FALL • 2017 TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT 0795_072117 “Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.” COLLIN COUNTY CONSTRUCTION PROJECTS 2017 HIGHWAY PROJECTS: Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Michelle Releford Public Information Officer (214) 320-4485 • [email protected]TxDOT graphic SOURCE: Texas Department of Transportation. COLLIN COUNTY PROJECTS UNDER CONSTRUCTION CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete 1 0047-06-133 US 75 Interchange improvements Interchange improvements Nov-2015 May-2016/ Oct-2018 Zachry Construction Corp. $37.5 M 40% 2 0047-06-139 US 75 From Spring Creek Parkway To SH 121 S. (Sam Rayburn Tollway) Widen 6-lanes to 8-lanes & frntg rds. Dec-2013 Apr-2014/ Nov-2017 MCM $47.5 M 99% 3 0047-06-159 US 75 From Dallas County Line to Telephone Rd. Full depth concrete repair Mar-2017 Sep-2017/ Dec-2017 O. Trevino Construction, LLC $0.66 M 14% 4 0047-14-068 US 75 From Telephone Rd (CR 275) to north of Melissa Rd. Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds Aug-2012 Sep-2013/ Nov-2017 Ed Bell Construction Company $63.6 M 99% 5 0047-14-069 US 75 From north of Melissa Rd. to south of FM 455 interchange Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds Dec-2015 Jul-2016/ Dec-2019 Austin Bridge & Road Services, LP $79.4 M 42% 6 0047-14-082 US 75 At SH 121 Interchange Landscape treatment of ROW and medians Jul-2017 Mar-2019 AALC, Inc. $2.8 M 0% 7 0091-03-025 SH 289 From FM 455 to north of BUS 289C Landsacpe enhancement Mar-2017 Jun-2017/ Dec-2019 AALC, Inc. $1.4 M$ 32% 8 0091-05-073 SH 289 From PGBT to SH 121 Landsacpe enhancement Aug-2016 Dec-2016/ May-2018 AALC, Inc. $0.47 M 96% 9 0135-11-018 US 380 From west of CR 26 (Denton C/L) to CR 73 (Lovers Lane) east of SH 289 Widen existing 4-ln to 6-ln divided w/ grade separation at SH 289 & DNT Nov-2014 Mar-2014/ Oct-2018 Mario Sinacola & Sons, Excavating, Inc. $58 M 48% 10 0549-03-025 SH 121 At SH 160 Construction of SH 160 grade separation Jan-2016 Oct-2016/ Mar-2018 Austin Bridge & Road Services, LP $14.8 M 70% 11 0549-03-027 SH 121 From SH 5 to 1.65 miles west of FM 455 Widen 2-ln rural to 4-ln divided highway May-2015 Oct-2015/ Oct-2018 Lone Star Civil Construction, Inc. $43.9 M 47% 12 0816-04-044 FM 455 From US 75 NB frontage road to SH 5 Widen facility to 4-ln urban divided ulitimate 6-ln dvided Mar-2013 Aug-2015/ Dec-2017 Lone Star Civil Construction, Inc. $12.4 M 96% 13 0816-05-019 FM 2862 At Elm Grove Creek Replace bridge & approaches Jun-2017 TBD/ Apr-2018 Pierce R & B LLC. $1.6 M 6% 14 1013-01-026 FM 546 From SH 5 to east of County Line/Airport Rd. Construct 4-ln divided facility May-2016 Jan-2017/ Oct-2018 Mario Sinacola & Sons, Excavating, Inc. $17.4 M 61% 15 1973-01-014 FM 1461 From SH 289 to FM 2478 Provide additional paved surface width Jun-2017 TBD/ Apr-2018 Austin Bridge & Road Services, LP $2.7 M 7% 16 2679-03-010 FM 2514 From FM 1378 to east of Lavon Parkway Realign highway construct 4ln divided Mar-2015 Aug-2016/ Nov-2017 Ed Bell Construction Company $6.3 M 99% 17 2977-01-008 FM 2933 From FM 1827 to CR 335 Provide additional paved surface width Jul-2017 TBD Austin Bridge & Road Services, LP $1.6 M 0% 18 3392-01-008 FM 2786 From SH 5 to east of Angel Pkwy. in City of Allen Widen to 4-ln div. (6-ln ultimate) with SH 5 intersection improvements Dec-2014 Apr-2016/ Aug-2018 Ed Bell Construction Company $15.8 M 55% 19 0387-01-014 FM 75 From Main St. to CR 461 Reconstruct existing pavement Aug-2017 Oct-2017/ Apr-2018 Jagoe-Public Co $1.4 M 0% ESTIMATED TOTAL $407.8 M NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017. 1 2 3 8 5 4 7 9 10 11 12 15 13 14 18 16 6 17 19 N 2 miles 30 67 COLLIN CO. COLLIN CO. COLLIN CO. DENTON CO. COLLIN CO. DENTON CO. COLLIN CO. DALLAS CO. COLLIN CO. DALLAS CO. GRAYSON CO. FANNIN CO. COLLIN CO. COLLIN CO. GRAYSON CO. ROCKWALL CO. 78 78 78 78 78 78 78 66 121 121 121 121 455 543 545 545 981 455 982 547 546 544 3356 3133 2862 2862 1377 1827 1827 2933 1377 2756 2194 1461 3038 2478 2478 2478 2478 2514 3537 1138 1138 2755 1778 McKINNEY Melissa New Hope Lowry Crossing Princeton Fairview Fate Sasche Garland Richardson Celina Anna Westminster Van Alstyne Weston Prosper Lucas Parker Wylie Lavon Nevada Blue Ridge Trenton Farmersville Allen Addison Plano FRISCO DALLAS Murphy Royse City 5 5 5 5 5 380 380 380 380 75 75 75 75 121 160 121 289 289 121 289 289 190 190 190 205 121 DNT DNT 75 6 6 McKinney Municipal Airport Lavon Lake Lake Ray Hubbard ROCKWALL 2551 1461 455 359 455 Project Limits
8
Embed
2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0795
_072
117
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”COLLIN COUNTY CONSTRUCTION PROJECTS
2017 HIGHWAY PROJECTS:
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONMichelle RelefordPublic Information Officer(214) 320-4485 • [email protected]
TxDOT graphicSOURCE: Texas Department of Transportation.
COLLIN COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0047-06-133 US 75 Interchange improvements Interchange improvements Nov-2015May-2016/Oct-2018
Zachry Construction Corp.
