Top Banner
2017 AQUATIC INVASIVE SPECIES PREVENTION AID PROGRAM RESULTS COUNTY BOARD WORKSHOP DECEMBER 12, 2017
15

2017 Washington county aquatic invasive species prevention ...

Dec 10, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2017 Washington county aquatic invasive species prevention ...

2017 AQUATIC INVASIVE SPECIES

PREVENTION AID PROGRAM RESULTSCOUNTY BOARD WORKSHOP

DECEMBER 12, 2017

Page 2: 2017 Washington county aquatic invasive species prevention ...

PRESENTATION OVERVIEW

• PROGRAM

BACKGROUND

• 2017 GRANTEES

• BRIEF PROJECT

RESULTS

• NEXT STEPS

Page 3: 2017 Washington county aquatic invasive species prevention ...

BACKGROUND

• REQUEST FOR PROPOSALS PROCESS

• RANGE OF PROJECTS

• WATERCRAFT INSPECTIONS

• EDUCATION AND OUTREACH

• MANAGEMENT/CONTROL

• WATER ACCESS IMPROVEMENTS

• PLANNING

• 2017 CERTIFICATION = $132,169

• 2018 CERTIFICATION = $136,065

Page 4: 2017 Washington county aquatic invasive species prevention ...

2017 GRANTEES

1. BIG MARINE LAKE ASSOCIATION

2. CARNELIAN-MARINE-ST. CROIX WATERSHED DISTRICT

3. CLEAR LAKE ASSOCIATION

4. COMFORT LAKE-FOREST LAKE WATERSHED DISTRICT

5. LAKE DEMONTREVILLE AND OLSON ASSOCIATION

6. LAKE ELMO LAKE ASSOCIATION

7. ST. CROIX RIVER ASSOCIATION

8. WASHINGTON CONSERVATION DISTRICT

BMLA

CMSCWD

CLA

CLFLWD

LDO

LELA

SCRA

WCD

Page 5: 2017 Washington county aquatic invasive species prevention ...

• EURASIAN WATERMILFOIL CONTROL

• TREATED 10.92 ACRES WITH

GRANULAR TRICLOPYR (PLM) AND 0.73

ACRE WITH LIQUID DMA 4 VIA HIGH-

PRESSURE LANCE (BMLA)

• “BY THE END OF AUGUST ALL OF THE

PLM AREAS WERE CLEAR OF EWM

PLANTS…”

• “ROOT BALL INJECTION WAS PROVEN

TO BE VERY EFFECTIVE…”

• PLAN TO TREAT 6.2 ACRES IN 2018

• DOWN 43% FROM 2017

• CONFIDENT IN MEETING 5-YEAR GOAL OF

TREATING 5 ACRES OR LESS BY END OF ‘19

BIG MARINE LAKE ASSOCIATION BMLA

Page 6: 2017 Washington county aquatic invasive species prevention ...

• EURASIAN WATERMILFOIL CONTROL

• DESIGN, INSTALL PROTECTION

STRUCTURE AT OUTLET OF

LONG LAKE (EOR)

• PROTECT TERRAPIN AND MAYS

LAKES

• FLORISTIC QUALITY INDEX (FQI)

SCORES REFLECT HIGH QUALITY

AQUATIC PLANT COMMUNITIES

CARNELIAN–MARINE–ST. CROIX WATERSHED DISTRICT CMSCWD

Page 7: 2017 Washington county aquatic invasive species prevention ...

• EURASIAN WATERMILFOIL CONTROL

• TREATED 37.5 ACRES, CONDUCTED

FIELD TRIAL (LAKE MANAGEMENT)

• SPLIT PROCESS LIQUID 2,4-D

• SPLIT PROCESS LIQUID TRICLOPYR

• SINGLE PASS LIQUID 2,4-D

• FIELD TRIAL RESULTS: SINGLE PASS

TREATMENT GAVE EQUAL OR

BETTER CONTROL THAN SPLIT PASS

PROCESS USING EITHER 2,4-D OR

TRICLOPYR

CLEAR LAKE ASSOCIATION CLA

Page 8: 2017 Washington county aquatic invasive species prevention ...

