018

FA-17-235.42 (5.42) g/t Au

3.10 m

FA-17-074.36 (4.36) g/t Au

2.76 m

FA-17-2780.38 (20.69) g/t Au

3.30 m

FA-97-14773.97 (73.97) g/t Au

0.34 m

FA-17-01914.32 (14.32) g/t Au

3.87 m

FA-17-1722.17 (22.17) g/t Au

3.15 m

FA-17-256.54 (6.54) g/t Au

3.77 m

FA-17-3211.30 (11.30) g/t Au

0.50 m

18-0990-01041.02 (41.02) g/t Au

4.99 m

18-0990-007122.35 (35.45) g/t Au

2.95 m

VG

VGVG

VG

VG

Surface DrillingFall 2018

Underground DrillingFall 2018

VG

VG

18-0990-01174.90 (57.09) g/t Au

5.21 m

18-0990-01324.30 (24.30) g/t Au

4.67 m

VG

18-0990-01798.90 (47.45) g/t Au

1.63 m