$37.5 M 40%
2 0047-06-139 US 75From Spring Creek Parkway To SH 121 S. (Sam Rayburn Tollway)
Widen 6-lanes to 8-lanes & frntg rds. Dec-2013Apr-2014/Nov-2017
MCM $47.5 M 99%
3 0047-06-159 US 75From Dallas County Line to Telephone Rd.
Full depth concrete repair Mar-2017Sep-2017/Dec-2017
O. Trevino Construction, LLC
$0.66 M 14%
4 0047-14-068 US 75From Telephone Rd (CR 275) to north of Melissa Rd.
Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds
Aug-2012Sep-2013/Nov-2017
Ed Bell Construction Company
$63.6 M 99%
5 0047-14-069 US 75From north of Melissa Rd. to south of FM 455 interchange
Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds
Dec-2015Jul-2016/Dec-2019
Austin Bridge & Road Services, LP
$79.4 M 42%
6 0047-14-082 US 75 At SH 121 InterchangeLandscape treatment of ROW and medians
Jul-2017 Mar-2019 AALC, Inc. $2.8 M 0%
7 0091-03-025 SH 289From FM 455 to north of BUS 289C
Landsacpe enhancement Mar-2017Jun-2017/Dec-2019
AALC, Inc. $1.4 M$ 32%
8 0091-05-073 SH 289 From PGBT to SH 121 Landsacpe enhancement Aug-2016Dec-2016/May-2018
AALC, Inc. $0.47 M 96%
9 0135-11-018 US 380From west of CR 26 (Denton C/L) to CR 73 (Lovers Lane) east of SH 289
Widen existing 4-ln to 6-ln divided w/ grade separation at SH 289 & DNT
Nov-2014Mar-2014/Oct-2018
Mario Sinacola & Sons, Excavating, Inc.
$58 M 48%
10 0549-03-025 SH 121 At SH 160Construction of SH 160 grade separation
Jan-2016Oct-2016/Mar-2018
Austin Bridge & Road Services, LP
$14.8 M 70%
11 0549-03-027 SH 121From SH 5 to 1.65 miles west of FM 455
Widen 2-ln rural to 4-ln divided highway
May-2015Oct-2015/Oct-2018
Lone Star Civil Construction, Inc.
$43.9 M 47%
12 0816-04-044 FM 455From US 75 NB frontage road to SH 5
Widen facility to 4-ln urban divided ulitimate 6-ln dvided
Mar-2013Aug-2015/Dec-2017
Lone Star Civil Construction, Inc.
$12.4 M 96%
13 0816-05-019 FM 2862 At Elm Grove Creek Replace bridge & approaches Jun-2017TBD/ Apr-2018
Pierce R & B LLC. $1.6 M 6%
14 1013-01-026 FM 546From SH 5 to east of County Line/Airport Rd.
17 2977-01-008 FM 2933 From FM 1827 to CR 335 Provide additional paved surface width Jul-2017 TBDAustin Bridge & Road Services, LP
$1.6 M 0%
18 3392-01-008 FM 2786From SH 5 to east of Angel Pkwy. in City of Allen
Widen to 4-ln div. (6-ln ultimate) with SH 5 intersection improvements
Dec-2014Apr-2016/Aug-2018
Ed Bell Construction Company
$15.8 M 55%
19 0387-01-014 FM 75 From Main St. to CR 461 Reconstruct existing pavement Aug-2017Oct-2017/Apr-2018
Jagoe-Public Co $1.4 M 0%
ESTIMATED TOTAL $407.8 M
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.
1
2
3
8
5
4
7
9
10
11
12
15
13
14
18
16
6
17
19
N
2 miles30
67
COLLIN CO. COLLIN CO.
COLLIN CO.
DENT
ON CO
.
COLL
IN CO
.
DENT
ON CO
.
COLL
IN CO
.
DALLAS CO.
COLLIN CO.
DALLAS CO.
GRAYSON CO.
COLL
IN CO
.CO
LLIN
CO.
HUNT
CO.
FANNIN CO.
COLLIN CO.
COLLIN CO.
GRAYSON CO.
ROCKWALL CO.
78
78
78
78
78
78
78
66
66
121121
121
121
455
543
545
545
981
981
455
982
547
546
544
3356
3133
2862
2862
13771827
1827
2933
1377
2756
2194
1461
3038
2478
2478
2478
2478
2514
3537
1138
11382755
1778
1777
McKINNEY
Melissa
New Hope
LowryCrossing
Princeton
Fairview
Fate
Sasche
Garland
Richardson
Celina
Anna
Westminster
Van Alstyne
Weston
Prosper
Lucas
Parker
Wylie Lavon
Nevada
BlueRidge
Trenton
Farmersville
Allen
Addison
Plano
FRISCO
DALLAS
Josephine
Murphy
Royse City
5
5
5
5
5
380
380
380
380
75
75
75
75
121160
121
289
289
121
289
289
190
190
190
205
121
69
DNT
DNT
75
36
6
6
McKinneyMunicipal Airport
LavonLake
Lake RayHubbard
ROCKWALL
2551
1461
455
359
455
Project Limits
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0799
_072
717
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”DALLAS COUNTY CONSTRUCTION PROJECTS
2017 HIGHWAY PROJECTS:
TxDOT graphicSOURCE: Texas Department of Transportation.
DALLAS COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0281-02-039 SH 78From Spring Creek Pkwy. to SH 205
Widen to 6-lane divided roadway
Jun-2012Sep-2013/Nov-2017
Glenn Thurman, Inc. $21.3 M 92%
2 0364-02-017 SH 121From S of FM 2499 to N of BUS 121H
Convert 4-lane to 10-lane hwy with FRs (Phase 2)
Jul-2013Mar-2014/Dec-2017
OHL USA, Inc. $58.8 M 93%
3 0918-45-761 CSOn S Marsalis Ave. at Five Mile Creek - 0.077 mi.
Replace bridge and approaches
Jun-2014Mar-2015/Nov-2017
Massana Construction, Inc.
$2.9 M 98%
4 0918-45-757 CSFrom 2nd Ave. to White Rock Creek
Replace bridge and approaches
Aug-2017Oct-2017/May-2019
Sema Construction $2.8 M 0%
5 0918-45-864 CSOn Whitlock Rd. from I-35E to Old Denton Rd. in Carrollton
Reconstruct rdwy to 4-lane divided facility
Jul-2014Oct-2016/Jan-2018
Tiseo Paving Co. $3.4 M 53%
6 0353-05-088 SL 12 From W of Midway to US 75Intersection improvements
Aug-2014Feb-2015/Nov-2017
Rebcon, Inc. $7.7 M 92%
7 0009-02-045 SH 78From Garland Rd. from S of Tranquilla to SP 244 (NW Hwy.)
