40 8 2 34 25 25 40 40 40 UNION FRANKLIN MARION MADISON PICKAWAY FAYETTE MORROW DELAWARE 41 30 25 43 45 27 35 36 19 3 14 24 9 13 22 1 21 26 7 12 5 15 44 18 17 33 4 32 23 28 36 20 7 11 36 36 33 7 41 27 1 26 7 12 35 36 19 7 9 21 35 15 20 43 33 3 10 10 10 6 6 6 6 26 30 30 30 30 21 37 42 32 26 25 38 39 29 19 19 19 31 16 22 22 22 20 31 § ¨ ¦ 71 § ¨ ¦ 70 § ¨ ¦ 270 § ¨ ¦ 270 § ¨ ¦ 71 § ¨ ¦ 270 § ¨ ¦ 70 § ¨ ¦ 71 § ¨ ¦ 70 § ¨ ¦ 71 § ¨ ¦ 71 § ¨ ¦ 71 § ¨ ¦ 70 § ¨ ¦ 71 § ¨ ¦ 71 £ ¤ 35 £ ¤ 33 £ ¤ 23 £ ¤ 42 £ ¤ 62 £ ¤ 36 £ ¤ 40 £ ¤ 22 £ ¤ 3 £ ¤ 23 £ ¤ 42 £ ¤ 42 £ ¤ 23 £ ¤ 36 £ ¤ 42 £ ¤ 33 £ ¤ 62 £ ¤ 40 £ ¤ 62 £ ¤ 40 £ ¤ 62 £ ¤ 22 £ ¤ 33 £ ¤ 23 £ ¤ 22 £ ¤ 36 £ ¤ 35 £ ¤ 23 £ ¤ 62 £ ¤ 33 £ ¤ 36 £ ¤ 40 £ ¤ 42 £ ¤ 23 £ ¤ 22 £ ¤ 23 £ ¤ 23 £ ¤ 23 £ ¤ 40 £ ¤ 33 £ ¤ 42 £ ¤ 23 £ ¤ 23 £ ¤ 42 £ ¤ 42 £ ¤ 62 £ ¤ 23 £ ¤ 42 £ ¤ 36 £ ¤ 35 £ ¤ 33 ¬ « 104 ¬ « 323 ¬ « 665 ¬ « 38 ¬ « 138 ¬ « 309 ¬ « 203 ¬ « 729 ¬ « 29 ¬ « 159 ¬ « 3 ¬ « 529 ¬ « 739 ¬ « 347 ¬ « 98 ¬ « 41 ¬ « 31 ¬ « 207 ¬ « 316 ¬ « 56 ¬ « 315 ¬ « 521 ¬ « 4 ¬ « 37 ¬ « 229 ¬ « 142 ¬ « 61 ¬ « 656 ¬ « 161 ¬ « 97 ¬ « 47 ¬ « 95 ¬ « 423 ¬ « 736 ¬ « 257 ¬ « 231 ¬ « 752 ¬ « 288 ¬ « 750 ¬ « 314 ¬ « 674 ¬ « 19 ¬ « 746 ¬ « 734 ¬ « 317 ¬ « 753 ¬ « 361 ¬ « 100 ¬ « 605 ¬ « 710 ¬ « 762 ¬ « 245 ¬ « 745 ¬ « 188 ¬ « 16 ¬ « 37 ¬ « 95 ¬ « 37 ¬ « 753 ¬ « 347 ¬ « 3 ¬ « 104 ¬ « 56 ¬ « 38 ¬ « 3 ¬ « 161 ¬ « 315 ¬ « 104 ¬ « 37 ¬ « 3 ¬ « 98 ¬ « 4 ¬ « 734 ¬ « 61 ¬ « 309 ¬ « 161 ¬ « 4 ¬ « 41 ¬ « 41 ¬ « 309 ¬ « 745 ¬ « 38 ¬ « 37 ¬ « 762 ¬ « 56 ¬ « 207 ¬ « 605 ¬ « 61 ¬ « 746 ¬ « 665 ¬ « 317 ¬ « 739 ¬ « 47 ¬ « 29 ¬ « 38 ¬ « 323 ¬ « 323 ¬ « 739 ¬ « 665 ¬ « 229 ¬ « 729 ¬ « 229 ¬ « 529 ¬ « 97 ¬ « 31 ¬ « 656 ¬ « 739 ¬ « 95 ¬ « 3 ¬ « 56 ¬ « 38 ¬ « 56 ¬ « 257 ¬ « 104 ¬ « 37 ¬ « 161 ¬ « 104 ¬ « 521 ¬ « 257 ¬ « 309 ¬ « 41 ¬ « 47 ¬ « 95 ¬ « 4 ¬ « 314 ¬ « 56 ¬ « 423 ¬ « 16 ¬ « 207 ¬ « 739 ¬ « 257 ¬ « 3 ¬ « 309 ¬ « 529 ¬ « 729 ¬ « 203 ¬ « 37 Project Name PID Award Date Estimated Construction Cost Work Type D06 Crackseal PPM FY18 91905 5/14/2018 $600,000 Resurfacing/Pavement Repair D06 ELEC FY18 98214 6/29/2017 $515,500 Other D06 GR End Treat FY18 104166 4/16/2018 $788,423 Other D06 GR FY17 98301 4/20/2017 $773,575 Other D06 GR FY19 98302 7/23/2018 $650,000 Other D06 PMF FY18 98311 2/12/2018 $2,654,321 Other D06 RPM FY18 100739 3/19/2018 $150,000 Other D06 STW CCTV FY17 104135 5/19/2017 $1,933,046 Other D06 STW CCTV FY18 106824 5/28/2018 $3,000,000 Other D06 STW ITS Maint - FY16 101708 5/26/2016 $1,164,600 Other D06 STW ITS Maint - FY18 106822 5/28/2018 $4,000,000 Other D06 STW Traf Sig Upgrade - FY 17 103914 5/19/2017 $819,083 Other D06 STW Traf Sig Upgrade FY18 106825 5/28/2018 $2,500,000 Other FRA Extrusign M 94156 9/28/2017 $2,587,532 Other FRA GR FY18 98303 6/15/2017 $1,374,906 Other FRA GR FY19 98307 7/2/2018 $800,000 Other Projects Not Mapped Ohio Department of Transportation - District 6 2018 Construction Season Interstate Routes US Routes State Routes County / Township Roads City / Village County Boundary Bridge/Culvert Major Construction Minor Construction Other Resurfacing/Pavement Repair F 0 10 20 5 Miles Map prepared by the planning section. 