Top Banner
2017/18 SH MIP Programme - Small project application form RTC Region: e.g. Waikato Submitted by: e.g. Jack James Phone No: Date: NOC: e.g. West Waikato South Safety Project? Resilience Project? Efficiency Project? The local System Manager supports the delivery of this project? Yes PROJECT OUTLINE Activity name e.g. SH1: Warkworth and Wellsford Webcams Location/ Site Description e.g. SH 1N: RP 346/0 Source of Project e.g. Network Management Inspections, Crash Reduction Study Planning Reference Describe the problem, 50 words or less Problem/ Opportunity Describe the problem, 50 words or less Brief scope description Describe the proposed solution, 50 words or less Main Type of Intervention Choose an item. Road Classification Choose an item. Main Primary to short term impact Choose an item. OPTIONS Version 0.2 – 9/02/2018
4

2017/18 SH MIP Programme - Small project … · Web viewlocal System Manager supports the delivery of this project ? Yes PROJECT OUTLINE Activity name e.g. SH1: Warkworth and Wellsford

Apr 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2017/18 SH MIP Programme - Small project … · Web viewlocal System Manager supports the delivery of this project ? Yes PROJECT OUTLINE Activity name e.g. SH1: Warkworth and Wellsford

2017/18 SH MIP Programme - Small project application form

RTC Region: e.g. Waikato Submitted by: e.g. Jack James

Phone No:

Date:

NOC: e.g. West Waikato South

Safety Project? ☐ Resilience Project? ☐ Efficiency Project? ☐

The local System Manager supports the delivery of this project? Yes ☐

PROJECT OUTLINE

Activity name e.g. SH1: Warkworth and Wellsford Webcams

Location/ Site Description

e.g. SH 1N: RP 346/0

Source of Project e.g. Network Management Inspections, Crash Reduction Study

Planning Reference Describe the problem, 50 words or less

Problem/ Opportunity

Describe the problem, 50 words or less

Brief scope description

Describe the proposed solution, 50 words or less

Main Type of Intervention

Choose an item.

Road Classification Choose an item.

Main Primary to short term impact

Choose an item.

OPTIONS

Options Description Total Estimated Cost $

Option 1 – Do NothingOption 2 – Do MinimumOption 3Recommendation

Version 0.2 – 9/02/2018

Page 2: 2017/18 SH MIP Programme - Small project … · Web viewlocal System Manager supports the delivery of this project ? Yes PROJECT OUTLINE Activity name e.g. SH1: Warkworth and Wellsford

2017/18 SH MIP Programme - Small project application form

RECOMMENDED OPTION COST SUMMARY

Investigation cost:

Design cost:

Construction cost:

Total Estimated Cost:

PHOTOS

Title e.g. SH8 Lindis Pass Summit – View of rest area / SH8 from one proposed camera location.Notes e.g. Final location tbc

Version 0.2 – 9/02/2018

Page 3: 2017/18 SH MIP Programme - Small project … · Web viewlocal System Manager supports the delivery of this project ? Yes PROJECT OUTLINE Activity name e.g. SH1: Warkworth and Wellsford

2017/18 SH MIP Programme - Small project application form

APPROVALS (FOR ADMINISTRATOR USE ONLY – DO NOT DELETE)

Efficiency ☐

Resilience ☐

Safety ☐

SAP Project Name

SAP Project Number

(funds going to)

Minor ImprovementsFunding Variation Received By:

Ron Minnema, Tristan Hook, Ranjan Pant

(Safety / Resilience / Efficiency Manager s)

Date:

Approve: ☐

SAP Project Number - 6036011(funds coming from)

PLI ☐Contingency ☒

SAP Project Name:MIP 2015-18, Tasman

Senior Manager OPPP Approvale.g. Refer to InfoHUB link: https://infohub.nzta.govt.nz/otcs/cs.dll/properties/28886081

Date:

COMPLETION AND NOTIFICATION

Updated in SAP & TIO ☐ Senior Programme Manager, Investment and Finance

Date:

MIP Template Updated ☐ MIP Administrator Date:

Project Manager notified ☐ e.g. Jack James Date:

Version 0.2 – 9/02/2018