Nine intersection improvements
Feb-2015 TBDLone Star Civil Construction, Inc.
$7.8 M 0%
8 0353-05-082 SL 12From W of Harry Hines to W of Midway in Dallas
Intersection improvements & utility adjustments
May-2015Nov-2015/Nov-2017
Ragle Construction, Inc.
$6.7 M 91%
9 0196-03-256 I-35E From SP 348 to Valley View LnMill and inlay; mainlanes/shoulders
Jun-2015Aug-2015/Dec-2017
Oldcastle Materials Texas, Inc.
$7.3 M 98%
10 2374-03-077 I-20From W of Haymarket Rd. to W of US 175 in City of Dallas
Construct frontage roads and ramps connecting I-20
Jun-2015Feb-2016/Oct-2017
Haydon Building Corp.
$7.4 M 95%
11 0092-14-080 I-345 From I-30 to SP 366Rehab. Julius Schepps: overhead bridge repair/replace steel elements
Sep-2015Feb-2016/Jul-2018
Gibson & Associates, Inc.
$30.5 M 83%
12 0442-02-157 I-35E From I-20 to LP 12Full depth repair and overlay mainlanes
Sep-2015Apr-2016/Dec-2017
Austin Bridge & Road Services, LP
$3.2 M 98%
13 0918-45-791 CSRed Oak Rd. at Ten Mile Creek in City of Lancaster
Rehab existig bridge and approaches
Nov-2015May-2016/Sep-2017
Hodges and Son Constru. Co., Inc.
$1.3 M 98%
14 1068-04-122 I-30From Belt Line Rd. to MacArthur Blvd.
Construct 3-lane frontage road
Dec-2015Jul-2016/Aug-2018
Haydon Central, LLC $25.2 M 55%
15 0197-02-122 US 175 From I-45 to E of Bexar St.Extend US 175; recon SM Wright/SH 310
Feb-2016Jun-2016/Sep-2019
Webber, LLC $103.9 M 55%
16 1068-04-148 I-30 From NW 7th St. to Belt Line Rd.Construct 3-lane EB frontage road & ramp mods
Feb-2016May-2016/Jul-2018
Austin Bridge & Road Services, LP
$8 M 48%
17 2374-04-077 I-20From E of Kirnwood Dr. to Wheatland Rd.
Intersection improvements
May-2016Sep-2016/Aug-2017
Texas-Reyes Group, Ltd.
$1.2 M 99%
18 0092-02-122 SH 310 From I-20 to 0.91 mi. S of SL 12Improve guardrail to design standards
Jun-2016Sep-2016/Oct-2017
Ragle Construction, Inc.
$1.3 M 99%
19 0009-11-233 I-30 At St. FrancisConstruct pedestrian bridge
Jul-2016May-2017/May-2018
Rama Enterprises, LLC
$2.3 M 15%
20 0095-02-102 US 80From I-635 from S of Gross Rd. to US 80 to US 80 from Gus Thomasson to Galloway
Ramp mods and additional lane on FR
Jul-2016Nov-2016/Sep-2019
Sterling Delaware Holding Company, Inc.
$10.4 M 55%
More Projects On Back Page »TxDOT graphicSOURCE: Texas Department of Transportation.
20
8
12
16 14
1
2
3
5
6
7
10
11
13
15
17
18
4
9
35E
35E
35E
35E
35E
DNT
DNT
DALLAS
635635
635
2020
45
45
45
20
20
30
30
30
121
114
114161
161
360
360
360
360
180
180
342
342
342
352352
183
356
183
121
121
121
190190
289
289
190
190
190
205
205
1382
1382
N
5 miles
75
75
75
67
80
80
80
67
77
77
67
78
78
6666
78
78
12
12
12
12
12
Lavon Lake
COLLIN CO.
DALLAS CO.
DENTON CO.
TARR
ANT C
O.
COLLIN CO.
DALLAS CO.
ROCK
WALL
CO.
DALL
AS CO
.
DALL
AS CO
.
DALLAS CO.
ELLIS CO.
DALLAS CO.
ELLIS CO.
KAUF
MAN
CO.
DALL
AS CO
.
TARR
ANT C
O.
DALL
AS CO
.
1171
544
740
740
548
269
550
175
175
175
3039
2757
660
664664
664
Garland Rd.
Mesquite
Garland
Richardson
PlanoLewisville
Sachse
Murphy
Irving
Grand Prairie
Las Colinas
FarmersBranch
Coppell Carrollton
Addison
Duncanville
Desoto
Hutchins Seagoville
WilmerLancaster
Forney
Crandall
Lawson
Combine
Sunnyvale
Mesquite
Garland
Richardson
PlanoLewisville
Sachse
Murphy
Irving
Grand Prairie
Las Colinas
FarmersBranch
Coppell Carrollton
Addison
Duncanville
Desoto
Hutchins Seagoville
WilmerLancaster
Forney
Crandall
Lawson
Combine
Sunnyvale
Balch Springs
Rowlett
WylieSaintPaul
Lavon
Rowlett
WylieSaintPaul
Lavon
ROCKWALL
WhiteRockLake
Lake RayHubbard
Mountain CreekLake
NorthLake
Dallas Love FieldAirport
Dallas ExecutiveAirport
DFW Int’l.Airport
Joe PoolLake
W Belt Line Rd.
S B
elt Li
ne Rd
.
University Park
Highland Park
Cockrell Hill
University Park
Highland Park
Cockrell Hill
HeathHeath
Red Oak
Oak LeafOvilla
FerrisRed Oak
Oak LeafOvilla
Ferris
Shiloh Rd.
E Belt Line Rd.
Malloy Bridge Rd.
LancasterRegionalAirport
MesquiteMetro
Airport
S Be
l t Lin
e Rd.
77
287
Projects from Reverse PageProjects Under Construction
6730
Balch Springs
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0799
_072
717
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”DALLAS COUNTY CONSTRUCTION PROJECTS
2017 HIGHWAY PROJECTS:
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONMichelle Releford – Public Information Officer(214) 320-4485 • [email protected]
DALLAS COUNTY PROJECTS UNDER CONSTRUCTION
CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost
% Complete
21 1047-03-070 FM 1382At Cedar Hill State Park Spine Rd.