3/14/2018 Q:\GIS\KatieB_Construction Maps\CY2018\D06\GIS\ODOT_Let_2018.mxd. Data version: District Map Tables.xlsx 3/14/2018 DISTRICT 6 1 PID: 91146 Project Project Staff: HOLBROOK, JEFFREY A \ VANCE, JEFFREY A Contractor: Start: July 2018 Complete: October 2018 Estimated Cost: $1,000,000 DELAWARE COUNTY U.S. Route 23 Partial depth concrete pavement repairs from Coover Rd to Weiser Rd. Temporary lane closures during non peak hours. FRANKLIN COUNTY Interstate 70 Partial depth concrete pavement repairs from Madison County Line to Alton Darby Creek Rd. Nighttime temporary lane and ramp closures. DELAWARE COUNTY PID: 103842 Project 18-0186 Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: April 2018 Complete: October 2018 Estimated Cost: $886,000 DELAWARE COUNTY Pavement repairs and resurfacing of Delaware State Park campground roads, loops, and pads, including sidewalk and curb improvements. Widening exit from entrance area parking lot and entrance to waste state. Culvert replacements. Work must suspend on May 23, 2018 and may resume September 5 to October 12. The roads will be closed to traffic. Coordinate maintenance of traffic with ODNR. 3 PID: 103527 Project 17-0538 Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: April 2018 Complete: July 2018 Estimated Cost: $1,004,142 DELAWARE COUNTY U.S. Route 36 Widening of guardrail on US-36 to I-71 SB entrance ramp (Ramp A) and pavement overlay from SR-61 to Knox County Line. Nighttime lane closures 9pm-5am Monday to Friday. 4 PID: 93147 Project 18-0055 Project Staff: VIOLET, DONALD J \ DANIEL, JACOB B Contractor: Start: April 2018 Complete: September 2018 Estimated Cost: $324,425 DELAWARE COUNTY U.S. Route 42 Urban resurfacing from US-36 to Horseshoe Rd within the City of Delaware and Delaware Township. Daytime restriction: maintain one lane of two-way traffic using flaggers. 5 PID: 102832 Project 18-0164 Project Staff: VIOLET, DONALD J \ DANIEL, JACOB B Contractor: Start: April 2018 Complete: October 2018 Estimated Cost: $1,348,000 DELAWARE COUNTY State Route 750 Resurfacing and guardrail improvements from SR-315 to Old State Rd. Nighttime lane closures 9pm-5am Monday to Friday. 6 PID: 106830 Project Project Staff: VIOLET, DONALD J \ VIOLET, DONALD J Contractor: Start: June 2018 Complete: August 2018 Estimated Cost: $65,000 DELAWARE COUNTY U.S. Route 23/Home Rd Addition of left turn dotted line striping for US-23 to Home Rd traffic. Temporary lane closures during non-peak hours. State Route 257/State Route 750 Addition of left turn dotted line striping for SR-257 to SR-750 traffic. Temporary lane closures during non-peak hours. State Route 257/Home Rd Addition of striping to condense roundabout from 2 to 1 circulating lanes. Temporary lane closures during non-peak hours. FRANKLIN COUNTY State Route 3 Addition of edge line striping for bike lane from north of Old Dublin Granville Rd to Cooper Rd/Westerville Crossing Dr. Temporary lane closures during non-peak hours. FAYETTE COUNTY 7 PID: 107290 Project Project Staff: HOLBROOK, JEFFREY A \ SHREVE, DONALD R Contractor: Start: July 2018 Complete: October 2018 Estimated Cost: $400,000 FAYETTE COUNTY Interstate 71 Partial depth pavement repairs from Hidy Rd NW to Madison County Line. Nighttime and early morning lane closures. State Route 35 Partial depth pavement repairs from SR-435 to Harmony Rd NW and from Palmer Rd NW to SR-753. Daytime and nighttime lane closures. MADISON COUNTY Interstate 71 Partial depth pavement repairs from Fayette County Line to Yankeetown-Chenoweth Rd. Nighttime temporary lane and ramp closures. FRANKLIN COUNTY 8 PID: 106168 Project 18-1018 Project Staff: LAU, THOMAS M \ BRUMENSCHENKEL, MARK F Contractor: Start: April 2018 Complete: June 2018 Estimated Cost: $296,042 FRANKLIN COUNTY Milling and paving various parking lots and access roads within the Ohio State Fairgrounds, including landscaped area maintenance. Temporary road closures to be scheduled around special events hosted by the Fairgrounds. Maintain at least one drive at all times. 