Page 1: 2018-2022 Financial Plan - Metro Vancouver

2018-2022 Financial Plan METRO VANCOUVERBoard Budget Workshop – October 20, 201723502824

Page 2: 2018-2022 Financial Plan - Metro Vancouver

2

LONG TERM FINANCIAL PLANNINGProcess – The Driver for Change

• Board Strategic Planning Workshop – February 25, 2017

• Need for a long-term financial framework• Statutory required 5 year plans – members, MVRD• Financial stability / sustainability

• Significant capital requirements• Population growth• Regulatory mandated upgrades• Aging infrastructure• Financial and resource constraints

Page 3: 2018-2022 Financial Plan - Metro Vancouver

3

Regional Management Plans

Supplemental Plans

Page 4: 2018-2022 Financial Plan - Metro Vancouver

4

LONG TERM FINANCIAL PLANNINGProcess – Thinking Long Term

• Thinking longer term• Proactive vs reactive

• Think strategically• Management plans aligned• Asset Management – maintain vs replace• Operational impacts

• Financial planning evolution• One year• Five year• Long-term

Page 5: 2018-2022 Financial Plan - Metro Vancouver

5

LONG TERM FINANCIAL PLANNINGShaping the Plan – Two Scenarios

Developed two scenarios:

Steady as we go Moderate level of risk Service levels maintained Generally consistent with annual budget process

Slowing things down Increased level of risk Service levels tempered - growth Fiscally driven

Page 6: 2018-2022 Financial Plan - Metro Vancouver

Themes

Addressing regional growth

System stewardship

Environmental protection & climate action

Opportunities for new & enhanced services

Page 7: 2018-2022 Financial Plan - Metro Vancouver

7

WHAT WE HEARD

Page 8: 2018-2022 Financial Plan - Metro Vancouver

8

Next steps – March to October

2018 Annual Budget

2018 to 2022 Five Year Financial Plan

Development of Long Term Plans

Page 9: 2018-2022 Financial Plan - Metro Vancouver

9

2 0 1 8 B U D G E T O V E R V I E W

Page 10: 2018-2022 Financial Plan - Metro Vancouver

10

2 0 1 8 B U D G E T OV E RV I E W – E X P E N D I T U R E S

Water District

36%

Liquid Waste35%

Solid Waste13%

Regional District7%

Housing Corporation

9%

2017$ in millions

2018$ in millions

Change%

WaterDistrict $265.1 $271.3 2.3%

Liquid Waste $236.2 $265.4 12.3%

Solid Waste $94.4 $101.6 7.6%

MVHC $48.1 $50.7 5.6%

Regional District $65.4 $68.5 4.7%

Total $709.2 $757.5 6.8%

Page 11: 2018-2022 Financial Plan - Metro Vancouver

11

2 0 1 8 - 2 0 2 2 B U D G E T OV E RV I E W – E X P E N D I T U R E S

($ in millions) 2017 2018 2019 2020 2021 2022

Water District $265.1 $271.3 $288.4 $313.6 $338.9 $367.8

Liquid Waste $236.2 $265.4 $299.1 $338.9 $383.8 $417.9

Solid Waste $94.4 $101.6 $102.1 $103.9 $105.2 $106.7

Housing $48.1 $50.7 $52.5 $52.8 $55.5 $58.6

Regional District $65.4 $68.5 $70.1 $70.8 $72.6 $74.6

Total Expenditures $709.2 $757.5 $812.2 $880.0 $956.0 $1,025.6

% Change 6.8% 7.2% 8.4% 8.6% 7.3%

Page 12: 2018-2022 Financial Plan - Metro Vancouver

12

2 0 1 8 B U D G E T OV E RV I E W – R E V E N U E S O U R C E S

2017$ in millions

2018$ in millions

Change%

Water Sales $261.7 $269.8 3.1%

GVS&DD Levy $213.9 $232.1 8.5%

Solid Waste Tipping Fee $85.4 $93.5 9.5%

Housing Rents $36.8 $38.8 5.7%

Tax Requisitions $51.9 $55.5 7.0%

External Revenues $27.7 $25.7 (7.2%)

Other* $31.8 $42.1 31.7%

Total $709.2 $757.5 6.8%

Water Sales36%

Sewer Levy31%

Solid Waste Tipping Fee

12%

Housing Rents

5%

Tax Requisitions

7%

External Revenues

3%Other*

6%

* Other revenue sources include reserves, BOD/TSS, DCC.