Install traffic signal; hike/bike trails
Jul-2016Mar-2017/Mar-2018
FNH Construction. LLC
$6 M 57%
22 0047-07-229 US 75From SP 366 (Woodall Rodgers Frwy.) to I-635 in City of Dallas
Landscape development Aug-2016Nov-2016/Aug-2018
DBI Services, LLC $0.8 M 79%
23 2374-02-149 I-635At Elam Rd. and at Lake June Rd.
Landscape development Aug-2016Nov-2016/Jul-2018
AALC, Inc. $0.8 M 60%
24 0196-03-272 I-35EFrom Oak Lawn Ave. to Harry Hines Blvd.
Mill, full depth repair and overlay on FR
Oct-2016Apr-2017/Dec-2017
Austin Bridge & Road Services, LP
$3.3 M 47%
25 0353-04-095 SH 114From Freeport Pkwy. to Esters Blvd.
Construct WB FR and ramp mods
Jan-2017Apr-2017/Dec-2017
Ed Bell Construction Company
$3.9 M 50%
26 0197-02-118 US 175 From Lake June Rd. to I-20WB FR, mill, full depth repair, overlay & pav markings
Feb-2017Apr-2017/Dec-2017
Austin Bridge & Road Services, LP
$1.5 M 98%
27 0047-06-160 US 75 From I-635 to PGBT SH 190 Water blast barrier and walls Mar-2017May-2017/Nov-2017
S & S Bridge Painting, Inc.
$0.7 M 95%
28 0581-02-145 SL 12From Shady Grove Rd. to SH 183
Mill, full depth repair and overlay
Apr-2017TBD/ Jan-2018
O. Trevino Constru., LLC
$1.5 M 15%
29 0261-02-074 US 67From Belt Line Rd. to Wheatland Rd.
Widen frwy. from 4-lanes to 6-lanes
May-2017Sep-2017/Sep-2019
Flatiron Contractors, Inc.
$59 M 0%
30 1047-03-072 FM 1382From E Grand Prairie Rd. to N of SH 180
Retaining wall and bridge abutment repairs
May-2017Oct-2017/Mar-2018
Ragle Construction, Inc.
$1.7 M 0%
31 0009-03-045 SH 66From Western City Limits of Rowlet to Heritage Parkway
Landscape enhancement Jun-2017Aug-2017/Aug-2019
AALC, Inc. $1.8 M 8%
32 0196-03-268 I-35EFrom I-30 to N of Oak Lawn Ave.
Reconstruct 2-lane FR and interchanges
Jun-2017Oct-2017/Sep-2020
Balfour Beatty Infrastructure, Inc.
$78.8 M 0%
33 0196-07-031 SS 366From Woodall Rodgers FR N Lamar St. to N Central Expy.
Concrete full depth repair on FRs
Jun-2017Dec-2017/Jan-2018
IIPL USA LLC $0.7 M 0%
34 2374-04-049 I-20 From W of Carrier Pkwy. to FM 1382 (Belt Line Rd.)
Construct 6-lane frontage roads and ramp mods
Jun-2017Nov-2017/Dec-2020
Fluor Heavy Civil, LLC
$54.2 M 0%
35 0918-47-118 PWAt Cedar Hill State Park in Shady Ridge Camping Area
Reconstruct park road including parking lots
Jul-2017Nov-2017/Feb-2018
Texas-Reyes Group. Ltd.
$1 M 0%
36 2374-01-187 I-635From west of FM 78 to Greenville Ave.
Improve guardrail Jul-2017Nov-2017/Aug-2018
SJ & J Construction, LLC
$3.5 M 0%
37 0196-02-068I-35E(35Express)
From south of I-635 to US 380
Construct add'l. lane each direction, reversible Texpress Lanes, SB bridge over Lewisville Lake, Belt Line Road intersection reconstruction and multiple intersection and bridge improvements.
Constru. Began:Oct. 2013
Lanes opened in May and ribbon cutting in November
AGL $1.4 B 99%
38 0442-02-088
I-35E/US 67(The Southern Gateway)
From 8th St. to US 67 and US 67 from I-35E to I-20
Widen highway and add reversible non-tolled express lanes
Jun-2017 2017 – 2021Pegasus Link Constructors, LLC
$666 M 0%
ESTIMATED TOTAL $2.6 B
TxDOT graphicSOURCE: Texas Department of Transportation.
31
36
19
23
35
29
23
32
38
28
30
24
23
25
26
27
34
33
37 To US 380
35E
35E
35E
35E
35E
DNT
DNT
DALLAS
635635
635
2020
45
45
45
20
20
30
30
30
121
114
114161
161
360
360
360
360
180
180
342
342
342
352352
183
356
183
121
121
121
190190
289
289
190
190
190
205
205
1382
1382
N
5 miles
75
75
75
67
80
80
80
67
77
77
67
78
78
6666
78
78
12
12
12
12
12
Lavon Lake
COLLIN CO.
DALLAS CO.
DENTON CO.
TARR
ANT C
O.
COLLIN CO.
DALLAS CO.
ROCK
WALL
CO.
DALL
AS CO
.
DALL
AS CO
.
DALLAS CO.
ELLIS CO.
DALLAS CO.
ELLIS CO.
KAUF
MAN
CO.
DALL
AS CO
.
TARR
ANT C
O.
DALL
AS CO
.
1171
544
740
740
548
269
550
175
175
175
3039
2757
660
664664
664
Garland Rd.
Mesquite
Garland
Richardson
PlanoLewisville
Sachse
Murphy
Irving
Grand Prairie
Las Colinas
FarmersBranch
Coppell Carrollton
Addison
Duncanville
Desoto
Hutchins Seagoville
WilmerLancaster
Forney
Crandall
Lawson
Combine
Sunnyvale
Mesquite
Garland
Richardson
PlanoLewisville
Sachse
Murphy
Irving
Grand Prairie
Las Colinas
FarmersBranch
Coppell Carrollton
Addison
Duncanville
Desoto
Hutchins Seagoville
WilmerLancaster
Forney
Crandall
Lawson
Combine
Sunnyvale
Balch Springs
Rowlett
WylieSaintPaul
Lavon
Rowlett
WylieSaintPaul
Lavon
ROCKWALL
WhiteRockLake
Lake RayHubbard
Mountain CreekLake
NorthLake
Dallas Love FieldAirport
Dallas ExecutiveAirport
DFW Int’l.Airport
Joe PoolLake
W Belt Line Rd.
S B
elt Li
ne Rd
.