• WATERCRAFT INSPECTIONS

ON FOREST LAKE

• INCREASE TOTAL HOURS TO

2,500

• FLOWERING RUSH MANAGEMENT

ON FOREST LAKE

• EDUCATION AND OUTREACH

• CONTROL

• TREATED 40.2 ACRES

WITH DIQUAT X 2 (PLM)

Public Water

Access

Total

Hours

Inspections/

Hour

Forest 1 994.5 2.8

Forest 2 741.75 1.5

Forest 3 1015.5 2.5

Total 2,751.75 2.3

COMFORT LAKE – FOREST LAKE WATERSHED DISTRICT CLFLWD

Page 9: 2017 Washington county aquatic invasive species prevention ...

• EURASIAN WATERMILFOIL

CONTROL

• TREATED 25 ACRES

WITH LIQUID 2,4-D

(PLM)

• COMBINE MID-LAKE

AND SHORELINE

TREATMENTS

LAKE DEMONTREVILLE AND OLSON ASSOCIATION LDO

Page 10: 2017 Washington county aquatic invasive species prevention ...

• EURASIAN WATERMILFOIL

CONTROL

• HARVESTED 3.3 ACRES

(DOCKSIDE)

• AN ESTIMATED 45,000 LB

BIOMASS REDUCTION

• ALMOST 2X AS 2016

LAKE ELMO LAKE ASSOCIATION LELA

Page 11: 2017 Washington county aquatic invasive species prevention ...

• MET WITH MARINA

GM’S TO DISCUSS AIS

ISSUES

• PROVIDED MARINAS

WITH AIS

INFORMATIONAL

MATERIALS,

ESPECIALLY ARTICLES

FOR MEMBER

NEWSLETTERS

ST. CROIX RIVER ASSOCIATION SCRA

Page 12: 2017 Washington county aquatic invasive species prevention ...

• CONDUCTED AIS OUTREACH

AND EDUCATION

• ID WORKSHOPS

• IMPLEMENTED SEASONAL

WATERCRAFT INSPECTION

PROGRAM

• IMPLEMENTED PRIORITY

RECOMMENDATIONS FROM THE

“PREVENTION, EARLY DETECTION,

AND RAPID RESPONSE PLAN”

• WCD EARLY DETECTION PROGRAM

WASHINGTON CONSERVATION DISTRICT WCD

Page 13: 2017 Washington county aquatic invasive species prevention ...

Watercraft inspections49%

Control/management39%

Education/outreach6%

Early detection/rapid response5%

Project management/admin1%

CLFLWD

WCD

CLFLWD

SCRA

WCD

WCD

CLFLWD

SCRA

WCD

BMLA

CLA

CLFLWD

CMSCWD

LDO

LELA

2017 AIS PREVENTION AIDPERCENT OF TOTAL AWARDED

Page 14: 2017 Washington county aquatic invasive species prevention ...

NEXT STEPS

DEC. 19TH COUNTY BOARD AGENDA: REQUEST APPROVAL OF RESOLUTION TO

ACCEPT AND CONTINUE IMPLEMENTATION OF THE STATE’S AIS

PREVENTION AID PROGRAM

JAN. 8TH RELEASE REQUEST FOR PROPOSALS

FEB. 9TH PROPOSAL DEADLINE

MAR. 6TH COUNTY BOARD WORKSHOP: GRANT RECOMMENDATIONS

MAR. 28TH ICE OUT ON BIG CARNELIAN (2017)

APR. 10TH COUNTY BOARD AGENDA: REQUEST APPROVAL OF GRANT

AGREEMENTS

MAY 12TH FISHING OPENER

Page 15: 2017 Washington county aquatic invasive species prevention ...

QUESTIONS? COMMENTS?