Page 13: 2018-2022 Financial Plan - Metro Vancouver

13

2 0 1 8 - 2 0 2 2 B U D G E T OV E RV I E W – R E V E N U E

($ in millions) 2017 2018 2019 2020 2021 2022

Water Sales $261.7 $269.8 $287.1 $312.3 $337.6 $366.5

GVS&DD Levy $213.9 $232.1 $255.8 $277.0 $305.6 $330.6

Tipping Fees $85.4 $93.5 $93.9 $94.9 $96.5 $97.7

Housing Rents $36.8 $38.8 $40.0 $41.0 $42.0 $43.1

MVRD Requisition $51.9 $55.5 $57.7 $59.3 $61.1 $63.1

External Revenues $27.7 $25.7 $25.2 $25.6 $25.2 $25.7

Other (DCC,BOD/TSS,Reserves) $31.8 $42.1 $52.5 $69.9 $88.0 $98.9

Total Revenues $709.2 $757.5 $812.2 $880.0 $956.0 $1,025.6

% Change 6.8% 7.2% 8.4% 8.6% 7.3%

Page 14: 2018-2022 Financial Plan - Metro Vancouver

14

2017 2018 2019 2020 2021 2022

Water District $162 $165 $172 $184 $196 $209

Liquid Waste $188 $201 $218 $231 $250 $266

Solid Waste $56 $56 $55 $55 $55 $55

Regional District $46 $48 $49 $50 $50 $51

Total Household Impact $452 $470 $494 $520 $551 $581

% Change 4.1% 5.1% 5.1% 6.0% 5.3%

2 0 1 8 - 2 0 2 2 B U D G E T OV E RV I E W – H O U S E H O L D I M PA C T 1

1 Average based on $1.14 Million assessed home value.

Page 15: 2018-2022 Financial Plan - Metro Vancouver

15

2 0 1 8 - 2 0 2 2 B U D G E T O V E R V I E W – C A P I TA L E X P E N D I T U R E S

($ in millions) 2017 2018 2019 2020 2021 2022

Water $163.1 $206.1 $320.8 $374.9 $422.5 $422.5

Liquid Waste $163.7 $354.9 $594.4 $727.2 $534.9 $447.8

Solid Waste $26.8 $31.1 $59.0 $49.6 $15.0 $1.5

Housing $12.6 $20.0 $26.0 $8.0 $0 $0

Regional Parks $11.3 $12.1 $12.5 $12.4 $12.5 $12.5

Total Capital Expenditures $377.5 $624.2 $1,012.7 $1,172.1 $984.9 $884.3

Page 16: 2018-2022 Financial Plan - Metro Vancouver

16

B U D G E T OV E RV I E W D e b t M a n a g e m e n t 2 0 0 8 - 2 0 1 7

Funding provided by: ($ in millions)

15 Year Debt Financing $1,081.0 48%

Pay As You Go Financing

Contributions from Operations $791.0

Reserves (Housing & Regional Parks) $127.8

Applied Surplus $251.6

$1,170.4 52%

Total 2008-2017 Capital Expenditures $2,251.4

Page 17: 2018-2022 Financial Plan - Metro Vancouver

17

B U D G E T OV E RV I E W D e b t M a n a g e m e n t 2 0 1 8 - 2 0 2 2

Funding provided by: ($ in millions)

15 Year Debt Financing $3,194.4 68%

Pay As You Go Financing

Senior Government Contributions $405.3

Contributions from Operations $898.3

Reserves (Housing & Regional Parks) $104.0

Applied Surplus $76.2

$1,483.8 32%

Total 2018-2022 Capital Expenditures $4,678.2

Page 18: 2018-2022 Financial Plan - Metro Vancouver

18

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N OV E RV I E WTo t a l E x p e n d i t u r e s

($ millions) 2017 % 2018 % 2019 % 2020 % 2021 % 2022 %

Operations $440.6 62.1% $469.2 61.9% $471.2 58.0% $479.3 54.5% $490.2 51.3% $496.9 48.5%

Debt Service $129.4 18.3% $125.9 16.6% $143.2 17.6% $190.3 21.6% $252.7 26.4% $310.1 30.2%

Contribution to Capital $139.2 19.6% $162.4 21.5% $197.8 24.4% $210.4 23.9% $213.1 22.3% $218.6 21.3%

Total $709.2 $757.5 $812.2 $880.0 $956.0 $1,025.6

Page 19: 2018-2022 Financial Plan - Metro Vancouver

19

2 0 1 8 B U D G E T OV E RV I E W P r o p o s e d R e s e r v e A p p l i c a t i o n s

Debt Avoidance:

• New Capital Items $83.0 M

One-time Expenditures:

• Software Development $2.5 M

• Other $7.2 M $9.7 M

Equipment Purchases $0.4 M

Total $93.1 M

Page 20: 2018-2022 Financial Plan - Metro Vancouver

20

2 0 1 8 B U D G E T OV E RV I E W P r o j e c t e d R e s e r v e s

($ in millions) 2018

Operating Reserves $51.6 M

Designated Reserves $225.7 M

Sewer DCC Reserves $315.0 M

Total $592.3 M

Page 21: 2018-2022 Financial Plan - Metro Vancouver

21

WATER SERVICESGREATER VANCOUVER WATER DISTRICT

Page 22: 2018-2022 Financial Plan - Metro Vancouver

22

$ millions 2017 2018 % Change

Water Sales $261.7 $269.8 3.1%

Other External Revenues

$1.2 $1.2 (4.2%)

Reserves $2.1 $0.3 (85.7%)

Total Revenues $265.1 $271.3 2.3%

2 0 1 8 WAT E R B U D G E T OV E RV I E W

Revenues Expenditures

$ millions 2017 2018 % Change

Operating $107.5 $111.8 4.0%

Debt Service $97.1 $91.0 (6.2%)

Contribution to Capital $60.5 $68.5 13.2%

Total Expenditures $265.1 $271.3 2.3%

Page 23: 2018-2022 Financial Plan - Metro Vancouver

23

2 0 1 8 WAT E R C A P I TA L P R O G R A M

2018 Capital Program is $206.1 M.2018 Major Capital Projects

• Fleetwood Reservoir Construction ($12M)

• Jericho Reservoir Construction ($10.5M)

• Clayton Reservoir ($10M)

