A: Area, ABV: Above AC: Air Conditioning, Acoustical ACC: Access ACOUST: Acoustical ACST: Acoustic ACT: Acoustical Tile; Actual AD: Access Door, Area Drain ADA: Americans with Disabilities Act of 1992 ADD: Addendum; Addition AF: Above the Floor AFF: Above Finished Floor AGG: Aggregate ALT: Alternate, Alteration; Altitude ALUM: Aluminum AMP: Ampere, Ampacity AMT: Amount ANCH: Anchor, Anchorage APT: Apartment ASC: Above Suspended Ceiling ASME: American Society of Mechanical Engineers ASPH: Asphalt ASTM: American Society for Testing and Materials AT: Acoustical Tile ATC: Acoustical Tile Ceiling AVG: Average AWS: American Welding Society B: Boiler, Bathroom, Bidet B TO B: Back to Back B/: Bottom (of) BAL: Balance, Ballast BD: Board, Blow Down (pipe) BDY: Boundary BDRM: Bedroom BEL: Below BETW: Between BEV: Bevel BF: Board Foot BHD: Bulkhead BIT: Bituminous BKR: Breaker BL: Base Line, Building Line, Block BLDG: Building BLK: Block BLT-IN: Built-In BM: Bench Mark BMT: Butyl Mastic Tape Sealant CI: Cast Iron CIR: Circle, Circular, Circuit CIRC: Circumference CISP: Cast Iron Soil/sewer Pipe CITG: Clear Insulating Tempered Glass CJ: Control Joint CL: Centerline, Clearance, Closing, Closure,Closet CLG: Ceiling CLKG: Caulking CLL: Contract Limit Line CLO: Closet CLR: Clear CLR OPG: Clear Opening CLS: Closure CMT: Ceramic Mosaic Tile CMU: Concrete Masonry Unit CND: Condition, Conduit CNTR: Center, Counter COAX: Coaxial CO: Company, Cleanout, Cased Opening, Cut Out CO & DP: Cleanout & Deck Plate COEF: Coefficient COL: Column COMB: Combination, Combustion COMP: Composition, Compressed CONC: Concrete COND: Condenser, Conduit CONN: Connection CONST: Construction CONT: Continuous, Continue, Control CONTR: Contractor CORR: Corridor, Corrugate CP: Cathodic Protection, Clothes Pole, Cesspool CPL: Cement Plaster CS: Countersink, Cast Steel, Cast Stone, CSMT: Casement CT: Ceramic Tile CTD: Coated CTR: Center, Counter CU: Cubic, Coefficient of Utilization CU. FT.: Cubic Feet CU. YD.: Cubic Yard CUR: Current CW: Cold Water CY: Cubic Yard, Cycle BN: Bullnose BNT: Bent BO: Blow Off BOT: Bottom BP: Base Plate, Blueprint, Bypass BR: Bedroom, Brick, Brass, Boiler Room BRDG: Bridge, Bridging BRG: Bearing BRKT: Bracket BRS: Butyl Rubber Sealant, Brass BRZ: Bronze BRZG: Brazing BS: Both Sides, Backset, Bluestone BSMT: Basement BT: Bathtub, Bolt BTU: British Thermal Units BTUH: British Thermal Units per Hour BVL: Bevelled BW: Both Ways C: Courses, Curb, Channel, Degrees Celsius, C/C: Center to Center C TO C: Center to Center CA: Compressed Air CAB: Cabinet CAP: Capacity CARP: Carpenter CAV: Cavity CB: Catch Basin, Concrete Block, CCT: Circuit CCW: Counter Clockwise CCTV: Closed Circuit TV CD: Cold Drawn, Cadmium CDS: Cold Drawn Steel CEM: Cement CEM AB: Cement Asbestos Board Cem P: Cement Water Paint CER: Ceramic CF: Cubic Feet CFM: Cubic Feet per