2018 ANNUAL FORUM “2019 – WHERE TO FROM HERE?” 7 TH NOVEMBER 2018
54

2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Jul 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

2 0 1 8 A N N U A L F O R U M

“ 2 0 1 9 – W H E R E T O F R O M H E R E ? ”

7 T H N OV E M B E R 2 0 1 8

Page 2: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

WELCOMET H A N K YO U A L L F O R YO U R AT T E N DA N C E , W I T H PA RT I C U L A R

T H A N K S TO O U R G U E S T S A N D G U E S T

S P E A K E R S

Page 3: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

CONSTRUCTION SAFETY PARTNERSHIP FORUM 2018

“2019 – where to from here?”

The Construction Sector is on the rise and nearly 18,000 people joined the industry in 2017/18.

How do we manage the health and safety issues arising from this growth?

Six CSPAC working groups will provide progress updates for their objectives.

Page 4: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

PAT B R E E N , T DM I N I S T E R O F S TAT E F O R T R A D E ,

E M P L OY M E N T, BU S I N E S S , E U D I G I TA L S I N G L E M A R K E T A N D DATA P ROT E C T I O N

Page 5: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

C O N S T R U C T I O N P E R S P E C T I V E S :

Page 6: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

T O M PA R LO N

D I R E C TO R G E N E R A L , C I F

Page 7: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

D R . S H A R O N M C G U I N N E S S

C H I E F E X E C U T I V E , H S A

Page 8: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

F R A N K VA U G H A N

D I R E C TO R O F L E A R N I N G , I C T U

Page 9: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

2018 CSPAC AWARDS FOR INNOVATION IN SAFETY• ‘Innovation in Safety - Design’

– Winner: Ward & Burke Construction Limited

• ‘Innovation in Safety - Construction & Maintenance’ – Winner: BAM Building

• ‘Innovation in Safety - Products and Services’ – Winner: Salus Training Services Limited

Page 10: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

C O N S T R U C T I O N S A F E T Y W E E K 2 0 1 8I N I T I A L F E E D B A C K

J OA N N A K I E R N A NC O M M U N I C AT I O N S E X E C U T I V E , C I F

Page 11: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

C S P A C 3 Y E A R P L A N : O B J E C T I V E U P D A T E S

Page 12: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

O B J E C T I V E 1 :TO IMPROVE SAFETY AND HEALTH FOR SMALL CONTRACTORS, THE SELF-EMPLOYED AND ALL WORKING ON SMALL PROJECTS

Page 13: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 1: TO IMPROVE SAFET Y AND HEALTH FOR SMALL CONTRACTORS, THE SELF-EMPLOYED AND ALL WORKING ON SMALL PROJECTS

Goals:

• To improve the health and safety management systems for small contractors and the self-employed through initiatives such as organising mentoring and support by larger contractors and by the promotion of BeSMART Construction

• To support Continuous Professional Development amongst small contractors and the self-employed including the CPD requirements of the Construction Industry Register or Ireland (CIRI) register

• To review Client guidance with a view to helping small contractors and the self-employed assess and demonstrate competence.

Page 14: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 1 - ACHIEVEMENTS

• >500 persons trained in CIF’ Site Supervisor Safety Programme (SSSP)

• Partnered with the HSA in developing a course: ‘An Introduction to Construction Safety (for small contractors and the self-employed)’

• Developed the CIF Virtual Academy for provision of free, online CPD training materials

• Monthly webinars held on topics of interest (e.g. mental health, intoxicant testing, protection from skin cancer)

• Developed a Lesson Learned / Best Practice portal for the sharing of safety alerts and industry success stories

• 9x Videos, 5x Webinars and 6x Posters developed for Construction Safety Week 2018.

Page 15: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

PORTAL FOR SHARING LESSONS LEARNED / BEST CASE

https://cif.ie/safety/

Page 16: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 1 – WORK IN PROGRESS

• Continue to roll-out the CIF’ Site Supervisor Safety Programme (SSSP)

• Seek to explore opportunities of synergy with industry and stakeholders

• Develop new CPD materials accessible via CIF Virtual Academy

• Monthly webinars on topics of interest

• Promote and further develop the Lesson Learned / Best Practice facility.

Page 17: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

O B J E C T I V E 2 :TO IMPROVE AND PROMOTE SAFETY AND HEALTH INNOVATION IN THE SECTOR

Page 18: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 2: TO IMPROVE AND PROMOTE SAFET Y AND HEALTH INNOVATION IN THE SECTOR

Goals:

• To continue to run and promote the CSPAC Innovation in Safety Award

• To update the CSPAC website and to have the website act as a portal for information on new innovative technologies

• To promote innovation in education including encouraging and supporting eLearning module initiatives relevant to the construction sector

• To review the current PSDP and PSCS training available and ensure they are mutually supportive and consistent

• To commit to the efficient communications of safety alerts and other safety information to all members.