• Second Narrows Crossing (Tunnel) Construction ($10M)

• Annacis Main No. 5 Marine Crossing Design ($8.1M)

• South Delta Main No. 1 (28 Ave to 34B Ave) ($7M)

• Whalley Main ($8M)

Growth$69.1M

Opportunity$0.3M

Resilience$56.0M

Maintenance$51.1M

Upgrade$29.6M

Page 24: 2018-2022 Financial Plan - Metro Vancouver

2017 2018 2019 2020 2021 2022

Total Expenditures($ Millions) $265.1 $271.3 $288.4 $313.6 $338.9 $367.8

% Change 2.3% 6.3% 8.7% 8.1% 8.5%

Blended Water Rate ($/m3) $0.6728 $0.6990 $0.7399 $0.7966 $0.8583 $0.9259

% Change 3.9% 5.9% 7.7% 7.7% 7.9%

Total Capital Expenditures ($ Millions) $163.1 $206.1 $320.8 $374.9 $422.5 $422.5

Household Impact ($)

% Change 1.5% 4.7% 6.8% 6.3% 6.7%

2 0 1 8 - 2 0 2 2 WAT E R F I N A N C I A L P L A N

Page 25: 2018-2022 Financial Plan - Metro Vancouver

2018 - 2022 Capital Program is $1.75B2018 – 2022 Major Capital Projects• Second Narrows Crossing (Tunnel) ($282.5M)

• Annacis Main No. 5 (Marine Crossing) ($165.1M)

• Coquitlam Main No. 4 ($164.3M)

• Coquitlam Intake No. 2 (Tunnel and Treatment) ($67.5M)

• Kennedy Newton Main ($113.1M)

• Capilano Main No. 5 (South Shaft to Lost Lagoon) ($76.1M)

• Central Park Main Replacement ($59.1M)

• Douglas Road Main No. 2 Still Creek ($52.1M)

25

2 0 1 8 - 2 0 2 2 WAT E R C A P I TA L P R O G R A M

Growth$823.3M

Opportunity$300,000

Resilience$510.5M

Maintenance$347.4M

Upgrade$65.1M

Page 26: 2018-2022 Financial Plan - Metro Vancouver

26

2 0 1 8 WAT E R B U D G E T H I G H L I G H T S

2018 Budget Key Actions:• Implement new Drinking Water Conservation Plan• Secure additional water allocation for the Coquitlam source• Commence development of an updated Drinking Water Management Plan• Complete regional assessment of residential water metering and recommended strategy for

Board consideration• Complete the development of an Environmental Management System for Water Services• Complete erosion control works on Sisters Creek in the Capilano Watershed• Commission the new sodium hypochlorite system at the Coquitlam Water Treatment Plant• Optimize operations at the Capilano Raw Water Pump Station and Energy Recovery Facility

Proposed Staffing Changes:• Project Engineer - to support water planning initiatives related to the Joint Water Use Plan

and enhanced Demand by Sector reporting• Utilities System Controller - to provide increased coverage in the Utility Systems Control

Room

Page 27: 2018-2022 Financial Plan - Metro Vancouver

27

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N – WAT E R S E RV I C E S

• Complete Coquitlam Intake No. 2 project definition and commence preliminary design

• Commence construction of Coquitlam Main No. 4• Commence construction of Annacis Water Supply Tunnel• Commence construction of Second Narrows Water Supply Tunnel• Implement backup power at major pump stations• Complete replacement of Central Park Main and Douglas Road Main• Commence construction of Capilano Main No. 5 (Stanley Park Section)• Implement watershed bridge replacement program• Implement final phase of treated water pH and alkalinity adjustments

Page 28: 2018-2022 Financial Plan - Metro Vancouver

28

LIQUID WASTE SERVICESGREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

Page 29: 2018-2022 Financial Plan - Metro Vancouver

29

$ millions 2017 2018 % Change

Levy $213.9 $232.1 8.5%

DCCs $6.8 $12.9 89.8%

Reserves $4.3 $7.5 72.5%

Fees $11.2 $12.8 14.4%

Total Revenues $236.2 $265.4 12.3%

2 0 1 8 L I Q U I D WA S T E B U D G E T OV E RV I E W

Revenues Expenditures

$ millions 2017 2018 % Change

Operating $153.5 $165.1 7.5%

Debt Service $17.9 $25.6 42.5%

Contribution to Capital $64.8 $74.7 15.3%

Total Expenditures $236.2 $265.4 12.3%

Page 30: 2018-2022 Financial Plan - Metro Vancouver

30

2 0 1 8 L I Q U I D WA S T E C A P I TA L P R O G R A M

2018 Capital Program is $354.9 M.

2018 Major Capital Projects

• Sapperton Pump Station ($19.0M)

• Annacis Stage 5 Expansion ($131.1M)

• South Surrey Intercepter Johnston Section ($11.4M)

• AIWWTP Cogeneration Backup Power ($30.6M)

• NSWWTP Secondary Upgrade and Conveyance ($12.3M)

• Iona Secondary Treatment Upgrade Project Definition ($5.2M)

