Sean Wehling
Sean Wehling
TABLE OF CONTENTS
LINCOLN RE-DEVELOPMENT 4-5
6-7
8-9
10-11
12-13
14-17
SHELDON ART MUSEUM
PRAIRIE PINES
ALBORADA PARK
SHELDON ANNEX
LAKEVILLE HOSPITAL
SPRING 2014ARCH 411This project looked at redeveloping downtown Lincoln corridors. Our group focused on the M street area and flowing north and south a block. We worked in teams of 3 to complete this project. Our group split up the project into the Pershing center, the housing complex, and the retail area.I focused on the housing district.Incorportaing first level retail as well to make this a walkable community.
"K"
"L"
"K"
19 TH
"N"
"M"
CENTENNIAL
"L"
R=20
Residential DistrictCommercial DistrictPublic DistrictDistricts
L ST
K ST
CEN
TEN
NIA
L M
ALL
14TH
ST
16TH
ST
17TH
ST
18TH
ST
S AN
TELO
PE V
ALLE
Y PK
WY
21ST
ST
M ST
N ST
SCALE: 1” = 40’-0”
4
"K"
"L"
"K"
19 TH
"N"
"M"
CENTENNIAL
"L"
R=20
Residential DistrictCommercial DistrictPublic DistrictDistricts
LINCOLN RE-DEVELOPMENT
"K"
"L"
"K"
19 TH
"N"
"M"
CENTENNIAL
"L"
R=20
Residential DistrictCommercial DistrictPublic DistrictDistricts
5
"K"
"L"
"K"
19 TH
"N"
"M"
CENTENNIAL
"L"
R=20
Residential DistrictCommercial DistrictPublic DistrictDistricts
RAMP LOOKING EAST
SCALE: 1/8”= 1’
SPRING 2014ARCH 410These projects were focused around the Sheldon Art Museum. We had to design a ramp that would lead you from the west side of the sheldon down to the courtyard which would contain a new pavilion. Both contained a water feature to connect the two.
SHELDON
WOODS ART BUILDING
SCALE: 1” = 50’KEY PLANPROJECT EXTENTS RAMP/PAVILION N
6
RAMP LOOKING EAST
SCALE: 1/8”= 1’
SHELDON ART MUSEUM
EXPLODED AXON SHOWING FEATURESSCALE: 1/8”= 1’
WATER FEATURE
CIRCULATION
TIER 1 TIER 2 TIER 3
7
SPRING 2013ARCH 311This project was building a school on the site as well as a trail system with a pavilion on it. The building was located to the south of the site and the pavilion towards the center. I created my trail system to flow through my building so it was continous. The pavilion was located in the center of the site so that it would have the opportunity to bring everyone to a central point.
LIBRARY
OFFICES
OUTSIDE KITCHEN AND DINNING
INSIDE KITCHEN AND DINNING
SECOND FLOOR PLANSCALE 1” = 16’
8
GREEN ROOF
STRUCTURAL SYSTEM
ROOF SYSTEM
NATURE PARTS
OUTDOOR AREA
PLATFORM
PAVILION
PRAIRIE PINESSITE PLAN
9
Proposed Site
5 Meters5 Meters5 Meters
Flexible Space
Check-outConcessions
Storage
0 1M 2.5M 5M
SUMMER 2014ECUADOR We worked with the community in the galapagos on designing parks. This one I worked with one other student on desiging a flexible space that could also be used for equipment storage. They wanted to renovate the exisiting building but we decided it was more efficent to bulid new.
