2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 1of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
ClackamasCounty ClackamasCounty 10001 JohnsonCreekBlvd.InterchangeImprovements
JCB/I-205interchange N/A Addlooprampandnorthboundon-ramp;realignsouthboundoff-rampandinstalldualright-turnlanes.
10,417,400$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty ClackamasCounty 10003 HarmonyRoadImprovements LinwoodAve FullerRd AddBikelanesandSidewalkswhereneeded,includingsafetytreatmentsatintersectionsandADAaccessibilityimprovementsasnecessary.
5,315,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 10023 82ndDr.Improvements Hwy212 StrawberryLaneIntersection
Widentoaconsistent4lanecrosssectionandincludebike/pedimprovementandADAaccessibilityimprovementsasnecessary.NotincludingintersectionimprovementsatStrawberryLane.
18,521,712$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty ClackamasCounty 10043 BorlandRdfromTualatintoStaffordRd TualatinCityLimits StaffordRd Addpavedshouldersandturnlanesatmajorintersections. 6,037,840$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 10057 RedlandRoad AbernethyRoad UGB ImproveRedlandRoadtourbanstandards,addingleftturnlanesatmajorintersections,upgradingtwobridgesandcompletingsidewalkgapsonwest/southsidebetweenAbernethyandAnchorWay,northsidebetweenAnchorandLivesay,andbothsidesfromLivesaytotheUGB(OregonCityTSPProjectsD91,W7,W17,W18).
13,091,908$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
ClackamasCounty ClackamasCounty 11491 FlavelDr AlbertaAve Countyboundary AddbikewaystoprovideconnectionbetweenSpringwater/PowerlinetrailandbikefacilitiesonFlavelDrand52ndAveinPortland.
2,561,830$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11517 JenningsAve OatfieldRoad WebsterRoad Widento2-laneurbanminorarterialstandardwithbikewayandpedestrianfacilitiesinfill
14,180,420$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11518 WebsterRd OR224 Gladstone Fillgapsinbikewaysandpedestrianfacilities,improveaccesstoschool,providebike/pedsafetytreatmentsatkeyintersectionsandimproveADAaccessibility.
20,207,630$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11522 97thAve/MatherRd LawnfieldRd SummersLane Addbikeways,pedwaysalongprojectlength,addeastboundleftturnlanesatMatherRd/SummersLn,provideADAaccessibilityimprovementsasnecessary.
4,847,280$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11618 BorlandRdfromStaffordRdtoWestLinnCityLimits
StaffordRd WestLinnCityLimits Addpavedshoulders.TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
10,661,890$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11668 SunriseMulti-usepathPhaseII 122ndAve RockCreekJunction Constructnewmulltiusepathfrom122ndAveto172ndparallelingtheSunriseproject.
6,378,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11670 OR212wideningto5laneboulevard 172nd EastofDamascustowncenter(intersectionwith222ndAve)
WidenHighway212toa5laneboulevardsectionfrom172ndthroughDamascustowncenterincludingintersectionimprovementsatFosterRd,safetyimprovementsatmajorcrossingpointsforbicyclistsandpedestrians,andADAaccessibilityimprovementsasnecessary.
24,500,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty ClackamasCounty 11766 JohnsonCreek/LinwoodAveITSImprovements
JohnsonCreekBlvd/LinewoodAveIntersection
NA AddintelligenttransportationsystemimprovementsattheintersectionofJohnsonCreekBlvdandLinwoodAvetoprovidewarningsandspecialphasingforbicyclistsandpedestrians.IncludeADAaccessibilityimprovementsasnecessary.
1,000,000$ 2028-2040 No TSMO/TDM/TOD Reducefatalandsevereinjurycrashes
ClackamasCounty ClackamasCounty 11768 StrawberryLane/I-205OverpassWidening(TSAP)
CasonDrive 82ndDrive ReplaceexistingStrawberryLaneoverpassoverI-205toprovidesufficientwidthtoincludebicycleandpedestrianfacilitieswithappropriateADAaccessibilityimprovements.
6,000,000$ 2028-2040 No RoadsandBridges
Reducefatalandsevereinjurycrashes
ClackamasCounty ClackamasCounty 11769 RuskRdBike/PedImprovements(TSAP) AldercrestRoad OR224 ProvidebicycleandpedestrianimprovementsonRuskRoadbetweenAldercrestRdandOR224toimprovesafety,fillanimportantsystemgapandprovideADAaccessibilityimprovementsasneeded.
1,000,000$ 2028-2040 No ActiveTransportation
Reducefatalandsevereinjurycrashes
ClackamasCounty ClackamasCounty 11772 ClackamasIndustrialAreaBike/PedImprovements(TSAP)
Intersectionof106thAveandOR212
IntersectionofJenniferRdand122ndAve
Improveintersectionof106thandOR212,andJenniferDriveand122ndAvetofacilitatebikeandpedestriansafetyandprovideADAaccessibilityimprovementsasneeded.Alsoimproveintersectiongeometrytofacilitatetruckaccesstoindustrialpark.
2,000,000$ 2028-2040 No ActiveTransportation
Increaseaccesstoopport.forhist.marg.comm.
ClackamasCounty ClackamasCounty 11774 JohnsonCreekBlvdandBellAveIntersectionSafetyImprovements(TSAP)
JohnsonCreekBlvd/BellAveintersection
NA ImprovedesignoftheintersectionofJohnsonCreekBlvdandBellAvetoimproveintersectionsafetyforbicyclistandpedestriansandimproveADAaccessibility.Nochangeinintersectioncapacity.
1,500,000$ 2028-2040 No ActiveTransportation
Reducefatalandsevereinjurycrashes
Page 2
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 2of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
ClackamasCounty ClackamasCounty 11937 McLoughlinBlvdHCTproject TriMetOrangeLinestationatParkAve.
DowntownOregonCityinthevicinityoftheexistingtransitcenter.
ExtendshighcapacitytransitfromthecurrentOrangeLineendatParkAvenuetodowntownOregonCity.
23,300,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
ClackamasCounty ClackamasCounty 11938 172ndAvenueFrequentTransit Intersectionof172ndAveandOR212
Intersectionof190thAveandFosterRd.
Newbustransitprovidingfrequentserviceon172nd/190thbetweenOR212andFosterRdinMultnomahCo.
23,300,000$ 2028-2040 No Transit Relievefuturecongestion
ClackamasCounty Gladstone 11887 TrolleyTrailBridgePhase2 PortlandAve,Gladstone ClackamasRiverTrail,OregonCity
SecondphaseofconstructionoftheTrolleyTrailBridgeacrosstheClackamasRiverfromGladstonetoOregonCity.
4,538,623$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 10035 UpperFosterRd.Improvements CountyLine 172nd190thConnector Widentwo-laneminorarterialfromthecountylinetothe172nd/190thconnector,toincludecontinuousleftturnlane,sidewalksandbikelanes.ProjectSegmentLength4,500feet.
6,271,700$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs
ClackamasCounty HappyValley 10036 145thAve. ClatsopSt. MonnerRd. Widen145thAvetoincludecontinuousleftturnlane,sidewalkandbikelaneinfill.Trafficsignalorroundaboutwillbeaddedtomitigatemodalconflict.Projectprovidessaferoutebetweenresidentialandrecreationallanduses.
8,300,000$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 10045 ClatsopSt. 132ndAve. 162ndAve. Widenroadto3lanes,withcontinuousleftturnlane,sidewalks,bikelanes,andtrafficsignalstomitigatemultimodalconflicts.Projectimprovesaccesstoindustrialandemploymentcenter;completessegmentofMt.Scott/ScouterMt.Loop.
8,291,400$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 10060 SE132ndAve. ClatsopRd. KingRd. Widenexistingfacilitytothreelanes,accommodatingcontinuousleftturnlane,sidewalksandbikelanes.
4,900,000$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 10061 142ndAve. SunnysideRd. TerritoryDr. Widen142ndAvetoincludecontinuousleftturnlane,sidewalksandbikelanestomitigatemodal/sight-distanceconflictsonminorarterial;createssafeconnectionfromcommercial,multifamilyandsubdivisiondevelopmentstoindustrialsector.
11,027,569$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs
ClackamasCounty HappyValley 10082 Mt.ScottBlvd./KingRd.Improvements HappyValleyCityLimits 145thAve. WidenMt.ScottBlvd.andKingRd.facilitiestothreelanes,withcontinuousleftturnlane,sidewalksandbikelanes.Trafficsignalsorroundaboutswillbeinstalledtomitigatemultimodalconflicts.
22,131,660$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 10538 Sager 162nd Foster Usingexistingalignment,widenandextendruralroadwaytothreelanes,includingcontinuousleftturnlane,bikelanesandsidewalkstoprovidedirectconnecttoemploymentlands.Projectwillsignalizecorridorat172ndAve.
16,795,400$ 2028-2040 No RoadsandBridges
Servenewurbanarea
ClackamasCounty HappyValley 11271 MistyDrive 162ndAve. 177thAve. Constructnew3laneroadwithcontinuousleftturnlane,sidewalks,bikelanes,trafficsignalsandbridgeoverRockCreek.Projectlocationimprovesaccesstogovernmentservices,urbanandemploymentcenters.
29,604,550$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty HappyValley 11508 HubbardRd 122ndAve 132ndAve FillgapsinpedestrianfacilitiesandimproveADAfacilitiesasneeded. 1,753,950$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 11511 StevensRd/StevensWay IdlemanRd CauseyAve Constructsidewalkinfilltocompletesystemgap;constructoptionaltrafficcalmingtominimizemodalconflict.
4,466,050$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty HappyValley 11529 ArmstrongExtension 162ndAve 172ndAve Constructnew,3laneroadwayextensionbetween172ndand190thAve,incorporatingbikelanes,sidewalks,andcontinuousleftturnlane.Projectbisectsindustrialcampusandemploymentcenter.
15,200,900$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs
ClackamasCounty HappyValley 11530 TrogeExtensionWest 162ndAve. 172ndAve Constructnew3laneroadwithcontinuousleftturnlane,sidewalks,bikelanes,trafficsignalsandabridgeoverRockCreek.
24,661,600$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs
ClackamasCounty HappyValley 11669 MiddleFosterRd.Improvements 172nd190thConnector SunnysideRoadExtension
Widentwo-laneminorarterialfromthe172nd/190thconnectortoSunnysideRoadeast,toincludecontinuousleftturnlane,sidewalksandbikelanes.Projectsegmentis8,000feetinlength.
11,055,200$ 2028-2040 No RoadsandBridges
Servenewurbanarea
ClackamasCounty HappyValley 11901 177thAve.ROWAcquisitionandPlanning SagerRd.ExtensionEast RockCreekBlvd. Conductplanningandpreliminaryright-of-wayacquisitionforanew3laneroadway(withsidewalks,bikelanesandcontinuousleftturnlane)fromSagerRd.extensioneasttoRockCreekBlvd.