Growth$220.6M

Opportunity$13.8M

Resilience$45.7M

Maintenance$44.0M

Upgrade$30.8M

Page 31: 2018-2022 Financial Plan - Metro Vancouver

2017 2018 2019 2020 2021 2022

Total Expenditures ($ Millions) $236.2 $265.4 $299.1 $339.0 $383.8 $417.9

% Change 12.3% 12.7% 13.3% 13.2% 8.9%

GVS&DD Sewer Levy ($ Millions) $213.9 $232.1 $255.8 $277.0 $305.6 $330.6

% Change 8.5% 10.2% 8.3% 10.3% 8.2%

Total Capital Expenditures ($ Millions) $163.7 $354.9 $594.4 $727.2 $534.9 $447.8

Household Impact ($)

% Change 6.8% 8.1% 6.1% 8.3% 6.2%

2 0 1 8 - 2 0 2 2 L I Q U I D WA S T E F I N A N C I A L P L A N

Page 32: 2018-2022 Financial Plan - Metro Vancouver

32

2 0 1 8 - 2 0 2 2 L I Q U I D WA S T E F I N A N C I A L P L A NVa n c o u v e r S e w e r a g e A r e a

2017 2018 2019 2020 2021 2022Total Expenditures

($ Millions) $71.8 $81.7 $87.4 $94.7 $101.1 $103.5

% Change 13.7% 7.0% 8.4% 6.7% 2.4%

VSA Sewer Levy ($ Millions) $65.4 $73.4 $79.0 $80.4 $84.8 $91.7

% Change 12.3% 7.5% 1.8% 5.5% 8.1%

Total Capital Expenditures ($ Millions) $29.2 $41.4 $70.9 $54.2 $36.7 $56.3

Household Impact ($)

% Change 10.3% 6.1% 0.6% 4.2% 6.8%

Page 33: 2018-2022 Financial Plan - Metro Vancouver

33

2 0 1 8 - 2 0 2 2 L I Q U I D WA S T E F I N A N C I A L P L A NN o r t h S h o r e S e w e r a g e A r e a

2017 2018 2019 2020 2021 2022Total Expenditures

($ Millions) $21.4 $23.7 $25.4 $30.8 $39.3 $46.5

% Change 10.7% 6.9% 21.6% 27.5% 18.4%

NSSA Sewer Levy ($ Millions) $20.4 $22.0 $23.3 $28.3 $36.3 $43.1

% Change 7.6% 6.0% 21.8% 28.1% 18.7%

Total Capital Expenditures ($ Millions) $14.2 $17.3 $165.5 $309.0 $201.0 $53.5

Household Impact ($)

% Change 6.6% 4.6% 20.2% 26.5% 17.2%

Page 34: 2018-2022 Financial Plan - Metro Vancouver

34

2 0 1 8 - 2 0 2 2 L I Q U I D WA S T E F I N A N C I A L P L A NL u l u I s l a n d W e s t S e w e r a g e A r e a

2017 2018 2019 2020 2021 2022Total Expenditures

($ Millions) $20.3 $21.3 $23.3 $25.1 $27.9 $30.9

% Change 5.0% 9.3% 7.7% 11.4% 10.6%

LIWSA Sewer Levy ($ Millions) $19.3 $19.9 $21.2 $22.4 $24.7 $26.9

% Change 3.1% 6.5% 5.7% 10.0% 8.9%

Total Capital Expenditures ($ Millions) $7.8 $20.2 $23.3 $21.3 $31.2 $36.3

Household Impact ($)

% Change 1.2% 5.0% 2.9% 8.6% 6.1%

Page 35: 2018-2022 Financial Plan - Metro Vancouver

35

2 0 1 8 - 2 0 2 2 L I Q U I D WA S T E F I N A N C I A L P L A NF r a s e r S e w e r a g e A r e a

2017 2018 2019 2020 2021 2022Total Expenditures

($ Millions) $119.9 $135.9 $160.6 $186.1 $213.2 $234.6

% Change 13.3% 18.2% 15.9% 14.6% 10.1%

FSA Sewer Levy ($ Millions) $106.3 $114.0 $129.6 $143.1 $157.1 $166.1

% Change 7.2% 13.7% 10.4% 9.8% 5.7%

Total Capital Expenditures ($ Millions) $112.5 $276.0 $334.7 $342.7 $266.0 $301.7

Household Impact ($)

% Change 6.1% 10.7% 7.7% 7.1% 3.6%

Page 36: 2018-2022 Financial Plan - Metro Vancouver

2018 - 2022 Capital Program is $2.66B2018 – 2022 Major Capital Projects

• Annacis Outfall System ($273.5M)

• Burnaby Lake North Interceptor ($131.6M)

• Northwest Langley WWTP Expansion ($205.5M)

• NSWWTP Secondary Upgrade and Conveyance ($726.7M)

• Gilbert/Brighouse Trunk Pressure Sewer ($68.3M)

• Golden Ears SSO Storage ($60.7M)

• South Surrey Interceptor Twinning ($59.0M)

36

2 0 1 8 - 2 0 2 2 L I Q U I D WA S T E C A P I TA L P R O G R A M

Growth$1,350.4M

Opportunity$20.1M

Resilience$101.3M

Maintenance$290.4M

Upgrade$897.0

Page 37: 2018-2022 Financial Plan - Metro Vancouver

37

2 0 1 8 L I Q U I D WA S T E B U D G E T H I G H L I G H T S

2018 Budget Key Actions:• Biosolids stockpile management• One time energy costs - Annacis Cogeneration project • Combined sewer separation plans for Cambie-Heather and Canoe Creek • Still Creek–Brunette River Drainage Area - flood plain mapping• Hydrodynamic model for Burrard Inlet• Co-Digestion and Trucked Liquid Waste Program Review• Commencing testing for contaminants of emerging concern