Page 19: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 2 - ACHIEVEMENTS

Developed scoring criteria and launched 3x CSPAC Innovation in Safety Awards:

• ‘Innovation in Safety - Design’

– Winner: Ward & Burke Construction Limited• ‘Innovation in Safety - Construction & Maintenance’

– Winner: BAM Building

• ‘Innovation in Safety - Products and Services’

– Winner: Salus Training Services Limited

Page 20: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

INNOVATION IN SAFETY – IN DESIGNWinner: Ward & Burke Construction Limited• The innovative Rebar Truss System was developed to support vertical

reinforcement cages prior to pouring in-situ concrete walls

• The rebar trusses improve Health, Safety and Wellbeing are beneficial on multiple fronts:

– Use of Acrow Props has been avoided

– The design of the Truss was developed with workers on the ground in relation installation and tying of the steel

– Workers are much happier using MEWP’s as opposed to Ladders for securing the steel cages to the Trusses

– Fixing rebar to the trusses is much safer and the formwork gang can work on the wall soon after the cages are in place.

Page 21: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

INNOVATION IN SAFETY – IN DESIGNWinner: Ward & Burke Construction Limited

Page 22: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

INNOVATION IN SAFETY – CONSTRUCTION & MAINTENANCEWinner: BAM Building• The BAM Ireland project team on the Blackpitts Hotel and Blackpitts Student

Accommodation projects undertook a pilot study to look at how the risk of workers being exposed to RCS dust could be eliminated as far as possible

– Using BIM to design out the hazard– Co-operation with designers at an early stage to allow for using products that

eliminated the production of RCS dust– Partnership approach with Hilti, tool supplier, where 95% of sub-contractors

purchased extraction units for their tools– Maintaining awareness, via site induction, RCS dust notice boards and regular talks

meant that all contractors were aware of the policies and procedures and the elimination of RCS became the acceptable norm

– Regular auditing of compliance– Using full face masks for RPE prevented inhalation of RCS dust, ensured eye

protection didn't steam-up and eliminated the need to be close shaven.

Page 23: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

INNOVATION IN SAFETY – CONSTRUCTION & MAINTENANCE

Winner: BAM Building

Page 24: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

INNOVATION IN SAFETY – PRODUCTS OR SERVICES

Winner: Salus Training Services Limited• Developed a course entitled “Advanced Underground Asset Protection”

– The course entails the use of the CAT 4 and its Signal Generator which allows for information to be gathered and Data Logged back to a laptop

– Introduce participants to the use of Ground Probing Radar, Soil Pick, Hand Held GPR which is capable of detecting PE and PP pipes which are not conductors and therefore not detectable by conventional means.

– Demonstrate a Magnetometer which can identify “Bell Joints” on steel pipes

– Use of a Vac Unit to extract soil after it has been pulverised by the Soil Pick hence protecting operatives and high value and hazardous services such as Gas, Electricity, Fiber Optics and a number of others.

Page 25: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

INNOVATION IN SAFETY – PRODUCTS OR SERVICES

Winner: Salus Training Services Limited

Page 26: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

O B J E C T I V E 3 :SAFETY CONSULTATION, WORKER ENGAGEMENT AND SAFETY REPRESENTATIVES

Page 27: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 3:SAFETY CONSULTATION, WORKER ENGAGEMENT AND SAFETY REPRESENTATIVES

Goals:

• To promote workers participation through consultation and engagement with employers and to support the role of the safety representative

• To investigate the feasibility of establishing a safety representative group

• To continue to run and promote the CSPAC Safety Representative Award.

Page 28: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

PROVISIONS FOR SAFETY REPS

• Under Section 25 of the Safety, Health and Welfare at Work Act 2005, all employees are entitled to select a safety representative to represent them on safety and health matters with their employer

• Under Regulation 23 of the 2013 Construction Regulations where more than 20 persons are employed at any one time on a construction site, the project supervisor for the construction stage must facilitate the appointment of a safety representative.

Page 29: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 3 - ACHIEVEMENTS• Reviewed existing resources / training materials for Construction Safety

Representatives

• Developed a scope of work for development of a mobile app for Construction Safety Representatives (which unfortunately proved cost prohibitive)

• Launched the 2018 Construction Safety Representative Award

• Investigated synergies with the Construction Workers Health Trust for onsite presence with respect to AED and mental health services.

Page 30: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 3 – WORK IN PROGRESS

• Promote the role of Construction Safety Representatives at a site level and by writing to employers

• Leverage the HSA’ BeSMART 2-min video for awareness of role

• Further develop ‘draft’ posters to raise awareness of Construction Safety Representative role for sites.