3,243,300$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
Page 3
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 3of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
ClackamasCounty HappyValley 12042 WestMountScott/ScouterMountainTrailLoop
SpringwaterCorridor Hwy.212 BuildlooptrailfromClatsopstreettoHighway212/ClackamasRiver.ConnectsSpringwaterCorridor,Mt.Talbert,ScoutersMountainNaturePark,andtheClackamasRiver.PartnersincludetheCityofPortlandandCityofHappyValley.
7,085,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty LakeOswego 11087 BryantRdbikelanes/pathway BoonesFerryRd ChildsRd 7,500'longwideningfor6'bikelanes,6'sidewalk/pathway,bothsides.Railroadcrossingreconstruction;retainingwallneededatcrossing.
16,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty LakeOswego 11171 TryonCreekPedBridge(@TryonCovePark) FoothillsPark TryonCovePark 500'long,10'wideasphaltpathwaycompletesaconnectionattheexistingnorthendFoothillspathwaywithtoTryonCoveParkwithapedestrianbridge(perFoothillsDistrictPlan).ConnectstofutureWillametteRiverGreenwayTrail.
3,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty LakeOswego 11172 OR43(StateSt)BikeLanes TerwilligerBlvd McVeyRd 5,500'longwideningforbikelanes,NBandSB.NHS/AASHTO/ODOTstdsapply.ImproveaccessandconnectivitytotheFoothillsarea.
10,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty LakeOswego 11286 TryonCreekBridge(@Hwy43/Terwilliger) 500'northofHwy43/Terwilliger
Hwy43/EAve ReplaceexistingboxculvertunderHwy43withvehicularbridgeoverTryonCreek,addmulti-usepathwayalongcreekandcompletewithbikelanes,sidewalksandturnlanetoTerwilliger.Fullcostofconstructiontobesharedamongagencypartnersand/orenvironmentalactionplans.
10,000,000$ 2028-2040 No RoadsandBridges
Planning/coordinatemulti-jurisdictioninvestments
ClackamasCounty LakeOswego 11396 SouthShorePathway LakeviewBlvd McVeyAve 12,800’long,6’wideseparatedasphaltpathwayonsouthsideofroadway.Retainingwallsandstormwaterimprovementsrequired.
12,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty LakeOswego 11397 OR43Pathway:LOtoWestLinn OakSt ArborDr ImplementthedesignplanforanactivetransportationcorridoralongHwy43consistentwiththeConnectingClackamasPlan.
19,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty LakeOswego 11613 KnausRdPathwaysandBikeLanes BoonesFerryRd CountryClubRd 4,000’long,6’wideseparatedasphaltpathwayand5'widebikelanesonbothsidesofroadway.
9,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty Milwaukie 10098 McLoughlinBlvdSidewalks HarrisonSt UPRR Fillinsidewalkgapsonbothsidesofstreet. 5,700,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty Milwaukie 10100 Group9--DowntownPedestrianImprovements
Downtown Downtown DowntownStreetscapeImprovements=Installsidewalkbulbouts,lighting,andpedestrianamenities.
DowntownParkingSignage=InstallwayfindingandidentificationsignageatMcLoughlinBlvdintersectionsandaroundpublicparkinglots.
DowntownPublicParkingLotImprovements=Upgradeandmaintainoff-streetpublicparkingfacilitieswithimprovedlandscapingandlighting.
13,800,000$ 2028-2040 No ActiveTransportation
Linklandusewithtransportationinvestments
ClackamasCounty Milwaukie 10101 KelloggCreekDamRemovalandOR99EUnderpass
Location-Specific Location-Specific ReplaceOR99EbridgeoverKelloggCreek,removedam,restorehabitat.Constructbike/pedundercrossingbetweendowntownMilwaukieandRiverfrontPark.
10,500,000$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
Page 4
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 4of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
ClackamasCounty Milwaukie 11174 Group3--ImprovedBike/PedConnectionstoSpringwaterTrailnearTacomaStation
VariousLocations VariousLocations 29th/Harvey/40thNeighborhoodGreenway=Designateasa"neighborhoodgreenway"andinstalltraffic-calmingimprovements.
ImprovedConnectionfromSpringwaterTrailtoPendletonSite(Ramps)=ConstructrampstoimproveexistingconnectionofSpringwaterTrailtoPendletonsiteatClatsopSt.(TSAP)
ImprovedConnectionfromSpringwaterTrailtoPendletonSite(WidenedUndercrossing)=WidenexistingundercrossingtoimproveconnectionofSpringwaterTrailtoPendletonsiteatClatsopSt.(TSAP)
ImprovedConnectionfromSpringwaterTrailtoTacomaStation=ConstructstairstoconnectSpringwaterTrailtoTacomastation.(TSAP)
ImprovedConnectionfromSpringwaterTrailtoPendletonSite(Tunnel)=ConstructtunnelunderSpringwaterTrailtoimproveconnectiontoPendletonsiteatClatsopSt.(TSAP)
ImprovedConnectionfromSpringwaterTrailtoMcLoughlinBlvd=ConstructstairsorotherfacilitytoconnectSpringwaterTrailtowestsideofMcLoughlinBlvd.(TSAP)
SpringwaterTrailCompletion=ContributetoregionalprojecttocompleteSpringwaterTrail("SellwoodGap")alongOchocoSt.
Bicycle/PedestrianImprovementstoMainSt-Constructmultiusepathorotherimprovedbike/pedfacilitiesonMainSttoprovidesaferconnectionbetweendowntownandTacomastation.(TSAP).-Phase1Committed=
8,900,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty Milwaukie 11175 PublicParkingStructure Location-specific Location-specific Construct3-to4-storypublicparkingstructurewithretailatgroundfloorforvisitor/employeeparking.
14,700,000$ 2028-2040 No TSMO/TDM/TOD Relievefuturecongestion
ClackamasCounty Milwaukie 11532 LinwoodAveCapacityImprovements(south) MonroeSt HarmonyRd Widentostandardthreelanecrosssection. 10,300,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
ClackamasCounty Milwaukie 11536 DowntownTransitCenterImprovements Location-specific Location-specific Constructnewbuslayoverfacilityoutsideofthedowntowncore. 1,100,000$ 2028-2040 No Transit Relievecurrentcongestion
ClackamasCounty Milwaukie 11538 LinwoodAveCapacityImprovements(north) JohnsonCreekBlvd MonroeSt Widentostandardthreelanecrosssection. 12,800,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
ClackamasCounty Milwaukie 11623 Group11--IntersectionImprovementsinNorthIndustrialArea
OchocoSt HarrisonSt SignageandIntersectionImprovementsatMcLoughlinBlvdandOchocoSt=Establishsignagefortrucksandimproveintersection.(TSAP)
IntersectionImprovementsatMcLoughlinBlvdand17thAve=Prohibitleft-turnmovementfrom17thAvetonorthboundMcLoughlinBlvdandincludeinHwy224&Hwy99ERefinementPlan.
IntersectionImprovementsatMainStandMailwellDr=Upgradeintersectionturningradiitobetteraccommodatefreightmovements.
2,300,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty Milwaukie 11624 LocalStreetImprovementsinTacomaStationArea
Location-specific Location-specific ConstructstreetimprovementsonStubbSt,BetaSt,OchocoSt,HannaHarvesterDr,andMailwellDr.(TSAP)
5,600,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac
ClackamasCounty Milwaukie 11957 LakeRdCapacityImprovements 21stAve OatfieldRd Widentostandardthreelanecrosssection. 6,300,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
ClackamasCounty ODOT 11992 I-205OperationalImprovements ColumbiaRiver I-5 ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-205.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning.
20,000,000$ 2028-2040 No Throughways Increasesystemefficiency
ClackamasCounty ODOT 12020 OR212/224SunriseProjectPhase3 I-205 172ndAve ConstructremainingimprovementsintheSunriseCorridorconsistentwiththeFEIS/ROD
475,000,000$ 2028-2040 No Throughways Relievecurrentcongestion
Page 5
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 5of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
ClackamasCounty OregonCity 10048 HollyLaneBike&PedestrianImprovements RedlandRoad MapleLane Improvetoaminorarterialcross-section,addingsidewalksandbikelanestobothsidesfromRedlandtoSDonovan,replacingthebridgejustsouthofRedlandandaddinganenhancedstreetcrossingatSDonovan.CompletesidewalkandbikelanegapsoneastsideofthestreetbetweenDonovanandMapleLane.(TSPProjectD83,W21,W22,B19,B20,C8)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
17,000,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
ClackamasCounty OregonCity 10120 WashingtonStreetBike&PedestrianImprovements(South)
HomeDepotDrive AbernethyRoad CompletetheBoulevardprojectincludingstormwaterlowimpactdevelopmentdesignimprovements,sidewalks,landscapingandstreetlighting.(TSPW5)
1,900,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
ClackamasCounty OregonCity 10144 Hwy99E&I-205SBInterchangeAccess DunesDrive I-205SBRampTerminus Dualleftturnlaneson99EapproachtoSBI-205ramp,rampwideningtoaccommodateapproach.(CloselyrelatedtoTSPD75,D76butnotactuallytheseprojects)
3,000,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty OregonCity 10147 NewellCreekCanyon/HollyLaneShared-UsePath
Hwy213andRedlandRoad
MapleLaneRoad Addashared-usepathalongthewestsideofthegullybetweentheRedland/LivesayandHolly/DonovanintersectionandthenalongHollyLanebetweenDonovanandMapleLane.WillrequireabridgeoverthegullysouthofRedlandRoad(TSPProjectS12,S13).TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
5,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty OregonCity 10150 BarlowRoadShared-UseTrail AbernethyRoad UGB Addashared-usepathonthewest/southsideofRedlandRoad,alongthenorthsideofthegullyfromtheRedland/LivesaytoHolcomb/OakTreeintersection,andfromHolcombtoAmesStreet.InstallenhancedcrossingsatRedlandRoadandHolcombBlvd(TSPS6,S9,S10,S11,C5,C7)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
4,600,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty OregonCity 11186 WillametteRiverShared-UsePath S2ndStreet UGB Addashared-usepathalongtherailroadgrade.RehabilitateexistingboardwalkbetweenSouth2ndStreetandHedgesStreet(TSPProjectS37)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
6,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty OregonCity 11547 ClairmontDriveExtension BeavercreekRoad HollyLane Constructnew3laneroadway,sidewalks,bikelanes,turnlanestoserveUGBexpansionarea.(TSPD54)
2,000,000$ 2028-2040 No RoadsandBridges
Servenewurbanarea
ClackamasCounty OregonCity 11548 WashingtonStreetBike&PedestrianImprovements(North)
11thStreet 7thStreet Boulevardimprovementsincludingwideningsidewalks,sidewalkinfill,ADAaccessibility,bikelanes,reconfiguretravellanes,addbusstopamenities.(TSPD28&D92plus50%ofD1)
1,600,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
ClackamasCounty OregonCity 11550 HollyLaneExtension(South) ThayerRoad MeyersRoad New3laneroadway,sidewalks,bikelanes,turnlanestoserveUGBexpansionarea.(TSPD58)
4,800,000$ 2028-2040 No RoadsandBridges
Servenewurbanarea
ClackamasCounty OregonCity 11551 SouthEndRoad PartlowRoad UGB Streetimprovementsincludinglanereconfigurations,sidewalks,ADAaccessibility,bikelanes,streetlighting,andtravellanes.(TSPD89,D33,D23,D41,D42)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
7,700,000$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
ClackamasCounty OregonCity 11552 OR99EPedestrianOvercrossing WillametteRiver McLoughlinPromenade ConstructapedestrianandbicyclebridgeoverHighway99E,connectingtheMcLoughlinPromenadetotheWillametteFallsShared-UsePath.(TSP___)
6,500,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty OregonCity 11757 McLoughlinBlvdBike&PedestrianImprovements(ViaductsOnly)
10thStreet 8thStreet Replacementoftheviaducts(onefull&onepartialviaduct),includingwidersidewalks&boulevardtreatmentsalongviaducts(PortionofTSPD74&S3)
38,000,000$ 2028-2040 No ActiveTransportation
Keepsystemingoodrepair
ClackamasCounty OregonCity 11891 OR99E&I-205NBInterchangeAccess I-205SBRampTerminus I-205NBRampTerminus Dualleftturnlaneson99EapproachtoNBI-205ramp,rampwideningtoaccomodateapproach,dualleftturnlanesfromoff-rampontoHwy99ESB,signalmodifications.(CloselyrelatedtoTSPD75,D76butnotactuallytheseprojects)
3,000,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
ClackamasCounty SMART 11749 Propertyacquisition WilsonvilleRoad WilsonvilleRoad Obtainpropertytocreateeasiercrosstownturnaroundsforlocalbusservice
8,000,000$ 2028-2040 No Transit Increasesystemefficiency
Page 6
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 6of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
ClackamasCounty SMART 11750 SMARTCentralInformationalCenteratWilsonvilleStation
9699SWBarberSt,Wilsonville,OR97070
9699SWBarberSt,Wilsonville,OR97070
Buildaninformationcenterwithkioskstopurchasebuspassesandgathertransitresources.