Proposed Staffing Changes:• Chemist/Analyst - to analyze contaminants of emerging concern• Policy Analyst - to assess and analyze Source Control issues • WWTP Operator - to operate the Solids Handling Facility at Iona Island WWTP• Maintenance Mechanic - to maintain the Northwest Langley WWTP

Page 38: 2018-2022 Financial Plan - Metro Vancouver

38

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N - L I Q U I D WA S T E

• Clearing stockpiled biosolids at Iona and Northwest Langley WWTP• Update the Integrated Liquid Waste and Resource Management Plan• Asset Management Plan• Review of Food Sector Grease Interceptor Bylaw• Biosolids Drying Facility study• Hydrothermal Liquefaction pilot • Develop combined sewer separation plans for Metro Vancouver trunk sewers

Page 39: 2018-2022 Financial Plan - Metro Vancouver

39

SOLID WASTE SERVICESGREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

Page 40: 2018-2022 Financial Plan - Metro Vancouver

40

$ millions 2017 2018 % Change

Tipping Fees $85.4 $93.5 3.1%

Energy Sales $5.7 $5.8 1.0%

Other External Revenues

$3.3 $2.3 (29.7%)

Total Revenues $94.4 $101.6 7.6%

2 0 1 8 S O L I D WA S T E B U D G E T OV E RV I E W

Revenues Expenditures

$ millions 2017 2018 % Change

Operating $88.0 $97.6 10.9%

Debt Service $1.5 $1.0 (32.0%)

Contribution to Reserve $4.9 $3.0 (39.6%)

Total Expenditures $94.4 $101.6 7.6%

Page 41: 2018-2022 Financial Plan - Metro Vancouver

41

2 0 1 8 S O L I D WA S T E C A P I TA L P R O G R A M

2018 Capital Program is $31.1 M.2018 Major Capital Projects

• Coquitlam Transfer Station Replacement ($5.0M)

• Surrey RDO Siting, Design and Construction ($5.7M)

• WTEF Secondary Economizers Replacement Construction ($4.0M)

• WTEF Furnace Liner Upgrade Construction ($2.5M)

• Weigh Scale Replacement ($1.5M)

Waste-to-Energy

$8.6

Landfills$6.7MTransfer

Stations$13.7M

Opportunity$2.1M

Page 42: 2018-2022 Financial Plan - Metro Vancouver

42

2 0 1 8 - 2 0 2 2 S O L I D WA S T E F I N A N C I A L P L A N

2017 2018 2019 2020 2021 2022

Total Expenditures ($ Millions) $94.4 $101.6 $102.1 $103.9 $105.2 $106.7

% Change 7.6% 0.6% 1.8% 1.3% 1.4%

Tipping Fees ($ Millions) $85.4 $93.5 $93.9 $94.9 $96.5 $97.7

% Change 9.5% 0.5% 1.1% 1.6% 1.3%

Total Capital Expenditures ($ Millions) $26.8 $31.1 $59.0 $49.6 $15.0 $1.5

Household Impact ($)

% Change 0.7% (1.7%) (0.8%) (0.2%) (0.5%)

Page 43: 2018-2022 Financial Plan - Metro Vancouver

43

2 0 1 8 - 2 0 2 2 S O L I D WA S T E F I N A N C I A L P L A N

2017 2018 2019 2020 2021 2022

Tipping Fees

Up to 1 tonne $133 $137 $141 $145 $150 $155

1 to 9 tonnes $112 $115 $119 $122 $126 $130

Over 9 tonnes $80 $82 $85 $87 $90 $93

Municipal $100 $103 $106 $109 $113 $116

Proposed Tonnage 804,000 850,000 825,000 800,000 787,000 775,000

Page 44: 2018-2022 Financial Plan - Metro Vancouver

2018 - 2022 Capital Program is $156.2M2018 – 2022 Major Capital Projects

• Coquitlam Transfer Station Replacement ($50.0M)

• Surrey Small Vehicle Drop-off Facility ($26.0M)

• WTEF Scrubber ($46.6M)

• WTEF Infrastructure Allowance ($12.5M)

44

2 0 1 8 - 2 0 2 2 S O L I D WA S T E C A P I TA L P R O G R A M

Waste-to-Energy$66.6M

Landfills$8.5M

Transfer Stations$79.0M

Opportunity$2.1M

Page 45: 2018-2022 Financial Plan - Metro Vancouver

45

2 0 1 8 S O L I D WA S T E B U D G E T H I G H L I G H T S

2018 Budget Key Actions:• Main budget drivers are amount of waste and cost of contingency disposal• Support for regional waste prevention, including the National Zero Waste Council• New regulatory framework for Generator Levy, Hauler Licensing, and Bylaw 181 update• New resources and programs for increased waste diversion• WTEF upgrades, and commissioning of non-ferrous metal recovery• Development of new Coquitlam Transfer Station, and Surrey Small Vehicle facility