9 PID: 91897 Project Project Staff: LAU, THOMAS M \ BRUMENSCHENKEL, MARK F Contractor: Start: May 2018 Complete: October 2018 Estimated Cost: $1,500,000 FRANKLIN COUNTY Interstate 71 Partial depth pavement repairs from Pickaway County Line to 0.82 miles south of SR-665. Nighttime temporary lane and ramp closures. Interstate 270 Partial depth pavement repairs from Parsons Ave to west of US-23. Nighttime temporary lane and ramp closures. PID: 104673 Project Project Staff: HOLBROOK, JEFFREY A \ KLINGLER, LUKE G Contractor: Start: July 2018 Complete: September 2018 Estimated Cost: $789,000 FRANKLIN COUNTY Interstate 270 Sealing the deck and patching the parapets of the FRA-270-1856 L&R structures over Scioto River, SR-745, and SR-257. Sealing the deck of the FRA-270-5353 L&R structures over Scioto River. Nighttime temporary lane and ramp closures. Interstate 670 Sealing the deck of the FRA-670-0031 structure over CSX RR, Scioto River, and US-33T. Shoulder closures and nighttime temporary lane closures. 11 PID: 100737 Project 17-0432 Project Staff: LAU, THOMAS M \ EDWARDS, ROBERT G Contractor: Start: August 2017 Complete: September 2018 Estimated Cost: $2,386,135 FRANKLIN COUNTY Interstate 270 Partial depth concrete pavement repairs from RR south of I-70 to northeast of Alum Creek Dr. Nighttime and weekend temporary lane ramp closures. 12 PID: 76467 Project 18-0012 Project Staff: KINER, CHARLES J \ DENNIS, WADE R Contractor: Start: April 2018 Complete: September 2018 Estimated Cost: $6,101,481 FRANKLIN COUNTY Interstate 270 Resurfacing from 1.1 miles west of SR-315 to 0.8 miles east of US-23, including ramps to/from SR-315 and US-23. Nighttime temporary lane closures. State Route 315 Resurfacing from north of SR-161 to Clubview Blvd S. Nighttime lane closures. 13 PID: 105137 Project Project Staff: LAU, THOMAS M \ GABLE, BRIAN D Contractor: Start: August 2018 Complete: October 2018 Estimated Cost: $3,728,000 FRANKLIN COUNTY Interstate 270 Resurfacing of I-270 CD lanes from SR-161 to McCutcheon Rd. Nighttime temporary lane and ramp closures. 14 PID: 76469 Project 17-0004 Project Staff: KINER, CHARLES J \ CHANNEL, GREGORY S Contractor: Start: April 2017 Complete: September 2018 Estimated Cost: $58,419,403 FRANKLIN COUNTY Interstate 270 Resurfacing and lane additions from N of I-70 to US-33, rehabilitation of mainline structures, and construction of storm sewers. Short term ramp closures of non-consecutive entrance/exit ramps. Nighttime lane closures of I-270. 15 PID: 76420 Project Project Staff: KINER, CHARLES J \ KESLING, JOHN Contractor: Start: June 2018 Complete: September 2018 Estimated Cost: $2,136,000 FRANKLIN COUNTY State Route 315 Resurfacing from Sullivant Ave to 670 entrance ramp. Nighttime temporary lane and ramp closures. PID: 104848 Project 18-0091 Project Staff: LAU, THOMAS M \ AMNAH, ZACHARY H Contractor: Start: April 2018 Complete: September 2018 Estimated Cost: $483,483 FRANKLIN COUNTY State Route 315 Deck patching the FRA-315-0278 structure of Olentangy River, Fifth Ave, and King Ave. Nighttime temporary lane and ramp closures. 