University Park
Highland Park
Cockrell Hill
University Park
Highland Park
Cockrell Hill
HeathHeath
Red Oak
Oak LeafOvilla
FerrisRed Oak
Oak LeafOvilla
Ferris
Shiloh Rd.
E Belt Line Rd.
Malloy Bridge Rd.
LancasterRegionalAirport
MesquiteMetro
Airport
S Be
l t Lin
e Rd.
77
287
Projects from Reverse PageProjects Under Construction
6730
Balch Springs
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0798
_072
517
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”DENTON COUNTY CONSTRUCTION PROJECTS
2017 HIGHWAY PROJECTS:
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONMichelle RelefordPublic Information Officer(214) 320-4485 • [email protected]
DENTON COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0134-09-063 US 380 From west of FM 156 to I-35Widen 2-lane to 6-lane divided urban highway
Jul-2012May-2013/Jul-2018
Texas Sterling Construction Co.
$39.3 M 99%
2 0134-09-034 US 380From west of Bonnie Brae St. to US 377
Reconst. and widen to 6-lane divided
Nov-2012Nov-2014/Oct-2017
Jagoe-Public Company
$15.1 M 98%
3 1315-02-009 FM 423From US 380 to 0.8 mi. south of FM 2934(Eldorado Pkwy.)
Widen 2-lane to 6-lane divided urban
Sep-2013Oct-2014/Nov-2017
MCM $29.8 M 98%
4 1567-01-025 FM 720From Eldorado Pkwy. (FM 720) to south of Martop St.
Widen 2-lane to 6-lane divided
Feb-2014Oct-2015/Dec-2017
Haydon Building Corp.
$15.6 M 74%
5 1567-02-032 FM 423From Stewarts Creek Rd. to SH 121
Widen to 6-8 lane divided urban rdwy.
May-2014Oct-2014/Dec-2017
Webber, LLC $57.9 M 98%
6 2681-01-012 FM 2499From FM 2181 North to I-35E in Corinth
Construct new location 6-lane divided urban facility
Jul-2014Apr-2015/Apr-2018
Webber, LLC $34.9 M 91%
7 0619-05-036 FM 544From FM 2281 to Parker Rd./ Dozier Rd.
Replace brideg and widen roadway
Sep-2014Jul-2015/Oct-2019
MCM $35.4 M 56%
8 0353-02-063 SH 114 At FM 156Construct interchange
Feb-2015Jan-2017/Jul-2019
Ed Bell Construction Company
$30.6 M 49%
9 2681-01-022 FM 2499From FM 2181 to Hickory Creek - 1.112 mi.
Landscape development
May-2015Aug-2015/Apr-2018
Apex Landscape & Irrigation, LLC
$0.4 M 84%
10 0081-13-041 I-35W From Eagle Pkwy. to SH 114Construct 2-lane SB frtg. rd., Litsey Rd. Bridge
Sep-2015Feb-2016/Mar-2018
Mario Sinacola & Sons, Excavating, Inc.
$15.4 M 5%
11 0718-01-064 FM 156 From SH 114 to 12th St. in JustinWiden 2-lane to 4-lane divided urban
Nov-2015Mar-2017/Mar-2019
Mario Sinacola & Sons, Excavating, Inc.
$32.5 M 20%
12 0135-10-055 US 377At various locations in Denton County
Full depth concrete repair and pavement markings
Jan-2016Aug-2016/Nov-2017
Silver Creek Construction, Inc.
$5.2 M 99%
13 0353-02-074 SH 114From Trophy Lake Dr. in Trophy Club to Tarrant C/L ( west of FM 1938) 1.071 mi.
Widen freeway from 4 to 6 lanes; SH 170: constr. ml./ overpass at Parrish Ln.
Jul-2016Oct-2016/Jun-2018
Mario Sinacola & Sons, Excavating, Inc.
$24.9 M 68%
14 0816-02-076 FM 455From west of Dyer to west of Indian - 1.939 mi.
Constructu paved shoulders
Jul-2016Nov-2016/Jun-2018
Jagoe-Public Company
$5 M 89%
15 0918-46-272* CSFrom Swisher Rd. in Lake Dallas to Kelton Rd. - 0 1.520 mi.
Hike and bike trails (Phase 3: A-train rail)
Jul-2016Apr-2017/Feb-2019
Encino Landscaping, Inc.
$6.7 M 27%
16 0196-01-106 I-35EFrom State School Rd. / Mayhill Rd. (FM 2499) to SL 288
Constr. grade sep. and intersection improvements
Sep-2016Apr-2017/Aug-2018
OHL USA, Inc. $27.1 M 14%
17 1785-01-032 FM 1830From FM 407 to US 377 - 5.477 mi.
Base repair, shoulder and culvert widening
Oct-2016Apr-2017/Aug-2018
Jagoe-Public Company
$5.9 M 26%
18 0081-13-057 I-35W From Eagle Pkwy. to SH 114Construct 2-lane NB frgt. rd. with ramp
Jun-2017Sep-2017/Mar-2019
Ed Bell Construction Company
$15.2 M 0%
19 0918-46-274 CSSouth of Blue Mound Rd. at Elizabeth Creek
Replace bridges and approaches
Jun-2017Sep-2017/Oct-2018
Coppell Constru. Co., Inc.
$1.6 M 9%
20 0364-03-099 BS 121HFrom Post Oak St. to FM 544 - 4.282 mi.
Landscape treatment of medians
Jul-2017 Oct-2018Apex Landscape & Irrigation, LLC
$1.9 M 0%
21 2054-02-015 FM 2181From Lillian Miller in Denton to W of FM 2499 (Barrel Strap Rd.)
Widen to 6-lane divided urban
Jul-2017 Jan-2020 MCM $35 M 0%
ESTIMATED TOTAL $435.4 MTxDOT graphic* Not mapped. SOURCE: Texas Department of Transportation.
1 2
34
5
7
9
1018
11
12
13
14
17
19
20
166
21
8
455455
455
428 428428
428
35W
35W
35E
35E
DNT
377
380
380
377
377
TARRANT CO.
DENTON CO. DENTON CO.
COOKE CO.
WISE
CO.
DENT
ON CO
.
WISE
CO.
DENT
ON CO
.
DENT
ON CO
.
COLL
IN CO
.
DENT
ON CO
.
COLL
IN CO
.