Page 46: 2018-2022 Financial Plan - Metro Vancouver

46

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N - S O L I D WA S T E

• Coquitlam Transfer Station replacement• Surrey Small Vehicle Drop-Off• New solid waste regulatory framework• Construction & demolition waste recycling options/regulatory framework• Organics management regulatory framework• Expanded Polystyrene Disposal Ban• Advocate for mattress and bulky furniture extended producer responsibility• National Zero Waste Council initiatives• North Shore Transfer Station structural modifications• Acid gas reduction project• Organics and construction & demolition waste regulatory framework

implementation.• New Coquitlam Transfer Station and Surrey Small Vehicle Drop-Off operations• Integrated Solid Waste and Resource Management Plan (ISWRMP) targets • Transfer station operating contract expiry

Page 47: 2018-2022 Financial Plan - Metro Vancouver

47

METRO VANCOUVER HOUSING CORPORATION

Page 48: 2018-2022 Financial Plan - Metro Vancouver

48

$ millions 2017 2018 % Change

Housing Rents $36.8 $38.8 5.7%

Subsidies $3.3 $2.0 (38.4%)

Other External Revenues

$1.0 $1.2 15.6%

Reserves $7.0 $8.7 24.7%

Total Revenues $48.1 $50.7 5.6%

2 0 1 8 M V H C B U D G E T OV E RV I E W

Revenues Expenditures

$ millions 2017 2018 % Change

Operating $27.2 $25.4 (6.5%)

Debt Service $12.7 $8.2 (35.6%)

Capital Replacement $7.0 $8.7 24.7%

Contribution to Reserve $1.2 $8.4 590.0%

Total Expenditures $48.1 $50.7 5.6%

Page 49: 2018-2022 Financial Plan - Metro Vancouver

49

2 0 1 8 M V H C C A P I TA L P R O G R A M

Heather Place Building A

$17.0M

Kingston Gardens Phase 1$3.0M

2018 Major Capital Projects

• Start construction of Heather Place. Building A consists of 67 housing units, community kitchen, indoor playing court and other community amenities.

• Kingston Gardens deconstruction of units and start construction of the new 83 housing unit building

Page 50: 2018-2022 Financial Plan - Metro Vancouver

50

2 0 1 8 - 2 0 2 2 M V H C F I N A N C I A L P L A N

2017 2018 2019 2020 2021 2022

Total Expenditures ($ Millions) $48.1 $50.7 $52.5 $52.8 $55.5 $58.6

% Change 5.6% 3.4% 0.7% 5.1% 5.7%

Capital Replacement ($ Millions) $7.0 $8.7 $9.9 $9.7 $11.4 $13.6

% Change 24.7% 13.9% (2.2%) 17.9% 18.8%

Housing Rents ($ Millions) $36.8 $38.8 $40.0 $41.0 $42.0 $43.1

% Change 5.7% 3.1% 2.4% 2.5% 2.5%

Housing Development Expenditures

($ Millions)$5.6 $20.0 $26.0 $8.0 $0 $0

Page 51: 2018-2022 Financial Plan - Metro Vancouver

51

2 0 1 8 - 2 0 2 2 M V H C C A P I TA L P R O G R A M

Heather Place

$26.0MKingston Gardens$28.0M

2018-2022 Capital Program is $54.0 M.

2018-2022 Major Capital Projects

• Heather Place Development ($26.0M)• Kingston Gardens Development ($28.0M)

Page 52: 2018-2022 Financial Plan - Metro Vancouver

52

2 0 1 8 M V H C B U D G E T H I G H L I G H T S

2018 Budget Key Actions:• Redevelopment of Heather Place and Kingston Gardens • Tenant relocation driven by redevelopment• Implementation of new asset management plan • Increase the number of tenant associations and community gardens• Building envelope projects at Evergreen Downs and Eastburn Square

complexes• Communications Program

Page 53: 2018-2022 Financial Plan - Metro Vancouver

53

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N - M V H C

2018-2022 Financial Plan Highlights:• Continue to provide clean and safe affordable

housing• Construction of Heather Place and Kingston Gardens

• Various partial and full building envelope projects• Implementation of an asset management plan• Increase in community programs and tenant

associations

Page 54: 2018-2022 Financial Plan - Metro Vancouver

54

METRO VANCOUVER REGIONAL DISTRICT

Page 55: 2018-2022 Financial Plan - Metro Vancouver

55

PARKS PLANNING AND ENVIRONMENT

AFFORDABLE HOUSING, AIR QUALITY, ELECTORAL AREA, REGIONAL PLANNING & REGIONAL PARKS

Page 56: 2018-2022 Financial Plan - Metro Vancouver

56

2 0 1 8 R E G I O N A L D I S T R I C T B U D G E T O V E RV I E WP a r k s , P l a n n i n g a n d E n v i r o n m e n t

$ millions 2017 2018 %Change

Affordable Housing $0.7 $2.0 170.5%

Air Quality $10.3 $10.5 1.9%

Electoral Area Service $0.6 $0.7 20.3%

Regional Planning $3.0 $3.1 3.2%

Regional Parks $36.2 $37.5 3.5%

Expenditures

Page 57: 2018-2022 Financial Plan - Metro Vancouver

57

2 0 1 8 R EG I O N A L PA R KS C A P I TAL P RO G R A M

Regional Parks Land Acquisition

$4.0M

Capital Maintenance

$4.0M

Capital Development

$4.1M

2018 Capital Program is $12.1 M. 2018 Major Capital Projects

• Colony Farm Sheep Paddocks Trail($1.5 M)

• Aldergrove Day Use Area & Trails ($0.5M)

• Belcarra – Connection to Water ($0.4M)