17 PID: 98111 Project Project Staff: LAU, THOMAS M \ BLOCK, JAMES C Contractor: Start: May 2018 Complete: October 2019 Estimated Cost: $12,733,000 FRANKLIN COUNTY U.S. Route 33 Part 1: Resurfacing from I-270 to SR-317 including addition of a third lane in the median of US-33 EB between the I-270 SB exit and the bridges over Big Walnut Creek and addition of an auxiliary lane on both sides of US-33 between the Hamilton Rd ramps and the I-270 EB ramps. Widening of the Big Walnut Creek bridge. Weekend long lane closure and nighttime temporary lane and ramp closures. Part 2: Replacement of fascia beam section and deck edge of structure FRA-33-2964, SR-674 over westbound 33. Weekend US-33 and Gender Rd lane closures. Weekend and nighttime ramp closures. 18 PID: 93136 Project 18-0130 Project Staff: KINER, CHARLES J \ WAGNER, BRYCE C Contractor: Start: May 2018 Complete: September 2018 Estimated Cost: $904,460 FRANKLIN COUNTY U.S. Route 33 Urban resurfacing from Trabue Rd/Cambridge Blvd to 0.1 miles south of Nottingham Rd within City of Columbus and City of Upper Arlington. Temporary lane closures during non-peak hours. 19 FRA-670-5.03 PID: 104674 Project Project Staff: LAU, THOMAS M \ AMNAH, ZACHARY H Contractor: Start: July 2018 Complete: October 2019 Estimated Cost: $51,717,845 FRANKLIN COUNTY Interstate 670 SmartLane (hard shoulder running) installation in eastbound direction from I-71 to I-270. Improve the 670/270/62 interchange. Resurface I-670 WB. Nighttime temporary lane and ramp closures. Short term interstate closures with detours for bridge work. 30 day closure of I-670 EB to US-62 EB ramp with detour. 60 day closure of US-62 WB to I-270 NB ramp with detour. Weekend closures of US-62, I-270 SB to US-62 EB ramp and US-62 WB to I-270 SB ramp. 20 PID: 103487 Project 17-0268 Project Staff: POLING, DAVID P \ ARISS, NATINA R Contractor: Start: July 2017 Complete: September 2018 Estimated Cost: $41,853,586 FRANKLIN COUNTY Interstate 70 Replace Grant Ave. bridge over I-70, closed for 285 days. Build four retaining walls along I-70. Reconfigure Mound St. and Fulton St. Nightly lane restrictions on Mound intersecting strees (High, Third, Fourth). Nightly closures with detour of I-70 and/or I-71. I-71 SB and I-70 WB reduced to 1 lane for a weekend. Main St to I-71SB/I-70WB ramp closed permanently. Fulton St. between Grant Ave. and Engler St. closed for 14 days. Lane closure on Fourth St. for 14 days. Lane closures on High St and Third St for 45 days. Mound St between Front St and Fourth St permanently becomes westbound ONLY and one lane westbound will be maintained during construction. 21 FRA-70-16.18 PID: 79668 Project Project Staff: POLING, DAVID P \ ARISS, NATINA R Contractor: Start: July 2018 Complete: July 2019 Estimated Cost: $5,250,000 FRANKLIN COUNTY Interstate 70 Resurfacing from Fairwood Ave to Fairfield County Line including guardrail replacement and miscellaneous repairs. Nighttime temporary lane and ramp closures. 22 PID: 105463 Project Project Staff: LAU, THOMAS M \ GRIESDORN, ANDREW R Contractor: Start: August 2018 Complete: October 2019 Estimated Cost: $8,407,000 FRANKLIN COUNTY Interstate 70 Pavement overlay with repairs and structure repairs from west of Wilson Rd to US-40/Broad St. Nighttime temporary lane and ramp closures. Weekend closures of I-70 WB detoured to I-270. Weekend closures of I-70 EB detoured to I-670. 