Top Banner
Sean Wehling
18
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2015 Portfolio

Sean Wehling

Page 2: 2015 Portfolio
Page 3: 2015 Portfolio

TABLE OF CONTENTS

LINCOLN RE-DEVELOPMENT 4-5

6-7

8-9

10-11

12-13

14-17

SHELDON ART MUSEUM

PRAIRIE PINES

ALBORADA PARK

SHELDON ANNEX

LAKEVILLE HOSPITAL

Page 4: 2015 Portfolio

SPRING 2014ARCH 411This project looked at redeveloping downtown Lincoln corridors. Our group focused on the M street area and flowing north and south a block. We worked in teams of 3 to complete this project. Our group split up the project into the Pershing center, the housing complex, and the retail area.I focused on the housing district.Incorportaing first level retail as well to make this a walkable community.

"K"

"L"

"K"

19 TH

"N"

"M"

CENTENNIAL

"L"

R=20

Residential DistrictCommercial DistrictPublic DistrictDistricts

L ST

K ST

CEN

TEN

NIA

L M

ALL

14TH

ST

16TH

ST

17TH

ST

18TH

ST

S AN

TELO

PE V

ALLE

Y PK

WY

21ST

ST

M ST

N ST

SCALE: 1” = 40’-0”

4

"K"

"L"

"K"

19 TH

"N"

"M"

CENTENNIAL

"L"

R=20

Residential DistrictCommercial DistrictPublic DistrictDistricts

Page 5: 2015 Portfolio

LINCOLN RE-DEVELOPMENT

"K"

"L"

"K"

19 TH

"N"

"M"

CENTENNIAL

"L"

R=20

Residential DistrictCommercial DistrictPublic DistrictDistricts

5

"K"

"L"

"K"

19 TH

"N"

"M"

CENTENNIAL

"L"

R=20

Residential DistrictCommercial DistrictPublic DistrictDistricts

Page 6: 2015 Portfolio

RAMP LOOKING EAST

SCALE: 1/8”= 1’

SPRING 2014ARCH 410These projects were focused around the Sheldon Art Museum. We had to design a ramp that would lead you from the west side of the sheldon down to the courtyard which would contain a new pavilion. Both contained a water feature to connect the two.

SHELDON

WOODS ART BUILDING

SCALE: 1” = 50’KEY PLANPROJECT EXTENTS RAMP/PAVILION N

6

Page 7: 2015 Portfolio

RAMP LOOKING EAST

SCALE: 1/8”= 1’

SHELDON ART MUSEUM

EXPLODED AXON SHOWING FEATURESSCALE: 1/8”= 1’

WATER FEATURE

CIRCULATION

TIER 1 TIER 2 TIER 3

7

Page 8: 2015 Portfolio

SPRING 2013ARCH 311This project was building a school on the site as well as a trail system with a pavilion on it. The building was located to the south of the site and the pavilion towards the center. I created my trail system to flow through my building so it was continous. The pavilion was located in the center of the site so that it would have the opportunity to bring everyone to a central point.

LIBRARY

OFFICES

OUTSIDE KITCHEN AND DINNING

INSIDE KITCHEN AND DINNING

SECOND FLOOR PLANSCALE 1” = 16’

8

Page 9: 2015 Portfolio

GREEN ROOF

STRUCTURAL SYSTEM

ROOF SYSTEM

NATURE PARTS

OUTDOOR AREA

PLATFORM

PAVILION

PRAIRIE PINESSITE PLAN

9

Page 10: 2015 Portfolio

Proposed Site

5 Meters5 Meters5 Meters

Flexible Space

Check-outConcessions

Storage

0 1M 2.5M 5M

SUMMER 2014ECUADOR We worked with the community in the galapagos on designing parks. This one I worked with one other student on desiging a flexible space that could also be used for equipment storage. They wanted to renovate the exisiting building but we decided it was more efficent to bulid new.