4,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
ClackamasCounty SMART 11751 WESExpansion Wilsonville Salem WESserviceexpansionfromWilsonvilletoSalem 15,000,000$ 2028-2040 No Transit Relievecurrentcongestion
ClackamasCounty Wilsonville 11770 WeidemanRoadExtension-West ParkwayAve CanyonCreekRoad Constructnewroadwaywithsidewalksandbufferedbikelanes 4,300,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
ClackamasCounty Wilsonville 11771 WeidemanRoadExtension-East CanyonCreekRoad StaffordRoad Constructnewroadwithsidewalksandbufferedbikelanes 8,800,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
ClackamasCounty Wilsonville 11775 ParkwayAveUrbanUpgrade Target/CostcoEntrance PrinterParkway Widento3lanesectionandaddsidewalksandbufferedbikelanes 5,000,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
ClackamasCounty Wilsonville 11776 PrinterParkwayUrbanUpgrade ParkwayAvenue CanyonCreekRoad Widento3lanesectionandaddsidewalks,bikelanesandmulti-usepath. 3,600,000$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs
ClackamasCounty,MultnomahCountyODOT 11985 I-205MultiUsePath GlenJacksonBridge 82ndDrive(southernterminus)
ImprovecrossingsandaccesstoI-205MUPatParkroseTransitCenter,Glisan,Burnside,Stark,Washington,SpringwaterTrail,JohnsonCreek/Flavel,CrystalSprings,ClackamasTownCenter,andotherlocations,asneeded.
10,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
ClackamasCounty,WashingtonCountyClackamasCounty 10054 65th/Elligsen/StaffordIntersectionRoundabout
65th,Elligsen,StaffordRd.intersections
65th,Elligsen,StaffordRd.intersections
Constructroundabouttoreplaceexistingunsafeintersectiontoimprovesafetyandreducecongestion.
5,846,500$ 2028-2040 No RoadsandBridges
Reducefatalandsevereinjurycrashes
ClackamasCounty,WashingtonCountyClackamasCounty 11939 I-205BusServicefromClackamastoBridgeport
EndoftheTriMetMAXGreenLineatClackamasTownCenter
EndoftheproposedSWCorridorHCTprojectatBridgeport
ProvidebusserviceonorparalleltoI-205connectinghighcapacitytransitwithemploymentcentersfromClackamasTownCenter(endoftheMaxGreenLine)toBridgeport(proposedendofSouthwesthighcapacitytransitproject)
23,300,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty Gresham 10416 HoganCorridorImprovements Stark Burnside Interimcapacityimprovementsandaccesscontrols. 20,346,310$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty Gresham 10417 Hogan:PalmquisttoRuggNewPrincipalArterialConnection
Palmquist RuggRd. Completeprojectdevelopmentandconstructnewprincipalarterialconnectionwithmulti-usepath.
36,152,117$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
MultnomahCounty Gresham 10422 Division:257th/KanetoCityLimits 257thAve. Citylimits Improvetocommunitystreetstandards,includingbikelanes. 4,194,291$ 2028-2040 No ActiveTransportation
Buildcompletestreet
MultnomahCounty Gresham 10424 Wallula/212th:DivisiontoStarkWidening Division Stark Widenroad,addcurb/gutter,sidewalks.AtBurnside,addnorthbound,southbound,leftturnlanes.SignalizeStark.
8,873,911$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10427 Regner:RobertstoSouthernCityLimitsReconstruction
Roberts SouthernCityLimits Bringstominorarterialstandard,addspedestrian,bicyclefacilities,improvesRegner/ButlerintersectionbyaddingNBleft-turnpocketandsignalizingintersection.
31,109,301$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10429 PowellValley:Burnsideto282ndBikeandPedImprovements
Burnside 282nd.Ave. ImprovePowellValleyw.pedandbikefacilities. 15,568,069$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Gresham 10430 Orient:SouthCitylimitstoKaneDrWidening SouthCityLimits KaneDr Upgradestoarterial4lanestandards. 9,567,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10432 Division:WallulatoBurnsideBoulevardImprovements
Birdsdale Wallula Completeboulevarddesignimprovements. 12,928,707$ 2028-2040 No ActiveTransportation
Buildcompletestreet
MultnomahCounty Gresham 10433 Division:KellytoBurnsideBoulevardImprovements
Kelly Burnside Completeboulevarddesignimprovements. 10,982,649$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10434 Burnside:212thtoHoganBoulevard Wallula Hogan CompleteboulevarddesignimprovementsonBurnsidefromWallula/212toHogan.ImproveintersectionofBurnsideatDivisionbyaddingeastboundRTandsignal,andalsoimprovetheintersectionofBurnsideandHogan.
34,595,974$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10447 162nd:GlisantoHalseyWidening&Bike/PedImprovements
Glisan Halsey Reconstruct,widento5lanes,plusEBRTatGlisan. 8,413,967$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10461 Towle:ButlertoBinfordLakeImprovements Butler BinfordLake Constructsidewalks,bikelanesandintersectionimprovements. 3,510,850$ 2028-2040 No ActiveTransportation
Buildcompletestreet
MultnomahCounty Gresham 10493 181st:I-84toSandyWidening Sandy I-84 Addsouthboundauxlane&widenRRovercrossing. 1,000,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
MultnomahCounty Gresham 10497 181st:atStarkandSandyIntersections Sandy Stark AtSandy:Northboundrightturn,2ndwestboundleftturn.Overlapeastboundrightturn.AtStark,add2ndleftturnlaneoneastandwestlegs.
2,003,107$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
Page 7
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 7of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
MultnomahCounty Gresham 10527 Hogan:PowelltoPalmquistWidening Powell Palmquist Improvetoarterialstandards. 13,228,630$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty Gresham 10541 182nd:GiesetoCheldelin Giese Cheldelin Improve182ndtocollectorstandards. 12,540,944$ 2028-2040 No RoadsandBridges
Servenewurbanarea
MultnomahCounty Gresham 11098 RockwoodTC181stLRTStationEnhancements
181stLRTStation LocalstreetstoLRTstation
Improvesidewalks,lighting,crossings,busshelters,benchesat181stLRTstation,onStarkSt.andotherintersectingstreets.
9,481,551$ 2028-2040 No ActiveTransportation
Increasesystemefficiency
MultnomahCounty Gresham 11252 Halsey:162ndto181stACMandTransitSignalPriority
162nd 181st Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.
5,208,700$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
MultnomahCounty Gresham 11253 Stark:162ndto190thACMSignalUpgrades 162nd 190th Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.
3,826,800$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
MultnomahCounty Gresham 11256 Division:BirdsdaletoUS26AdaptiveSigns+TransitPriority
Birdsdale US26 IncludestheACMwithbothadaptivesignaltimingandtransitprioritytreatment.
2,232,300$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
MultnomahCounty Gresham 11603 Hogan:PowelltoDivision Powell Division BuildoutofHogantomajorarterialcross-section. 26,575,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty MultnomahCounty 10386 GlisanSt.Multi-modalImprovements 202ndAve./Gresham-FairviewTrail
207thAve./SalishPondsNaturalArea
ReconstructGlisanStreettoprovidemultimodalconnectionbetweenGresham-FairviewTrailandSalishPondsNaturalArea.Includebikelanes,sidewalks,twotravellanesineachdirection,andon-streetparking.4lanes.Designgreen-streettreatmentfordrainageimprovements,includingFairviewCreekculvertreplacement.SouthsideofGlisanStisinGresham,northisCityofFairview.
12,224,500$ 2028-2040 No RoadsandBridges
Buildcompletestreet
MultnomahCounty MultnomahCounty 10391 ReconstructHistoricColumbiaRiverHwy. 244thAve. HalseySt. ReconstructHistoricColumbiaRiverHwyandNE244thAvetominorarterialstandardswith2travellanes,centerturnlane/median,bicyclelanesandsidewalk.ReconstructionofrailroadbridgeonHCRHisnotincludedinthisproject.
6,538,513$ 2028-2040 No ActiveTransportation
Increasesystemefficiency
MultnomahCounty MultnomahCounty 10395 ReplaceRRovercrossingatHistoricColumbiaRiverHwy
Halfmileeastof244thAve.