Page 58: 2018-2022 Financial Plan - Metro Vancouver

$ millions 2017 2018 %Change 2019 %

Change 2020 %Change 2021 %

Change 2022 % Change

Affordable Housing $0.7 $2.0 170.5% $2.1 2.8% $2.1 1.2% $2.2 1.3% $2.2 1.6%

Air Quality $10.3 $10.5 1.9% $10.5 0.4% $10.5 (0.5%) $10.6 1.8% $10.8 1.8%

Electoral Area Service $0.6 $0.7 20.3% $0.6 (11.7%) $0.7 5.2% $0.6 (1.9%) $0.7 15.4%

Regional Planning $3.0 $3.1 3.2% $3.2 3.2% $3.3 3.3% $3.4 2.8% $3.4 0.6%

Regional Parks $36.2 $37.5 3.5% $38.6 2.9% $39.4 2.0% $40.8 3.8% $42.3 3.5%

2 0 1 8 - 2 0 2 2 R E G I O N A L D I S T R I C T F I N A N C I A L P L A NP a r k s , P l a n n i n g a n d E n v i r o n m e n t

Page 59: 2018-2022 Financial Plan - Metro Vancouver

59

2 0 1 8 - 2 0 2 2 R E G I O N A L PA R K S C A P I TA L P R O G R A M

Regional Parks Land Acquisition

$20.0M

Capital Maintenance

$18.7M

Capital Development

$23.3M

2018-2022 Capital Program is $62.0 M. Major Capital Projects

• Colony Farm Sheep Paddocks Trail($3.1M)

• Pacific Spirit Service Yard Replacement ($2.8M)

• Belcarra South Picnic Area and Cabins ($2.8M)

Page 60: 2018-2022 Financial Plan - Metro Vancouver

60

2018 Budget Key Actions:• Develop a ‘Metro Vancouver Affordable Rental Housing 10-Year Action Plan’• Implementation plan for the Regional Affordable Housing Strategy• Climate 2050 – integrated framework for regional climate action• Air Quality regulatory and permit fee review• Adopt and implement Electoral Area A Official Community Plan• Complete an Agricultural Viability Study for Barnston Island• Complete the 2018 local election

2 0 1 8 R E G I O N A L D I S T R I C T B U D G E T O V E RV I E WP a r k s , P l a n n i n g a n d E n v i r o n m e n t

Page 61: 2018-2022 Financial Plan - Metro Vancouver

61

2018 Budget Key Actions (continued):• Develop 100 year growth scenarios• Develop Regional Industrial Lands Strategy• Completion and adoption of Parks Land Acquisition Strategy• Colony Farm Sheep Paddocks Trail

Proposed Staffing Changes:• Policy Coordinator – to lead consultation activities on Air quality bylaws and regulations• Policy Analyst – to undertake policy development and climate change related projects• Special Events Assistant – to support park event throughout the region• Policy Analyst – to develop long-range data forecasts

2 0 1 8 R E G I O N A L D I S T R I C T B U D G E T O V E RV I E WP a r k s , P l a n n i n g a n d E n v i r o n m e n t

Page 62: 2018-2022 Financial Plan - Metro Vancouver

62

2018-2022 Financial Plan Highlights:• Implement a ‘Metro Vancouver Affordable Rental Housing 10-Year Action Plan’• New Air Quality Management Plan• Implementation of Climate 2050• Adopt and implement Electoral Area A Official Community Plan• Complete an Agricultural Viability Study for Barnston Island• Implement Regional Industrial Lands Strategy• Regional Growth Strategy Update• Colony Farm Sheep Paddocks Trail• Crippen Park Davies Orchard – Phase 1• Derby Reach day-use improvements• Belcarra south picnic area construction

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N - R E G I O N A L D I S T R I C TP a r k s , P l a n n i n g a n d E n v i r o n m e n t

Page 63: 2018-2022 Financial Plan - Metro Vancouver

63

METRO VANCOUVER REGIONAL DISTRICTOTHER REGIONAL DISTRICT SERVICES

Page 64: 2018-2022 Financial Plan - Metro Vancouver

64

2 0 1 8 R E G I O N A L D I S T R I C T B U D G E T O V E RV I E WO t h e r R e g i o n a l S e r v i c e s

$ millions 2017 2018 %Change

E911 Emergency Telephone Service $4.2 $4.3 2.8%

General Government $6.2 $6.8 10.2%

Labour Relations $2.7 $2.7 (1.4%)

Regional Emergency Management $0.2 $0.2 (18.1%)

Regional Global Positioning System $0.4 $0.3 (6.8%)

Sasamat Fire Protection Service $0.9 $0.4 (58.6%)

Expenditures

Page 65: 2018-2022 Financial Plan - Metro Vancouver

$ millions 2017 2018 %Change 2019 %

Change 2020%

Change 2021%

Change 2022%

Change

E911 Emergency TelephoneService $4.2 $4.3 2.8% $4.4 2.5% $4.5 2.5% $4.6 2.5% $4.7 2.5%

General Government $6.2 $6.8 10.2% $6.9 1.0% $6.7 (2.0%) $6.7 (1.3%) $6.7 0.7%

Labour Relations $2.7 $2.7 (1.4%) $2.7 1.1% $2.7 1.1% $2.8 2.1% $2.8 2.0%

Regional Emergency Management $0.2 $0.2 (18.1%) $0.2 13.0% $0.2 2.1% $0.2 (8.0%) $0.2 (20.9%)

