2018 PAVING PROJECTS SOUTHEAST SEATTLE FACT SHEET October 2016 PROJECT INFORMATION & CONTACT www.seattle.gov/transportation/paving.htm Dan Anderson | Communications Lead (206) 684-8105 | [email protected]PROJECT DESCRIPTION The Seattle Department of Transportation (SDOT) is planning to repave several arterial streets in your neighborhood in 2018 with funding provided by the voter-approved Levy to Move Seattle. We have just begun the design for six large paving projects scheduled for construction in 2018. Paving provides an opportunity to implement other changes on these streets to improve safety and mobility for people and goods in a growing Seattle. PROPOSED PROJECT LOCATIONS • S Columbian Way/S Alaska St - Beacon Ave S to MLK Jr Way S • Swift Ave S/S Myrtle St/S Othello St - 15th Ave S to MLK Jr Way S • Wilson Ave S - Seward Park Ave S to S Dawson St PROJECT BACKGROUND Arterial streets are primary routes for moving people and goods through the city, connecting neighborhoods and business districts to one another and to the regional transportation network. Each year, Seattle repaves arterial streets in poor condition to make them safer and more comfortable and to extend their useful life. Paving projects are prioritized based on pavement condition, traffic volume, geographic equity throughout the city, cost, and opportunities for grants or coordination with other projects in the area. GET INVOLVED We want to hear from you – the people who use these streets every day: • What you like and what you would change about how the streets operate • Business loading and access needs • Locations where there are missing/broken/worn infrastructure other than paving • Opportunities for landscaping, walking and biking improvements By talking with community members and gathering feedback during this early planning phase, we aim to create a project that addresses more comprehensive needs beyond paving and brings us closer to meeting our mobility plans for Seattle. For translation services, please call (206) 684-8105 PROJECT MAP S ORCAS ST S MORGAN ST S HENDERSON ST S CLOVERDALE ST S GRAHAM ST S COLUMBIAN WAY EAST MARGINAL WAY S S ALBRO PL BEACON AVE S RENTON AVE S RAINIER AVE S 15TH AVE S M L K I NG JR WAY S S GENESEE ST S DAWSON ST 14TH AVE S S OTHELLO ST SEWARD PARK AVE S 50TH AVE S AIRPORT WAY S ON AVE S SW IFT AV E S W IL S O N A V E S S MYRTLE PL S MYRTLE ST S ALASKA ST 2018 Paving Projects 5
2
Embed
2018 PAVING PROJECTS SOUTHEAST SEATTLE · kalsada taon-taon, kabilang na ang ilan sa inyong neighborhood. Sabihin sa amin kung paano kami makakapagsagawa ng mga pagbabago sa mga kalye
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2018 PAVING PROJECTSSOUTHEAST SEATTLE
FACT SHEET October 2016
PROJECT INFORMATION & CONTACTwww.seattle.gov/transportation/paving.htm Dan Anderson | Communications Lead(206) 684-8105 | [email protected]
PROJECT DESCRIPTIONThe Seattle Department of Transportation (SDOT) is planning to repave several arterial streets in your neighborhood in 2018 with funding provided by the voter-approved Levy to Move Seattle. We have just begun the design for six large paving projects scheduled for construction in 2018.
Paving provides an opportunity to implement other changes on these streets to improve safety and mobility for people and goods in a growing Seattle.
PROPOSED PROJECT LOCATIONS• S Columbian Way/S Alaska St - Beacon Ave S to
MLK Jr Way S
• Swift Ave S/S Myrtle St/S Othello St - 15th Ave S to MLK Jr Way S
• Wilson Ave S - Seward Park Ave S to S Dawson St
PROJECT BACKGROUNDArterial streets are primary routes for moving people and goods through the city, connecting neighborhoods and business districts to one another and to the regional transportation network. Each year, Seattle repaves arterial streets in poor condition to make them safer and more comfortable and to extend their useful life.
Paving projects are prioritized based on pavement condition, traffic volume, geographic equity throughout the city, cost, and opportunities for grants or coordination with other projects in the area.