Halfmileeastof244thAve.
Reconstructrailroadbridgetoaccommodatewidertravellanes,sidewalksandbikelanes.
7,441,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty MultnomahCounty 10401 ReconstructMarineDr. Interlachen I-84 ReconstructMarineDrivebetweenIntelachenandthefrontageroadsinTroutdale.
14,882,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty MultnomahCounty 10407 Fishpassageculvertreplacement FairviewandArataCreeks FairviewandArataCreeks
Replace5culvertswithfishfriendlystructuresallowingforpassagetofederallyendangeredspecies.Culvertlocations:223rd/Fairview,Sandy/Fairview,Arata/244th,ArataCreek/Halsey,Fairview/Glisan
1,606,193$ 2028-2040 No RoadsandBridges
Keepsystemingoodrepair
MultnomahCounty MultnomahCounty 11297 NE207thAve.:ArterialCorridorManagement(ACM)
Sandy Glisan Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.
1,647,650$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
MultnomahCounty MultnomahCounty 11299 257th/KaneDr.:ArterialCorridorManagement(ACM)w/AdaptiveSignalTiming
I-84 OrientDr. Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.
2,976,400$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
MultnomahCounty MultnomahCounty 11375 StarkStreetBridge StarkStreetBridgeatSandyRiver
RepairandupdateStarkStreetBridge. 15,945,000$ 2028-2040 No RoadsandBridges
Keepsystemingoodrepair
Page 8
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 8of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
MultnomahCounty MultnomahCounty 11376 EarthquakeReadyBurnsideBridgePhase2 WillametteRiver WillametteRiver ERBBDesignandROWPhase 105,000,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty MultnomahCounty 11599 ATPProjectImplementation EastMultnomahCounty EastMultnomahCounty ImplementationofrecommendationsfromATP 21,260,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
MultnomahCounty MultnomahCounty 11600 MarineDriveat223rd MarineDriveat223rd MarineDriveat223rd Widentoaccommodatefreighttrafficandprovidebike/pedfacilities 10,630,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac
MultnomahCounty MultnomahCounty 11688 SandytoSpringwaterPathPlanning SpringwaterCorridor 40-mileloop SandytoSpringwaterPath:masterplan 1,594,500$ 2028-2040 No ActiveTransportation
Planning/coordinatemulti-jurisdictioninvestments
MultnomahCounty MultnomahCounty 12018 TDMandTSMOinEastMultnomahCounty EastMultnomahCounty EastMultnomahCounty CarandVanpoolincentives,TMAs,Shuttles,supportprograms,andtargetedoutreachtoreducesingleoccupantvehicletravel
2,258,875$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone
MultnomahCounty ODOT 11583 I-5Northbound:LowerBoonesFerrytoCarmanAuxiliaryLaneExtension
LowerBoonesFerryRd.Interchange
CarmanDr.Interchange ExtendexistingauxiliarylanebetweentheLowerBoonesFerryRoadinterchangeandtheCarmanDriveinterchange.
22,500,000$ 2028-2040 No Throughways Increasesystemefficiency
MultnomahCounty ODOT 11974 I-405OperationalImprovements FremontBridge I-5 ConstructoperationalimprovementstoaddressbottlenecksandimprovesafetyonI-405.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysis,andrefinementplanning
50,000,000$ 2028-2040 No Throughways Increasesystemefficiency
MultnomahCounty ODOT 11983 I-5Multi-UsePath HaydenIslandDrive VictoryBlvd ConstructimprovementstotheI-5MUPinJantzenBeachtobringpathuptocurrentstandards,improvesafety,andimproveaccesstotheI-5ColumbiaRiverBridge.Improveped.crossingsatTomahawkIslandDriveandHaydenIslandDrive.
10,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty ODOT 11993 I-84OperationalImprovements I-5 Troutdale ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-84.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning
20,000,000$ 2028-2040 No Throughways Increasesystemefficiency
MultnomahCounty PortofPortland 10364 PDXLightRailStation/TrackRealignment PDXTerminalArea PDXTerminalArea Realignlightrailtrackintoterminalbuildingtoaccommodateairlinegateexpansions.
17,359,534$ 2028-2040 No Transit Linklandusewithtransportationinvestments
MultnomahCounty PortofPortland 11309 CullyBlvd.Gradeseparation Columbia Lombard ConstructroadwayovercrossingatNECullyBlvd.overKentonline. 37,205,000$ 2028-2040 No Freight Increasesystemefficiency
MultnomahCounty PortofPortland 11949 NorthPortlandJunction:Undoingthe"X" UPRRPeninsulaJunction NorthPortlandJunction Eliminatetheat-gradecrossingofUPRRandBNSFtracksatNorthPortlandJunction.
33,598,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac
MultnomahCounty PortofPortland 11951 ColumbiaBoulevardRailOvercrossing ColumbiaBoulevardatPennJunction
ColumbiaBoulevardatPennJunction
GradeseparateColumbiaBlvd.atPennJunctiontoeliminatethreeat-gradecrossings.
28,935,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
MultnomahCounty PortofPortland 11952 ColumbiaRiverRailBridgeImprovements ColumbiaRiverRailBridge
ColumbiaRiverRailBridge
ReplaceExistingswingspanwithliftspanandrelocatepositiontomid-riverchannel.
35,548,800$ 2028-2040 No Freight Increasesystemefficiency
MultnomahCounty PortofPortland 11953 SixmphCurvesRailroadImprovements SteelBridge JustnorthofSteelBridge
RealignthecurvesjustnorthoftheSteelBridgetoimproverailspeedandcapacity.
23,600,000$ 2028-2040 No Freight Increasesystemefficiency
MultnomahCounty PortofPortland 11955 RailroadBridgeandTrackImprovements ColumbiaSloughRailBridge
ColumbiaRiverRailBridge
ImproverailtrackconditionsonapproachestoWillametteRiverandColumbiaRivebridgestoincreaserailroadspeedandcapacity.
10,751,000$ 2028-2040 No Freight Increasesystemefficiency
MultnomahCounty PortofPortland 11956 RivergateColumbiaSloughRailBridge Terminal6 Terminal5 ConstructarailbridgeacrossColumbiaSloughtoproviderailconnectiontoSouthRivergatefromTerminal6.
10,840,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac
MultnomahCounty Portland 10222 FlavelDrRoadwayImprovements SE45th Clatsop FullyimprovestreetfromSE45thtoClatsopStreetwithtravellanes,curbs,swales,sidewalks,andseparatedin-roadwaybicyclefacilitiesfrom52ndtoClatsop.
7,294,088$ 2028-2040 No ActiveTransportation
Buildcompletestreet
MultnomahCounty Portland 10244 KittridgeBridgeSeismicRetrofit NWKittridge/YeonBridge NWKittridge/YeonBridge
Retrofitexistingseismicallyvulnerablebridge(#010)acrossrailroadtrackstoensureemergencyresponseandaccesstopetroleumsupplieslocatedalongtheWillametteRiverintheeventofanearthquake.
15,249,213$ 2028-2040 No Freight Keepsystemingoodrepair
MultnomahCounty Portland 10288 ParkroseConnectivityImprovements,NE 105th 109th SupplementaccessrouteforcommercialpropertiesinParkrosebyimproving109thfromSandytoKillingsworthandKillingsworthfrom109thto105th,servingtruckaccessfunctions,pedestrian,andbikeconnections.
5,000,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
Page 9
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 9of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
MultnomahCounty Portland 10292 BelmontStreetscapeImprovements SE25th SE43rd Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.
5,722,698$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 10293 NEFremontStreetscapeImprovements NE42nd NE52nd Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.
7,446,133$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 10295 OuterMilwaukieStreetscapeImprovements SEYukon SETacoma Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.
5,386,378$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 10308 BoonesFerryRdBikeway SWTerwilliger PortlandCityLimits Designandimplementbicyclefacilities. 7,015,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 10316 HalseyStBridgeSeismicRetrofit NEHalsey/I-84 NEHalsey/I-84 RetrofitexistingseismicallyvulnerablebridgeacrossI-84(#021)toensureemergencyresponseandeconomicrecoveryintheeventofanearthquake.
7,670,501$ 2028-2040 No RoadsandBridges
Keepsystemingoodrepair
MultnomahCounty Portland 10334 11th/13thAveRailOvercrossing NE11thAve&NELombardPl
NE11thAve&NELombardPl
ConstructroadwayovercrossingatNE11th/13thoverKentonline. 35,000,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty Portland 10339 ColumbiaBlvdProtectedBikeway MLKJr.Blvd NLombard Designandimplementaprotectedbikewayormulti-usepath. 6,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 10347 PleasantValleyFosterRdExtension SEJenneRd SEGieseRd. DesignandimplementmultimodalimprovementsbasedonthePleasantValleyImplementationPlanrecommendations.
2,525,400$ 2028-2040 No RoadsandBridges
Servenewurbanarea
MultnomahCounty Portland 10376 ColumbiaBlvdFreightImprovements:Design/Construction
NE60thAve. NE82ndAve. Constructstreetandintersectionmodificationstoimprovefreightreliabilityandaccesstoindustrialproperties.
14,000,000$ 2028-2040 No Freight Increasesystemefficiency
MultnomahCounty Portland 10536 ClatsopStreetExtension SE162ndAve PortlandCityLimits ExtendstreeteastintoPleasantValleybasedonthePleasantValleyImplementationPlan.
4,202,582$ 2028-2040 No RoadsandBridges
Servenewurbanarea
MultnomahCounty Portland 11117 WillbridgeIndustrialAreaRailOvercrossing NWBalboa NWStHelensRd ProvideanalternativecrossingoftheBNSFRailroadtoimproveconnectivityandsafetybetweenUS30andtheindustrialpropertiesservedbyNWFrontAvenueintheWillbridgeareaoftheNWIndustrialDistrict.
23,113,022$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
MultnomahCounty Portland 11323 Sullivan'sGulchTrail,Segment1 EastbankEsplande NE21st Multi-usepathalongSullivan'sGulch.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedtobedeveloped.
40,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 11870 UnionStation,Phase3 UnionStation UnionStation Corebuildingimprovements,operationalimprovements,andrailsideimprovementsforUnionStation.
150,000,000$ 2028-2040 No Transit Keepsystemingoodrepair
MultnomahCounty Portland 11871 Going/GreeleyInterchangeImprovements NGoing/Greeley NGoing/Greeley RedesignGoing/GreeleyinterchangeincludingclimbinglaneonGoingtoimprovetruckmovementbetweenSwanIsland,LowerAlbina,andI-5.