Minute CFS: Cubic Feet per Second CFT: Cubic Foot CG: Corner Guard CHB: Chalk Board CHR: Chilled Water Return CHAM: Chamfer CHAN: Channel CHS: Chilled Water Supply DB: Decibel DBL: Double DC: Direct Current DEG: Degree DEMO: Demolition DEPT: Department DET: Detail DH: Double Hung DIAG: Diagonal DIAM: Diameter DIFF: Diffuser DIM: Dimension DISL: Disposal DIV: Division DL: Dead Load DN: Down DP: Dampproofing, Dew Point, Distribution Panel DR: Door, Drain, Dining Room DRBD: Drainboard DT: Drain Tile DTL: Detail DVTL: Dovetail DW: Dumbwaiter, Distilled Water DWGS: Drawings DWL: Dowel DWP: Drywall, Painted E: East, Enamel, Exhaust EB: Expansion Bolt EC: Exposed Construction ECC: Eccentric EDR: Equivalent Direct Radiation EE: Each End EF: Each Face EIFS: Exterior Insulation and Finish System EJ: Expansion Joint EL: Elevation, Elevator ELB: Elbow ELECT: Electrical ELEV: Elevator, Elevation ELP: Emergency Lighting Panel EMER: Emergency ENAM: Enamel ENCL: Enclosure ENTR: Entrance EP: Electrical Panelboard, Explosion Proof EPJF: Expanded Polyethelene Joint Filler EQUIP: Equipment EQ: Equal ERP: Emergency Receptacle Panel ESC: Escalator EVAP: Evaporator EW: Each Way EW & C: Electric Wiring and Communication EWH: Electric Water Heater EX: Exposed Construction, Exit EXC: Excavate EXEC: Executive EXG: Existing TSL: Top of Slab TST: Top of Steel TT: Terrazzo Tile, Traffic Topping TTC: Telephone Terminal Closet TV: Television TW: Top of Wall, Thin Wall (conduit) TW: Top of Wall, Thin Wall (conduit), TYP: Typical TZ: Terrazzo UH: Unit Heater UL: Underwriters' Laboratories UNEX: Unexcavated UNEXC: Unexcavated UNF: Unfinished UNFIN: Unfinished UNO: Unless Noted Otherwise UON: Unless Otherwise Noted UP: Unpainted UR: Urinal V: Volt, Valve, Vinyl, Vent, Ventilator VA: Volt Ampere VAC: Vacuum VACBR: Vacuum Breaker VAR: Varnish, Varies VAT: Vinyl Asbestos Tile VB: Vapor Barrier, Vacuum Breaker VBC: Vinyl Base (Coved) VBS: Vinyl Base (Straight) VC: Varnished Cambric VCP: Vitrified Clay Pipe VCT: Vinyl Composition Tile VENT: Ventilate, Ventilator VERT: Vertical VEST: Vestibule VF: Vinyl Fabric VFGT: Vinyl Foam Glazing Tape VIF: Verify In the Field VIT: Vitreous VLT: Vault VNR: Veneer VOL: Volume VP: Vapor Proof, Vent Pipe VR: Vapor Retarder,Vertical Riser VS: Vent Stack VT: Vinyl Tile VTR: Vent Through Roof VWC: Vinyl Wall Covering W: West, Width, Wide, Watt, Waste, Water, W/: With W/O: Without W&M: Washburn & Moen Gauge WAINS: Wainscot WB: Wood Base WC: Watercloset WD: Wood WDP: Wood, Painted WDSS: Wood, Stained & Sealed WDW: Window WF: Wide Flange (structural steel) WFS: Water Flow Switch WG: Wired Glass WGL: Wire-Glass WH: Water Heater, Wall Hung, Wall Hydrant WI: Wrought Iron WIN: Window WM: Wire Mesh, Water Meter WP: Waterproof, Working Point, Working Pressure, Weatherproof WPR: Waterproofing WW: Window Wall WWF: Welded Wire Fabric YD: Yard YR: Year Abbreviation: CONTRACTOR NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE PROCEEDING WITH WORK. IF ANY DISCREPANCIES, ERRORS OR OMISSIONS SHOULD BE ENCOUNTERED ON PLANS. CONTRACTOR SHALL NOTIFY ARCHITECT BEFORE ANY PART OF THE WORK IS STARTED SO THAT PROPER CORRECTIONS ARE MADE. IF ARCHITECT IS NOT NOTIFIED PRIOR TO COMMENCING OF THE WORK. THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ANY DISCREPANCIES. ERRORS AND/OR OMISSIONS. * ALL DESIGNS AND DRAWINGS HEREIN AND PRINTS ISSUED BY THE ARCHITECT ARE THE PROPERTY OF THE ARCHITECT AND SHALL NOT BE REUSED ON ANY OTHER LOCATION EXCEPT THE ONE FOR WHICH THEY WERE EXPRESSLY DESIGNED. * IF THESE DRAWINGS OR ANY PART THEREOF IS REPRODUCED WITHOUT THE CONSENT OF THE ARCHITECT. THE PERSON SO DOING WILL BE INDEBTED TO THE ARCHITECT FOR HIS FULL COMMISSION. * CONTRACTOR SHALL NOT USE FOR CONSTRUCTION PURPOSES ANY DRAWINGS THAT WERE ADVANCED TO HIM PRIOR TO THE START OF CONSTRUCTION. ALL PLANS BEING USED BY CONTRACTOR SHOULD BEAR A STAMP WITH THE LABEL: "FOR CONSTRUCTION ONLY" SIGNED BY ARCHITECT. * GENERAL CONTRACTOR SHALL FIELD SURVEY LOCATION AND VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. ANY DISCREPANCES SHALL BE REPORTED TO THE TENANT AND ARCHITECT * GENERAL CONTRACTOR SHALL COMPLETE ALL WORK AS INDICATED ON THESE PLANS UNLESS OTHERWISE NOTED. * GENERAL CONTRACTOR SHALL OBTAIN PERMITS, APPROVALS, INSPECTIONS, CERTIFICATE FOR COMPLIANCE AND CERTIFICATE OF OCCUPANCY AS REQUIRED, UNLESS OTHERWISE NOTED. * GENERAL CONTRACTOR SHALL CHECK IN WITH AND COORDINATE ALL WORK WITH THE LANDLORD'S PROJECT PERSONNEL. * GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY POWER, LIGHT AND TELEPHONE IN ACCORDANCE WITH LANDLORD'S AND TENANTS REQUIREMENTS. * GENERAL CONTRACTOR SHALL REMOVED ALL THESE ITEMS AT THE COMPLETION OF WORK OR AS REQUIRED. * GENERAL CONTRACTOR SHALL HAVE TENANT'S SPACE CLEANED UPON COMPLETION OF WORK BY A PROFFESSIONAL CLEANNING SERVICE. * GENERAL CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES, ALL APPROVED DRAWINGS INCLUDING ALL REVISIONS AND ADDENDA. * GENERAL CONTRACTOR SHALL HAVE AT ALL TIME IN SITE OFFICE COPY OF ALL ENDORSEMENTS AND PERMITS OF THE PROJECT AT A VISIBLE PLACE. Recessed mounted Ceiling Light Fixture Wall mounted Light Fixture, mounting height as indicated Switches - circuit base Switches- Dimmer - mounted at 48" AFF. Switches- Door - mounted at 48" AFF. Switches- four Way- mounted at 48" AFF. Switches- Pole - mounted at 48" AFF. Switches- Three Way Switches- Timer Recessed or surface mounted Electrical Panel Single Receptacle -120 volt, 1 Phase, 3 Wire Wall mounted at 18" AFF Duplex Receptacle -120 volt, 1 Phase, 3 Wire Wall mounted at 18" AFF Single Receptacle -240 volt, 1 Phase, 4 Wire Wall, mounted at 18" AFF Duplex Receptacle - Ground Fault -120 volt, 1 Phase, 3 Wire Wall mounted at 18" AFF