GET INVOLVEDWe want to hear from you – the people who use these streets every day:
• What you like and what you would change about how the streets operate
• Business loading and access needs
• Locations where there are missing/broken/worn infrastructure other than paving
• Opportunities for landscaping, walking and biking improvements
By talking with community members and gathering feedback during this early planning phase, we aim to create a project that addresses more comprehensive needs beyond paving and brings us closer to meeting our mobility plans for Seattle.
For translation services, please call (206) 684-8105
PROJECT MAP
S ORCAS ST
S MORGAN ST
S HENDERSON ST
S CLOVERDALE ST
S GRAHAM ST
S COLUMBIAN WAY
S SPOKANE ST
EAST MARGINAL WAY S
S ALBRO PL
BEAC
ON
AVE S
REN
TON
AVE S
RAINIER AVE S
M L K
ING
JR W
AY S
15TH
AVE
S
ML
KIN
GJR
WAY
SLAKE W
ASHINGTON BLVD S
31S
T AV
E S
S MCCLELLAN ST
S MT BAKER BLVD
23R
D A
VE S
S GENESEE ST
S DAWSON ST
14TH
AVE
S
S COLLEGE ST
17TH
AVE
S
S OTHELLO ST SEW
ARD
PAR
K AV
E S
50TH
AVE
S
AIRPORT WAY S
BEA
CON
AVE SSW
IFTAVE
S
WILSO
NAV
ES
S MYRTLE PL
S MYRTLE ST
S ALASKA ST
2018 Paving Projects
5
5
PROJECT INFORMATION & CONTACTwww.seattle.gov/transportation/paving.htm Dan Anderson | Communications Lead(206) 684-8105 | [email protected]
For translation services, please call (206) 684-8105
The City of Seattle paves streets each year, including some in your neighborhood. Tell us how we might make changes to the streets being paved in 2018 (see map) to better serve your needs. To request translation of these materials call (206) 684-8105.
La ciudad de Seattle pavimenta las calles cada año, incluyendo algunas de su vecindario. Díganos cómo podríamos cambiar las calles que se pavimentarán en 2018 (véase el mapa) para satisfacer mejor sus necesidades. Para solicitar la traducción de este material llame al (206) 684-8105.
Thành phố Seattle tiến hành hoạt động lát đường phố hàng năm, bao gồm một số đường phố trong khu vực lân cận của quý vị. Hãy cho chúng tôi biết chúng tôi nên thay đổi đường phố như thế nào trong năm 2018 (xem bản đồ) để có thể phục vụ tốt hơn các nhu cầu của quý vị. Để yêu cầu dịch thuật các tài liệu này hoặc gọi (206) 684-8105.
시애틀 시는 여러분의 인근 지역을 포함하여 매년 도로를 포장하고 있습니다. 여러분의 요구에 더 잘 부응할 수 있도록 2018년에 포장될 도로에 대한 더 좋은 변경 방법이 있으면 연락 주십시오(지도 참조). 회의에서 이 내용의 번역 또는 통역이 필요한 경우, (206) 684-8105로 문의하십시오.
Magaalada Seattle waxay laami saartaa jidadka sannad kasta, waxaana ka mid ah qaar ku yaal xaafadaada. Noo sheeg sida aan baddalaad ugu samayn karno jidadka la saaro laamiga sannadka 2018 (fiiri khariidada) si loogu adeego baahidaada. Si aad u codsatid tarjumo qoran oo ku saabsan qoraalkaan ama tarjumada afka marka la yimaado shirka, wac (206) 684-8105.
Ang Lungsod ng Seattle ay nag-aayos ng mga kalsada taon-taon, kabilang na ang ilan sa inyong neighborhood. Sabihin sa amin kung paano kami makakapagsagawa ng mga pagbabago sa mga kalye na aayusin sa taong 2018 (basahin ang mapa) upang higit pang mapaglingkuran ang inyong mga pangangailangan. Para humiling ng pagsasalin-wika ng mga materyal na ito o interpretation sa pagpupulong, tumawag sa (206) 684-8105.