16,750,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac
MultnomahCounty Portland 11872 NFessendenStBridgeReplacement FessendenSt,N(overrailroadcut)
FessendenSt,N(overrailroadcut)
Replaceexistingstructurally-deficient,weight-restrictedbridge(ownedbyBNSF)overrailroadcut.
4,700,000$ 2028-2040 No RoadsandBridges
Keepsystemingoodrepair
MultnomahCounty Portland 11873 NWillametteBlvdBridgeReplacement WillametteBlvd,N(overrailroadcut)
WillametteBlvd,N(overrailroadcut)
Replaceexistingstructurally-deficient,weight-restrictedbridge(ownedbyBNSF)overrailroadcut.
9,750,000$ 2028-2040 No RoadsandBridges
Keepsystemingoodrepair
MultnomahCounty Portland 11874 HaydenIslandBridge MarineDr HaydenIsland DesignandconstructanarterialbridgefromExpoCentertoEastHaydenIsland.Explorefeasibilityofdesignsthatwouldprioritizetransit,bikes,andemergencyvehicleaccess,andnotfacilitatecut-throughtrafficforvehiclesthatdonothaveoriginsordestinationsontheisland.
80,000,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
Page 10
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 10of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
MultnomahCounty Portland 11875 NEArgyleStreetExtension 14th MLK ExtendNEArgyletoprovideamoreconnectedstreetgrid.Thisstreetwillserveasacollector/distributorforindustrialbusinessesandreducetrafficcongestionattheMLK/Columbiaintersection.
11,397,579$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
MultnomahCounty Portland 11876 NMississippiStreetscapeImprovements Fremont Skidmore ConstructstreetscapeimprovementstoenhancetheareaasaPedestrianDistrict.
2,500,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 11878 Sullivan'sGulchTrail,Segment2 21stAve HollywoodTransitCenter
Constructamulti-usetrailforpedestriansandbicycleswithintheBanfield(I-84)Corridorfrom21stAvetotheHollywoodTransitCenter.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedtobedeveloped.
30,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 11879 Sullivan'sGulchTrail,Segment3 HollywoodTransitCenter Broadway Constructamulti-usetrailforpedestriansandbicycleswithintheBanfield(I-84)CorridorfromtheHollywoodTransitCentertoBroadway.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedt
35,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty Portland 11880 CullyBlvdRailOvercrossing NECullyBlvd(overKentonline)
NECullyBlvd(overKentonline)
ConstructroadwayovercrossingatNECullyBlvd.overKentonline. 35,000,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac
MultnomahCounty Portland 11882 SE13thAveStreetscapeImprovements Malden Tacoma Planandimplementstreetscapeandtransportationimprovements,includingcrossingimprovements,toincreaseopportunitiestowalkandenhancethemainstreetcharacter.
2,223,555$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 11318 StreetcarExtension:MLK Broadway Killingsworth Publicoutreach,planning,design,engineering,andconstructionforfuturestreetcarextensionfromLloydDistricttoNEPortland.
65,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 11639 Streetcar:JohnsLanding SWLowell WillamettePark CorridorAlternativesAnalysis,publicoutreach,planning,design,engineering,andconstructionforfuturestreetcarextensionfromPortlandtoJohnsLanding.Potentialfutureconstruction.
80,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 12033 ETC:SEBelmontEnhancedTransitProject CentralCityPortland GatewayTransitCenter Capitalconstructionofregionalenhancedtransitproject. 20,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 12034 ETC:Lombard/CesarChavezEnhancedTransitProject
St.JohnsTownCenter MilwaukieTownCenter Capitalconstructionofregionalenhancedtransitproject.ProjectwillcoordinatewithODOTtoidentifylocationsanddesigntreatments.
50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 12035 ETC:SEPowellBlvdTransitProject CentralCityPortland TBD Constructmulti-modalsafetyandtransitimprovementsbasedontheoutcomesoftheprecedingSEPowellBlvdCorridorsRefinementPlan.ProjectwillcoordinatewithODOTtoidentifylocationsanddesigntreatments.
50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 12036 ETC:ColumbiatoClackamasEnhancedTransitProject
AirportWay FosterRoad Capitalconstructionofregionalenhancedtransitproject,reflectingMultnomahCountyportionofcorridor(connectswithClackamasCounty172ndTransitProject).
20,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
MultnomahCounty TriMet 12050 CentralCityCapacityAnalysis(ProjectDevelopment&PreliminaryEngineering)
CentralCity(West) CentralCity(East) AstudytoanalyzeCentralCitytransitcapacityandidentifypreferredoptionstoaddresstransitbottlenecks,delays,layoverneedsandimprovetransitreliability,traveltimesandregionalmobility.Includeanalysisofapotentialtunneloption.
50,000,000$ 2028-2040 No Transit Relievefuturecongestion
MultnomahCounty,WashingtonCountyODOT 11971 US26(SunsetHighway)OperationalImprovements
I-405 WestMPOBoundary ConstructImprovementstoaddressbottlenecksandimprovesafetyonUS26(SunsetHighway)Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysis,andrefinementplanning
50,000,000$ 2028-2040 No Throughways Increasesystemefficiency
Page 11
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 11of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
Region-wide Metro 11965 AdditionalCorridorInvestmentAreasActivitiesfor2028-2040
Regional Regional TheRTPidentifiesmobilitycorridorsandfuturehighcapacitytransitcapitalinvestmentsneededtosupportthe2040GrowthConcept.Corridorinvestmentareasactivitiesfocusonaligninginvestmentsaroundspecificoutcomestosupportlocalandregionalgoalsinlocationswithmultijurisdictionalinterests.InvestmentareasactivitiesincludecompletingcorridorrefinementplanninganddevelopingmultimodalprojectsinmajortransportationcorridorsidentifiedintheRTPaswellasdevelopingsharedinvestmentstrategiestoalignlocal,regionalandstateinvestmentsineconomicinvestmentareasthatsupporttheregion’sgrowtheconomy.Activitiesincludeongoinginvolvementinlocalandregionaltransitandroadwayprojectconception,funding,anddesign.Metroprovidesassistancetolocaljurisdictionsforthedevelopmentofspecificprojectsaswellascorridor-basedprogramsidentifiedintheRTP.
11,300,000$ 2028-2040 No Other Planning/coordinatemulti-jurisdictioninvestments
Region-wide Metro 11968 AdditionalRegionalMPOActivitiesfor2028-2040
Regional Regional Additionalsystemplanning,topicalplanning,andactivitiesthatMetrofortheperiod2028-2040inordertoremaincertifiedasanmetropolitanplanningorganizationbythefederalgovernmentandbeeligibletoreceiveanddistributefederaldollars
26,800,000$ 2028-2040 No Other Planning/coordinatemulti-jurisdictioninvestments
Region-wide Metro 11979 AdditionalRegionalTODInvestmentsfor2028-2040
2040Centers,stationareasandcorridors
2040Centers,stationareasandcorridors
ThecoreprogramactivityistoprovidefinancialincentivesforTODprojectstoincreasetransitridership,stimulateprivatedevelopmentofmixed-usebuildingsthatwouldotherwisenotproceed,andincreaseaffordablehousingopportunitiesinhighcostandgentrifyingneighborhoodsthroughlandacquisitionandprojectinvestments.
66,950,000$ 2028-2040 No TSMO/TDM/TOD Linklandusewithtransportationinvestments
Region-wide Metro 12011 AdditionalRegionalTravelOptionsActivitiesfor2028-2040
Regional Regional Metroawardsgrantfunding,coordinatesmarketingefforts,andprovidestechnicalassistanceandevaluationtoagenciesandorganizationstoencouragepeopletomakefewerautotrips.RTO-fundedactivitiesincludeworksiteandcollegeinformationprogramsthatmaketransit,bicycling,walkingandridesharingeasiertouse
54,418,000$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone
Region-wide Metro 12014 AdditionalRegionalTSMOProgramInvestmentsfor2028-2040
Regional Regional ImplementandmaintainTransportationsSystemManagementandOperations(TSMO)investmentsusedbymultipleagencies(e.g.,CentralSignalSystem,trafficsignalpriority,datacommunicationsandarchiving)andcoordinateresponsetocrashes.Theregionalprogramalsoincludesstrategyplanning(e.g.,periodicTSMOStrategyupdates),coordinationofactivitiesforTransPortsubcommitteetoTPAC,updatestotheblueprintsforagencysoftwareandhardwaresystems(ITSArchitecture),improvingtravelerinformationwithlive-streamingdataforconnectedvehicleandmobileinformationsystems(TripCheckTravelerInformationPortalEnhancement),andimproving“bigdata”processing(PSUPORTAL)tosupportanalyzingperformancemeasures.
17,773,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
Region-wide Metro 12023 AdditionalRegionalSafeRoutestoSchoolActivitiesfor2028-2040
Regional Regional ThroughtheRegionalTravelOptionsprogram,fundingisallocatedtoschooldistrictsandotherpartnerstoimplementongoingeducationalprogramsinschoolsthatencouragechildrentowalkandbicycletoschool
10,010,000$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone
Region-wide Metro 12026 AdditionalRegionalTSMOCorridorsPriorityInvestmentsfor2028-2040
Regional Regional ThroughtheregionalTSMOprogram,providefundingforoperatorstoworktogethertodeploysafe,integratedcorridormanagementwithadvancedtechnologyinregionalmobilitycorridorsincludingdecisionsupportsystems,real-timetravelerinformationonroutechoiceandestimatedtraveltimethatusesavarietyofdatasensors,softwareandsystems(e.g.,smartmobilityhubs,internetofthings,connectedandautomatedvehicles).Thisalsoincludesdeploymentofinnovativetechnologysystems,automatedcorridormanagement,andotheractivetrafficmanagementstrategies.
17,773,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
Region-wide ODOT 11980 ActiveTrafficManagement(ATM)andConnectedandAutomatedVehicles(CAV)Region-widePhase2
Region-wide Region-wide DeployATMrecommendationsfromtheODOTActiveTrafficManagementStrategy.PerformenhancementstoexistinginfrastructureanddeploynewinfrastructuretosupportCAVapplications.Specificprojectstobedetermined.
10,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
Page 12
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 12of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
Region-wide ODOT 11982 ActiveTransportationCriticalConnectionsRegion-Wide
Region-wide Region-wide ConstructimprovementstoaddressgapsanddeficienciesintheregionalactivetransportationnetworkonODOTfacilities.SpecificprojectstobedeterminedbasedonODOTRegion1ActiveTransportationNeedsInventory.
100,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
Region-wide ODOT 11991 I-5FreightOperationalImprovements ColumbiaRiver SouthMPOBoundary ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-5.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning.