23 PID: 93446 Project Project Staff: KINER, CHARLES J \ HEARING, AMY B Contractor: Start: July 2018 Complete: November 2018 Estimated Cost: $1,390,000 FRANKLIN COUNTY Interstate 71 Replace existing noise wall panels with fiberglass panels from 5th Ave SB ramp to I-71 SB and 5th Ave SB ramp to I-670 WB. Nighttime temporary lane and I-670 ramp closures. 24 PID: 104799 Project 17-0393 Project Staff: HOLBROOK, JEFFREY A \ OPSITNIK, ANDREW J Contractor: Start: August 2017 Complete: June 2020 Estimated Cost: $113,106,284 FRANKLIN COUNTY Interstate 71 Widening and Rehabilitation from Stringtown to SR-315. Combination of FRA-71-8.87, PID 92615 and FRA-71-9.74, PID 93497. Maintain existing number of mainline lanes and ramps except for several 5, 15, and 30 day ramp closures with detours at Greenlawn, Frank/SR-104, and I-270. 25 PID: 105438 Project Project Staff: POLING, DAVID P \ GRIESDORN, ANDREW R Contractor: Start: June 2018 Complete: July 2019 Estimated Cost: $6,600,000 LOGAN COUNTY Fiber optic cable installation along various local roads. Single-lane closures during non-peak hours. UNION COUNTY Fiber optic cable installation along various local roads. Single-lane closures during non-peak hours. FRANKLIN COUNTY Fiber optic cable installation along various local roads. Single-lane closures during non-peak hours. FRA-SP-FY18(P) FRA-33-24.26 Part 1&2 FRA-33-9.33 FRA-70-14.56 (2G) Parts 1&2 Kokosing Construction Company Inc. FRA-71-9.62/9.71 Part 1 & 2 Shelly & Sands Inc. LOG/UNI/FRA-33-Smart Mobil Ph2 FRA-71-18.64 (Noise Walls) FRA-270-29.39/30.60CD FRA-270-9.15 FRA-270/MAD-70/42 SP Shelly & Sands Inc. DEL/FRA-Int Striping FY18 FAY/MAD-71/FAY-35 Spot Paving FRA-EXPO-FY18 Strawser Paving Company Inc. FRA-315-0.49 FRA-315-2.78 Truesdell Corporation of Wisconsin Inc. Kokosing Construction Company Inc. FRA-270/670-18.56/0.31 FRA-270-21.69 Kokosing Construction Company Inc. D06-SP-FY19 Concrete DEL-36-17.92/22.25 Shelly & Sands Inc. DEL-42-8.78 Strawser Paving Company Inc. DEL-750-4.43 DEL-Delaware State Park FY18 FRA-70-7.63 Parts 1 & 2 3 6 16 19 20 21 22 9 2 10 8 19 MADISON COUNTY 26 PID: 25596 Project Project Staff: HOLBROOK, JEFFREY A \ SHREVE, DONALD R Contractor: Start: July 2018 Complete: June 2019 Estimated Cost: $14,378,000 MADISON COUNTY Interstate 71 Resurfacing from west of Yankeetown-Chenoweth Rd to Pickaway County Line including guardrail replacement and rehabilitation of structures over Dyer Rd, Mud Run, and Bradford Creek. Nighttime temporary lane closures. Combination part-width and median crossover of one lane to maintain two lanes of traffic in each direction during structure construction.Dyer Rd closed four separate times for 2 week durations. Detour route: Yankeetown-Chenoweth Rd to SR-323 to SR-56 PICKAWAY COUNTY Interstate 71 Resurfacing from Madison County Line to Franklin County Line including guardrail replacement. Nighttime temporary lane and ramp closures. 