2450
1173
1173
2622
2153
Hackberry
Hebron
Sanger
Aubrey
Lincoln Park
Cross Roads
Oak Point
The Colony
Lewisville
Coppell
CopperCanyon
HickoryCreek
Shady Shores
Krum
Bolivar
Ponder
Northlake
Justin
FlowerMound
RoanokeTrophy Club
PilotPoint
Krugerville
Argyle
DENTON
Fort WorthAlliance Airport
DentonMunicipalAirport
Texas MotorSpeedway
Ray RobertsLake
GrapevineLake
LewisvilleLake
156
156
156
407
407 407
407
288 288
288
423
3163
2449
1171 1171
2499
2499
2181
2499
21642931
1385
121
121
190
121
121
114
114
170
423
380 377 1385
380
455
35E
77Corral City
35
35
377
2 miles
156
1830
Corinth
TxDOT graphicSOURCE: Texas Department of Transportation.
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0792
_071
817
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”ELLIS COUNTY CONSTRUCTION PROJECTS
2017 HIGHWAY PROJECTS:
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONMichelle RelefordPublic Information Officer(214) 320-4485 • [email protected] TxDOT graphicSOURCE: Texas Department of Transportation.
ELLIS COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0048-04-079 I-35EFrom US 77 north of Waxahachie to US 77 south of Waxahachie
Reconstruct and widen from 4 lanes to 6 lanes
Aug-2015Mar-2016/ Jul-2019
OHL USA, Inc. $126.4 M 29%
2 0048-08-049 I-35EFrom south of FM 566 (Hill C/L) to US 77 south of Waxahachie
Widen 4 lanes to 6 lanes Sep-2015Feb-2016/Jan-2018
OHL USA, Inc. $35.8 M 67%
3 0172-08-053 US 287From south of SH 34 to I-45 south in Ennis
Widen 2 ln to 4 lane divided hwy. with grade seperated interchanges
Jan-2017May-2017/Apr-2020
Fluor Heavy Civil, LLC
$61.7 M 12%
4 0596-02-037 FM 66 At West Fork Weakly BranchReplace bridge and approaches
Nov-2015Dec-2016/Sep-2018
IEA, Inc.. $2.7 M 11%
5 0596-02-039 FM 66 At West Fork Greathouse BranchReplace bridge and approaches
Jun-2015Oct-2016/Mar-2018
Massana Construction, Inc.
$3.4 M 38%
6 0596-02-042 FM 66 At Greathouse Road Add left turn lanes Jul-2015Jan-2017/Mar-2018
O. Trevino Construction, LLC
$2.1 M 67%
7 0596-02-043 FM 66 From FM 308 to Brindley RoadWiden pavement, safety trat fixed objects and centerline texturing
Jul-2015Jan-2016/Nov-2017
Oldcastle Materials Texas, Inc.
$4.3 M 99%
8 0596-04-041 FM 878Along FM 878, FM 664 and FM 813
Mill, base repair & resurface & add shoulders
Nov-2016Mar-2017/ Mar-2018
Big Creek Construction, Ltd.
$7 M 32%
9 0815-08-031 FM 8750.6 miles west of Norrell to 0.3 miles north of Jordan 1.50 mi.
Widen, safety treat fixed objects and centerline texturing
Apr-2016Jun-2016/Dec-2017
Knife River Corporation - South
$8.8 M 88%
10 0918-22-141 CR Forest Brook Dr at Red Oak CreekReplace bridge and approaches
Dec-2015Jan-2017/Aug-2017
DCI Contracting, Inc.
$1 M 1%
11 1050-01-017 FM 85 From I-45 to FM 1182Add shoulders & rehabilitate roadway
Oct-2015Mar-2016/Jun-2018
Big Creek Construction, Ltd.
$12.9 M 80%
12 1051-01-042 FM 664From north of BUS 287R to south of Red Oak Creek in Ovilla
Add 3-foot paved shoulders
Mar-2015Jun-2015/Nov-2017
Ed Bell Construction Company
$11.1 M 99%
13 1051-02-017 FM 876 At Big Onion Creek 0.117 mi.Replace bridge and approaches
Feb-2015Sep-2015/Oct-2017
Massana Construction, Inc.
$1.7 M 99%
14 1159-01-022 FM 875 At Waxahachie CreekReplace bridge and approaches
Jun-2015May-2017/Jan-2018
Massana Construction, Inc.
$3.7 M 17%
15 1159-02-032 FM 879From 2.1 mi. west of Ike Rd. to 0.3 mi. west of FM 1722
Provide additional paved surface width
Jun-2015Sep-2015/Nov-2017
Ed Bell Construction Company
$9.5 M 99%
16 1211-01-018 FM 984At Draw, 1.7 mi. south of SH 34; At Onion Creek Relief 1 & 2
Replace bridge and approaches
Jan-2015Feb-2016/Jul-2018
IEA, Inc.. $2.3 M 46%
17 1451-01-020 FM 55 At Little Onion Creek 0.178 mi.Replace bridge and approaches
May-2015Feb-2016/Jun-2018
IEA, Inc.. $2 M 45%
18 1451-01-024 FM 55From SH 34 to south of Nash Howard Rd.
Rehabilitate existing pavement
Jul-2014Dec-2014/Nov-2017
Big Creek Construction, Ltd.
$5.5 M 99%
19 1451-01-025 FM 55 At Big Onion CreekReplace bridge and approaches
Aug-2015Nov-2016/Sep-2018
IEA, Inc.. $1.5 M 10%
20 0092-15-002 SS 469 BI 45G Ennis to FM 879 Restore Pavement Jul-2017ECD Mar-2018
Johnson Bros. $2.8 M 0%
ESTIMATED TOTAL $306.2 M
7
6
48
1
2
3
5
9
10 11
13
12
1
2
34
5
9
6
7
8
10
11
12
13
1415
20
17
161819
CORSICANA
MIDLOTHIAN
ENNIS
WAXAHACHIE
CORSICANA
MIDLOTHIAN
ENNIS
WAXAHACHIE
45
45
77
77
77
7767
67
287
67
45
45
45
35E
35E
35E35W
FerrisOvilla
Pecan Hill
Red Oak
Trumbull
Milford
Palmer
Maypearl
Garrett
Rosser
Rice
Emhouse
Barry
Frost
BloomingGrove
Alma
Bardwell
Italy
Forreston
JOHN
SON
CO.
ELLIS CO.
NAVARRO CO.
ELLIS CO.
NAVARRO CO.
HILL CO.ELLIS CO.
ELLIS
CO.
JOHN
SON
CO.
ELLIS
CO.
KAUFMAN CO.
ELLIS CO.
DALLAS CO.
ELLIS CO.DALLAS CO.TARRANT CO.
ELLIS CO.