200,000,000$ 2028-2040 No Throughways Increasesystemefficiency
Region-wide TriMet 10920 OperatingCapital:Infrastructure N/A N/A Improveoperations,possiblegradeseparation,bikeaccommodation. 25,000,000$ 2028-2040 No Transit Keepsystemingoodrepair
Region-wide TriMet 10988 Access:Park&RideFacilities Regionwide Regionwide 50-space+/-lots(oradditionstoexistinglots)incommunities.20lotsregion-wide.
20,000,000$ 2028-2040 No Transit Relievecurrentcongestion
Region-wide TriMet 11331 Access:BusAmenities Regionwide Regionwide BusstopandROWimprovementstosupportexpansionoffrequentservicebus
15,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
Region-wide TriMet 11335 OperatingCapital:Equipment N/A N/A Additionalmaintencecoststosupportexistingbussystemincludingongoingbuspurchasesasneededtomaintainandupdatefleet.
241,301,000$ 2028-2040 No Transit Keepsystemingoodrepair
WashingtonCounty Beaverton 11900 AllenBoulevardMultimodalImprovements(MurrayBoulevardtoORHighway217)
MurrayBoulevard ORHighway217 Constructturnlanes,bikelanes,sidewalks,andsignalswhereneeded. 51,200,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Cornelius 10796 HolladayStreetExtension-Central 10thAve GraySt. Constructnewcollector. 3,212,711$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty Cornelius 10797 HolladayStreetExtension-East GraySt. 19thAve. Constructnewcollector. 3,424,538$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty Cornelius 10798 DavisStreetExtension-West 4thAve 7thAve Constructnewcollector. 4,130,629$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty Cornelius 10799 DavisStreetExtension-East 19thAve 29thAve Constructnewcollector. 10,529,421$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty Cornelius 11246 CorneliusCitywideSidewalkInfill Citywide SidewalkinfillonHeatherSt(8thAve-10thAve);4thAve(3FRailroad-Barlow);and26thAve(Holladay-S.CityLimits)
1,558,648$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Cornelius 11251 N.29thAvenue 3FRailroad Baseline Improvetocollectorstandardsincludingsidewalks. 4,501,205$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
WashingtonCounty ForestGrove 10771 HighCapacityTransit:BlueLinewest:OR8extension
Hillsboro ForestGrove ProjectDevelopmentthroughROWacquisition/earlyconstructionforHighCapacityTransitprojectbetweenHillsboroandForestGrove.
30,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
WashingtonCounty ForestGrove 11479 CouncilCreekRegionalTrail:North-SouthSegment
Hillsboro ForestGrove Multi-usetrailfromForestGrovethroughWashingtonCounty,theCityofBanks,connectingtotheBanks-VernoniaStateTrail.
27,100,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Hillsboro 10817 AloclekDrGapCompletion CorneliusPassRd AmberwoodDr CompletemissingsegmentofAloclekDrbetweenCorneliusPassRdandAmberwoodDrasthree-laneroadwithbikelanesandsidewalks
2,126,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 10824 CornellRdTurnLanesandBike/PedImprovements(MaintoArrington)
MainSt ArringtonRd Widenroadwayfromfourtofivelaneswithbike/pedfacilites 9,830,624$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 10827 QuatamaRdTurnLanesandBike/PedGaps CorneliusPassRd 205thAve Widenroadwaytoaddcenterturnlaneandcompletemissingsidewalksandbikelanes
1,913,400$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 10830 JohnsonStTurnLanesandBike/PedImprovements
CenturyBlvd CorneliusPassRd Widenroadwaytoaddcenterturnlane,bikelanes,andsidewalks 8,504,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 10832 QuatamaRdImprovementsand69thAveExtension
CorneliusPassRd 69thAve WidenQuatamafromCorneliusPassRdto69thAveandconstructmissingsegmentof69thAvefromQuatamasouthasthree-laneroadwaywithbike/pedfacilities;upgradebridgeoverRockCreek
1,913,400$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 11090 CornellRdBikeLanes ArringtonRd 25thAve Widenroadwaytoaddbikelanes 5,038,620$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11141 BrogdenStExtensionandBike/PedImprovements
28thAve BrookwoodPkwy Extendroadwayfrom43rdAvetoBrookwood;widentoprovidebike/pedfacilitiesfrom28thtoBrookwood;newtrafficsignalatBrookwood
3,189,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
Page 13
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 13of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
WashingtonCounty Hillsboro 11145 AirportRdBike/PedGaps BrookwoodPkwy 48thAve Completemissingbikelanesandsidewalk 1,594,500$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11149 HelvetiaRdTurnLanesandBike/PedImprovements
SchaafRd WestUnionRd Widenroadwaytothreelanes(onethroughlaneineachdirectionandcenterturnlane)withbike/pedfacilities
4,252,000$ 2028-2040 No RoadsandBridges
Servenewurbanarea
WashingtonCounty Hillsboro 11150 JacobsonRdTurnLanesandBike/PedImprovements
HelvetiaRd CenturyBlvd Widenroadwayfromtwotothreelanes(addcenterturnlane);completebike/pedfacilities;reconfigureintersectionwithHelvetiaRdtoright-in,right-outonly
2,657,500$ 2028-2040 No RoadsandBridges
Increasefreightaccesstoindust&intermodalfac
WashingtonCounty Hillsboro 11151 BentleyStBike/PedImprovements 32ndAve BrookwoodAve Constructsidewalksandbufferedbikelanes 3,189,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11155 DrakeStTurnLanesandBike/PedImprovements(East)
ImlayAve 67thAve Constructcenterturnlaneandaddbike/pedfacilities 1,913,400$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 11156 DrakeStTurnLanesandBike/PedImprovements(West)
BrookwoodAve ImlayAve Constructcenterturnlaneandaddbike/pedfacilities 1,594,500$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Hillsboro 11157 ImlayAveBike/PedImprovements TVHwy LoisSt Completesidewalkgapsandconstructbikelanes 2,126,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11158 206thAveBike/PedImprovements BaselineRd RockRd Completesidewalkgapsandconstructbikelanes 3,189,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11159 AlexanderStBike/PedImprovements BrookwoodAve 56thCt Completebikelaneandsidewalkgaps 1,063,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11160 WitchHazelRdBike/PedImprovements RiverRd BrookwoodAve Completebikelaneandsidewalkgaps 1,063,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11161 RoodBridgeRdBike/PedImprovements RiverRd PipersDr(UGB) Constructsidewalksandbikelanes 2,657,500$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11162 24thAveBike/PedImprovements MainSt MapleSt Widenroadwaytoprovidebike/pedfacilitiesincludingbridgeoverTurnerCreek
4,252,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11164 17thAveBike/PedImprovements CornellRd SunriseLn Widenroadwaytoprovidebike/pedfacilities 1,063,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11278 AmberGlen/NorthHillsboroStreetcar,Phase1
QuatamaMAXStation Proposed"EvergreenTransitCenter"(atEvergreen&194th)
ConstructhighcapacitytransitfromQuatamaMAXstationthroughAmberGlen/TanasbourneRegionalCenter;providelocalmatchfundingtoleveragefederalfundsforstreetcarextensionthroughAmberglen;continueworkaspartoftheHCTsystemexpansionpolicy;nextphasecorridorasidentifiedintheHCTsystemplanandadoptedbyJPACTandMetroCouncil;alsoseeproject11573
25,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
WashingtonCounty Hillsboro 11279 US26&185thAveInterchangeRefinementStudyandImplementation
N/A N/A Conductinterchangerefinementstudyandimplementation 26,575,000$ 2028-2040 No Throughways Relievefuturecongestion
WashingtonCounty Hillsboro 11280 RonlerDrExtension CorneliusPassRd 215thAve Constructthree-laneextensionwithbike/pedfacilities 1,000,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty Hillsboro 11282 MinterBridgeRdBike/PedImprovements RiverRd MorganRd(UGB) Completebike/pedfacilities 2,126,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Hillsboro 11341 WestUnionRdWideningandImprovements HelvetiaRd CorneliusPassRd WidentothreelanesfromHelvetiatoCentury,andfivelanesfromCenturytoCorneliusPass,includingbike/pedfacilitiesalongentirelength
12,000,000$ 2028-2040 No RoadsandBridges
Servenewurbanarea
WashingtonCounty Hillsboro 11389 ImbrieDrWidening EvergreenPkwy CorneliusPassRd Widenfromthree(onewestbound,oneeastbound,onecenterturnlane)tofourlanes(onewestbound,twoeastbound,onecenterturnlane)throughadditionofoneeastboundlane
2,657,500$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty Hillsboro 11392 TVHwy&RiverRdIntersectionImprovements
N/A N/A Constructeastboundright-turnlaneandsecondnorthboundleft-turnlane;modifytrafficsignal;improvebikeandpedcrossingofTVHwy
2,126,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
Page 14
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 14of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
WashingtonCounty Hillsboro 11573 AmberGlen/NorthHillsboroStreetcar,Phase2
Proposed"EvergreenTransitCenter"atEvergreen&194th
HillsboroStaduim,IntelRonlerAcres,OrencoStation
ExtendhighcapacitytransitfromAmberGlen/TanasbourneRegionalCentertoHillsborostadium,IntelRonlerAcres,andOrencoStation;providelocalmatchfundingtoleveragefederalfundsforLRTextension;continueworkaspartoftheHCTsystemexpansionpolicy;nextphasecorridorasidentifiedintheHCTsystemplanandadoptedbyJPACTandMetroCouncil;alsoseeproject11278
50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
WashingtonCounty Hillsboro 11912 SunsetHwyHighCapacityTransit SunsetTransitCenter FairComplex/HillsboroAirportMAXStation
StudyandimplementationofhighcapacitytransitfromSunsetTransitCentertoFairComplex/HillsboroAirportMAXStationviaUS26
50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
WashingtonCounty KingCity 11946 FisherRd.Extension RoyRogersRd. KingLearWy. Constructnew2laneCollectorRdwithsidewalksbikelanes,streetlightingandtrafficsignalsatkeyintersections
21,200,000$ 2028-2040 No RoadsandBridges
Servenewurbanarea
WashingtonCounty ODOT 11302 I-5/OR217InterchangePhase2 I-5/OR217Interchange N/A I-5/OR217InterchangePhase2-southboundOR217tosouthboundI-5entranceramp;southboundI-5exittoKruseWayloopramp.