10
ALBORADA PARK
11
1.5” ALUMINUM PANELS
METAL CLIPS
6” MULLION SYSTEM
5/8” SHEATHING
3” RIGID INSULATION
5/8” GYP BOARD
2X6 STEEL STUD WALLBAT INSULATION
3” CONCRETE
3” CONCRETE
3” RIGID INSULATIONPLYWOODROOF MEMBRANE
3” RIGID INSULATIONPLYWOODROOF MEMBRANE
3” CONCRETE TOPPING ON METAL DECKING
STEEL W FLANGE BEAMS
DROP DOWN CEILING TILES
6” CONCRETE SLAB3” RIGID INSULATION
3” RIGID INSULATION
12” FOUNDATION WALL
DRAINAGE PIPE
1.5” ALUMINUM PANELS
METAL CLIPS
6” MULLION SYSTEM
5/8” SHEATHING
3” RIGID INSULATION
5/8” GYP BOARD
2X6 STEEL STUD WALLBAT INSULATION
VAPOR BARRIER
VAPOR BARRIER
3” CONCRETE TOPPING ON METAL DECKING
STEEL W FLANGE BEAMS
DROP DOWN CEILING TILES
STEEL W FLANGE BEAMS
DROP DOWN CEILING TILES
1.5” ALUMINUM PANELS
METAL CLIPS
6” MULLION SYSTEM
5/8” SHEATHING
3” RIGID INSULATION
5/8” GYP BOARD
2X6 STEEL STUD WALLBAT INSULATION
3” CONCRETE
3” CONCRETE
3” RIGID INSULATIONPLYWOODROOF MEMBRANE
3” RIGID INSULATIONPLYWOODROOF MEMBRANE
3” CONCRETE TOPPING ON METAL DECKING
STEEL W FLANGE BEAMS
DROP DOWN CEILING TILES
6” CONCRETE SLAB3” RIGID INSULATION
3” RIGID INSULATION
12” FOUNDATION WALL
DRAINAGE PIPE
1.5” ALUMINUM PANELS
METAL CLIPS
6” MULLION SYSTEM
5/8” SHEATHING
3” RIGID INSULATION
5/8” GYP BOARD
2X6 STEEL STUD WALLBAT INSULATION
VAPOR BARRIER
VAPOR BARRIER
3” CONCRETE TOPPING ON METAL DECKING
STEEL W FLANGE BEAMS
DROP DOWN CEILING TILES
STEEL W FLANGE BEAMS
DROP DOWN CEILING TILES
FALL 2013ARCH 410The Sheldon Annex was located outside of arch hall using the parking lots. We combined exhibiton space with student housing and a dinning faciltiy. Wanting to give the residents in this area a place of their own i created the courtyard in the back away from the street.
UP
UPUP
Lobby
Restroom
Restroom
Restroom
Housing Lobby
Storage
Restroom
Lobby
liateRliateR
Cafe
Recreation Area
Housing Lobby
Performance Space
Storage
Study Rooms
Q STREET
11TH
STR
EET
10TH
STR
EET
12
UP
UPUP
Lobby
Restroom
Restroom
Restroom
Housing Lobby
Storage
Restroom
Lobby
liateRliateR
Cafe
Recreation Area
Housing Lobby
Performance Space
Storage
Study Rooms
Q STREET
11TH
STR
EET
10TH
STR
EET
SHELDON ANNEX
13
FALL 2014ARCH 511
0' - 0"
Second Floor15' - 0"
Bottom Floor-10' - 0"
First Floor0' - 0"
1/16" = 1'-0"1 Section 6
We had to choose a city that we wanted to design a hospital in. Taking in the conditions of the city and whether or not they needed a new hospital. Then working in groups of two, one architect and one interior designer, we got to start designing. Major focus on the interior side was the emgency department shown in the renders on this spread.
14
0' - 0"
Second Floor15' - 0"
Bottom Floor-10' - 0"
First Floor0' - 0"
1/16" = 1'-0"1 Section 6
LAKEVILLE MINNESOTA HOSPITAL
15
FALL 2014ARCH 511The exterior had two major focuses the entrance and the chapel. The chapel being on the east and the entrance on the west. Materials chosen for the building was derived from the site, being a quarry wanting to utlize the stones and the darker colors.
16
LAKEVILLE MINNESOTA HOSPITAL
17