BardwellLake
LakeWaxahachie
Mid-WayRegionalAirport
660
983
813
878879
876
308
934
308
667
877
984
984985
744
660
1390
1182
1603
1126
1722
916
157
875
663
34
34
34
34
34
22
22
31
287
287
287
287
287
287
66
66
66
55
55
55
Combine
LancasterAirport
Cedar Hill
LancasterDeSoto WilmerJoe Pool
Lake1382
35
N
2 miles
664
1387
664
1446
Wes
tmor
elan
d Rd
.
Projects Under Construction
879
85
TxDOT graphicSOURCE: Texas Department of Transportation.
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”
0784
_062
717
KAUFMAN COUNTY CONSTRUCTION PROJECTS2017 HIGHWAY PROJECTS:
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
TxDOT graphicSOURCE: Texas Department of Transportation.
CONTACT INFORMATIONMichelle RelefordPublic Information Officer (214) [email protected]
KAUFMAN COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0095-03-087 US 80 FM 460 to FM 740Relocate eastbound US 80 entrance/exit ramps; extension of eastbound frontage road
Jun-2016Feb-2017/Feb-2018
Ed Bell Construction Company
$5 M 35%
2 0095-14-028 I-20Dallas C/L to SS 557; I-635 to Kaufman C/L
Concrete pavement repair Jun-2017 Feb-2018 HPL USA, LLC $1.1 M 0%
3 0197-03-075 US 175Dallas C/L to Brushy Creek relief
4 0751-03-038 FM 148 FM 1388 to FM 3094 NReconstruct existing pavement and add shoulders
Jun-2017Oct-2017/Dec-2018
Big Creek Constru., Ltd. $4.1 M 0%
5 0918-11-091 CRCR 324 at Greasy Creek Tributary
Replace bridge and approaches Apr-2017Jul-2017/Jan-2018
Stateline Construction, LLC
$0.7 M 50%
6 1016-06-011 FM 1392 US 80 to SH 205Reconstruct existing pavement and add shoulders
Apr-2017Sep-2017/ Aug-2018
A. L. Helmcamp, Inc. $5.7 M 5%
7 1217-03-019 FM 1388 FM 148 to US 175Provide additional pavement surface & overlay
Dec-2015Apr-2016/Jun-2018
Austin Bridge & Road, LP
$22 M 76%
8 1397-01-030 FM 1836 FM 2515 to FM 90 Rehabilitation of existing roadway Nov-2015Apr-2016/Dec-2017
D. L. Lennon, Inc. $6.1 M 99%
9 1494-03-001 FM 3486 FM 986 to SH 34 Construct new 2-lane FM highway Apr-2016Jul-2016/Nov-2017
Ed Bell Constru. Company
$4.8 M 99%
10 2512-02-010 FM 2728 FM 429 to US 80Provide additional pavement surface and overlay
May-2017Jul-2017/Mar-2018
A. K. Gillis & Sons, Inc. $3.8 M 40%
11 2555-01-011 FM 2578 US 175 to FM 987 Restore existing pavement and add shoulders Oct-2016Feb-2017/Jan-2018
A. L. Helmcamp, Inc. $6.9 M 60%
12 2981-01-007 FM 2932 FM 741 to FM 148Reconstruct existing pavement and add shoulders
Feb-2017May-2017/Mar-2018
Oldcastle Materials Texas, Inc.
$4 M 55%
13 0197-03-073 US 175 FM 148 to CR 4106 Pavement repair Aug-2017Dec-2017/May-2018
IOC Company LLC $2.3 M 0%
14 0197-05-054 US 175 FM 1895 to SH 198 Pavement repair Aug-2017Dec-2017/May-2018
O.Trevino Construction LLC
$1.4 M 0%
15 0495-01-074 I-20 SH 34 to Van Zandt C/L Mill and overlay Jul-2017Nov-2017/Jul-2018
Oldcastle Materials Texas, Inc.
$9.1 M 0%
16 0751-03-037 FM 148 At King’s Creek Replace bridge and approaches Jul-2017Oct-2017/Oct-2018
Stateline Construction LLC
$1.3 M 0%
ESTIMATED TOTAL $82.3 M
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.
1
12
14
2211
3
4
5
110
15
2213
16
2
6
9
7
8
To I-63520
KAUFMAN CO.
HUNT CO.
ELLIS CO.
KAUFMAN CO.
HENDERSON CO.
KAUFMAN CO.
KAUF
MAN
CO.
KAUF
MAN
CO.
VAN
ZAND
T CO.
DALL
AS CO
.
KAUF
MAN
CO.
ROCKWALL CO.
KAUFMAN CO.
VAN
ZAND
T CO.
TERRELL
N
5 miles
Elmo
KAUFMAN
LakeRayHubbard
Crandall
Combine
Malloy Bridge
Rd.
Cedar CreekReservoir
NewTerrell CityLake
Post OakBend City
RosserCottonwood Grays Prairie
Ennis
Oak Grove
Kemp
Scurry
Talty
Mabank
Oak Ridge
WillsPoint
Forney
Heath Mclendon-Chisholm
Seagoville
Mesquite
DALLAS CO.
ELLIS CO.
429751
429
429
429103
148
148
660
557740
548
740
741
987
90
90
2578
1392
205
243243
90
198
198
274
34
34
34
34
175
175
175
175
80
80
2860
1390
1390
2613
3094
3396
3080
1391
1836
1895
1895
2727
2515
2965
34
34
80
80
2728
20
20
986548
740
1641
2451
148
148
2728
148
205
1836
1388
To I-635
148
175
3039
2728
2932
Projects Under Construction
TxDOT graphicNOTE: Highlighted areas are not drawn to scale.
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”
0801
_101
317
NAVARRO COUNTY CONSTRUCTION PROJECTS2017 HIGHWAY PROJECTS:
CONTACT INFORMATIONMichelle RelefordPublic Information Officer (214) [email protected]
Dallas District Office4777 E. Highway 80Mesquite, TX 75150NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.
NAVARRO COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0092-06-101 I-45From 2.1 miles S of of Bus 45 to I-45 Bus north in Corsicana
Widen freeway FR four to six lanes and install wireless ITS
Jul-2015Apr-2016/Mar-2019
Sterling Delaware Holding Co., Inc.