Duplex Receptacle - Water Proof -120 volt, 1 Phase, 3 Wire Wall mounted at 18" AFF Wye Combination Bend PVC SCH 40 Wye 45 Degree Bend PVC SCH 40 Tee PVC SCH 40 Elbow PVC SCH 40 Cross PVC SCH 40 Reducing Coupling PVC SCH 40 Cap PVC SCH 40 Double Elbow PVC SCH 40 AHU - Air Handing Unit Duct Fitting Rectangular Transition Mark Mark Mark CB Mark D Mark DR Mark 4 Mark SP Mark 3 Mark T GFCI WP R @ ? ? Existing Wall- to Remain Existing Wall- to be Demolish New Wall- Concrete Wall 6" or 8" New Wall- GypsumBoard with Studs Room Tag With Area Section Head - Filled Callout Head Windows Tags Door Tags Detail Number Stair Tag Revision Tag Door SYMBOLS Duct Fitting Rectangular Tee Duct Fitting Rectangular Elbow Duct Fitting Cap Shower Tub 30" x 60" Sink Mount 101 Room Name 150 sf 101 Toilets 1 1 101 A1 1 A1 1 Exhaust Fan Vanity New Wall- CMU Blocks Windows Washer & Dryer Combo - N.I.C. Sheet List Sheet Number Sheet Name S0.01 TYPICAL - Foundation Details S0.02 TYPICAL - Subflooring Details S4.01 Walls Sections S4.02 Walls Sections S0.03 TYPICAL - Wall Details A1.02 Finish Schedules A4.01 BlowUp floor Plan A1.01 Windows & Doors Details A1.05 Room Plans S1.01 FOUNDATION PLAN DETAILS E2.01 SMOKE DETECTOR PLAN & NOTES S3.01 ROOF - Plans & Details A2.00 Site Plan S2.01 Ballon frame Notes S2.02 Stairs Details A1.03 Insulation Details A3.05 3D View A0.00 Tittle Sheet A1.00 Schedules & Legends A1.04 Code Compliance A2.01 Floor plan A2.02 Elevations A2.03 Roof plan A3.01 Sections A3.02 Sections A5.00 Interior Wall & Details P1.00 Plumbing Schedule & Details P1.01 Plumbing E1.00 Electrical Schedules & Details E1.02 Electrical second floor E1.01 Electrical first floor S0.00 Structural Schedule & Details Site Schedule Zoning District Lot Area Allowable Building Area Scale Date Drawn By Checked By Project Number DRWNG. NO. IF THESE DRAWINGS OR ANY PART THEREOF IS REPRODUCED WITHOUT THE CONSENT OF THE ARCHITECT OR THE ENGINEER THE PERSON SO DOING WILL BE INDEBTED TO THE ARCHITECT FOR HIS FULL COMMISSION. ALL DESIGNS AND DRAWINGS HERE IN AND PRINTS ISSUED BY THE ARCHITECT OR THE ENGINEER ARE THE PROPERTY OF THE ARCHITECTS AND SHALL NOT BE REUSED ON ANY OTHER LOCATION EXCEPT THE ONE FOR WHICH THEY WERE EXPRESSLY DESIGNED. NOT FOR CONSTRUCTION Zoning District Lot Area Allowable Building Area Proposed Building Area GENERAL BUILDING HEIGHT Building Area SETBACK REQUIREMENTS Front Side Interior Side Street Rear OCCUPANCY GROUP Occupancy Group APPLICABLE CODES Applicable Codes include, but are not limited to: DESCRIPTION OF BUILDING: As indicated 13/12/2016 18:49:57 Enter address here Enter address here Enter address here A0.00 Tittle Sheet Jaime Cortés 2016-12-08-01 Jaime Cortés Checker Author Issue Date 2016-12-08-01 2016-12-08-01 Jaime Cortés R-1 0 SF 0 SF 0 SF 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" R-1 IBC 2014 No. Description Date