Page 31: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

EXISTING HSA RESOURCES

• 2-min video on BeSMART.ie

• Information Sheet

• Resource Book

• Safety Reps & Safety Consultation Guidelines

Page 32: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

2018 AWARD – APPLICATIONS SOUGHT

Page 33: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

POSTERS – IN DEVELOPMENT

Page 34: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

O B J E C T I V E 4 :OCCUPATIONAL HEALTH IN CONSTRUCTION

Page 35: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 4:OCCUPATIONAL HEALTH IN CONSTRUCTION

Goals:

• Raise awareness of risks from construction dusts and promote safer work practices in the industry

• Raise awareness of risks of other occupational related cancers such as the increased risk of skin cancer for outdoor workers

• Promote initiatives to support construction workers with psychosocial issues.

Page 36: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 4 - ACHIEVEMENTS

Achievements:

• Participated in 2x Social Dialogue Workshops on RCS with FIEC & EFBWW

• Manual, Checksheet, Training Materials and FAQ’s developed as an information pack for the construction sector

• Press release for SunSmart in June 2018 with Infographic generated and supporting live webinar with the Irish Cancer Society and Deb Group

• Live webinars on Mental Health and Stress Management with Pieta House and FL Safety Training

• Met with Mates in Mind, Pieta House, Laya Healthcare to determine best potential employee assistance programme for mental health.

Page 37: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar
Page 38: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar
Page 39: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Manual drafted for RCS 13x Toolbox Talks for Dust Management

Page 40: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

OBJECTIVE 4 – WORK IN PROGRESS

• Finalisation and dissemination of information pack on RCS for the construction sector

• Support 2x MSc students investigating exposure to RCS on construction sites

• Continue to explore opportunities to partner with entity for provision of mental health services for construction personnel (e.g. Laya, VHI, Inspire).

Page 41: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

O B J E C T I V E 5 :TRAINING, QUALIFICATIONS AND PROFESSIONALISM

Page 42: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar
Page 43: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

CSPAC Objective 5Training, Qualifications and Professionalism

To ensure training programmes deliver the best outcomes for the construction sector.

SOLAS Construction Services Unit:-• Safe Pass Programme• 21 Construction Skills Programmes• 14 Quarrying Skills Programmes• Card Management System

Page 44: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

CSPAC Objective 5Training, Qualifications and Professionalism

In recognition of the importance and current challenges SOLAS established:-

Stakeholder Oversight Group• To consider the future arrangements of the schemes

Technical Working Group • To provide oversight and guidance on the process review of the current

operations and process of the national construction schemes.

• Bearing Point Report

• Consultation Paper/Submissions

Page 45: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Programme Review

• Signing Lighting and Guarding • Health and Safety at Road Works• Scaffolding Programme• Safe Pass Version 8• Transition Year Grant

Page 46: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Group Members

John Egan – CIFJim Bulger - L.A.John Coleman – Engineers IrelandMichael McDonagh/Aisling Davis – H.S.A.Jim Coughlan - ICTUTony Pearson - SOLAS

Page 47: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Thank You

Page 48: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

O B J E C T I V E 6 :CLIENTS, DESIGNERS AND PROJECT SUPERVISORS FOR THE DESIGN PROCESS

Page 49: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Objective

• To continue to review procurement procedures and advise relevant bodies on effectiveness of these with regard to improving safety and health in a practical way

• To engage with the Department of Housing, Planning, Community and Local Government and other Client Bodies to develop initiatives to simplify clients duties under both the construction regulations and the BCaR regulations.

Page 50: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Identified Issues

• Late PSDP appointment by/on behalf of Client

• Lack of awareness of specific Client liabilities/responsibilities in relation to PSDP appointments/competences

• No consistent analysis of adequate resources/competence

• Spectrum of procurement models/metrics for PSDP engagement

Page 51: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Potential Solutions 1

• Integration of PSDP appointment/AF1 within Planning/BCAR/project timelines.

• Insert to be included in Client Guidelines specifically highlighting potential client liabilities. (Sections 77/81 SHWW 2005 et seq.).

• Create baseline accepted resource levels to COP standard of compliance. Define consistent price/quality ratio for tendering PSDP role.

Page 52: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

Potential Solutions 2

• Post Hoc Assessment of representative projects to assess PSDP inputs/impacts to inform/amend resource levels.

• Compare/contrast/benchmark Client data on PSDP role.

• Maintain dialogue with Client stakeholders on streamlining PSDP appointment procedures/oversight.

Page 53: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

C O N S T R U C T I O N I N 2 0 1 9 - F O R E C A S TJ E A N E T T E M A I RE C O N O M I C & P O L I C Y R E S E A R C H E X E C U T I V E , C I F

Page 54: 2018 ANNUAL FORUM - Partnership · • The innovative Rebar Truss System was developed to support vertical reinforcement cages prior to pouring in -situ concrete walls • The rebar

THANK YOU