10

Page 11: 2015 Portfolio

ALBORADA PARK

11

Page 12: 2015 Portfolio

1.5” ALUMINUM PANELS

METAL CLIPS

6” MULLION SYSTEM

5/8” SHEATHING

3” RIGID INSULATION

5/8” GYP BOARD

2X6 STEEL STUD WALLBAT INSULATION

3” CONCRETE

3” CONCRETE

3” RIGID INSULATIONPLYWOODROOF MEMBRANE

3” RIGID INSULATIONPLYWOODROOF MEMBRANE

3” CONCRETE TOPPING ON METAL DECKING

STEEL W FLANGE BEAMS

DROP DOWN CEILING TILES

6” CONCRETE SLAB3” RIGID INSULATION

3” RIGID INSULATION

12” FOUNDATION WALL

DRAINAGE PIPE

1.5” ALUMINUM PANELS

METAL CLIPS

6” MULLION SYSTEM

5/8” SHEATHING

3” RIGID INSULATION

5/8” GYP BOARD

2X6 STEEL STUD WALLBAT INSULATION

VAPOR BARRIER

VAPOR BARRIER

3” CONCRETE TOPPING ON METAL DECKING

STEEL W FLANGE BEAMS

DROP DOWN CEILING TILES

STEEL W FLANGE BEAMS

DROP DOWN CEILING TILES

1.5” ALUMINUM PANELS

METAL CLIPS

6” MULLION SYSTEM

5/8” SHEATHING

3” RIGID INSULATION

5/8” GYP BOARD

2X6 STEEL STUD WALLBAT INSULATION

3” CONCRETE

3” CONCRETE

3” RIGID INSULATIONPLYWOODROOF MEMBRANE

3” RIGID INSULATIONPLYWOODROOF MEMBRANE

3” CONCRETE TOPPING ON METAL DECKING

STEEL W FLANGE BEAMS

DROP DOWN CEILING TILES

6” CONCRETE SLAB3” RIGID INSULATION

3” RIGID INSULATION

12” FOUNDATION WALL

DRAINAGE PIPE

1.5” ALUMINUM PANELS

METAL CLIPS

6” MULLION SYSTEM

5/8” SHEATHING

3” RIGID INSULATION

5/8” GYP BOARD

2X6 STEEL STUD WALLBAT INSULATION

VAPOR BARRIER

VAPOR BARRIER

3” CONCRETE TOPPING ON METAL DECKING

STEEL W FLANGE BEAMS

DROP DOWN CEILING TILES

STEEL W FLANGE BEAMS

DROP DOWN CEILING TILES

FALL 2013ARCH 410The Sheldon Annex was located outside of arch hall using the parking lots. We combined exhibiton space with student housing and a dinning faciltiy. Wanting to give the residents in this area a place of their own i created the courtyard in the back away from the street.

UP

UPUP

Lobby

Restroom

Restroom

Restroom

Housing Lobby

Storage

Restroom

Lobby

liateRliateR

Cafe

Recreation Area

Housing Lobby

Performance Space

Storage

Study Rooms

Q STREET

11TH

STR

EET

10TH

STR

EET

12

Page 13: 2015 Portfolio

UP

UPUP

Lobby

Restroom

Restroom

Restroom

Housing Lobby

Storage

Restroom

Lobby

liateRliateR

Cafe

Recreation Area

Housing Lobby

Performance Space

Storage

Study Rooms

Q STREET

11TH

STR

EET

10TH

STR

EET

SHELDON ANNEX

13

Page 14: 2015 Portfolio

FALL 2014ARCH 511

0' - 0"

Second Floor15' - 0"

Bottom Floor-10' - 0"

First Floor0' - 0"

1/16" = 1'-0"1 Section 6

We had to choose a city that we wanted to design a hospital in. Taking in the conditions of the city and whether or not they needed a new hospital. Then working in groups of two, one architect and one interior designer, we got to start designing. Major focus on the interior side was the emgency department shown in the renders on this spread.

14

Page 15: 2015 Portfolio

0' - 0"

Second Floor15' - 0"

Bottom Floor-10' - 0"

First Floor0' - 0"

1/16" = 1'-0"1 Section 6

LAKEVILLE MINNESOTA HOSPITAL

15

Page 16: 2015 Portfolio

FALL 2014ARCH 511The exterior had two major focuses the entrance and the chapel. The chapel being on the east and the entrance on the west. Materials chosen for the building was derived from the site, being a quarry wanting to utlize the stones and the darker colors.

16

Page 17: 2015 Portfolio

LAKEVILLE MINNESOTA HOSPITAL

17

Page 18: 2015 Portfolio