VIETTEL TANZANIA LIMITED Code: TECHNICAL DEPARTMENT Effected date: INSTRUCTION TO CONFIGURING, COMMISSIONING HUAWEI NODEB Expired date: Issued times: Page : 1 PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 1 / 28 Say it your way MODIFICATION MONITORING TABLE No. Page Modified Content Effective date Editor Inspector Approver Signature
28

20150608_hd.vtz.Ktkt.02-Bss_instruction to Config Node Nokia Remotely_ver 1 (2)

Sep 13, 2015

Download

Documents

Abuba Dohu

NodeB auto-deployment feature,
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 1

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 1 / 28

    Say it your

    way

    MODIFICATION MONITORING TABLE

    No. Page Modified Content Effective date

    Editor Inspector Approver

    Signature

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 2

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 2 / 28

    Say it your

    way

    TABLE OF CONTENTS

    1. Purpose: ..................................................................................................................... 3

    2. Scope of application: ................................................................................................ 3

    3. Reference documents: .............................................................................................. 3

    4. Content: ...................................................................................................................... 3

    4.1. Login to NodeB by 3G BTS Site Manager ......................................................................... 3

    4.2. Click Commissioning .......................................................................................................... 5

    4.3. Site Properties ..................................................................................................................... 8

    4.4. Security ................................................................................................................................ 8

    4.5. Physical Layer Configuration ............................................................................................ 9

    4.6. Ethernet Switching, Ethernet Link OAM, Ethernet Service OAM, Rapid Spanning

    Tree, Quality of Service ............................................................................................................. 9

    4.7. IP interfaces ...................................................................................................................... 12

    4.8. CES over PSN ................................................................................................................... 14

    4.9. Iub IP ................................................................................................................................. 14

    4.10. Timing over Packet ......................................................................................................... 15

    4.11. Application Addresses ..................................................................................................... 15

    4.12. RTT Measurement, IP Security, Synchronization......................................................... 16

    4.13. BTS Routing .................................................................................................................... 17

    4.14. IP Filtering ...................................................................................................................... 18

    4.15. BTS Settings .................................................................................................................... 18

    4.16. Send Parameters ............................................................................................................. 28

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 3

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 3 / 28

    Say it your

    way

    1. Purpose:

    Instruct how to configure remotely NodeB Nokia, it should be used during

    integrating the site or synchronizing the parameters of NodeB after.

    2. Scope of application:

    This instruction is applied to engineers of BSS team in Technical Department and

    all the engineers of Viettel Cameroon have duty of doing NodeB Nokia configuration.

    3. Reference documents:

    - NED library Nokia document.

    4. Content:

    4.1. Login to NodeB by 3G BTS Site Manager

    Therere 2 ways: i. On window of OMS, right click on NodeB that want to login, choose External

    Applications BTS Site manager (This can be done only when OAM of

    NodeB has connected to OMS)

    ii. Open BTS Site Manager from desktop, input the OAM IP of the NodeB

    Input user/pass: Nemuadmin/nemuuser Connect

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 4

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 4 / 28

    Say it your

    way

    When the program ask Do you want to accept the coonection? choose Accept

    Window of 3G BTS Site Manager after login:

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 5

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 5 / 28

    Say it your

    way

    4.2. Click Commissioning

    If the NodeB has not been integrated:

    i. Back up the TRS Commissioning file: Choose File Backup Commissioning

    Files

    ii. In the arising window Backup Commissioning Files, choose only TRS, set

    the name of NodeB Save

    iii. In Commissioning Type, choose Template Select the Commissioning file

    - 1st : choose the TRS file BackupCommissioning__TRS_

    yyyymmdd that has just been backup in the last step

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 6

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 6 / 28

    Say it your

    way

    - 2nd : choose the BTS file BackupCommissioning_BTS_20140907 the

    model file has been backup before and was used to be the template for all

    the NodeB

    Note: when choose the TRS file, should crosscheck the TRS IP address in the

    windoe File details, make sure its correctly with the current NodeB. Unless the NodeB will be disconnected if we input the wrong IP address of other one.

    The BTS Commissioning Backup file was made from the original NodeB UCE117

    - 3rd : After choose 2 Commissioning file Next

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 7

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 7 / 28

    Say it your

    way

    When the Commissioning Introduction window arises, click Continue

    If the NodeB has been integrated before:

    In Commissioning type, choose Reconfiguration Next

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 8

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 8 / 28

    Say it your

    way

    4.3. Site Properties

    The 1st page of commissioning: Site Properties:

    Check information of the site, make sure all the information was followed the

    planning

    - Name: NodeB name

    - Location: The region name of NodeB

    - Description:

    o 1+1+1 if NodeB has 1 cell/sector

    o 2+2+2 if NodeB has 2 cell/sector

    - BTS ID: is the WBTS ID has been planned on OMS and OMU

    - IP addresses

    o TRS: The OAM IP of NodeB (second IP), ex: 10.93.200.82

    o BTS: The OAM IP of NodeB (first IP), ex: 10.93.200.81

    o RNC: IP OMU of RNC

    YARC01: 10.124.200.4

    YARC02: 10.124.200.68

    YARC03: 10.124.200.132

    o NTP server: IP of OMS, is always 10.124.236.120

    Click Next

    4.4. Security

    No change

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 9

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 9 / 28

    Say it your

    way

    4.5. Physical Layer Configuration

    Check the Ethernet interfaces: EIF 2 should be check In use, Speed and duplex

    should be set 100 Mbit/s full duplex

    Make sure all the IFs in PDH interface have been uncheck to avoid the alarm of E1

