Land and Building Committee April 26, 2016 2:00 to 3:30pm Agenda Current AARB Submissions Hazel Hall Cell Tower Transit Center Hylton Education Center Planning Projects/Requests Salt Shed Bench Painting – Original Quad Robinson/Infrastructure – Presentation by Perkins + Will Future Topics Stream Restoration/Storm Water Management Water Tower Golf Cart Policy Meeting Schedule May 17 June 14 August 16 September 6
35

20160426 Land and Building Committee April

Dec 29, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 20160426 Land and Building Committee April

Land and Building CommitteeApril 26, 2016

2:00 to 3:30pm

Agenda

� Current AARB Submissions� Hazel Hall Cell Tower

� Transit Center

� Hylton Education Center

� Planning Projects/Requests� Salt Shed

� Bench Painting – Original Quad

� Robinson/Infrastructure –

Presentation by Perkins + Will

� Future Topics� Stream Restoration/Storm

Water Management

� Water Tower

� Golf Cart Policy

� Meeting Schedule� May 17

� June 14

� August 16

� September 6

Page 2: 20160426 Land and Building Committee April

Past Meeting Topics: February 29, 2016 Agenda

� Planning Projects

� Robinson/Infrastructure - REVIEWED

� Housing RFI - REVIEWED

� Status/Info Update

� Spuhler Field Dugouts - REVIEWED

� Basketball Training - REVIEWED

� Hylton Addition - REVIEWED

Page 3: 20160426 Land and Building Committee April

AARB Submitted for May 6 Agenda: Bus Shelters

Field House

Transit Center

Page 4: 20160426 Land and Building Committee April

AARB Submitted for May 6 Agenda: Hylton Education Center Addition

Page 5: 20160426 Land and Building Committee April

Bench Painting & Salt Shed:

Page 6: 20160426 Land and Building Committee April

Updates & Future Topics:

Next Meeting: May 17, 2016 2:00-4:00 FAC 102

� Future Topics:

� Stream Restoration/Storm Water Management

� Water Tower

� Golf Cart Policy

Page 7: 20160426 Land and Building Committee April

LAND + BUILDING COMMITTEE

Campus Utilities InfrastructureRobinson Hall

PROJECT INTRODUCTION

Page 8: 20160426 Land and Building Committee April

01 | SCHEDULE

Page 9: 20160426 Land and Building Committee April

PROJECT SCHEDULE

M

2016 2017 2018 2019 2020 2021 2022

A M J J A S O N D MFJ A M J J A S O N D MFJ A M J J A S O N D MFJ A M J J A S O N D MFJ A M J J A S O N D MFJ MFJA M J J A S O N D

Phase

Phase

L+BC L+BC

L+BC L+BC

L+BC

L+BCL+BC L+BC

BCOM + GMP

BCOM + GMP

BCOM + GMP

BCOM + GMP

CAMPUS UTILITIES INFRASTRUCTURE

ROBINSON HALL

Page 10: 20160426 Land and Building Committee April

M

2016 2017

A M J J A S O N D MFJ A M J J A S O

L+BC L+BC

L+BC L+BC

L+BC

L+BCL+BC L+BC

CAMPUS UTILITIES INFRASTRUCTURE

ROBINSON HALL

PROJECT SCHEDULE

Page 11: 20160426 Land and Building Committee April

PROJECT SCHEDULE

2018 2019

J A S O N D MFJ A M J J A S O N D MFJ A M J J A S

BCOM + GMP

BCOM + GMP

BCOM + GMP

BCOM + GMP

CAMPUS UTILITIES INFRASTRUCTURE

ROBINSON HALL

Page 12: 20160426 Land and Building Committee April

Phase

Phase

2020 2021 2022

A S O N D MFJ A M J J A S O N D MFJ MFJA M J J A S O N D

CAMPUS UTILITIES INFRASTRUCTURE

ROBINSON HALL

PROJECT SCHEDULE

Page 13: 20160426 Land and Building Committee April

CAMPUS UTILITIES INFRASTRUCTURE

• Schedule and phasing• Overall intent and scope of project• Character of the Mason Landscape

• Vision for the campus-wide landscape• Preliminary rerouting/routing decisions for new utilities• Preliminary determination of phasing• Range of options for signature landscape spaces

SD beginS

• Early plan diagrams • Refined ideas for landscape features• Stormwater management options for ‘non-maintenance’ areas

• Confirm project direction prior to BCOM submission

bCOM SubMiSSiOn

ROBINSON HALL

• Schedule and phasing• Overall intent and scope of project• General site constraints and opportunities

SD beginS

• Vision for Building and associated landscape• Early building massing options and site strategies• Stormwater management options for building scope

• Range of options for signature landscape features• Early plan diagrams • Developed building massing and site footprint• Refined ideas for landscape features