$58.8 M 57%
2 0093-01-098 I-45From S of FM 246 to 2.1 miles S of BI 45F
Widen freeway FR four to six lanes and install wireless ITS
Jul-2015Oct-2015/Dec-2018
Webber, LLC $72 M 82%
3 0093-02-015 SH 14 At UP RR S of Richland Replace RR underpass Aug-2013Dec-2013/Jul-2017
JW Payne Constr., LLC
$6.6 M 99%
4 0162-11-001 SH 31From 3.2 miles W of FM 2555 to 3.7 miles E of I-45
Concrete new location relief route Nov-2015Oct-2016/Apr-2020
Sundt Constr., Inc.
$106 M 16%
5 0918-18-126 CRNW CR 2310 at Rush Creek 0.064 mile
Replace bridges and approaches Sep-2016Jan-2017/Dec-2017
Pierce Bridges and Approaches
$1.1 M 73%
6 0997-02-039 FM 1838From 0.9 mile N of CR 4270 to FM 638 1.553 miles
Construct paved shoulders and safety treat fixed objects
Dec-2016Feb-2017/Dec-2017
Knife River Corp. - South
$3.9 M 88%
7 1289-01-029 FM 1126At Chambers Creek SW of I-45
Bridge replacement Apr-2016Aug-2016/Dec-2017
Coppell Constru., Co., Inc.
$6.7 M 80%
ESTIMATED TOTAL $255.1 M
TxDOT graphicSOURCE: Texas Department of Transportation.
3
2
1
45
6
7
171
309
Project Limits45
45
45
45
45
45
45
BUS
287
287
287
287
287
287287
N
5 miles
CORSICANA
NavarroMills Lake
Richland ChambersReservoir
Cedar CreekReservoir
BardwellLake
34
34
22
2222
31
31
31
31
31
31
34
45
ENNIS
Frost
BloomingGrove
Barry
Raleigh
SilverCity
Emhouse
RiceChat�eld
Powell
Kerens
Tool
SevenPoints
Goodlow
Mildred
Eureka
Navarro
Angus
Richland
Purdon
Dawson
AlmaBardwell
Wortham
Hubbard
85
85
55
85
ELLIS CO.
NAVARRO CO.
ELLIS CO.
NAVARRO CO.
HILL CO.NAVARRO CO.
LIMESTONE CO.
NAVARRO CO.
FREESTONE CO.NAVARRO CO.
HENDERSON CO.
HENDERSON CO.
ELLIS CO.
NAVARRO CO.
1182
1126 3383
1839
2452
3041
1603
1129
1393
1129
274
274
984
984
877
985
744667
744
744
55
55
14 75
75
14
709
709
642641
638
636
246
416
833
488
637
TxDOT graphicNOTE: Highlighted areas are not drawn to scale.
FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”
0800
_101
317
ROCKWALL COUNTY CONSTRUCTION PROJECTS2017 HIGHWAY PROJECTS:
CONTACT INFORMATIONMichelle RelefordPublic Information Officer (214) 320-4485 • [email protected]
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
ROCKWALL COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete
1 0009-04-061 SH 66W of FM 1141 to Collin C/L
Provide additional pavement surface width
Mar-2016Mar-2017/Apr-2019
Apac-Texas, Inc. $15.9 M 35%
2 0009-12-072 I-30 At FM 3549Reconstruct interchange, incorporate frontage roads and ramp construction
4 0009-12-214 I-30 SH 205 to John King Blvd. Reverse I-30 ramps east of SH 205 Apr-2016Jul-2016-Oct-2017
Ed Bell Construction Company
$3.5 M 99%
5 1014-02-041 FM 548 SH 205 to SH 66Provide additional pavement surface width and overlay
Oct-2015Mar-2016/Oct-2017
Zachry Construction Corp.
$13.8 M 68%
6 1014-03-049 FM 740FM 549/FM 550 Intersection
Widen 2-lane to 4-lane divided urban
Aug-2013Jul-2015/Mar-2018
Ed Bell Construction Company
$13 M 70%
7 1015-01-022 FM 3549 SH 66 to FM 552 Base repair, level-up and overlay Feb-2015Aug-2015/Oct-2017
D. L. Lennon, Inc.
$2.6 M 99%
8 1015-01-025 FM 549Various highways In Rockwall County
Provide additional pavement surface width and overlay
Jun-2015Feb-2015/Feb-2018
Ed Bell Construction Company
$7.7 M 70%
9 1016-03-013 FM 1138 SH 66 toCollin C/LProvide additional pavement shoulders
May-2016Aug-2016/Dec-2017
Apac-Texas, Inc. $2 M 99%
10 3148-01-006 FM 3097FM 740 to east of Tubbs Rd.
Reconstruct and widen to 4-lane divided
Jul-2014Jan-2016/Oct-2017
Ed Bell Construction Company
$9.3 M 85%
11 1091-04-022 FM 549 FM 550 to SH 205 Addtl. pvmt. Surface and overlay Jul-2017Nov-2017/Jan-2010
Ed Bell Construction Company
$11.5 M 0%
ESTIMATED TOTAL $114.5 M
TxDOT graphicSOURCE: Texas Department of Transportation.
1
3
1
4
5
6
7
2
10
11
9
8
HUNT
CO.
ROCK
WALL
CO.
KAUFMAN CO.
HUNT
CO.
KAUF
MAN
CO.
KAUFMAN CO.
ROCKWALL CO.
ROCK
WALL
CO.
DALL
AS CO
.
COLLIN CO.
ROCKWALL CO.
COLLIN CO.
ROCKWALL CO.
DALL
AS CO
.
ROCK
WAL
L CO.
DALL
AS CO
.
ROCKWALL CO.
Princeton Rd. Lakeview Pkwy.
Dalton Rd.
John Kin g Blvd.
Roch
elle R
d.
Smirl Dr.
Pullen Rd.
Klutts Rd.
Smith Rd.
Neal Rd.
Mann Rd.
McDonald Rd.
Stevens Rd.
Valley View
Dowell Rd.
Edwards Rd.
Kuban Rd.
Wallace Rd.
Blackland Rd.
Crenshaw Rd.
Poetry Rd.
Jones Rd.
S Munson Rd.
Highpoint Rd.
N Munson Rd.
Old m
illwoo
d Rd.
N L
akesho re Dr.
Heath
McLendon-Chisholm
Mobile City
Royse City
Royse City
Fate
ROCKWALL
N
1 mile
Lake RayHubbard
Lake RayHubbard
30
30
67
67
205
205
205
205
276
205
205
205
1138 1777
1141
1139
3097
1140
2458
66
66
66
66
66
551
550
548
740
740
740
740
740
552552
2453
35
550
550
550
549
549
548243
548
548
548
548
276
J ohn King Blvd.
3549