    (no use)

    Click Next

    4.6. Ethernet Switching, Ethernet Link OAM, Ethernet Service OAM, Rapid

    Spanning Tree, Quality of Service

    No change

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 10

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 10 / 28

    Say it your

    way

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 11

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 11 / 28

    Say it your

    way

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 12

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 12 / 28

    Say it your

    way

    4.7. IP interfaces

    In Setting: No change

    Click Transport Ethernet interface

    - Traffic shaping type: Choose off Change Bandwidth: 100 Mbit/s

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 13

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 13 / 28

    Say it your

    way

    - Traffic shaping type: Choose back to WFQ Change Total shaper

    information rate: 100 Mbit/s

    Note: Keep Traffic shaping type: WFQ

    - Committed information rate: 88.5 Mbit/s

    - Check Include Ethernet overhead

    Click Next

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 14

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 14 / 28

    Say it your

    way

    4.8. CES over PSN

    No change

    4.9. Iub IP

    Check

    - Far end SCTP subnet:

    o YARC01: 10.92.12.0

    o YARC02: 10.92.12.64

    o YARC03: 10.92.12.128

    - Minimum SCTP port: Follow the planning (= 50.000 + WBTS ID * 2 1)

    - Minimum UDP port: always 49152

    - CAC committed bit rate: 88.5 Mbit/s

    - Signaling bit rate: 1000 kbit/s

    - DCN bit rate: 500 kbit/s

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 15

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 15 / 28

    Say it your

    way

    4.10. Timing over Packet

    Check In use in the first row

    Input the Service IP of the ToP has been planned for BTS in the ToP masters Address

    Click Next

    4.11. Application Addresses

    Check the User plane 1, Control plane, Management plane and Synchronization

    plane, make sure that they have been inputed automatically by the system

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 16

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 16 / 28

    Say it your

    way

    4.12. RTT Measurement, IP Security, Synchronization

    No change

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 17

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 17 / 28

    Say it your

    way

    4.13. BTS Routing

    Check

    - Destination: 0.0.0.0

    - Netmask: 0.0.0.0

    - Gateway: The GW IP of NodeB Service IP (plus 5), ex: NodeB Service IP:

    10.93.136.81 GW: 10.93.136.86

    Click Next

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 18

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 18 / 28

    Say it your

    way

    4.14. IP Filtering

    No change

    4.15. BTS Settings

    From this page, no need to change anything because all of the configurations have

    been inside the BTS Commissioning backup file. Just click Next to the end.

    Note:

    - Only change in case the site has the configuration different with 1/1/1. At that

    time, the configuration of RF module must be corresponding with the real

    installation at the site.

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 19

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 19 / 28

    Say it your

    way

    - In case the BTS has Smart Bias-T for remote electric tilt (RET), system will

    automatically show one more new page for configure the RET

    Follow the instruction at the end of this document for refer of configuring cell 4

    and RET

    Configuration name: 1+1+1

    Time zone: (GMT+1) Africa/Douala

    Check in Transmission synchronization (TDM/SynE/ToP) in use

    R99 Channel Elements (CE): 212

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 20

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 20 / 28

    Say it your

    way

    The Power of all the Local cells is 20W (ANT 1,3,5: TX/RX, ANT 2,4,6: RX)

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 21

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 21 / 28

    Say it your

    way

    Add 1 more cell if the site has 4 cells: Click New Cell, unless pass this step

    Note: Cell 4 will use ANT 1 of FRGP 1.2.1. To do this, 2 RF Module must be

    connected to System Module

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 22

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 22 / 28

    Say it your

    way

    UARFCN: 10663

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 23

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 23 / 28

    Say it your

    way

    HSDPA 16 QAM, PFRP, shared scheduler should be in use

    HSDPA capacity sets BTS processing set 3 = 1

    FSME 1 Scheduler ID 1 Max throughput steps = 12 ~ 86.4 Mbps FSME 1 Scheduler ID 2 Max throughput steps = 0

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 24

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 24 / 28

    Say it your

    way

    HSUPA capacity sets BTS processing set 1 = 3

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 25

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 25 / 28

    Say it your

    way

    Flexi WCDMA BTS 3GPP antenna tilt support and Rx signal level monitoring

    should be in use

    VSWR: Minor fault 1.5, Major fault 2.0 for all TX antennas (1,3,5)

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 26

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 26 / 28

    Say it your

    way

    If no RET detected, from page 43/51, the system will jump to page 46/51

    If RET modules are detected (unless pass this step), that mean the site has been

    installed Smart Bias-T, on page 40/51, we can see RET in the column Detected

    devices

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 27

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 27 / 28

    Say it your

    way

    And on page 44/51, configure the Antenna that assigned to the RET

    RET 1:

    RET 2&3:

    And on page 45/51, configure the angle of each cell:

  • VIETTEL TANZANIA LIMITED Code:

    TECHNICAL DEPARTMENT Effected date:

    INSTRUCTION TO CONFIGURING,

    COMMISSIONING HUAWEI NODEB

    Expired date:

    Issued times:

    Page: 28

    PL.01/HD.VC.TCNS.01 Issued time: 01/ Effective date: 01/02/2013 28 / 28

    Say it your

    way

    Take the information of Tilts (angle) from the CDD:

    Page 46/51 Next

    4.16. Send Parameters

    Wait for the site resets finish