53,000,000$ 2028-2040 No Throughways Relievecurrentcongestion
WashingtonCounty ODOT 11582 OR217CapacityImprovements US26(SunsetHwy) I-5 Constructasa6-lanefreeway,adding3rdthroughlaneineachdirection,andcompleteinterchangereconstructionwithrampandovercrossingimprovements
398,500,000$ 2028-2040 No Throughways Relievecurrentcongestion
WashingtonCounty ODOT 11976 OR217NorthboundAuxiliaryLaneExtensionSchollsFerrytoAllen/Denney
SchollsFerryRoad Allen/DenneyInterchange
ExtendOR217auxiliarylanefromSchollsFerrytoAllen/Denneyinterchangebyfillingintheexistingauxiliarylaneandmodifyingrelatedrampconnections
50,000,000$ 2028-2040 No Throughways Increasesystemefficiency
WashingtonCounty ODOT 11978 OR217Interchange,Safety,andOperationalImprovements
US26(SunsetHighway) I-5 DesignandconstructimprovementstoOR217betweenUS26andAllen/Denneyinterchangetoimprovesafety,reliabilityandmobility
75,000,000$ 2028-2040 No Throughways Increasesystemefficiency
WashingtonCounty Sherwood 10684 CedarBrookWay 99W ElwertRd ConstructcollectorstatusroadbetweenSWElwertRd@intersectionwithSWHandleyStandSWPacificHwy(OR99W).
6,000,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty Sherwood 10689 OldTownArterials-Collectors SW3rdSt SWWillametteSt CompletearterialsandcollectorstreetswithinoldtownoverlayperCityTSP.
5,800,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Sherwood 10698 SunsetBlvd. SWAldergroveAve SWEucalyptusLane Reconstructroadto3lanearterialstandardsinsectionsnotalreadytoTSPsectionforarterial.FixverticalcrestsightdistanceissueatPineStintersection.PossiblesignalorroundaboutatSunset/Main/LaddHillandcompletestreetstowestofSWMainSt.
8,300,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Sherwood 10700 ArrowStreetImprovements SWLangerFarmsParkway
SWGerdaLane Construct3-lanecollectorstreettoTSPstandardsbetweenSWLangerFarmsParkwayandSWGerdaLane.
8,200,000$ 2028-2040 No RoadsandBridges
Linklandusewithtransportationinvestments
WashingtonCounty Sherwood 10703 PedestrianLinkstoSchools&TownCenter Various various Pedestrianupgrades,newsidewalks,sidewalkinfillat:Sunset,Division,Edy,Elwert,Meinecke,Pine,Roy,LaddHill,Timbrel,Washington,Willamette,OldPacificHwy.
7,300,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Sherwood 10707 OR99WRegionalTrailCrossing SWPacificHwy.(westside)
SWPacificHwy.(eastside)
ConstructsseparatedgradecrossingforCedarCreekTrail(regionaltrailsystem)underSWPacificHwy(OR99W).The$15.9Mcostestimateincludesraisinghighwaygradestoprovideforopenundercrossingcoupledwithstreamenhancementstocreateamoreopenandnaturalundercrossingw/adjacentnaturalstream.Thiswillimprovedownstreamconveyanceduringlargestormevents,aswellasconnectwildlifecorridorscurrentlybisectedbySWPacificHighway.
15,900,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Sherwood 11614 PineStPhase2 SWDivisionSt SWSunsetBlvd ReconstructSWPineSttothe2-lanecollectorstandardperCityTSP.Existingstreetis2-lanesw/non-ADAcompliantsidewalksandthisprojectwillimprovestormdrainageandaddressADAissues,butnotaddanycapacityincreasingfeatures(i.e.notravelorturnlanesadded,nobikelanes,nomajorsidewalkadditions).
2,100,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty Sherwood 11660 Century-LangerIntersectionImprovements CenturyDr LangerDr Improveintersectioncapacityandsafety.PossibleroundaboutatCenturyDr.RestrictLangermovementstoright-in/right-out,possibleEBleft-in.InTSP.CanbecombinedwithRTP10691.
2,100,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty THPRD 10809 BronsonCreekTrail(Community) BronsonCreekParkCornellRd.(THPRD)
NWLaidlawRd.atNWSaltzmanRd.
Todesignandconstructacommunitytrailsegmentinagreenwaycorridor,10'widepaved.
8,682,500$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
Page 15
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 15of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
WashingtonCounty THPRD 11406 FannoCreekTrailBridge(Regional) northsideofHallBlvd. southsideofHallBlvd. Wouldavoidout-of-directionbike/pedtripsonamajorregionaltrailthatisotherwisecompleteinthisarea.
5,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty THPRD 11941 TurftoSurfRegionalTrail SW194thAve/T.V.Hwy BeavertonCreekTrailatSWEricksonAve.
Designandconstructaregionalmulti-usetrail,12'-14'wide 12,500,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty THPRD 11942 WaterhouseCommunityTrailConnection,Segment9
THPRDboundary SWSpringvilleRd.justwestofSickleTerr.
Designandconstructa10'widecommunitymulti-usetrailtoconnectNorthBethanyresidentstoWestsideandRockCreekRegionalTrails.
2,325,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty THPRD 11944 SouthCooperLoopTrail SWGrabhornRd.justnorthofSchollsFerryRd.
SW175thAve Designandconstructa12'wideregionalmulti-usetrail. 13,200,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Tigard 10747 OR217Bike/PedOvercrossing-CascadePlaza
NimbusorCascade SchollsFerry Newpedestrianandbicyclebridgerunningeast/westoverHwy217fromNimbusorCascadetoSchollsFerryRoad(eastof217)onthenorthsideofWashingtonSquareRegionalCenter.
3,700,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Tigard 10756 72ndAve.Improvements-HunzikertoBonita HunzikerRoad BonitaRoad Widento3laneswithbikewaysandsidewalks 12,800,000$ 2028-2040 No ActiveTransportation
Increaseaccesstojobs
WashingtonCounty Tigard 10757 72ndAve.Improvements-BonitatoDurham BonitaRoad DurhamRoad Widento3laneswithbikewaysandsidewalks 6,400,000$ 2028-2040 No ActiveTransportation
Increaseaccesstojobs
WashingtonCounty Tigard 10768 DurhamRd/UpperBoonesFerryIntersectionImprovements
DurhamRoad I-5 ConstructintersectionimprovementsatDurhamRoadandUpperBoonesFerryRoadtoprovidedualsouthboundright-turns,dualeastboundleft-turns,eastboundright-turns,existingandimprovesignaltiming.InstallbikelanesonbothsidesofthestreetsfromjustsouthofDurhamRdtojustnorthofDurhamRd.
5,000,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
WashingtonCounty Tigard 10770 OR99WIntersectionImprovements(PE) 64thAve. DurhamRd. Projectdevelopmentphase:Provideincreasedcapacityatpriorityintersections,includingbusqueuebypasslanesinsomelocations,improvedsidewalks,prioritypedestriancrossings,andanaccessmanagementplan,whileretainingexisting4/5-lanefacilityfromI-5toDurhamRoad.See2035TigardTSPProject#66forspecificimprovements.
5,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
WashingtonCounty Tigard 11225 DowntownCirculationPlanImplementation DowntownTigard BetweenHwy.99W,Hall&FannoCreek
AcquireROW,constructstreetsandstreetscapeimprovementsindowntownTigard
4,300,000$ 2028-2040 No RoadsandBridges
Increaseaccesstoopport.forhist.marg.comm.
WashingtonCounty Tigard 11666 OR99WIntersectionImprovements(CON) 64thAve. DurhamRd. Constructionphase:Provideincreasedcapacityatpriorityintersections,includingbusqueuebypasslanesinsomelocations,improvedsidewalks,prioritypedestriancrossings,andanaccessmanagementplan,whileretainingexisting4/5-lanefacilityfromI-5toDurhamRoad.See2035TigardTSPProject#66forspecificimprovements.
25,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
WashingtonCounty Tigard 12015 OR217Ped/BikeOvercrossing-NDakotatoPfaffle
NorthDakotaat217 HallBlvdnearoratPfaffle
Pfaffle-NorthDakotaeast-westconnectionwithHwy217ped/bikeover-crossingtoprovideaneighborhoodroute
5,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Tigard 12041 OR217Ped/BikeOvercrossing-WashSqRegionalCenter
LocustSt CascadeAve,NimbusAve,orFannoCreekTrail
ProvidePed/bikebridgeoverHwy217fromWashingtonSquareRegionalCenterfromLocustSttoCascadeAve,NimbusAve,orFannoCreekRegionalTrail
5,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty TriMet 10900 HCT:WESDoubleTrackingandFrequencyUpgrades
BeavertonTransitCenter Wilsonville CommuterRailfrequencyandspanofserviceimprovements.WillrequirecapitalimprovementsincludingdoubletrackingandDMUs.
400,000,000$ 2028-2040 No Transit Relievefuturecongestion
WashingtonCounty Tualatin 10712 BoonesFerry Martinazzi LowerBoonesFerry Reconstruction/widento5-lanesfromMartinazzitoLowerBoonesFerryRoad,includeswideningbridgeoverTualatinRiver.
18,940,534$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
WashingtonCounty Tualatin 10717 CipoleStreetReconstruction OR99W Tualatin-Sherwood Reconstruct/widento3lanesfrom99WtoTualatin-SherwoodRoadandincludeshared-usepathfortheIceAgeTonquinTrail,includessignalatCipoleandHerman.TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.
21,291,890$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs
WashingtonCounty Tualatin 10739 Nyberg Tualatin-Sherwood 65th AddbikelanesonNybergfromI-5to65th. 7,441,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
Page 16
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 16of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
WashingtonCounty Tualatin 10742 108thAve. TualatinRiverGreenwayTrail-SouthBankoftheTualatinRiver
TualatinRiverGreenwayTrail-NorthBankoftheTualatinRiver
PedestrianbridgeoverTualatinRiverandconnectingpaths. 2,587,342$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Tualatin 10743 OR99WSidewalks SouthCityLimits NorthCityLimits InstallsidewalksfromCipoletoTualatinRiver. 11,055,200$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Tualatin 11420 Nyberg I-5on-ramp I-5on-ramp Addanadditionalon-ramplaneforvehiclestravelingwestboundonSWNybergStreettoI-5northbound(northeastquadrantoftheNybergInterchange).Reducethepedestrianislandandimproveilluminationtoenhancesafety.
