Page 1: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

April 2015

inovgrid to Smartlife

Page 2: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 20142

UK

USACanada

Portugal

Angola

Spain

Italy

FranceBelgium

PolandRomania

China

Brazil

Brazil17% of EBITDA•Company: EDP Brazil (EDP owns 51%)•Bought in 1996•Power generation: 2.2 GW (with 1.8GW hydro)•2 electricity distribution companies

Portugal41% of EBITDA•Privatization in 1997 (IPO)•Power generation: 8.9 GW (excluding wind and with 5.4 GW hydro)• Distribution of electricity at all the mainland and gas at the northern mainland

Spain17% of EBITDA•Presence since 2001•Power generation 3.9 GW (excluding wind)•# 2 in gas distribution

Wind energy25% of EBITDA•IPO at Jun‐08•Power: 8.1 GW•# 3 world operator (in 11 countries)•Company: EDP Renewables

(EDP owns 77.5%)

Main remarks:• From generation and

distribution to supply & efficiency

• 4 continents

• 14 countries

• 31 different nationalities

• 9.8 million electricity customers

• 1.3 million gas supply points

• 60.2 TWh generated

• 71% generated energy came from renewable sources

• EBITDA:

Portugal 41%

Others 59%

Peru

*

* 2014 figures

EDP started as a local incumbent and is now a truly global energy player

Page 3: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

SmartGrids are essential to the new challenges of distributed generation, energy efficiency and integration of electric vehicles...

3

Smart GridSmart Grid

Quality of Service

OperationalEfficiency

Historical challenges New challenges

− Give to the consumers a better

supply quality

− Minimize OPEX and CAPEX

Renewabless and Distribution Generation

Energy efficiency and new business models

Electric Vehicle

− Allow greater renewable energy

penetration

− Integrate the electric vehicle

− Support new customer-centric

services

Page 4: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

With inovgrid project, EDP Distribuição is building a smart grid based on a holistic concept, touching several changing areas...

4

HV NetworkSubstation

VHV/HVSubstation

HV/MV

MV Network2nd Substation

MV/LV

LV Network Consumers

WAN HAN

EDP BoxHead-end systems

LAN

DTC

Wide area network Local area network Home area network

Energy efficiency services

New tariffs, products and services

Mini and microgeneration

integration

EV charging network

GIS andWork Force

Management

Remote public lightning

management

MV Automation and telecontrol

DG and storage

Operations and quality of service

improvement

Network management new

tools

Systems Integration and Cybersecurity

Information Management and

data mining

Page 5: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

To reach it, EDP Distribuição created an implementation model where were identified several initiatives…

5

Campaigns Planning andManagement

Processes and

Operations

End-to-end integration

EV Charging Network

Dispatch AV/MV/LV

Economic Impact

Social Impact

Distribution Automation

Energy Quality

Tests and Qualification

Storage

Commercial Losses/

Revenue Ass

Data Infrastructure Supervision

Work Force Management

Telemetering S Substation

and PL

GeographicalInformation

Functional and Technical Specification

Cyber-Security

Demand Management

Telecom Pilots

Information Systems

Energy Balance and

ProfilesREIVE Project

Assets Sensorization

European Funds and Projects

SG Business and Models Services

ÉvoraProducts and Services Pilot

Municipalities Energy

Efficiency

Information Government and Mgmt

Technical Losses

Commercial Operations Efficiency

Claims Management

InovGridInstitutional Promotion

Project lines

1

2

3

4

13

14

17

18

23

21 29

30

6

5

7

32

33

34

35

12

20

22

19 36

8

9 26

25

15 24

27

28

InovGrid Operational Management

InovGrid Solution Integration

InovGrid Projects and Business Development Management

InovGrid Communication

10

Project Office

Organiza-tional

Development

European Projects PMO

11

16

Microproduc-tion

Integration

37

InovGridOperations

Solution Develop-ment

European Initiatives

Systems and Processes Integration

Automation and

Telecontrol

Energy Manage-ment

Customer/ Comercial

Business Impact

Electrical Mobility

Networks Innovation

Implementation Coordination Platform

Regulation Impact

31

PL new technologies

38

Electro-magnetic

fields

39

Page 6: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

EDP Distribution created Évora inovcity, which is a living lab to demonstrate the SmartGrid concept…