27 PID: 91512 Project 18-0025 Project Staff: HOLBROOK, JEFFREY A \ VANCE, JEFFREY A Contractor: Start: March 2018 Complete: August 2018 Estimated Cost: $1,661,600 MADISON COUNTY U.S. Route 42 Urban resurfacing of US-42/High St/Elm St from London South Corp Limit to Lafayette St within City of London. Daytime restriction: maintain one lane of traffic in each direction at all times. State Route 38 Urban resurfacing of SR-38/Elm St from Lafayette St/US-42 to SR-29 within City of London. Daytime restriction: maintain one lane of two-way traffic using flaggers. 28 PID: 107109 Project Project Staff: HOLBROOK, JEFFREY A \ VANCE, JEFFREY A Contractor: Start: September 2018 Complete: October 2020 Estimated Cost: $57,200,000 MADISON COUNTY Interstate 70 SR-142 interchange ramp repairs, construct temporary pavement and crossovers, signal improvements at SR-29 US-42 intersection. Single lane closure on I-70 EB and I-70 WB. MARION COUNTY PID: 102332 Project Project Staff: VIOLET, DONALD J \ DANIEL, JACOB B Contractor: Start: August 2018 Complete: August 2019 Estimated Cost: $2,500,000 MARION COUNTY U.S. Route 23 Replace existing concrete deck of structures MAR-23-0185 L&R over SR-98 and MAR-23-0204 L&R over Qu Qua Creek, including resurfacing and guardrail replacement. Utilize two phases of median crossover for 45-70 days each to maintain one lane of traffic in each direction. US-23SB to SR-98 ramp closed during second phase. Detour: US-23 SB to SR-229 slip ramp to SR-47 to SR-98. 30 PID: 25597 Project 17-0365 Project Staff: VIOLET, DONALD J \ BARD, RYAN L Contractor: Start: August 2017 Complete: July 2018 Estimated Cost: $2,948,233 MARION COUNTY U.S. Route 23 Spot paving, bridge work, and guardrail improvements from 0.5 miles N of SR-95 to Wyandot County Line. Maintain one lane each direction on US-23. Maintain one lane at all times using flaggers on CR-167 and CR-26. PID: 104811 Project Project Staff: VIOLET, DONALD J \ DANIEL, JACOB B Contractor: Start: July 2018 Complete: November 2018 Estimated Cost: $1,020,000 MARION COUNTY U.S. Route 23 Replace decks of structure MAR-23-1675 L&R over Rock Fork Creek and repair and seal deck of structure MAR-23-1875 L&R over Little Scioto River.US-23 will be reduced to one lane in both directions for the duration of the bridge work. 32 PID: 90264 Project Project Staff: VIOLET, DONALD J \ BARD, RYAN L Contractor: Start: July 2018 Complete: October 2019 Estimated Cost: $5,949,000 MARION COUNTY State Route 309 Construct railroad overpass over CSX railroad spur east of US-23 including slight realignment of SR-309 and service road. Maintain minimum one lane of traffic in each direction with temporary signal. Pole Lane Rd weekend closure with detour. 33 PID: 91516 Project Project Staff: VIOLET, DONALD J \ BARD, RYAN L Contractor: Start: June 2018 Complete: October 2018 Estimated Cost: $1,409,000 MARION COUNTY State Route 95 Urban resurfacing from Davids St & Columbia St to Blaine Ave & W Church St and from S Grand Ave to University Dr within the City of Marion. Daytime restriction: maintain one lane of two-way traffic using flaggers. State Route 95D Urban resurfacing from E Church St & Mt Vernon Ave to Park Blvd within City of Marion. Daytime restriction: maintain one lane of two-way traffic using flaggers. MORROW COUNTY PID: 106542 Project Project Staff: \ Contractor: Start: September 2018 Complete: October 2018 Estimated Cost: $435,000 MORROW COUNTY Resurfacing roadways within Mt Gilead State Park, including sidewalk, curb ramp, and culvert work in various locations. Work shall commence on or after