Regional Global Positioning System $0.4 $0.3 (6.8%) $0.6 59.1% $0.4 (35.6%) $0.4 1.2% $0.4 1.1%

Sasamat Fire Protection Service $0.9 $0.4 (58.6%) $0.3 (10.1%) $0.3 2.0% $0.3 2.0% $0.4 2.0%

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N - OT H E R R E G I O N A L S E R V I C E S

Page 66: 2018-2022 Financial Plan - Metro Vancouver

66

2018 Budget Key Actions:• Enhanced Zero Waste Communication – Abandoned Waste and Textiles• Regional Prosperity Initiative – Mobile Business Licencing and a Regional Film

Portal• Expanding the National Zero Waste Council to one and a half days• Enhancements to Regional Employers Services website and base services

information and data availability

2 0 1 8 OT H E R R E G I O N A L S E RV I C E S B U D G E T H I G H L I G H T S

Page 67: 2018-2022 Financial Plan - Metro Vancouver

67

2018-2022 Financial Plan Highlights:• Continuation of Zero Waste Campaigns including: Abandoned Waste, Create Memories

Not Garbage, Love Food Hate Waste, Food Scraps, Textile Awareness• Implementation of Annual RPI Contribution – subject to creation of independent entity

with cost sharing from Federal, Provincial and local partners• Coordination and implementation of IPREM Regional Exercise Program, Regional

Recovery Framework, Disaster Debris Management Plan and Regional Risk Assessment• Review and phase in implementation of Sasamat Fire Protection Service seismic

improvement program

2 0 1 8 - 2 0 2 2 F I N A N C I A L P L A N - OT H E R R E G I O N A L S E R V I C E S

Page 68: 2018-2022 Financial Plan - Metro Vancouver

68

2 0 1 8 - 2 0 2 2 R E G I O N A L D I S T R I C T F I N A N C I A L P L A N

2017 2018 2019 2020 2021 2022Total Expenditures

($ Millions) $65.4 $68.5 $70.1 $70.8 $72.6 $74.6

% Change 4.7% 2.3% 1.0% 2.6% 2.7%

MVRD Requisition ($ Millions) $51.9 $55.5 $57.7 $59.3 $61.1 $63.1

% Change 7.0% 4.0% 2.7% 3.1% 3.3%

Total Capital ExpendituresRegional Parks

($ Millions)$11.3 $12.1 $12.5 $12.4 $12.5 $12.5

Household Impact ($)

% Change 5.3% 2.2% 0.8% 1.2% 1.6%

Page 69: 2018-2022 Financial Plan - Metro Vancouver

69

STANDING COMMITTEE FEEDBACK & SUMMARY

Page 70: 2018-2022 Financial Plan - Metro Vancouver

70

Aboriginal Relations - Community to community forum program success

Climate Action – reserve fund policy direction, additional information for new position requests, tax impact from decreasing regulatory revenue

Electoral Area – additional detail in 5 year plan, reserve fund policy direction, benefits to EA residents , clarity on average household impact

Finance and Intergovernment – reserve fund policy and application, asset condition assessments for long range planning, more detail in staff reports on budget changes, NZWC external funding, separate report on proposed RPI program, household impact by sub-region and municipality

S TA N D I N G C O M M I T T E E F E E D B A C K

Page 71: 2018-2022 Financial Plan - Metro Vancouver

71

Housing – affordable housing reserve policy, corporate reserve fund policy, targets for new affordable rental housing, staffing resources to support development

Regional Parks – deconstruction of parks buildings, rental housing in parks, impact to taxpayers of increasing parks acquisition levy

Regional Planning – additional information for new position requests, budget drivers for external legal and communications

Utilities – how growth affects capital projects, single regional rate for sewer ley and DCCs

Zero Waste – reserve fund policy direction, ongoing costs for Ashcroft Ranch

S TA N D I N G C O M M I T T E E F E E D B A C K ( c o n t i n u e d )

Page 72: 2018-2022 Financial Plan - Metro Vancouver

72

That the MVRD Board approve an increase to the 2018Contribution to the Regional Park Land Acquisition Fund by $3.8Million to bring the total contribution to $7.57 million, providedannually from the MVRD Regional Parks tax requisition.

R EG I O N A L PA R KS CO M M I T T E E R ES O LU T I O N

Page 73: 2018-2022 Financial Plan - Metro Vancouver

Average Assessed

Value(Millions)

2017 2018 % 2019 % 2020 % 2021 % 2022 %

Vancouver Sewer Area $1.682 $474 $501 5.6% $522 4.4% $536 2.5% $559 4.2% $590 5.6%

North Shore Sewer Area $1.824 $503 $524 4.2% $542 3.8% $609 12 % $706 15.9% $790 11.8%

Lulu Island West Sewer Area $1.035 $476 $484 1.6% $502 3.8% $521 3.6% $553 6.2% $582 5.2%

Fraser Sewer Area $0.846 $437 $453 3.6% $479 6.1% $508 5.7% $536 5.5% $558 4.1%

Regional Average $1.140 $452 $470 4.1% $494 5.1% $520 5.1% $551 6.0% $581 5.3%

H O U S E H O L D I M PA C T S U M M A R Y (1)

(1) Details can be referenced – Page 1 of 2018-2022 Financial Plan

Page 74: 2018-2022 Financial Plan - Metro Vancouver

Thank you