• Confirm project direction prior to BCOM submission

bCOM SubMiSSiOn

LAND + BUILDING COMMITTEE MEETINGS | TOPICS TO BE COVERED

APRIL 26

JUNE 14

AUGUST 16

SEPTEMBER 6

Page 14: 20160426 Land and Building Committee April

02 | Campus Utilities Infrastructure

Page 15: 20160426 Land and Building Committee April

HEADLINE GOES HERE

PROJECT EXTENTS

PROJECT BOUNDARY

POSSIBLE ALTERNATE ROUTE

ADD ALTERNATE

ROBINSON HALL SITE

Page 16: 20160426 Land and Building Committee April

HEADLINE GOES HERE

UTILITY SCOPEUTILITIES

REPLACE CHILLED WATER

POSSIBLE ALTERNATE ROUTE

NEW CHILLED WATER

NEW HTHW

REPLACE CHILLED WATER + HTHW IMPROVEMENTS

ROBINSON HALL SITE

Page 17: 20160426 Land and Building Committee April

HEADLINE GOES HERE

LAYERS OF INTERVENTION

REINVENT

REFINE

REPAIR

ROBINSON HALL SITE

Page 18: 20160426 Land and Building Committee April

HEADLINE GOES HERE

LAYERS OF INTERVENTION

REPAIR

PROJECT EXTENTS

ROBINSON HALL SITE

Page 19: 20160426 Land and Building Committee April

HEADLINE GOES HERE

LAYERS OF INTERVENTION

REFINE

PROJECT EXTENTS

ROBINSON HALL SITE

Page 20: 20160426 Land and Building Committee April

HEADLINE GOES HERE

LAYERS OF INTERVENTION

REINVENT

PROJECT EXTENTS

ROBINSON HALL SITE

Page 21: 20160426 Land and Building Committee April

HEADLINE GOES HERE

PEDESTRIAN CIRCULATION

PRIMARY ROUTE

SECONDARY ROUTE

WAYFINDING POINT

TRANSIT HUB

PROJECT EXTENTS

Page 22: 20160426 Land and Building Committee April

HEADLINE GOES HERE

EXISTING PEDESTRIAN CORE

PEDESTRIAN CORE

STRONG PEDESTRIAN CONNECTION

STRONG PEDESTRIAN NODE

PROJECT EXTENTS

Page 23: 20160426 Land and Building Committee April

BICYCLE CIRCULATION

EXISTING BIKE LANE

PROPOSED BIKE LANE

BIKE FRIENDLY STREET

BIKE SHELTER

BIKE DROP-OFF

PROJECT EXTENTS

Page 24: 20160426 Land and Building Committee April

CHARACTER OF THE MASON LANDSCAPE

Page 25: 20160426 Land and Building Committee April

HEADLINE GOES HERE

OPEN SPACE STRUCTURE

AXIAL CORE

COURTYARDS/PLAZAS

INFORMAL GREEN

PERIMETER GLEN

PROJECT EXTENTS

Page 26: 20160426 Land and Building Committee April

FOUNTAIN | EXISTING

Page 27: 20160426 Land and Building Committee April

FOUNTAIN | FUNCTIONALITY + GOALS

Page 28: 20160426 Land and Building Committee April

RECENT INSTALLATIONS

Page 29: 20160426 Land and Building Committee April

CAMPUS CHARACTER

Page 30: 20160426 Land and Building Committee April

03 | Robinson Hall

Page 31: 20160426 Land and Building Committee April

ROBINSON HALL B

ROBINSONHALL A

HARRISTHEATER

STUDENT UNIONBUILDING I

LIBRARY

JOHNSON CENTER

DAVID KINGHALL

de LASKI PERFORMINGARTS BUILDING

MASON PONDPARKING DECK

AQUIA BUILDING

KRUG HALL

EXISTING

ROBINSON HALL A + B | EXISTING

Page 32: 20160426 Land and Building Committee April

ROBINSON HALL B

HARRISTHEATER

STUDENT UNIONBUILDING I

LIBRARY

JOHNSON CENTER

DAVID KINGHALL

de LASKI PERFORMINGARTS BUILDING

MASON PONDPARKING DECK

AQUIA BUILDING

KRUG HALL

ROBINSON HALL A | DEMO

Page 33: 20160426 Land and Building Committee April

ROBINSON HALL B

PHASE 1

HARRISTHEATER

STUDENT UNIONBUILDING I

LIBRARY

JOHNSON CENTER

DAVID KINGHALL

de LASKI PERFORMINGARTS BUILDING

MASON PONDPARKING DECK

AQUIA BUILDING

KRUG HALL

NEW ROBINSON HALL | PHASE 1

Page 34: 20160426 Land and Building Committee April

PHASE 1

HARRISTHEATER

STUDENT UNIONBUILDING I

LIBRARY

JOHNSON CENTER

DAVID KINGHALL

de LASKI PERFORMINGARTS BUILDING

MASON PONDPARKING DECK

AQUIA BUILDING

KRUG HALL

ROBINSON HALL B | DEMO

Page 35: 20160426 Land and Building Committee April

PHASE 2

FUTURE BUILDING

SITE

PHASE 1

HARRISTHEATER

STUDENT UNIONBUILDING I

LIBRARY

JOHNSON CENTER

DAVID KINGHALL

de LASKI PERFORMINGARTS BUILDING

MASON PONDPARKING DECK

AQUIA BUILDING

KRUG HALL

NEW ROBINSON HALL: 220,000 SF

(5 STORIES +/-)

NEW ROBINSON HALL | PHASE 2 + HARRIS THEATER ADDITION

ADDITION