1,138,473$ 2028-2040 No Throughways Relievecurrentcongestion
WashingtonCounty Tualatin 11427 IceAgeTonquinTrail 112th Tualatin/BoonesFerry Constructshared-usepath 24,135,415$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Tualatin 11429 Sagert I-5 I-5 AddsidewalksonI-5bridgeoverpass 5,673,203$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Tualatin 11432 I-5Path LowerBoonesFerryRoad Norwood Constructshared-usepathparalleltoI-5 3,449,435$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty WashingtonCounty 10557 Murray/TVHwy.Intersection FarmingtonRd. TVHwy. IntersectionimprovementatTVHwy.andFarmingtonwithMurrayBlvd. 26,600,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
WashingtonCounty WashingtonCounty 10572 BarnesRd.Improvements St.Vincent'sHosp.entrance
LeahyRd. Widenfromtwotofivelaneswithbikelanesandsidewalks. 9,500,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
WashingtonCounty WashingtonCounty 10573 BarnesRd.Improvements LeahyRd. Multnomah.Co.Line Widenfromtwotothreelaneswithbikelanesandsidewalks. 18,400,000$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 10580 ButnerRd.Improvements MurrayBlvd. CedarHillsBlvd. Widento3laneswithbikelanesandsidewalks. 19,700,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 10586 197th/198thAve.Improvements BaselineRd. T.V.Hwy. Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 20,500,000$ 2028-2040 No ActiveTransportation
Relievefuturecongestion
WashingtonCounty WashingtonCounty 10589 95thAve.Ped/BikeConnection MorrisonSt. SunsetTC Pedestrian/bicyclepathway,lighting,bridgeoverJohnsonCreek,grade-separatedcrossingofBarnesRoad.
12,300,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 10591 GlencoeRd.Improvements EvergreenRd. JacksonAve. Widentothreelaneswithbikelanesandsidewalks. 27,700,000$ 2028-2040 No RoadsandBridges
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 10593 KinnamanRd.Improvements 209thAve. FarmingtonRd. Reconstructwithsidewalks,bikelanesandturnlanesatmajorintersecions;consolidateoffsetintersectionat198thAve.
28,500,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty WashingtonCounty 10596 SchollsFerryRd.Improvements Hwy.217 121stAve. Widentosevenlaneswithbikelanesandsidewalks. 21,000,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
WashingtonCounty WashingtonCounty 10598 SouthernArterial Hwy.99W I-5 PurchaseROW.Construct2/3lanearterialwithbikelanesandsidewalks. 116,000,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 10599 OR217/72ndAve.InterchangeImprovements
OR217/72ndAvenue OR217/72ndAvenue Completeinterchangereconstructionwithadditionalrampsandbridgestructurereplacement
21,300,000$ 2028-2040 No Throughways Relievefuturecongestion
WashingtonCounty WashingtonCounty 10606 WashingtonSquareRegionalCenterPedestrianImprovements
Wash.Sq.RegionalCenter
Complete7400feetofsidewalkimprovements. 9,500,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 10607 SunsetTCStationCommunityPedestrianImprovements
SunsetTCStationCommunity
Sidewalks,pedestriancrossings,accessways,ped/bikebridgesovercreeks.
6,400,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 10614 ButnerRd.Bike CedarHillsBlvd. ParkWay Completes7800feetofbikelanestotransitcorridor. 3,700,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 10615 BronsonRd.BikeLanes 185thAve. BethanyBlvd. Completes15000feetofbikelanestotransitcorridor. 5,800,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 11045 185thAvenue/MAXGradeSeparation 185thAvenue BaselineRoad Gradeseparate185thAvenue/BaselineRoadintersectionandMAXline. 26,256,000$ 2028-2040 No RoadsandBridges
Increasesystemefficiency
WashingtonCounty WashingtonCounty 11436 East-WestArterialOvercrossing BoonesFerryRd EastofI-5 Extendnew4-laneovercrossingoverI-5fromBoonesFerryRdto65thandStaffordRd.
40,400,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
Page 17
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 17of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
WashingtonCounty WashingtonCounty 11446 WashingtonCountyITS/TSMO(Strategic) County-wide County-wide Conductprojectdevelopment,preliminary/systemengineering,design,construct,andintegratethefollowingITSprojectsCountywideonkeyfreight,transit,andcommutercorridors:AdvancedTrafficControllers,Next-GenerationEmergencyVehiclePreemption&TransitSignalPriority,TrafficSignalModernization,RoadsideConnectedVehicle&InternetofThingsSystem,AutonomousVehicleEnablingSystems,AutomatedTrafficSignalPerformanceSystem,TrafficIncidentManagement
16,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency
WashingtonCounty WashingtonCounty 11456 ShackelfordRd 185thAve. Bridge Buildnew3laneroadwithbike/pedfacilities,stormdrainage,streetlightingtoserveNorthBethany.
12,800,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11457 ShackelfordRdBridge Buildnew3laneroadwithbike/pedfacilities,stormdrainage,streetlightingtoserveNorthBethany
15,600,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11460 OR10:OlesonRd.ImprovementPh.2 Beaverton-HiilsdaleHwy. OlesonRd.andSchollsFerry
Beaverton-Hillsdale/Oleson/SchollsFerryPhase2improvementstoproject10545
40,000,000$ 2028-2040 No RoadsandBridges
Reducecrashes
WashingtonCounty WashingtonCounty 11466 LaidlawImprovements SkycrestPkwy. LakeviewDr. Straightencurves,widento3laneswithbikelanesandsidewalks. 10,600,000$ 2028-2040 No RoadsandBridges
Reducecrashes
WashingtonCounty WashingtonCounty 11469 124thAveImprovements Tualatin-SherwoodRd. GrahamsFerryRd Widen124thfrom2lanesto5laneswithbikelanesandsidewalks 14,900,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11472 160thAveImprovements TVHwy. FarmingtonRd. Widentothreelaneswithbikelanesandsidewalks. 15,900,000$ 2028-2040 No RoadsandBridges
Relievecurrentcongestion
WashingtonCounty WashingtonCounty 11473 111th/RainmontRd/113thAve McDanielRd CornellRd. Constructsidewalks 9,600,000$ 2028-2040 No ActiveTransportation
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11474 113thAve McDanielRd RainmontRd Constructnew2laneCollectorRdwithsidewalksbikelanesandstreetlighting
6,400,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11478 185th ShackelfordRd. SpringvilleRd. Widenfromtwolanestothreelaneswithbikelanesandsidewalks. 60,600,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11490 DayRdOvercrossing BoonesFerryRd ElligsenRd Extendnew4-laneovercrossingoverI-5fromBoonesFerryRdtoElligsenRd.
46,900,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11574 CornellRoad 107th CountyLine Widenfrom2tothreelaneswithsidewalks,bikelanes,streetlighting,andcommunityfeatures
22,300,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty WashingtonCounty 11575 Leahy CornellRd. BarnesRd. Constructsidewalks 2,700,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 11576 BullMountainRd RoyRogersRd. OR99W Widentothreelaneswithbikelanesandsidewalks. 36,100,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11577 BeefBendRd RoyRogers HWY99W Widentothreelaneswithbikelanesandsidewalks. 41,900,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11578 80thAve OlesonRd OakSt Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 13,800,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 11579 119thAve McDanielRd CornellRd. Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 12,800,000$ 2028-2040 No ActiveTransportation
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11580 McDanielRd 119thAve. CountyLine Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 22,300,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty WashingtonCounty 11737 Cornell@185thIntersectionImprovements 185thAve. CornellRd Prioritizenear-termimprovementssuchassignaltiming,transitprioritization,trafficoperations,monitoring,andspecificturnlaneconfigurations.Intersectionimprovements(and/orotherreasonablereplacementimprovements)aretobeimplementedandprioritizedasfundingallows.If,aftersuchimprovementshavebeenconsideredandmotorvehicletrafficcongestionbecomesunacceptable,thentheseintersectionscouldbeconsideredascandidatesforgradeseparationand/orotherimprovementstomeettravelneeds.
22,300,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
Page 18
2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.
DownloadedfromRTPProjectHubon10/17/17. 18of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.
CountyNominatingAgency
2018RTPID ProjectName StartLocation EndLocation Description
EstimatedCost(2016dollars)
TimePeriod
ProjectisonFinanciallyConstrainedprojectlist
RTPInvestmentCategory PrimaryPurpose
WashingtonCounty WashingtonCounty 11738 Walker@185thIntersectionImprovements 185thAve. WalkerRd. Prioritizenear-termimprovementssuchassignaltiming,transitprioritization,trafficoperations,monitoring,andspecificturnlaneconfigurations.Intersectionimprovements(and/orotherreasonablereplacementimprovements)aretobeimplementedandprioritizedasfundingallows.If,aftersuchimprovementshavebeenconsideredandmotorvehicletrafficcongestionbecomesunacceptable,thentheseintersectionscouldbeconsideredascandidatesforgradeseparationand/orotherimprovementstomeettravelneeds.
22,300,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11923 GrahamsFerryRoad(HeleniustoTonquin) HeleniusSt TonquinRd Widenroadwayto3lanes,includessidewalksandbikelanes 4,000,000$ 2028-2040 No RoadsandBridges
Buildcompletestreet
WashingtonCounty WashingtonCounty 11924 GrahamsFerryRoad(TonquintoDay) TonquinRd. DayRd. Widenroadwayto5lanes,includessidewalksandbikelanes 6,000,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11925 Beaverton-HillsdaleHwyBikeLanes OR217 MultnomahCountyLine Completes12,000feetofbikelanes. 2,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 11926 CanyonRoadand110thBikeLanes Beaverton-HillsdaleHwy. 91stAve Completes7,000feetofbikelanes. 2,500,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 11927 ShawStreetMulti-UseTrailOverpass 185thAve 185thAve Designandconstructamulti-useregionaltrail10-12ftwideover-crossingof185thAve
5,100,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 11930 BrookmanRd OR99W LaddHillRd Widento4/5lanearterialstandard 20,000,000$ 2028-2040 No RoadsandBridges
Relievefuturecongestion
WashingtonCounty WashingtonCounty 11970 TransitPriorityonFrequentServiceRoutes County-wide County-wide Providequeuejumps,signalpreemptionforfrequentserviceroutes 50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 12039 Bikelanesandsidewalksoncollectorsandarterials
Countywide Countywide Complete35milesofbikelanesandsidewalksonCountyarterialsandcollectors
220,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty WashingtonCounty 12049 WashingtonCountyNeighborhoodBikeways WashingtonCounty WashingtonCounty 3milesofneighborhoodbikeways(bikeboulevards)onlow-trafficstreetsthroughoutunincorporatedurbanWashingtonCounty,includingenhancedat-gradecrossingsofarterials.
2,000,000$ 2028-2040 No ActiveTransportation
Increasetraveloptions/alt.todrivingalone
WashingtonCounty Wilsonville 11798 ElligsenRoadUrbanUpgrade ParkwayCenterDrive 65th Reconstructstreetto3laneswithbufferedbikelanesandsidewalks.(TSPprojectUU-P3)
6,000,000$ 2028-2040 No ActiveTransportation
Buildcompletestreet
WashingtonCounty Wilsonville 11809 JavaRoadConnectionandSignal GrahamsFerryRoad GardenAcresRoad ConstructnewJavaRoadwithbufferedbikelanesandsidewalks,disconnectClutterStreetfromGrahamsFerryRoad,andinstalltrafficsignalatGrahamsFerryRoad.
1,500,000$ 2028-2040 No RoadsandBridges
Increaseaccesstojobs