September 4, 2018. Allowable hours are Monday to Thursday, 7a to 6p, and Friday 7a to 12p. Coordinate maintenance of traffic with ODNR. 35 PID: 102835 Project 18-0068 Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: April 2018 Complete: September 2018 Estimated Cost: $3,235,844 MORROW COUNTY State Route 95 Resurfacing from eastern Mt. Gilead Corp to CR-253. Daytime restriction: maintain one lane of two-way traffic using flaggers. State Route 309 Resurfacing from eastern Marion County Line to southern Marion County Line. Daytime restriction: maintain one lane of two-way traffic using flaggers. MARION COUNTY State Route 309 Resurfacing from SR-98 to western Morrow County Line and northern Morrow County Line to bridge over Flat Run. Daytime restriction: maintain one lane of two-way traffic using flaggers. 36 PID: 103438 Project 18-0175 Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: April 2018 Complete: October 2018 Estimated Cost: $3,387,000 MORROW COUNTY U.S. Route 42 Resurfacing from southern SR-61 intersection to south of CR-29 including through the Village of Mt. Gilead, suspending from SLM 19.44 (SR-19) to SLM 23.46 which was resurfaced with PID 101179. Daytime restriction: maintain one lane of two-way traffic using flaggers outside of Mt. Gilead. Nighttime restriction: maintain one lane of two-way traffic using flaggers inside Mt. Gilead. State Route 61 Resurfacing from US-42 to north of the northern Mt. Gilead Corp Limit including through the Village of Mt. Gilead. Nighttime restriction: maintain one lane of two-way traffic using flaggers. State Route 314 Resurfacing from SR-229 to Richland County line, suspending from SLM 9.73 (SR-95) to SLM 19.86 (CR-81) which was resurfaced with PID 101179. Daytime restriction: maintain one lane of two-way traffic using flaggers. PID: 88609 Project Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: May 2018 Complete: October 2018 Estimated Cost: $1,392,000 MORROW COUNTY State Route 95 Replace concrete slab bridge MRW-95-0024 over Otter Creek with Arch-type culvert, including pavement replacement and guardrail installation. Maintain 1 lane in each direction at all times except for max 45 day closure. Detour: SR-746 to SR-529 to US-42 Township Route 60 Replace steel beam bridge MRW-TR60-02087 over Otter Creek with Arch-type culvert, including pavement replacement and guardrail installation. Full closure for max 90 days. Detour route:SR-95 to Cardington Caledonia to Canaan Central to SR-746 to SR-95 PID: 96211 Project 18-4004 Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: June 2018 Complete: August 2018 Estimated Cost: $798,965 MORROW COUNTY State Route 95 Replace structure MRW-95-1610 over Sylvester Run. Maintain traffic using part-width construction with traffic signals. **** PID: 99792 Project 18-3002 Project Staff: VIOLET, DONALD J \ STOVER, DONALD L Contractor: Start: May 2018 Complete: October 2018 Estimated Cost: $1,029,990 MORROW COUNTY County Route 15 Replace structure MRW-CR15-0501 over Big Walnut Creek. Closure for 90 days. Detour route: Olive Green Marengo Fulton Rd to Kanable Rd to E Liberty North Rd. PICKAWAY COUNTY PID: 105157 Project 18-0038 Project Staff: HOLBROOK, JEFFREY A \ SHREVE, DONALD R Contractor: Start: February 2018 Complete: August 2018 Estimated Cost: $124,802 FAYETTE COUNTY Chip seal Deer Creek Wildlife