6

InovCity store

Efficiency audits at specific customers

Microgeneration integration

New products and services to residential customers and SOHOs

DTC installed at all the 2nd

substations

Efficient public lightning

Évora key attributes

1. Municipality

• 54 000 inhabitants

• 1 307 square km of area (urban + rural)

2. Infrastructure components:

• 31k EDP Boxes and 341 DTC

• Processes and systems integration

• Communications (WAN, LAN, HAN)

• New products and services pilot

3. Involvement of the major authorities of the region

4. Coordination with the national electric vehicle charging network

EV Charging points

inovcity showroom

Page 7: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

…with a strong involvement of the local stakeholders…

7

Major initiatives

• Customer surveys and psycho-social studies;

• Joint actions with the municipality and other local public authorities;

• Collaboration with universities;

• Media, professional organizations and local businesses connections.

Évora information and promotion prepared plan

• The Information and Dynamization Plan aims to motivate consumers to take advantage of the benefits of Inovgrid Project regarding the consumption rationalization and energy efficiency

• The whole project was based on the realization of a reasoned analysis of costs and benefits to the various stakeholders, including customers.

Page 8: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

…and with institutional visits from over 30 Countries and 2500 visitors

8

Customer within-home display

Micro Producers

Page 9: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

The results in key areas of SmartGrid are significant…

9

• 100% of the energy entered at the distribution network is telemetered, including all microgenerators(21k), wind farms (600) and primary substations (350).

• Recently we conclude the telemetering installation campaign at special LV customers.

• About 50% of all the distributed energy is telemetered, corresponding to all VAV, AV, MV and special LV customers.

• 1060 EV charging points installed in selected 25 Municipalities.

• Évora InovCity belongs to these selected municipalities, with 20 charging points.

• Telemetering installation campaign in all 66k EDP Distribution secondary Substations.

• With this telemetering at MV/LV secondary Substations, we can make the Power Energy Balance.

• Investments in measure equipment (#6k), cabinets (#3k) and network reconfigurations to allow us to telemeter 53k Public Lightning circuits.

• Public lightning new technologies pilots at several locals (e.g. Évora and Cascais).

• Covenants elimination at Lisbon and Oporto metropolitan areas (actually with estimation invoicing, without readings).

Public Lightning Remote Mgmt

Electric Vehicle Loading

Secondary Substations Telemetering

Energy Telemetering

Page 10: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

The results in key areas of SmartGrid are significant…

13

• Investment in 700 Secondary Substations and 400 OCRs in 2012 – the MV network automation and telecontrol aims to ensure a bigger MV and LV networks management capacity.

• It allows the LV faults detection, PL control, Microproduction integration, Energy quality, Secondary Substation Voltage regulation and Demand Side Management (DSM).

•MV defaults detection and apartness, self healing and network automatic recovery

• Quality of Service monitoring and Network Dispatch with digital solutions.

• AV/MV dispatch at Oporto (50% of EDP Distribuição network): Network Visualization and Management with virtual information, digitally represented at a video wall, Technical Systems Monitoring.

• Schematics Paperless (all in computer screens).

• Cyber-security new solutions implementation.

• LV network deeper knowledge, through geo-reference e assets classification.

• LV geo-reference campaign allows a better energy planning and incidents management.

•Work Force Management (WFM) allows parameterization and SmartMeter automatic information picksand better field teams management (EDP and Subcontractors ).

• 21k Microproducers connected to the network in 4 years.

•More than 70 MWh installed power.

• Miniproduction quick growing.

MV Automations and Telecontrol

Dispatching and Active Management

LV network geo-reference and WFM

MicroproductionIntegration

2008 2009 2010 2011

Nº Pot.