Area Roads D-51, D-58, D-62, parking lots F-1, F-5, and F-6, and access roads to parking lots F-5 and F-6. Coordinate maintenance of traffic with ODNR. PICKAWAY COUNTY Chip seal Waters Rd. Coordinate maintenance of traffic with ODNR. 41 PID: 102841 Project 17-0600 Project Staff: HOLBROOK, JEFFREY A \ SHREVE, DONALD R Contractor: Start: April 2018 Complete: October 2018 Estimated Cost: $4,065,593 PICKAWAY COUNTY U.S. Route 22 Resurfacing from Fayette County Line to SR-104. Repairs on structures PIC-22-0755 over Slate Run, PIC-22-1050 over Yellowbud Creek and PIC-22-1358 over Lick Run. Daytime restriction: maintain one lane of two-way traffic using flaggers. Temporary traffic signals shall maintain traffic for structure work. U.S. Route 62 Resurfacing from Madison County Line to Franklin County Line. Daytime restriction: maintain 1 lane of 2-way traffic using flaggers. UNION COUNTY PID: 88614 Project 17-0335 Project Staff: VIOLET, DONALD J \ DANIEL, JACOB B Contractor: Start: June 2017 Complete: June 2019 Estimated Cost: $1,859,841 UNION COUNTY State Route 31 Replacement of SR-31 over Mill Creek structure. SR-31 closed for 120 days. Detour: Elwood to Maple to 5th (cars) or Stocksdale (trucks). 43 PID: 101246 Project 18-0155 Project Staff: VIOLET, DONALD J \ KIRBY, MELISSA J Contractor: Start: April 2018 Complete: October 2018 Estimated Cost: $4,949,974 UNION COUNTY U.S. Route 33 Resurfacing from Logan County Line to the western Marysville Corp Limit. Temporary lane closures during non-peak hours. Short term ramp closures. State Route 287 Resurfacing from Logan County Line to SR-739I. Daytime restriction: maintain one lane of two-way traffic using flaggers. State Route 739I Resurfacing from SR-287 to SR-739. Daytime restriction: maintain one lane of two-way traffic using flaggers. State Route 739 Resurfacing from SR-739I to 0.02 miles north of Honda Pkwy. Daytime restriction: maintain 1 lane of two-way traffic using flaggers. 44 PID: 91391 Project 18-0115 Project Staff: VIOLET, DONALD J \ KIRBY, MELISSA J Contractor: Start: April 2018 Complete: October 2018 Estimated Cost: $515,960 UNION COUNTY State Route 38 Urban resurfacing from southern Marysville Corp Limit (Walker Woods Ln) to north of 7th St within City of Marysville. Daytime restriction: maintain one lane of two-way traffic using flaggers. 45 PID: 100681 Project Project Staff: VIOLET, DONALD J \ KIRBY, MELISSA J Contractor: Start: July 2018 Complete: November 2018 Estimated Cost: $1,000,000 UNION COUNTY State Route 739 Partial depth pavement repairs from SR-347 to SR-31. Daytime restriction: maintain one lane of two-way traffic using flaggers. UNI-33/287/739-0.00/0.00/0.28 Shelly Company UNI-38-7.61 Shelly Company MRW-CR 15-5.01 V O Menuez & Son Inc. PIC-22/62-0.00/0.00 Shelly Company UNI-31-0.23 Eagle Bridge Company Axis Civil Construction LLC MAR-95-14.25 Shelly & Sands Inc. UNI-739 SP FY18 MRW-42/61/314-PPM FY18 MRW-95-0.24 MRW-95-16.10 PIC Deer Creek State Park Shelly Company MRW/MAR-95/309-8.13/22.62(MRW) MAD-70-8.62 MRW-Mt Gilead State Park FY19 MAD/PIC-71-4.56/0.00 MAD-42-5.92 MAD-38-13.88 Shelly Company MAR-23-1.85/2.04 MAR-23-10.63 Shelly & Sands Inc. MAR-23-16.75/18.15 MAR-309-19.59 26 29 30 31 32 37 42 39 38 40 34 Projects with a * next to the number are local projects that are ODOT let. Contact locals for utility coordination.