Page 11: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 201411

…mainly in the energy and operations efficiency, as well as in quality of service

• Energy efficiency increase of 4.4% with InovCity effect (invoice based on actual consumption + consumption information + efficiency generic recommendations + exposure to projects environment).

•Consumption reduction between 2.6% and 6.7%, with a margin of error of 2.3%.

• Energy efficiency increase of 6.9% with consumption reports/alerts and special tariffs (5% error margin).

• Energy efficiency increase of 6.7% with displays (4.2% error margin).

The above results were measured compared to an independent control group and already integrates the InovCity effect (ie, the effects are not cumulative)

• >98% success rate in remote readings

• >90% success rate in remote work orders

• >12% reduction of unnecessary workers travel in current faults reported by customers

Quality of Service

Évora Savings with new services tests

Operations efficiency

Évora Savings with InovCity effect

Page 12: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

While we don’t have Government’s rollout decision, we are anticipating the network management optimization, focusing on the Secondary Substations modernization…

12

SmartMetersInstallation -

2nd phase

Main Secondary Substations DTCs

installation

Secondary Substations

remote metering

Public Lighting (PL) remote metering and management

Projects Main objectives

• Develop the smart grid component market;

• Validation of new communication technologies;

• Deepen integration of new solutions in business processes.

• Increase network supervision and control capacity;

• Improve network management in severe conditions situation;

• Create new remote management options.

• Increase energy balance and ensure its breakdown by voltage level (HV / MV / LV);

• Support commercial and technical losses fights.

• Improve the municipalities provided services, supporting the effort to increase public lighting energy efficiency;

• Improve the energy balance.

Clients covered

27%14%

6%

100%98%

35%

100%*80%28%

1,7%0,7%

2013 2014 2015

* % of SSs with PL

Secondary substations area

5,1%

2013 2014 2015

2013 2014 2015

2013 2014 2015

Page 13: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 2014

We are also on an ongoing effort to integrate systems and processes, essential to reach the forecasted benefits...

13

EB PT

DTCEB LV

‐ Remote metering

‐ PL remote metering and management

‐ LV production / usage‐ LV network supervision‐ LV supervision

‐ SS sensoring‐ MV supervision‐ MV remote management

HV/MV Dispatch Contact CenterInovgrid Supervision Centre

Fraud detection and

fight

LV network and

monitoring management

Inovgridinfrastructure

supervision

DTC Cell

EB PL

Page 14: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 201414

…and several pilot projects that reflect the smart grids broad view concept

Main objectives

• Reduce outages;• Increase operational efficiency;

In numbers…

Proof of Concept

>5.500 RF Mesh

Customers

~500 SS with PL

control

~400 EV

charging stations

• MV Remote Mgmt• Batalha Pilot• LV Monitoring• OCR3

30

2013

300

2014

2010

2012

80

2011

11

TCMT (DTC cells)

OCR3

Projects

• Development distribution network management solutions with production –usage balancing;

• LV Monitoring• Energy Balance

• Communication technologies pilots;• Architecture tests;

• Carregado Pilot• Batalha Pilot• SS Router

• PL multi‐vendor control and management solution test as an alternative to centralized remote management;

• Web PL• Évora Pilot (DTC)• Batalha Pilot (EB‐PL)

• EV charging solutions test;• Charging stations• REIVE

Remote mgmtand network automation

Communications

PublicLighting

ElectricMobility

Distributed Generation

150 routers

Page 15: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning

© Copyright EDP Internacional, S.A. 201415

• EDP Distribution focuses on value creation based on benefits to thesystem and to the society, as well as in customer service and activeparticipation of stakeholders ...

• ... demonstrating at Évora the concept of inovcity, a solution in atechnically and commercially future project, facilitating innovativeservices ...

• … aligned with the EDP Group sustainability and innovation strategy ...

• … and in conjunction with initiatives, institutions and Europeanprojects focusing on knowledge sharing and dissemination.

In conclusion…

Page 16: 20150416 - EDPI presentation to IFC event€¦ · To reach it, EDP Distribuiçãocreated an implementation model where were identified several initiatives… 5 Campaigns Planning